That will save the environment & help us build the living environments of the future, which can cope with and extensively reduce risks from disaster. Dr. Ashok K. Jain: B.Tech & M. Tech (IIT-Kanpur), Faculty: MNNIT Allahabad. Mr. Sumit K. Agarwal: Ferroconcrete specialist, Social Entrepreneur. [email protected]

Upload: others

Post on 15-Aug-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: That will save the environment & help us build the …...That will save the environment & help us build the living environments of the future, which can cope with and extensively reduce

That will save the environment & help us build the living environments of the future, which can cope with and extensively reduce risks from disaster.

Dr. Ashok K. Jain: B.Tech & M. Tech (IIT-Kanpur), Faculty: MNNIT Allahabad.

Mr. Sumit K. Agarwal: Ferroconcrete specialist, Social Entrepreneur. [email protected]

Page 2: That will save the environment & help us build the …...That will save the environment & help us build the living environments of the future, which can cope with and extensively reduce

Prefabricated

Livelihood Skill Training & Research

Centre (LSTR)

Ferrocement/Ferroconcrete has been recognised as a Separate Construction Technology by the American Science Congress in 1972. It is on the approved technology list of HUDCO, BMTPC, CBRI, PCERF, Concrete Institute of India, IE(I) etc.

EXTENSIVE WORKS DONE IN INDIA FOR: RDSO & Indian Railways UPSRTC UP Jal Nigam UK Forest Department UK Organic board UK Dairy Development Board Dehradun Municipal Corporation Gas Authority of India Ltd. (GAIL) Maharashtra Water Works

Tanjun Associate LLP has been organizing this event with the Institution of Engineers ( India), and eminent researchers, academicians, engineers & architects across India since the year 2012.

Page 3: That will save the environment & help us build the …...That will save the environment & help us build the living environments of the future, which can cope with and extensively reduce

Ferroconcrete has been used extensively in housing, roofing, water tanks and storage construction for over 65 years globally. What is ferro-concrete ?

!! Dense concrete impregnated wire-mesh structure

!! Very high strength & very low weight (in some cases over 8 times stronger than RCC)

!! Strength through shape and

NOT by mass

!! Highly water and earthquake resistant

!! Affordable, Quick and extremely durable (Life-span is same as RCC)

Page 4: That will save the environment & help us build the …...That will save the environment & help us build the living environments of the future, which can cope with and extensively reduce

Ferroconcrete was certified in 1991 by IIT Kanpur as one of the most suitable and durable materials of our times. IIT-KANPUR certification

Gram : !TECHNOLOGY" Telex : 0325-296/0325-329 Off : 214151 Ext. 2511 PHONES: Res : 242050 214151 Ext. 8937

DR. A. S. R. SAI I. I. T. Kanpur – 208 016 (India) Professor

INDIAN INSTITUTE OF TECHNOLOGY KANPUR DEPARTMENT OF CIVIL ENGINEERING

!

1

2

3

August 10, 1991 Mr. Ashok Jain Director M/s Ashok & Associates Lucknow Dear Ashok, Subject: Ferrocement Prefabricated Housing Panels

I am glad to inform you that the prefab panel 2850x900x150 has been tested under all possible loadings expected on the element for its use as wall, roof and floor. The element is safe for a live load of 4.5 kpa (450 kg/m2 approx) when used as a roof panel; a wind load of 6.0 kpa (600 kg/m2 approx) for a wall panel.

The structure made of the panels as per Chunar Project will

be in a position to withstand the codal forces (live, wind, seismic etc.) safely. As the margin is more than 100%, economy may further be done. The structure can withstand an earthquake of intensity 9.0 on the Richter scale. This is the speciality of this type of element assembly. The number of bolts may be altered for different situations.

Besides, the structure is blast proof. Only mortar falls off

which in turn can be repaired easily, insitu. I would like to add that custom made panels can be designed

for different levels of loads/thermal/acoustic comfort using the filler materials.

If you have any queries, please call me.

Yours Sincerely,

(ASR Sai)

LIVE LOAD (450kg/m2) & WIND LOAD (650kg/m2)

Can withstand earthquake of intensity 9.0 on the richter

Blast Proof

Page 5: That will save the environment & help us build the …...That will save the environment & help us build the living environments of the future, which can cope with and extensively reduce

Maharashtra Govt. - SOR The government of maharashtra has already included ferroconcrete into their SOR.

Tanjun advisor Dr. A.K. J a i n a t t h e G l o b a l F e r r o c o n c r e t e app l i ca t ion seminar during “CONSTRO” at Pune, Maharashtra.

Page 6: That will save the environment & help us build the …...That will save the environment & help us build the living environments of the future, which can cope with and extensively reduce

GAIL - SOR The Gas Authority of India Ltd has already included Ferroconcrete as a SOR item in it’s tender documents.

!"#$"%&'(&& )& *+,-.'/.012.1314.5678&!"#$"%&9(%&&&&&&&&&&&&&&&&&&&)& 0:'1!2;0!,:'&:<&!:,-=!&;',!1&&

&

Signature of Bidder:

148

�������������- ���������� ������������

ANNEXURE- III TO SECTION-VI

D ESC RIPT I O N O F I T E MS A ND SPE C I F I C A T I O NS (INDI C A T I V E) F O R F E RR O-C E M E N T/F E RR O C O N C R E T E B I O-L A T RIN ES IN SC H O O LS

[ALTERNATIVE TO CONVENTIONAL BRICK & MORTAR CONSTRUCTION AS MENTIONED IN THE TENDER]

SL . No.

I T E M N O .

D ESC RIPT I O N O F I T E MS

1 1 SUPE RST RU C T UR E 1.1 FLOOR, ROOF & WALLS 1.2 Providing, fixing, erecting, welding, Tray shaped floor component reinforcement

cage with height of 100mm on all sides and reinforcing ridges of 25mm thickness at 1100mm maximum c/c where applicable, with 3.2mm m.s. bar as per IS 100mm C/C both ways for ferro-cement flooring and roofing and walling and chicken mesh 2 layers of 24 gauge including binding with wire etc. complete.

1.3 Prefabricating and casting ferro-cement/ferroconcrete floor of 20mm(wall thickness) and approved size and shape and design in cement mortar 1:3 (1 cement: 3 coarse sand),and jointing with grey slurry @ 3.3 Kg/smt (excluding m.s. bar reinforcement/chicken mesh) including placing curing etc. complete.

1.4 On-site erection and installation of prefabricated components using MS nuts and bolts of not less than 8mm x 75mm size and finishing with cement slurry @ 3.3 kg/smt to plug all holes made for bolts and fixing fixtures.

2 2 SUB ST RU C T UR E (SEPT I C T A N K)

2.1 F L O O R , & W A L LS 2.2 Providing, fixing, erecting, welding, Tray shaped component reinforcement cage

with height of 100mm on all sides and reinforcing ridges of 25mm thickness at 900mm maximum c/c where applicable, with 3.2mm m.s. bar as per IS 100mm C/C both ways for ferro-cement flooring and roofing and walling and chicken mesh 2 layers of 24 gauge including binding with wire etc complete.

2.3 Prefabricating and casting ferro-cement/ferroconcrete component of 20mm(wall thickness) and approved size and shape and design in cement mortar 1:3 (1 cement: 3 coarse sand),and jointing with grey slurry @ 3.3 Kg/smt (excluding m.s. bar reinforcement/chicken mesh) including placing curing etc. complete.

2.4 On-site erection and installation of prefabricated components using MS nuts and bolts of not less than 8mm x 75mm size and finishing with cement slurry @ 3.3 kg/smt to plug all holes made for bolts and fixing fixtures.

3 3 PL AST E RIN G & F INISH IN G (IN T E RN A L & E X T E RN A L)

3.1 Finishing of walls with two or more coats of waterproofing cement paint applied at 3.84 Kg/10smt.

3.2 Pre-coating of floor component using cement paint mix at the time of casting of approved makes and shades except burgundy, and black and finished to smoothness by use of 000 number polishing stone.

4 4 D O O R SH U T T E R 4.1 Providing & fixing door shutter of 12mm minimum thickness made of cement

bonded particle board conforming to IS:14276-1995 on prefabricated end of ferro-cement/ferroconcrete wall component.

4.1 Providing two coats of synthetic enamel paint over primer coat. 4.3 Providing and fixing MS butt hinges, and all necessary fittings including 150mm

!"#$"%&'(&& )& *+,-.'/.012.1314.5678&!"#$"%&9(%&&&&&&&&&&&&&&&&&&&)& 0:'1!2;0!,:'&:<&!:,-=!&;',!1&&

&

Signature of Bidder:

149

�������������- ���������� ������������

x 10 mm tower bolts, anodised with necessary screws etc., 100mm long aluminium handles, on both sides of the door shutter, complete with necessary screws etc.

5 5 PA V IN G 5.1 Providing, fixing, erecting, welding, Tray shaped paving component

reinforcement cage with height of 100mm on all sides and reinforcing ridges of 25mm thickness at 1000mm maximum c/c where applicable, with 3.2mm m.s. bar as per IS 100mm C/C both ways for ferro-cement flooring and roofing and walling and chicken mesh 2 layers of 24 gauge including binding with wire etc complete.

5.2 Prefabricating and casting ferro-cement/ferroconcrete component of 25mm(wall thickness) and approved size and shape and design in cement mortar 1:3 (1 cement: 3 coarse sand),and jointing with grey slurry @ 3.3 Kg/smt (excluding m.s. bar reinforcement/chicken mesh) including placing curing etc. complete.

5.3 On-site erection and installation of prefabricated components using MS nuts and bolts of not less than 8mm x 75mm size and finishing with cement slurry @ 3.3 kg/smt to plug all holes made for bolts and fixing fixtures.

6 6 SUNSH A D ES, JA A L IS A ND C H H AJJAS 6.1 Providing, fixing, erecting, welding, Tray shaped component reinforcement cage

with height of 100mm on all sides and reinforcing ridges of 25mm thickness at 1000mm maximum c/c where applicable, with 3.2mm m.s. bar as per IS 100mm C/C both ways for ferro-cement flooring and roofing and walling and chicken mesh 2 layers of 24 gauge including binding with wire etc. complete.

6.2 Prefabricating and casting ferro-cement/ferroconcrete Component with 15 degree slope of 25mm(wall thickness) and approved size and shape and design in cement mortar 1:3 (1 cement: 3 coarse sand),and jointing with grey slurry @ 3.3 Kg/smt (excluding m.s. bar reinforcement/chicken mesh) including placing curing etc. complete.

6.3 On-site erection and installation of prefabricated components using MS nuts and bolts of not less than 8mm x 75mm size and finishing with cement slurry @ 3.3 kg/smt to plug all holes made for bolts and fixing fixtures.

Tanjun Founder Shri: Sumit Kumar Agarwal at the India Prefab-2014 conference delivering the inaugural address on Ferroconcrete.

Page 7: That will save the environment & help us build the …...That will save the environment & help us build the living environments of the future, which can cope with and extensively reduce

Er. P.L. Nervi first used Ferroconcrete in 1948 in Italy to construct buildings and continued to build the Turin exhibition hall as well as the Pirelli tower. The American Navy today makes their large high-speed boat hulls using Ferroconcrete. Some Global Examples

The Turin exhibition hall:1000 feet unsupported structure

CNIT-France : 2.5” Thin section curved spanroof

Page 8: That will save the environment & help us build the …...That will save the environment & help us build the living environments of the future, which can cope with and extensively reduce

RESIDENTIAL & COMMERCIAL STRUCTURES FERROCONCRETE

LUCKNOW-UP (INDIA)

Sahara Arts & Management Academy

15000 sft : 80 days

Page 9: That will save the environment & help us build the …...That will save the environment & help us build the living environments of the future, which can cope with and extensively reduce

IN-SITU GUNITED STRUCTURES FERROCONCRETE

NASHIK: (INDIA)

6000 sft school library built entirely above ground

Page 10: That will save the environment & help us build the …...That will save the environment & help us build the living environments of the future, which can cope with and extensively reduce

RESIDENTIAL & COMMERCIAL STRUCTURES FERROCONCRETE

ASAN DAM-UK (INDIA)

Residences for forest department officers

Foundation above-ground r e d u c e s e a r t h q u a k e intensity to nearly half and allows passage of water dur ing f loods w i thou t damaging the structure.

Page 11: That will save the environment & help us build the …...That will save the environment & help us build the living environments of the future, which can cope with and extensively reduce

RESIDENTIAL & COMMERCIAL STRUCTURES FERROCONCRETE

LUCKNOW-UP (INDIA)

Double story prefab construction

Page 12: That will save the environment & help us build the …...That will save the environment & help us build the living environments of the future, which can cope with and extensively reduce

RESIDENTIAL & COMMERCIAL STRUCTURES FERROCONCRETE

KHAJURAHO-MP(INDIA)

15 Meter span temple roof in 1.5 inch thick section

Page 13: That will save the environment & help us build the …...That will save the environment & help us build the living environments of the future, which can cope with and extensively reduce

WATER TANKS & BOUNDARY WALLS FERROCONCRETE

KANPUR-UP (INDIA)

70 Thousand Litre water tank at 12 meter height

This a component based complete ly nut bol ted structure and holds water perfectly well since 1998.

Page 14: That will save the environment & help us build the …...That will save the environment & help us build the living environments of the future, which can cope with and extensively reduce

WATER TANKS & BOUNDARY WALLS FERROCONCRETE

Various: (INDIA)

Extremely durable boundary walls

These are component based complete ly nut bolted structures and can be erec ted ex t remely quickly.

Page 15: That will save the environment & help us build the …...That will save the environment & help us build the living environments of the future, which can cope with and extensively reduce

CHECK DAMS & LOAD TESTING FERROCONCRETE

Maharashtra: (INDIA)

Check dams built for the Maharashtra government

Retaining wall components are tested on site once aga in us ing the co in deflection method.

Page 16: That will save the environment & help us build the …...That will save the environment & help us build the living environments of the future, which can cope with and extensively reduce

RAPID INSTALLATION & COMMISSIONING FERROCONCRETE

Uttarakhand: (INDIA)

One room Home installation process – 36 hours from start to finish

Step-1: Laying the floor components Step-2: Erecting the wall components

Page 17: That will save the environment & help us build the …...That will save the environment & help us build the living environments of the future, which can cope with and extensively reduce

RAPID INSTALLATION & COMMISSIONING FERROCONCRETE

Uttarakhand: (INDIA)

One room Home installation process – 36 hours from start to finish

Step-3: Laying the wall raisers & binders Step-4: Laying the roof components

Page 18: That will save the environment & help us build the …...That will save the environment & help us build the living environments of the future, which can cope with and extensively reduce

RAPID INSTALLATION & COMMISSIONING FERROCONCRETE

Uttarakhand: (INDIA)

One room Home installation process – 36 hours from start to finish

Step-5: Securing & sealing of roof Step-6: Painting, Electrification & finishing

Page 19: That will save the environment & help us build the …...That will save the environment & help us build the living environments of the future, which can cope with and extensively reduce

TWO ROOM DISASTER REHAB HOUSING FERROCONCRETE

Uttarakhand: (INDIA)

Exhibition of rehab solutions at India Prefab 2014

Page 20: That will save the environment & help us build the …...That will save the environment & help us build the living environments of the future, which can cope with and extensively reduce

ONE ROOM DISASTER REHAB HOUSING FERROCONCRETE

Uttarakhand: (INDIA)

Site installations at Vikasnagar

Page 21: That will save the environment & help us build the …...That will save the environment & help us build the living environments of the future, which can cope with and extensively reduce

INDVIDUAL TOILETS & SEPTIC TANKS FERROCONCRETE

BADRINATH Uttarakhand

JHABUA Madhya Pradesh

GANJAM Orissa

PUNE Maharashtra

TUNDLA Uttar Pradesh

UKHIMATH Uttarakhand

SAHARANPUR Uttar Pradesh

DEHRADUN Uttarakhand

Page 22: That will save the environment & help us build the …...That will save the environment & help us build the living environments of the future, which can cope with and extensively reduce

COMMUNITY & SCHOOL TOILETS FERROCONCRETE

Kalsi Siyat

Uttarakhand: (INDIA)

Page 23: That will save the environment & help us build the …...That will save the environment & help us build the living environments of the future, which can cope with and extensively reduce

SO WHAT MAKES FC THE BEST REHABILITATION

OPTION??

Page 24: That will save the environment & help us build the …...That will save the environment & help us build the living environments of the future, which can cope with and extensively reduce

Skill building of Bhil Tribal youth at Jhabua in Madhya Pradesh.

Skill building of a team from Bihar at our training centre.

Skill building at PUNE, Maharashtra.

Convocation of Master Trainers at our Training Centre with the faculty.

Training of trainers at haridwar

SKILL DEVELOPMENT OF COMMUNITY FERROCONCRETE

Page 25: That will save the environment & help us build the …...That will save the environment & help us build the living environments of the future, which can cope with and extensively reduce

No foundation & monolithic structure means very low transfer of ground vibrations. (EARTHQUAKE RESISTANT)

Hollow plinth allows nearly 6 feet of water to flow under without damage to structure. (FLOOD RESISTANT)

Light & Free: The safest alternative

Page 26: That will save the environment & help us build the …...That will save the environment & help us build the living environments of the future, which can cope with and extensively reduce

HOW TO MAKE YOUR OWN HOUSE USING YOUR OWN DESIGN FROM EXACTLYHOW TO MAKE YOUR OWN HOUSE USING YOUR OWN DESIGN FROM EXACTLYTHE SAME NUMBER OF COMPONENTS (35 IN THIS CASE) AS EVERYBODYTHE SAME NUMBER OF COMPONENTS (35 IN THIS CASE) AS EVERYBODYELSE. IN OTHER WORDS, WHAT IF WE GIVE COMPONENTS AND A CHOICEELSE. IN OTHER WORDS, WHAT IF WE GIVE COMPONENTS AND A CHOICE

RATHER THAN A HOUSE, TO THE VALMIKI AWAS/INDIRA AWAS RECIPIENTS.RATHER THAN A HOUSE, TO THE VALMIKI AWAS/INDIRA AWAS RECIPIENTS.

HOW TO MAKE YOUR OWN HOUSE USING YOUR OWN DESIGN FROM EXACTLYHOW TO MAKE YOUR OWN HOUSE USING YOUR OWN DESIGN FROM EXACTLYTHE SAME NUMBER OF COMPONENTS (35 IN THIS CASE) AS EVERYBODYTHE SAME NUMBER OF COMPONENTS (35 IN THIS CASE) AS EVERYBODYELSE. IN OTHER WORDS, WHAT IF WE GIVE COMPONENTS AND A CHOICEELSE. IN OTHER WORDS, WHAT IF WE GIVE COMPONENTS AND A CHOICE

RATHER THAN A HOUSE, TO THE VALMIKI AWAS/INDIRA AWAS RECIPIENTS.RATHER THAN A HOUSE, TO THE VALMIKI AWAS/INDIRA AWAS RECIPIENTS.

HOW TO MAKE YOUR OWN HOUSE USING YOUR OWN DESIGN FROM EXACTLYHOW TO MAKE YOUR OWN HOUSE USING YOUR OWN DESIGN FROM EXACTLYTHE SAME NUMBER OF COMPONENTS (35 IN THIS CASE) AS EVERYBODYTHE SAME NUMBER OF COMPONENTS (35 IN THIS CASE) AS EVERYBODYELSE. IN OTHER WORDS, WHAT IF WE GIVE COMPONENTS AND A CHOICEELSE. IN OTHER WORDS, WHAT IF WE GIVE COMPONENTS AND A CHOICE

RATHER THAN A HOUSE, TO THE VALMIKI AWAS/INDIRA AWAS RECIPIENTS.RATHER THAN A HOUSE, TO THE VALMIKI AWAS/INDIRA AWAS RECIPIENTS.

GIVING THE COMMUNITY THEIR DIGNITY BACK RETAIL HOUSING

FRIENDLY FUTURISTIC SUSTAINABLE AFFORDABLE

Option showing two separate houses made from the same number of components on the same size of 5mx8m plot. This gives every person the dignity to individually design their homes and add or expand at their own free will. Readymade designs from a given number of components provide for quick and easy choice of homes for the disaster affected people while keeping the social fabric intact as before and not burdening the govt/funder with multiple costsings.

Page 27: That will save the environment & help us build the …...That will save the environment & help us build the living environments of the future, which can cope with and extensively reduce

Use the trolley to carry raw material

Use trolly to transport fin-ished components to erec-tion site

Use hydraulic lifts to take component to roof height

Carry personnel and tools to and from site

Use belt driven conrete mixerUse belt driven sprayer to continuously water the com-ponents while driving through

Attach alternator to create up to 7.5 KvA output of power

Use tilt function to neatly place finishedpieces in a straight row on both sides of the tiller

Attach belt driven vibrator on trolly to manufacture components

Use standard tilling apparatus to draw sand

TRANSPORTATION

MINING

MIXING

MANUFACTURING

CURING

POWER GENERATION

LIFTING

COMPLETE PORTABLE FERROCEMENT PREFAB-FACTORYCOMPLETE PORTABLE FERROCEMENT PREFAB-FACTORY

rduhdh Xkzke fodkLk Lkferh

ashok jain <[email protected]>Sumit Kumar Agarwal <[email protected]>

Double & single story prefab homesPrefab Public toilet

& rural sanitation unit

Prefab Tank & Boundary wall

Page 28: That will save the environment & help us build the …...That will save the environment & help us build the living environments of the future, which can cope with and extensively reduce

Quick look at present (2014) Uttarakhand The difference between quick-response

Disaster Shelters & long-term Rehabilitation

Quick response Tin & steel shelters at Govindghat where wind speeds can reach up to 125 kmph and outside temp in the sun can be 38 degrees celcius.

B r i c k s c o s t R s . 1 3 a t Augustyamuni. 90% death & damage during earthquakes happens from falling debris. Please also read the annexed article on Blood-Bricks.

Lamgordi shelters. Eventually, we must build for humans just like you and me.

Page 29: That will save the environment & help us build the …...That will save the environment & help us build the living environments of the future, which can cope with and extensively reduce

INNOVATIONS UNDERSTANDING & ADDRESSSING PORTABILITY

Structures for difficult terrain

•! Maximum component load 80 KG.

•! Carrying by mule in the hills is the option.

•! Roof component 150mm thick as against the balance, which are 100mm thick.

Design: Ar. Jayant Patankar

FERROCONCRETE STRUCTURES AS OLD AS 25 YEARS EXIST IN

DISASTER PRONE UTTARAKHAND

Page 30: That will save the environment & help us build the …...That will save the environment & help us build the living environments of the future, which can cope with and extensively reduce

CONCLUSION: SO WHAT MAKES FC THE BEST REHABILITATION OPTION??

It withstands earthquakes up to 9.0 on the richter scale.

The structure is blast-proof.

It withstands wind loads of upto 650Kg/m2.

Proven technology for over 35 years under Indian conditions and over 65 years globally.

It is the only prefab option made from a traditionally proven structural material: Concrete.

It can be constructed from many locally available materials.

Extremely cost effective.

Extremely speedy construction

Portability allows for remote area construction with ease.

Standardized quality and pricing across locations and terrains.

Simple Technology allows transfer & development of skills to the community for sustainability.

Both prefab & in-situ options allow for exceptional versatility.

TECHNO COMMERCIAL ANALYSIS

Modular design for expansion.

Page 31: That will save the environment & help us build the …...That will save the environment & help us build the living environments of the future, which can cope with and extensively reduce

WHERE COULD WE BEGIN? One modular expandable dwelling. One hygienic toilet with septic tank.

Skill development & technology transfer to the community

The Tanjun Model. Quick, cost-effective, local, long-lasting & sustainable

THANK YOU