The Certificate of Public Need Program in Virginia Denial of COPN Applications Case Study Presentation to COPN Workgroup Erik Bodin, Director VDH Office of Licensure and Certification September 28, 2015

Upload: norman-rodgers

Post on 12-Jan-2016

213 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: The Certificate of Public Need Program in Virginia Denial of COPN Applications Case Study Presentation to COPN Workgroup Erik Bodin, Director VDH Office

The Certificate of Public Need Program in Virginia

Denial of COPN Applications Case Study

Presentation to COPN WorkgroupErik Bodin, Director

VDH Office of Licensure and CertificationSeptember 28, 2015

Page 2: The Certificate of Public Need Program in Virginia Denial of COPN Applications Case Study Presentation to COPN Workgroup Erik Bodin, Director VDH Office

The Certificate of Public Need Program in Virginia

FY 2000 – FY 2015

• 1,168 Decisions•1,021 Approved•147 Denied

•15 year average 12.6% denied•15 year median 10.9% denied•Range 5.3% - 21.7% denied annually

Page 3: The Certificate of Public Need Program in Virginia Denial of COPN Applications Case Study Presentation to COPN Workgroup Erik Bodin, Director VDH Office

Case Study that involved denial of a COPN Request from within the last four

years

Page 4: The Certificate of Public Need Program in Virginia Denial of COPN Applications Case Study Presentation to COPN Workgroup Erik Bodin, Director VDH Office

2011 COPN ActivityLOIs Applications Accepted Approved Denied Withdrawn

Capital Expenditure 4 4 4 4Establish a Hospital 1 1 1 1Establish an OSH 9 9 5 2 3Establish Rehabilitation Hospital 1Introduce Special Care Nursury 2 2 2 1 1Introduce Open Heart Surgury 1 1 1 1Add Rehabilitation Beds 2 2 2 1 1Add ORs 8 8 6 6Add Cardiac Catheterization 1 1 1 1Establish Radiation Therapy Center 4 1 1 1Introduce Radiation Therapy 3 3 3 2 1Introduce Renal Lithotripsy 1 1 1 1Add Radiation Therapy 3 3 3 3Establish a Center for CT, MRI, or CT & MRI 6 5 5 3 1 1Introduce PET/CT 1 1 1 1Add MRI 3 3 3 3Add CT 4 4 4 4Add Nursing Home Beds 4 4 4 3 1Establish a Nursing Home 2 2 2 2

Page 5: The Certificate of Public Need Program in Virginia Denial of COPN Applications Case Study Presentation to COPN Workgroup Erik Bodin, Director VDH Office

Request to Add a CT Scanner

COPN Request No. VA-7846Inova Health Services d/b/a

Inova Mount Vernon Hospital

Expand CT Service through the Placement of a CT Scanner at Inova Lorton HealthPlex

 

Page 6: The Certificate of Public Need Program in Virginia Denial of COPN Applications Case Study Presentation to COPN Workgroup Erik Bodin, Director VDH Office

Request to Add a CT Scanner

Planning District 8• 50 operational CT scanners at 32 different sites

• 27 CTs in 10 hospitals• 23 CTs in 22 outpatient centers

• CT utilization: 106%, increasing 5.4%/yr• Hospital: 143%, increasing 5.43%/yr• Outpatient center: 62%, increasing 5.5%/yr

• Population: increasing 1.8%/yr

Page 7: The Certificate of Public Need Program in Virginia Denial of COPN Applications Case Study Presentation to COPN Workgroup Erik Bodin, Director VDH Office

1. The extent to which the proposed service or facility will provide or increase access to needed services for residents of the area to be served, and the effects that the proposed service or facility will have on access to needed services in areas having distinct and unique geographic, socioeconomic, cultural, transportation, and other barriers to access to care.

• Based on the number and distribution of CT scanners in the PD, there are no identified issues with geographic access.

• Many existing CT imaging providers have conditioned COPNs. More than half the CT scanners in the PD are in acute care hospitals with charity obligations.

Page 8: The Certificate of Public Need Program in Virginia Denial of COPN Applications Case Study Presentation to COPN Workgroup Erik Bodin, Director VDH Office

2. The extent to which the project will meet the needs of the residents of the area to be served, as demonstrated by each of the following:

• Ample support and opposition voiced for the project

• Alternatives exist for the project

• The Regional Health Planning Agency recommended approval of the project

• Cost / benefit was neutral

• PD poverty rate is lower than the Virginia average and the applicant has a history and/or commitment to provide charity care

Page 9: The Certificate of Public Need Program in Virginia Denial of COPN Applications Case Study Presentation to COPN Workgroup Erik Bodin, Director VDH Office

3. The extent to which the application is consistent with the State Medical Facilities Plan.

• 100% of the population of the PD is already within a 30 minute drive of CT imaging services

• The average utilization of existing CT scanners in the PD is 7,829 per scanner per year, 105.8% of the standard

• CT utilization at Inova Mount Vernon Hospital was 92%

• The proposed site is within 30 minute drive of 2 other Inova facilities with underutilized CTs

Page 10: The Certificate of Public Need Program in Virginia Denial of COPN Applications Case Study Presentation to COPN Workgroup Erik Bodin, Director VDH Office

4. The extent to which the proposed service or facility fosters institutional competition that benefits the area to be served while improving access to essential health care services for all persons in the area to be served.

• Based on the number and distribution of CT scanners in PD 8 there already exists ample competition

Page 11: The Certificate of Public Need Program in Virginia Denial of COPN Applications Case Study Presentation to COPN Workgroup Erik Bodin, Director VDH Office

5. The relationship of the project to the existing health care system of the area to be served, including the utilization and efficiency of existing services or facilities.

• The project is associated with an existing system that operates 41% of the CTs in the PD

• CT capacity in the PD would increase by 1

• More than half of the CTs in freestanding center are underutilized, 7 are operating at less than 30% of the SMFP standard

Page 12: The Certificate of Public Need Program in Virginia Denial of COPN Applications Case Study Presentation to COPN Workgroup Erik Bodin, Director VDH Office

6. The feasibility of the project, including the financial benefits of the project to the applicant, the cost of construction, the availability of financial and human resources, and the cost of capital.

• The pro forma budget presented demonstrated profitability

• The project is being funded through internal resources, reducing the cost of capital

Page 13: The Certificate of Public Need Program in Virginia Denial of COPN Applications Case Study Presentation to COPN Workgroup Erik Bodin, Director VDH Office

7. The extent to which the project provides improvements or innovations in the financing and delivery of health services, as demonstrated by:

• Newer equipment is more efficient

• Presence of a CT scanner in the ED does improve care delivery

• The project is for an outpatient service

• Locations would be more convenient yet retain access to larger systems

Page 14: The Certificate of Public Need Program in Virginia Denial of COPN Applications Case Study Presentation to COPN Workgroup Erik Bodin, Director VDH Office

8. In the case of a project proposed by or affecting a teaching hospital associated with a public institution of higher education or a medical school in the area to be served.

The applicant does not intend to affiliate this project with any clinical training programs

Page 15: The Certificate of Public Need Program in Virginia Denial of COPN Applications Case Study Presentation to COPN Workgroup Erik Bodin, Director VDH Office

Request to Add a CT ScannerHSANV Recommendations

• HSANV recommends Approval• The project appears consistent with sound regional and

community service planning and development, as well as with applicable COPN planning guidelines and standards.

• An onsite CT scanner is needed to support the emergency care service being developed in Lorton.

• The project will likely improve emergency and related services to residents of the Route 1 corridor in Fairfax County.

• There is no indication, or reason to believe, that developing a CT scanning service in Lorton would have appreciable negative effects on other imaging services.

• Projected capital costs are reasonable for the size and nature of the project.

Page 16: The Certificate of Public Need Program in Virginia Denial of COPN Applications Case Study Presentation to COPN Workgroup Erik Bodin, Director VDH Office

Request to Add a CT ScannerDCOPN Recommendations

• DCOPN recommends Denial• The addition of a third CT scanner the Hospital is generally

inconsistent with SMFP’s criteria, as well as the 8 Required Considerations.

• The proposed CT service would only minimally improve the distribution of CT services within PD 8.

• The Hospital’s existing CT service does not qualify for expansion as it is not performing an average of 7,400 procedures per CT scanner.

• Based on the increased performance capacity of modern CTs, there is the potential to increase the Inova’s CT presence in the PD and thereby negatively impact existing providers of CT services.

• There is underutilized CT capability within the Inova Health System that could accommodate Inova’s high CT utilization through relocation of existing underutilized CT.

Page 17: The Certificate of Public Need Program in Virginia Denial of COPN Applications Case Study Presentation to COPN Workgroup Erik Bodin, Director VDH Office

Request to Add a CT ScannerAdjudication Recommendations

• ALJ recommends Denial• The project is inconsistent with the SMFP.• While the average CT utilization exceeds the

SMFP standard, the functional capacity of new CTs exceeds the 2009 SMFP standard.

• Approval of the project would likely exert an influence at odds with the statutory consideration that calls for an assessment, in the review of a project, of a project’s ability to foster institutional competition.

• Adequate capacity for providing CT services in PD 8 is currently distributed such that geographical accessibility to these services exists.

Page 18: The Certificate of Public Need Program in Virginia Denial of COPN Applications Case Study Presentation to COPN Workgroup Erik Bodin, Director VDH Office

Request to Add a CT ScannerCommissioner’s Decision

• Commissioner Denied• The project is inconsistent with the SMFP.• While the average CT utilization exceeds the

SMFP standard, the functional capacity of new CTs exceeds the 2009 SMFP standard.

• Approval of the project would likely exert an influence at odds with the statutory consideration that calls for an assessment, in the review of a project, of a project’s ability to foster institutional competition.

• Adequate capacity for providing CT services in PD 8 is currently distributed such that geographical accessibility to these services exists.

Page 19: The Certificate of Public Need Program in Virginia Denial of COPN Applications Case Study Presentation to COPN Workgroup Erik Bodin, Director VDH Office

Questions?