Tetris offers a range of interior it out related

services, delivering a “turnkey” lump

sum or “open book” solution. The  Tetris

model provides a dedicated single point

of contact for the Client who will drive

the completion of the project, simplifying

the administrative process, optimising

the timeline and value for money offering.

The  interior design / space planning can

be produced in house – ensuring speed

and control of the process.

The results oriented culture in Tetris is based

upon long term partnerships with reliable

contractors and suppliers who are selected

using rigorous criteria and then continuously

monitored. In particular, the Tetris team ensures

that each project is designed and constructed

in accordance with current best practices and

in compliance with statutory obligations and

landlord requirements, ensuring peace of mind

from the project’s inception to its completion

and beyond. The Client beneits from the

reduced time input required and hassle free

delivery of the refurbishment / it out project.

OFFER

RESULTS

Page 5: Tétris emea projects book 2013 light

KEY FACTSCountries 10

Offi ces 13

Employees 165

Projects in 2012 510

Turnover ($M) 2012 138

Page 6: Tétris emea projects book 2013 light
Page 7: Tétris emea projects book 2013 light

AMAZON

Location Madrid | Spain

Mission Refurbishment of Headquarters

Area 3 500 sqm

Duration 3 months

Delivery 2012

Other Locations Milan | Italy

Clichy | France

Page 8: Tétris emea projects book 2013 light

AUTODESK

Location Milan | Italy

Mission Refurbishment of Headquarters

Area 750 sqm

Duration 4 months

Delivery June 2012

Page 9: Tétris emea projects book 2013 light
Page 10: Tétris emea projects book 2013 light
Page 11: Tétris emea projects book 2013 light

ASTELLAS

Location Lisbon | Portugal

Mission Design and it-out

works of an innovative space

Area 900 sqm

Duration 3 months

Delivery May 2012

Page 12: Tétris emea projects book 2013 light

ATRADIUS

Location Antwerp | Belgium

Mission Fit-out works

Area 900 sqm

Duration 9 weeks

Delivery November 2012

Page 13: Tétris emea projects book 2013 light
Page 14: Tétris emea projects book 2013 light
Page 15: Tétris emea projects book 2013 light

BRIGHTPOINT

Location Barcelona | Spain

Mission Design and it-out works

Area 1 474 sqm

Duration 3 months

Delivery 2010

Page 16: Tétris emea projects book 2013 light

BUREAU VERITAS

Location Milan | Italy

Mission Fit-out works

Area 4 000 sqm

Duration 2 months

Delivery January 2013

Page 17: Tétris emea projects book 2013 light
Page 18: Tétris emea projects book 2013 light
Page 19: Tétris emea projects book 2013 light

CAUDEX MEDICAL

Location Oxford | United Kingdom

Mission Complete design & it-out

Area 680 sqm

Duration 6 weeks

Delivery January 2012

Page 20: Tétris emea projects book 2013 light

CHARTIS

Location Paris-La Defense | France

Mission General contractor for building services and architectural works

Area 5 900 sqm

Duration 4 months

Delivery June 2012

Page 21: Tétris emea projects book 2013 light
Page 22: Tétris emea projects book 2013 light
Page 23: Tétris emea projects book 2013 light

DOC GENERICI

Location Milan | Italy

Mission Fit-out works of their new premises

Area 1 200 sqm

Duration 4 months

Delivery September 2012

Page 24: Tétris emea projects book 2013 light

EPTISA

Location Madrid | Spain

Mission Fit-out of their Headquarters

Area 12 500 sqm

Duration 3 months

Delivery 2010

Page 25: Tétris emea projects book 2013 light
Page 26: Tétris emea projects book 2013 light
Page 27: Tétris emea projects book 2013 light

FUJITSU

Location Milan | Italy

Mission Design and Fit-out works

Area 1 900 sqm

Duration 2 months

Delivery November 2012

Page 28: Tétris emea projects book 2013 light

HEINEKEN

Location Rueil-Malmaison | France

Mission Fit-out of the new Headquarters

Area 9 000 sqm

Duration 6 months

Delivery September 2011

Page 29: Tétris emea projects book 2013 light
Page 30: Tétris emea projects book 2013 light
Page 31: Tétris emea projects book 2013 light

IHS

Location Paris | France

Mission Fit-out of the new Headquarters

Area 1 350 sqm

Duration 2 months

Delivery January 2011

Page 32: Tétris emea projects book 2013 light

INTEL

Location London | United Kingdom

Mission Complete design & it-out

Area 1 300 sqm

Duration 3 months

Delivery April 2012

Other Locations Bucarest | Romania Moscow | Russia Madrid | Spain Nantes, Nice, Toulouse | France

Page 33: Tétris emea projects book 2013 light
Page 34: Tétris emea projects book 2013 light
Page 35: Tétris emea projects book 2013 light

JLL

Location Moscow | Russia

Mission Interior it-out of Headquarters

Area 2 500 sqm

Duration 5 months

Delivery August 2012

Other Locations Lyon, Paris | France Madrid | Spain London | United Kingdom

Page 36: Tétris emea projects book 2013 light

LAVINIA

Location Paris La Defense | France

Mission Fit-out of a store

Area 235 sqm

Time 3 months

Delivery March 2011

Other Locations Paris | France Madrid | Spain

Page 37: Tétris emea projects book 2013 light
Page 38: Tétris emea projects book 2013 light
Page 39: Tétris emea projects book 2013 light

LEASEPLAN

Location Lisbon | Portugal

Mission Refurbishment of the cafeteria in their Headquarters

Area 3 700 sqm

Duration 5 months

Delivery July 2012

Page 40: Tétris emea projects book 2013 light

MARS

Location Casablanca | Morocco

Mission Fit-out of their new Headquarters

Area 200 sqm

Duration 6 weeks

Delivery December 2012

Page 41: Tétris emea projects book 2013 light
Page 42: Tétris emea projects book 2013 light
Page 43: Tétris emea projects book 2013 light

MULTIOPTICAS

Location Sintra | Portugal

Mission Refurbishment of a store

Area 200 sqm

Duration 1 month

Delivery second quarter of 2011

Other Locations 7 stores in Portugal

Page 44: Tétris emea projects book 2013 light

NAPAPIJRI

Location Paris | France

Mission Full renovation of the store according to the new concept

Area 250 sqm

Duration 2 weeks

Delivery August 2012

Page 45: Tétris emea projects book 2013 light
Page 46: Tétris emea projects book 2013 light
Page 47: Tétris emea projects book 2013 light

NVIDIA

Location Cambridge | United Kingdom

Mission Fit-out works

Area 580 sqm

Duration 7 weeks

Delivery September 2012

Page 48: Tétris emea projects book 2013 light

PANASONIC

Location Gennevilliers | France

Mission Design and Construction works

Area 3 470 sqm

Duration 3 months

Delivery August 2011

Page 49: Tétris emea projects book 2013 light
Page 50: Tétris emea projects book 2013 light
Page 51: Tétris emea projects book 2013 light

PUIG

Location Milan | Italy

Mission Refurbishment of Headquarters

Area 380 sqm

Duration 2 months

Delivery June 2011

Page 52: Tétris emea projects book 2013 light

ROBERT WALTERS

Location Brussels | Belgium

Mission Fit-out

Area 550 sqm

Duration 6 weeks

Delivery October 2012

Page 53: Tétris emea projects book 2013 light
Page 54: Tétris emea projects book 2013 light
Page 55: Tétris emea projects book 2013 light

SAP

Location Lisbon | Portugal

Mission Design and interior it-out works

Area 1 000 sqm

Duration 8 weeks

Delivery May 2012

Other Locations Hulpe | Belgium Moscow | Russia Paris | France

Page 56: Tétris emea projects book 2013 light

SCHWEPPES

Location Mardrid | Spain

Mission Design of a new concept for its ofices and it-out works

Area 3 500 sqm

Duration 2 months

Delivery September 2012

Page 57: Tétris emea projects book 2013 light
Page 58: Tétris emea projects book 2013 light
Page 59: Tétris emea projects book 2013 light

SONY FRANCE

Location Puteaux | France

Mission Full interior Fit-out of Headquarters

Area 8 900 sqm

Duration 3 months

Delivery July 2011

Page 60: Tétris emea projects book 2013 light

STANLEY BLACK & DECKER

Location Lisbon | Portugal

Mission Refurbishment of Headquarters

Area 1 058 sqm

Duration 3 months

Delivery September 2012

Other Locations Diegem, Mechelen | Belgium Dijon, Lyon, Paris, Strasbourg | France Spennymoor | United Kingdom Moscow | Russia

Page 61: Tétris emea projects book 2013 light
Page 62: Tétris emea projects book 2013 light
Page 63: Tétris emea projects book 2013 light

TORONTO STOCKEXCHANGE

Location London | United Kingdom

Mission Complete design & it-out

Area 510 sqm

Duration 9 weeks

Delivery April 2012

Page 64: Tétris emea projects book 2013 light

TUI

Location Levallois-Perret | France

Mission Fit-out works of their new Headquarters

Area 6 000 sqm

Duration 2 months

Delivery December 2012

Page 65: Tétris emea projects book 2013 light
Page 66: Tétris emea projects book 2013 light
Page 67: Tétris emea projects book 2013 light

Photos : Spaces and Places, Daniel Runacher, Alexis Paoli

Page 68: Tétris emea projects book 2013 light

CONTACT US

United Kingdom+44 0207 852 4050

Belgium+32 495 582 552

France+33 611 42 27 13

Italy+39 393 53 84 145

Luxembourg+32 495 582 552

Morocco+212 679 77 63 63

Netherlands+31 20 541 00 50

Portugal+351 91 035 53 50

Russia+7 495 739 2000

Spain+34 649 817 303