the impact of bim: an architect’s perspective
DESCRIPTION
The impact of BIM: An Architect’s Perspective. About Stride Treglown. Formed in 1953 10th largest practice in the UK 76th largest practice in the world £14m turnover (2012) 80% retained clients Secured over 50 frameworks throughout the UK 245 members of staff - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: The impact of BIM: An Architect’s Perspective](https://reader035.vdocuments.us/reader035/viewer/2022062309/56815959550346895dc694c9/html5/thumbnails/1.jpg)
The impact of BIM: An Architect’s Perspective
![Page 2: The impact of BIM: An Architect’s Perspective](https://reader035.vdocuments.us/reader035/viewer/2022062309/56815959550346895dc694c9/html5/thumbnails/2.jpg)
About Stride Treglown
Formed in 1953
10th largest practice in the UK
76th largest practice in the world
£14m turnover (2012)
80% retained clients
Secured over 50 frameworks throughout the UK
245 members of staff
Quality Assured to ISO 9001 / ISO 14001 Environmental Management and BS OHSAS 1800 accredited
Investors in People and CHAS accredited
We are a ‘Building Top 300’ company
South
ampt
on
![Page 3: The impact of BIM: An Architect’s Perspective](https://reader035.vdocuments.us/reader035/viewer/2022062309/56815959550346895dc694c9/html5/thumbnails/3.jpg)
What is BIM?
![Page 4: The impact of BIM: An Architect’s Perspective](https://reader035.vdocuments.us/reader035/viewer/2022062309/56815959550346895dc694c9/html5/thumbnails/4.jpg)
BIM is ‘Building Information Modelling’
• A collaborative process of virtual design, construction and management of buildings
• The use of BIM unites design phase; construction phase and post construction phases including facility management.
• It means understanding and controlling the data flow through these phases, ensuring leanness in its handling and therefore driving efficiency.
• If we make the construction process more efficient and eliminate uncertainties before construction, we can drive down cost
![Page 5: The impact of BIM: An Architect’s Perspective](https://reader035.vdocuments.us/reader035/viewer/2022062309/56815959550346895dc694c9/html5/thumbnails/5.jpg)
![Page 6: The impact of BIM: An Architect’s Perspective](https://reader035.vdocuments.us/reader035/viewer/2022062309/56815959550346895dc694c9/html5/thumbnails/6.jpg)
4D Time (Phasing/Sequencing)
5D Cost. (Measuring/Estimating)
6D Life Cycle. (Building Owner / FM)
And the list goes on...
11D?
More dimensions
![Page 7: The impact of BIM: An Architect’s Perspective](https://reader035.vdocuments.us/reader035/viewer/2022062309/56815959550346895dc694c9/html5/thumbnails/7.jpg)
Levels of BIM Collaboration
Level 1•Lonely BIM
Level 2•Shared BIM
Level 3• Integrated BIM
Contractor
Architect
Structure M+E
Architect
Contractor
Structure M+E
Structure
M+EArchitect
Contractor
![Page 8: The impact of BIM: An Architect’s Perspective](https://reader035.vdocuments.us/reader035/viewer/2022062309/56815959550346895dc694c9/html5/thumbnails/8.jpg)
Why BIM?
![Page 9: The impact of BIM: An Architect’s Perspective](https://reader035.vdocuments.us/reader035/viewer/2022062309/56815959550346895dc694c9/html5/thumbnails/9.jpg)
Reduce Operation Costs
Most of a buildings cost is in it’s operation
Design Construct Operate
£1=£10=£100
![Page 10: The impact of BIM: An Architect’s Perspective](https://reader035.vdocuments.us/reader035/viewer/2022062309/56815959550346895dc694c9/html5/thumbnails/10.jpg)
Why from the Government?
Digital Leaders
Inefficient Industry
UK construction costs 20% more than Europe
Singapore takes ½ hour to register a planning application
All US projects have to be delivered in BIM
Zero Change contracts now possible
2016 All Government projects to be Level 2 Shared BIM
![Page 11: The impact of BIM: An Architect’s Perspective](https://reader035.vdocuments.us/reader035/viewer/2022062309/56815959550346895dc694c9/html5/thumbnails/11.jpg)
• A shared knowledge resource to support decision-making
• Improved coordination
• Increased efficiency
• Better decisions
“A model should provide access to all graphic and non graphic information about a building, as an integrated resource”
Access to Information
![Page 12: The impact of BIM: An Architect’s Perspective](https://reader035.vdocuments.us/reader035/viewer/2022062309/56815959550346895dc694c9/html5/thumbnails/12.jpg)
The Design Process
3D Virtual Design
2D Formation
Use
Construction
![Page 13: The impact of BIM: An Architect’s Perspective](https://reader035.vdocuments.us/reader035/viewer/2022062309/56815959550346895dc694c9/html5/thumbnails/13.jpg)
More Output for Less Input
![Page 14: The impact of BIM: An Architect’s Perspective](https://reader035.vdocuments.us/reader035/viewer/2022062309/56815959550346895dc694c9/html5/thumbnails/14.jpg)
BIM forces collaboration
"BIM is a 21st Century campfire - it gathers people together."
David Philp, Cabinet Office
![Page 15: The impact of BIM: An Architect’s Perspective](https://reader035.vdocuments.us/reader035/viewer/2022062309/56815959550346895dc694c9/html5/thumbnails/15.jpg)
What are the challenges?
![Page 16: The impact of BIM: An Architect’s Perspective](https://reader035.vdocuments.us/reader035/viewer/2022062309/56815959550346895dc694c9/html5/thumbnails/16.jpg)
A whole new world
![Page 17: The impact of BIM: An Architect’s Perspective](https://reader035.vdocuments.us/reader035/viewer/2022062309/56815959550346895dc694c9/html5/thumbnails/17.jpg)
The process of change
denial
resistance
commitment
exploration
![Page 18: The impact of BIM: An Architect’s Perspective](https://reader035.vdocuments.us/reader035/viewer/2022062309/56815959550346895dc694c9/html5/thumbnails/18.jpg)
New www.ribaplanofwork.com
![Page 19: The impact of BIM: An Architect’s Perspective](https://reader035.vdocuments.us/reader035/viewer/2022062309/56815959550346895dc694c9/html5/thumbnails/19.jpg)
Sub-Structure
![Page 20: The impact of BIM: An Architect’s Perspective](https://reader035.vdocuments.us/reader035/viewer/2022062309/56815959550346895dc694c9/html5/thumbnails/20.jpg)
Super-Structure
![Page 21: The impact of BIM: An Architect’s Perspective](https://reader035.vdocuments.us/reader035/viewer/2022062309/56815959550346895dc694c9/html5/thumbnails/21.jpg)
Mechanical & Electrical
![Page 22: The impact of BIM: An Architect’s Perspective](https://reader035.vdocuments.us/reader035/viewer/2022062309/56815959550346895dc694c9/html5/thumbnails/22.jpg)
Fit-out
![Page 23: The impact of BIM: An Architect’s Perspective](https://reader035.vdocuments.us/reader035/viewer/2022062309/56815959550346895dc694c9/html5/thumbnails/23.jpg)
Shell
![Page 24: The impact of BIM: An Architect’s Perspective](https://reader035.vdocuments.us/reader035/viewer/2022062309/56815959550346895dc694c9/html5/thumbnails/24.jpg)
We have this…
![Page 25: The impact of BIM: An Architect’s Perspective](https://reader035.vdocuments.us/reader035/viewer/2022062309/56815959550346895dc694c9/html5/thumbnails/25.jpg)
… and hope for this…
![Page 26: The impact of BIM: An Architect’s Perspective](https://reader035.vdocuments.us/reader035/viewer/2022062309/56815959550346895dc694c9/html5/thumbnails/26.jpg)
… to produce this
![Page 27: The impact of BIM: An Architect’s Perspective](https://reader035.vdocuments.us/reader035/viewer/2022062309/56815959550346895dc694c9/html5/thumbnails/27.jpg)
But we get this…
![Page 28: The impact of BIM: An Architect’s Perspective](https://reader035.vdocuments.us/reader035/viewer/2022062309/56815959550346895dc694c9/html5/thumbnails/28.jpg)
… and this…
![Page 29: The impact of BIM: An Architect’s Perspective](https://reader035.vdocuments.us/reader035/viewer/2022062309/56815959550346895dc694c9/html5/thumbnails/29.jpg)
… and have to produce this.
![Page 30: The impact of BIM: An Architect’s Perspective](https://reader035.vdocuments.us/reader035/viewer/2022062309/56815959550346895dc694c9/html5/thumbnails/30.jpg)
Twin tracking
traditional bim
bim
![Page 31: The impact of BIM: An Architect’s Perspective](https://reader035.vdocuments.us/reader035/viewer/2022062309/56815959550346895dc694c9/html5/thumbnails/31.jpg)
Exemplar industry response?
![Page 32: The impact of BIM: An Architect’s Perspective](https://reader035.vdocuments.us/reader035/viewer/2022062309/56815959550346895dc694c9/html5/thumbnails/32.jpg)
Furniture’s Light Bulb Moment
![Page 33: The impact of BIM: An Architect’s Perspective](https://reader035.vdocuments.us/reader035/viewer/2022062309/56815959550346895dc694c9/html5/thumbnails/33.jpg)
Embedded data
![Page 34: The impact of BIM: An Architect’s Perspective](https://reader035.vdocuments.us/reader035/viewer/2022062309/56815959550346895dc694c9/html5/thumbnails/34.jpg)
…driving 100 hits a day
![Page 35: The impact of BIM: An Architect’s Perspective](https://reader035.vdocuments.us/reader035/viewer/2022062309/56815959550346895dc694c9/html5/thumbnails/35.jpg)
When are you having yours?
![Page 36: The impact of BIM: An Architect’s Perspective](https://reader035.vdocuments.us/reader035/viewer/2022062309/56815959550346895dc694c9/html5/thumbnails/36.jpg)
stridetreglown.co.uk