Page 1: The design of soil nailed structures to AS4678 Technical ...€¦ · The design of soil nailed structures to AS4678 ___ Chris Bridges Technical Principal - Geotechnics. Presentation

7 December 2016 1

[email protected]

The design of soil nailed structures to AS4678___

Chris BridgesTechnical Principal - Geotechnics

Page 2: The design of soil nailed structures to AS4678 Technical ...€¦ · The design of soil nailed structures to AS4678 ___ Chris Bridges Technical Principal - Geotechnics. Presentation

Presentation Layout

2

• Introduction

• Soil Nailing in AS4678

• Design Process

Page 3: The design of soil nailed structures to AS4678 Technical ...€¦ · The design of soil nailed structures to AS4678 ___ Chris Bridges Technical Principal - Geotechnics. Presentation

Soil Nail – Main Components

HDPE Sheath (for corrosion protection)

External centraliser

Internal centraliser

Outer grout tube

Inner grout tube

Soil nail head plate (galvanised for corrosion protection)

Domed soil nail nut (galvanised for corrosion protection)

32mm diameter deformed soil nail bar (galvanised for corrosion protection)

3

Page 4: The design of soil nailed structures to AS4678 Technical ...€¦ · The design of soil nailed structures to AS4678 ___ Chris Bridges Technical Principal - Geotechnics. Presentation

Construction

Page 5: The design of soil nailed structures to AS4678 Technical ...€¦ · The design of soil nailed structures to AS4678 ___ Chris Bridges Technical Principal - Geotechnics. Presentation

Reinforcing the soil

Page 6: The design of soil nailed structures to AS4678 Technical ...€¦ · The design of soil nailed structures to AS4678 ___ Chris Bridges Technical Principal - Geotechnics. Presentation

Figure 2.13 Forces Acting on a Potential Sliding Zone for a Nailed Slope

(Phear et al., 2005)

RN - resisting forces (nail)

RS - resisting forces (soil)

RD - disturbing forces

Active Zone

Passive

Zone

How soil nails work

Page 7: The design of soil nailed structures to AS4678 Technical ...€¦ · The design of soil nailed structures to AS4678 ___ Chris Bridges Technical Principal - Geotechnics. Presentation

Soil nailed wall

How soil nails work

7

Page 8: The design of soil nailed structures to AS4678 Technical ...€¦ · The design of soil nailed structures to AS4678 ___ Chris Bridges Technical Principal - Geotechnics. Presentation

Soil Nailing – Is it suitable?

8

Page 9: The design of soil nailed structures to AS4678 Technical ...€¦ · The design of soil nailed structures to AS4678 ___ Chris Bridges Technical Principal - Geotechnics. Presentation

Advantages Disadvantages

• construction flexibility

• cost

• environmental/aesthetic considerations

• Complex excavation geometry

• Faster relative to other lateral support systems

• Permits top-down construction

• Can be used in situations with limited access

• temporary conditions (cut must stand vertically)

• Groundwater

• clay soils

• land issues

• Corrosion

• ground movement

• Untried for depths beyond about 25m

• Not suitable for deep seated failures

Advantages & Disadvantages

Page 10: The design of soil nailed structures to AS4678 Technical ...€¦ · The design of soil nailed structures to AS4678 ___ Chris Bridges Technical Principal - Geotechnics. Presentation

7 December 2016

AS4678 - 2002

10

Page 11: The design of soil nailed structures to AS4678 Technical ...€¦ · The design of soil nailed structures to AS4678 ___ Chris Bridges Technical Principal - Geotechnics. Presentation

11

• Design Considerations – Limit States

• Strength - Must consider all critical conditions during the excavation/nail installation process

• Serviceability – must include movements during excavation

• External Stability

• Internal Stability

• Design Loads – load combinations & factors

• Design Factors – factors on material properties & uncertainty

AS 4678 – 2002

Page 12: The design of soil nailed structures to AS4678 Technical ...€¦ · The design of soil nailed structures to AS4678 ___ Chris Bridges Technical Principal - Geotechnics. Presentation

12

• Structures <15m

• Face angle <90⁰, >70⁰

• “Uncomplicated”

AS 4678 – 2002

Page 13: The design of soil nailed structures to AS4678 Technical ...€¦ · The design of soil nailed structures to AS4678 ___ Chris Bridges Technical Principal - Geotechnics. Presentation

AS 4678 – 2002

• Informative Guidelines only

• Appendix C of AS4678

• Design principle is similar to Reinforced Soil Walls

• Appendix C refers back to Appendix B – Ground anchors

13

Page 14: The design of soil nailed structures to AS4678 Technical ...€¦ · The design of soil nailed structures to AS4678 ___ Chris Bridges Technical Principal - Geotechnics. Presentation

7 December 2016

Design Process

14

Page 15: The design of soil nailed structures to AS4678 Technical ...€¦ · The design of soil nailed structures to AS4678 ___ Chris Bridges Technical Principal - Geotechnics. Presentation

Design Process

15

Page 16: The design of soil nailed structures to AS4678 Technical ...€¦ · The design of soil nailed structures to AS4678 ___ Chris Bridges Technical Principal - Geotechnics. Presentation

Design Process

16

Page 17: The design of soil nailed structures to AS4678 Technical ...€¦ · The design of soil nailed structures to AS4678 ___ Chris Bridges Technical Principal - Geotechnics. Presentation

7 December 2016

Step 2 – Input parameters

17

Page 18: The design of soil nailed structures to AS4678 Technical ...€¦ · The design of soil nailed structures to AS4678 ___ Chris Bridges Technical Principal - Geotechnics. Presentation

Soil Properties – Uncertainty Factors

18

f* = design angle of internal friction of soil (deg.)(= tan-1(Fuf (tanf’));

c* = design value of cohesion of soil (kN/m2) (=c’ Fuc);

Page 19: The design of soil nailed structures to AS4678 Technical ...€¦ · The design of soil nailed structures to AS4678 ___ Chris Bridges Technical Principal - Geotechnics. Presentation

Bar size and hole dia.

19

Page 20: The design of soil nailed structures to AS4678 Technical ...€¦ · The design of soil nailed structures to AS4678 ___ Chris Bridges Technical Principal - Geotechnics. Presentation

7 December 2016

Step 3 - Concept

20

Page 21: The design of soil nailed structures to AS4678 Technical ...€¦ · The design of soil nailed structures to AS4678 ___ Chris Bridges Technical Principal - Geotechnics. Presentation

MODEL 1

No soil nails

Planar failure

Ref.: Zhang et al, 2001

MODEL 6

Short soil nails

L/H = 0.32

Block failure

MODEL 8

Long, widely spaced soil nails

L/H = 1

Planar failure

Nail spacing, length and inclination

Page 22: The design of soil nailed structures to AS4678 Technical ...€¦ · The design of soil nailed structures to AS4678 ___ Chris Bridges Technical Principal - Geotechnics. Presentation

Ref.: Vucetic et al, 1996

TESTS 5-7

L/H = 0.67 & 1.0

Widely spaced at 0 deg inclination

Planar failure

TESTS 1-4

L/H = 0.67 (incl. 0-30 deg)

Closely spaced

Two-part wedge: no difference in

failure with nail inclination 0-30 deg.

Nail spacing, length and inclination

Page 23: The design of soil nailed structures to AS4678 Technical ...€¦ · The design of soil nailed structures to AS4678 ___ Chris Bridges Technical Principal - Geotechnics. Presentation

Nail spacing, length and inclination

Factor of safety for different soil nail inclinations (90° wall face angle)

Factor of safety for different L/H ratios (90° wall face angle)

23

0.000

0.010

0.020

0.030

0.040

0.050

0.060

0.070

0.80

1.20

1.60

2.00

2.40

-5 0 5 10 15 20 25 30

De

form

atio

n (

m)

F.O

.S

Nail Inclination (deg)

FOS Vertical Deformation

Horizontal Deformation

f'=36°, c’=6kPa

0.000

0.005

0.010

0.015

0.020

0.025

0.81.21.6

22.42.83.23.6

44.44.85.2

0.5 0.6 0.7 0.8 0.9 1.0 1.1 1.2 1.3

De

form

atio

n (

m)

F.O

.S

L/H Ratio

FOS Vertical Deformation

Horizontal Deformation

f'=36°, c’=6kPa

H

L

Inclination

Page 24: The design of soil nailed structures to AS4678 Technical ...€¦ · The design of soil nailed structures to AS4678 ___ Chris Bridges Technical Principal - Geotechnics. Presentation

Effect of soil nail inclination on nail force (Nail 1 is top row of nails)

24

-0.090

-0.080

-0.070

-0.060

-0.050

-0.040

-0.030

-0.020

-0.010

0.000

20 25 30 35 40

Sett

lem

en

t (m

)

Distance from Wall Face (m)

10 deg

20 deg

25 deg

30 deg

Wall face

End of 5m

long nail

0.6

0.7

0.8

0.9

1

1.1

1.2

1.3

1.4

0.0

10.0

20.0

30.0

40.0

50.0

60.0

70.0

80.0

-10 -5 0 5 10 15 20 25 30 35 40

Fact

or

of

Safe

ty

Nai

l Fo

rce

(kN

)

Soil Nail Inclination below Horizontal (degrees)

Nail 1

Nail 2

Nail 3

Nail 4

Nail 5

Nail 6

FOS

+ve

Inclination

H

123456

-ve

L

6

5

3

42 1

Nail spacing, length and inclination

Page 25: The design of soil nailed structures to AS4678 Technical ...€¦ · The design of soil nailed structures to AS4678 ___ Chris Bridges Technical Principal - Geotechnics. Presentation

• Closer spaced nails provide greater internal stability

• Wide spacing of nails can effect internal stability

• Soil nail spacing should not exceed 1 nail per 6m2 of hard facing or 1 nail per 2m2 to 4m2 of flexible facing otherwise the soil nailed structure will not act as a reinforced mass (CIRIA C637)

• Max. spacing – typically 1 - 2m

Nail Spacing

25

Page 26: The design of soil nailed structures to AS4678 Technical ...€¦ · The design of soil nailed structures to AS4678 ___ Chris Bridges Technical Principal - Geotechnics. Presentation

• Short nails at bottom provides less stability – likely pullout

• Shorter nails at top, longer at bottom provides “excellent” stability but shorter nails at the top will increase deformations (Shui & Chang, 2005)

• As L/H increases, deformations decrease – no additional effect when L/H>1

• Short nail lengths can effect external stability – thin gravity wall

• Length of Nails - 0.8 - 1.2H (Clouterre)

• Soil nail lengths above 15m should be avoided due to drilling difficulties and greater deformation required to mobilise tensile capacity.

26

Nail Length

Page 27: The design of soil nailed structures to AS4678 Technical ...€¦ · The design of soil nailed structures to AS4678 ___ Chris Bridges Technical Principal - Geotechnics. Presentation

27

Page 28: The design of soil nailed structures to AS4678 Technical ...€¦ · The design of soil nailed structures to AS4678 ___ Chris Bridges Technical Principal - Geotechnics. Presentation

Nail inclination between 0 and 20 deg does not appear to affect stability

>20 deg then rapid increase in wall deformation

28

Nail Inclination

Page 29: The design of soil nailed structures to AS4678 Technical ...€¦ · The design of soil nailed structures to AS4678 ___ Chris Bridges Technical Principal - Geotechnics. Presentation

Preliminary Sizing

The following relationships were derived by Bruce & Jewell (1987):

Length Ratio = Length of soil nail / Excavation height (L/H)

Bond Ratio = (Hole Dia. x L) / Nail Spacing

Strength Ratio = (Nail Dia.)2 / Nail Spacing

Nail Spacing = horizontal spacing x vertical spacing (m2)

Performance Ratio = Outward Movement = d

Excavation height H

Marl – mix of calcium carbonate & clay

Morraine – glacial debris (silt thru to boulders)

29

Page 30: The design of soil nailed structures to AS4678 Technical ...€¦ · The design of soil nailed structures to AS4678 ___ Chris Bridges Technical Principal - Geotechnics. Presentation

7 December 2016

Step 4 - Analyses

30

Page 31: The design of soil nailed structures to AS4678 Technical ...€¦ · The design of soil nailed structures to AS4678 ___ Chris Bridges Technical Principal - Geotechnics. Presentation

External Stability - Modes of Failure

External Stability

Page 32: The design of soil nailed structures to AS4678 Technical ...€¦ · The design of soil nailed structures to AS4678 ___ Chris Bridges Technical Principal - Geotechnics. Presentation

Stability Analyses

1.333

Surcharge (Unit Weight): 32 kN/m³

Name: Stiff Clay Unit Weight: 21 kN/m³ Cohesion: 5 kPa Phi: 25 ° Name: Hard Clay Unit Weight: 21 kN/m³ Cohesion: 5 kPa Phi: 28 ° Name: VLS - LS Siltstone Unit Weight: 22 kN/m³ Cohesion: 22.5 kPa Phi: 30 ° Name: MS Siltstone Unit Weight: 22 kN/m³ Cohesion: 200 kPa Phi: 40 °

Stiff Clay

Hard Clay

VLS - LS Siltstone

MS Siltstone

South WallEastern Side

Distance

0 5 10 15 20 25 30 35 40 45 50 55 60 65-5

0

5

10

15

20

25

30

350 5 10 15 20 25 30 35 40 45 50 55 60 65

Ele

va

tion

(m

RL

)

-5

0

5

10

15

20

25

30

35

32

Page 33: The design of soil nailed structures to AS4678 Technical ...€¦ · The design of soil nailed structures to AS4678 ___ Chris Bridges Technical Principal - Geotechnics. Presentation

Nail Tension Forces

33

Page 34: The design of soil nailed structures to AS4678 Technical ...€¦ · The design of soil nailed structures to AS4678 ___ Chris Bridges Technical Principal - Geotechnics. Presentation

Modes of Failure

Internal Stability

Page 35: The design of soil nailed structures to AS4678 Technical ...€¦ · The design of soil nailed structures to AS4678 ___ Chris Bridges Technical Principal - Geotechnics. Presentation

Soil Nailing – Internal Stability

• Soil nail pull-out (grout-ground bond)

• Nail failure (i.e. tensile failure of nail)

• Pull-out of connection to facing material

35

Page 36: The design of soil nailed structures to AS4678 Technical ...€¦ · The design of soil nailed structures to AS4678 ___ Chris Bridges Technical Principal - Geotechnics. Presentation

Design pull-out capacity (AS4678)

T* = Fn .Fb ..D.Lf .u

Where: .

Fn = Structure classification design factor (Table 5.2) = 0.9-1.1;

Fb = Bond reduction factor (Table B2) = 0.7;

D = Diameter of grout hole (m);

Lf = Fixed length (m);

u = Design grout/ground resistance (bond stress) (kN/m2).

36

Page 37: The design of soil nailed structures to AS4678 Technical ...€¦ · The design of soil nailed structures to AS4678 ___ Chris Bridges Technical Principal - Geotechnics. Presentation

• Effective stress design methods

• Pull out tests

• Empirical values

37

Bond Stress

Page 38: The design of soil nailed structures to AS4678 Technical ...€¦ · The design of soil nailed structures to AS4678 ___ Chris Bridges Technical Principal - Geotechnics. Presentation

Design bond stress (effective stress design method)

u = (c* + σ‘v tanf*) (kN/m2)

where:

σ‘v = effective vertical stress at the mid-depth of nail behind the failure surface;

f* = design angle of internal friction of soil (deg.);

c* = design value of cohesion of soil (kN/m2).

38

Page 39: The design of soil nailed structures to AS4678 Technical ...€¦ · The design of soil nailed structures to AS4678 ___ Chris Bridges Technical Principal - Geotechnics. Presentation

Pull-out tests

u = Pult / DL (kPa)

where:

Pult = pull out resistance from pullout test (kN)

D = diameter of grout hole (m)

L = grouted length of soil nail (m)

39

Page 40: The design of soil nailed structures to AS4678 Technical ...€¦ · The design of soil nailed structures to AS4678 ___ Chris Bridges Technical Principal - Geotechnics. Presentation

Pull-out tests

u = Pult / DL ξ ϒp (kPa)

where:

Pult = pull out resistance from pullout test (kN)

D = diameter of grout hole (m)

L = grouted length of soil nail (m)

ξ = correction based on test results

ϒp = partial factor (1.25 temp, 1.5 perm)

40

Page 41: The design of soil nailed structures to AS4678 Technical ...€¦ · The design of soil nailed structures to AS4678 ___ Chris Bridges Technical Principal - Geotechnics. Presentation

Material Ultimate Bond Stress (kPa)

Material Ultimate Bond Stress (kPa)

Residual soil 50 – 75 Class V Sandstone 150

Class V Shale 75 – 100 Class IV Sandstone 250 – 800

Class IV Shale 150

Typical values of ultimate bond stress for various materials in the Sydney region are given below:

See also:FHWA Geotechnical Engineering Circular No. 7 – Soil nail walls (2003)CIRIA C637 Soil nailing – best practice guidance (2005)

Values should be confirmed by pull-out testing.

41

Empirical Values

Apply a factor on ultimate of 0.5 - 0.66

Page 42: The design of soil nailed structures to AS4678 Technical ...€¦ · The design of soil nailed structures to AS4678 ___ Chris Bridges Technical Principal - Geotechnics. Presentation

Design pull-out capacity

• Pull-out resistance is usually assumed to be uniform along the length of the nail.

• This is reasonable if nails are short and stiff (dia. of bar >20mm, bond length <5m)

• For more elastic nails (eg. fibre-composite nails) the ave. bond stress reduces when bond length >3m

CIRIA Report C637

42

0

50

100

150

200

250

300

350

0 5 10 15 20 25 30

Av

era

ge

Bo

nd

Str

ess

(kP

a)

Fixed Length (m)

GRP 22mm bar

GRP Strands

Steel 50mm bar

Steel 20mm bar

Power (GRP 22mm bar)

Power (GRP Strands)

Effect of Fixed Length on Bond Stress (Barley and Graham, 1997)

Page 43: The design of soil nailed structures to AS4678 Technical ...€¦ · The design of soil nailed structures to AS4678 ___ Chris Bridges Technical Principal - Geotechnics. Presentation

Nail tensile capacity

Bar strength (tension capacity) can be determined from

equation B4(1) in AS4678-2002

T = Fk Fn Ft fp Ap (kN)where:

Fk = Importance category reduction factor

(Table B1) = 0.8 (perm.) - 0.9 (temp);

Fn = structure classification design factor (Table 5.2, AS4678) = 0.9 - 1.1

Ft = Material reduction factor (Table B2) = 0.9;

fp = Tensile strength of nail (kN/m2);

Ap = Cross sectional area of nail (m2).

43

Page 44: The design of soil nailed structures to AS4678 Technical ...€¦ · The design of soil nailed structures to AS4678 ___ Chris Bridges Technical Principal - Geotechnics. Presentation

Facing

44

Facing can comprise:

• Individual plates or pads

• Mesh

• Shotcrete facing with steel mesh or steel fibrereinforcement

• Vegetation

Flexible facing provides similar overall stability to rigid facing, but more localised deformation

Facing type (based on case studies) –

• face angle ≥70°= hard

• face angle ≤70°= flexible

Page 45: The design of soil nailed structures to AS4678 Technical ...€¦ · The design of soil nailed structures to AS4678 ___ Chris Bridges Technical Principal - Geotechnics. Presentation

45

Page 46: The design of soil nailed structures to AS4678 Technical ...€¦ · The design of soil nailed structures to AS4678 ___ Chris Bridges Technical Principal - Geotechnics. Presentation

Vegetated Slope Works

July 2001 August 2001

September 2002 April 2003

June 2001

Page 47: The design of soil nailed structures to AS4678 Technical ...€¦ · The design of soil nailed structures to AS4678 ___ Chris Bridges Technical Principal - Geotechnics. Presentation

47

Facing

1. FHWA approach

2. FHWA Modified Approach (CIRIA C637)

3. Clouterre

• Shotcrete can be applied in one of two layers (a temporary layer and a permanent layer). Typical temp thickness is 75mm with a single layer of mesh

• Shotcrete thickness for a soil nailed wall is generally > 150mm (MRTS03 – 160mm)

• Shotcrete thickness for a slope 75-100mm (MRTS03 – 120mm)

• Shotcrete thickness generally governed by min. cover to steel requirements

Page 48: The design of soil nailed structures to AS4678 Technical ...€¦ · The design of soil nailed structures to AS4678 ___ Chris Bridges Technical Principal - Geotechnics. Presentation

Soil Nailing - Serviceability

Serviceability limit state of soil nailed structure is similar to RSW.

Remember – movement is required to generate resistance. Therefore beware of existing structures on top of proposed cut.

Where special concrete facings are used, any excessive deformation of the facing may constitute a serviceability limit state.

48

Page 49: The design of soil nailed structures to AS4678 Technical ...€¦ · The design of soil nailed structures to AS4678 ___ Chris Bridges Technical Principal - Geotechnics. Presentation

49

Page 50: The design of soil nailed structures to AS4678 Technical ...€¦ · The design of soil nailed structures to AS4678 ___ Chris Bridges Technical Principal - Geotechnics. Presentation

Soil Nailing - Serviceability

27 November 201750

Page 51: The design of soil nailed structures to AS4678 Technical ...€¦ · The design of soil nailed structures to AS4678 ___ Chris Bridges Technical Principal - Geotechnics. Presentation

Drainage

51

Page 52: The design of soil nailed structures to AS4678 Technical ...€¦ · The design of soil nailed structures to AS4678 ___ Chris Bridges Technical Principal - Geotechnics. Presentation

52

Drainage

Page 53: The design of soil nailed structures to AS4678 Technical ...€¦ · The design of soil nailed structures to AS4678 ___ Chris Bridges Technical Principal - Geotechnics. Presentation

Conclusion

AS 4678 – 2002 can be used for soil nailing

But:

Lack of information and guidance in the standard limits its use

Clients specify different standards

And

53

Page 54: The design of soil nailed structures to AS4678 Technical ...€¦ · The design of soil nailed structures to AS4678 ___ Chris Bridges Technical Principal - Geotechnics. Presentation

7 December 2016

Thank you

54

Page 55: The design of soil nailed structures to AS4678 Technical ...€¦ · The design of soil nailed structures to AS4678 ___ Chris Bridges Technical Principal - Geotechnics. Presentation

7 December 2016

Construction Issues

55

Page 56: The design of soil nailed structures to AS4678 Technical ...€¦ · The design of soil nailed structures to AS4678 ___ Chris Bridges Technical Principal - Geotechnics. Presentation

225m long wall – signs of distress during construction

Page 57: The design of soil nailed structures to AS4678 Technical ...€¦ · The design of soil nailed structures to AS4678 ___ Chris Bridges Technical Principal - Geotechnics. Presentation

1

2 3

4

5

6

7 8

9

10

11

12

13 14

15

1.51

Mudstone

Original Design

Sandstone

Claystone

Name: General Backfill

Model: Mohr-Coulomb

Unit Weight: 19 kN/m³

Cohesion: 5 kPa

Phi: 30 °

Name: Claystone

Model: Mohr-Coulomb

Unit Weight: 21 kN/m³

Cohesion: 10 kPa

Phi: 40 °

Name: Mudstone

Model: Mohr-Coulomb

Unit Weight: 21 kN/m³

Cohesion: 10 kPa

Phi: 42 °

Name: Sandstone

Model: Mohr-Coulomb

Unit Weight: 20 kN/m³

Cohesion: 2 kPa

Phi: 42 °

Sandstone

Directory: K:\Q1215 - LMI\Coffey\Design\Walls\RW08\

Pressure (Unit Weight): 20 kN/m³

General Backfill

Offset (m)

0 5 10 15 20 25 30 35

He

igh

t (m

)

0

5

10

15

20

25

57

Page 58: The design of soil nailed structures to AS4678 Technical ...€¦ · The design of soil nailed structures to AS4678 ___ Chris Bridges Technical Principal - Geotechnics. Presentation

1

2 3

4

5

6

7 8

9

10

11

12

13 14

15

1.53

Mudstone

Revised Design

Sandstone

Claystone

Name: General Backfill

Model: Mohr-Coulomb

Unit Weight: 19 kN/m³

Cohesion: 5 kPa

Phi: 30 °

Name: Claystone

Model: Mohr-Coulomb

Unit Weight: 21 kN/m³

Cohesion: 10 kPa

Phi: 40 °

Name: Mudstone

Model: Mohr-Coulomb

Unit Weight: 21 kN/m³

Cohesion: 10 kPa

Phi: 42 °

Name: Uncemented Sandstone

Model: Mohr-Coulomb

Unit Weight: 20 kN/m³

Cohesion: 0 kPa

Phi: 35 °

Name: Sandstone

Model: Mohr-Coulomb

Unit Weight: 20 kN/m³

Cohesion: 2 kPa

Phi: 42 °

Uncemented Sandstone

Directory: K:\Q1215 - LMI\Coffey\Design\Walls\RW08\

Pressure (Unit Weight): 20 kN/m³

General Backfill

Offset (m)

0 5 10 15 20 25 30 35

He

igh

t (m

)

0

5

10

15

20

25

Re-analysed wall with revised ground model and design amended to incorporate same length nails for full height of wall over affected section

58

Page 59: The design of soil nailed structures to AS4678 Technical ...€¦ · The design of soil nailed structures to AS4678 ___ Chris Bridges Technical Principal - Geotechnics. Presentation
Page 60: The design of soil nailed structures to AS4678 Technical ...€¦ · The design of soil nailed structures to AS4678 ___ Chris Bridges Technical Principal - Geotechnics. Presentation

Remediation

But, after wall completed:

Wall still showed signs of movement

Extra nails 10m in length were recommended along 20m

of the unstable section

60

Page 61: The design of soil nailed structures to AS4678 Technical ...€¦ · The design of soil nailed structures to AS4678 ___ Chris Bridges Technical Principal - Geotechnics. Presentation

1

2 3

4

5

6

7 8

9

10

11

12

13 14

15

1.59

Mudstone

Remediation Nail Design

Sandstone

Claystone

Name: General Backfill

Model: Mohr-Coulomb

Unit Weight: 19 kN/m³

Cohesion: 5 kPa

Phi: 30 °

Name: Claystone

Model: Mohr-Coulomb

Unit Weight: 21 kN/m³

Cohesion: 10 kPa

Phi: 40 °

Name: Mudstone

Model: Mohr-Coulomb

Unit Weight: 21 kN/m³

Cohesion: 10 kPa

Phi: 42 °

Name: Uncemented Sandstone

Model: Mohr-Coulomb

Unit Weight: 20 kN/m³

Cohesion: 0 kPa

Phi: 35 °

Name: Sandstone

Model: Mohr-Coulomb

Unit Weight: 20 kN/m³

Cohesion: 2 kPa

Phi: 42 °

Uncemented Sandstone

Directory: K:\Q1215 - LMI\Coffey\Design\Walls\RW08\

Pressure (Unit Weight): 20 kN/m³

General Backfill

Offset (m)

0 5 10 15 20 25 30 35

He

igh

t (m

)

0

5

10

15

20

25

61

Page 62: The design of soil nailed structures to AS4678 Technical ...€¦ · The design of soil nailed structures to AS4678 ___ Chris Bridges Technical Principal - Geotechnics. Presentation

Spacers of inadequate strength

Damage to installed soil nail bars by

excavator

Lack of experience of contractors staff

62

Page 63: The design of soil nailed structures to AS4678 Technical ...€¦ · The design of soil nailed structures to AS4678 ___ Chris Bridges Technical Principal - Geotechnics. Presentation

Soil Nail Failures

Ref.: Tan. & Chow, 2004

Soil nail facing failure

Grout cover cracked and

peeled off from nail

Page 64: The design of soil nailed structures to AS4678 Technical ...€¦ · The design of soil nailed structures to AS4678 ___ Chris Bridges Technical Principal - Geotechnics. Presentation

Void within

cement grout

~250mm

Probed depth = 320 mm

into cement grout

Probed depth = 1590 mm

into cement grout

Cross-section

Soil Nail Failures

64

Page 65: The design of soil nailed structures to AS4678 Technical ...€¦ · The design of soil nailed structures to AS4678 ___ Chris Bridges Technical Principal - Geotechnics. Presentation

Nail with

no grout

Plastic sheet

Short

column of

cement

grout

65

Page 66: The design of soil nailed structures to AS4678 Technical ...€¦ · The design of soil nailed structures to AS4678 ___ Chris Bridges Technical Principal - Geotechnics. Presentation

Soil Nail Failures

Ref.: Sun & Tsui, 2005

Slope failure prior to soil nail heads being installed during heavy rain

Cause of failure:

• Ingress of water

Assisted by -

• Upper row of nails too low below crest

• Wide nail spacing

• Lack of surface protection

• Poor construction of nails

Page 67: The design of soil nailed structures to AS4678 Technical ...€¦ · The design of soil nailed structures to AS4678 ___ Chris Bridges Technical Principal - Geotechnics. Presentation

Soil Nail Failures

6m3 failure in Completely Decomposed Tuff

Page 68: The design of soil nailed structures to AS4678 Technical ...€¦ · The design of soil nailed structures to AS4678 ___ Chris Bridges Technical Principal - Geotechnics. Presentation

Soil Nail Walls are not such a great idea in water charged sands and silts

(They also can’t be expected to have a 2 weeks stand up time)

Airport Link – Construction Issues

68

Page 69: The design of soil nailed structures to AS4678 Technical ...€¦ · The design of soil nailed structures to AS4678 ___ Chris Bridges Technical Principal - Geotechnics. Presentation

Soil Nails and Reinforced Soil

69

Page 70: The design of soil nailed structures to AS4678 Technical ...€¦ · The design of soil nailed structures to AS4678 ___ Chris Bridges Technical Principal - Geotechnics. Presentation

Excavations – Soil Nails

70