DESIGN & BUILD
EMEA
![Page 2: Tétris emea projects book 2013 light](https://reader033.vdocuments.us/reader033/viewer/2022052702/568bdbd61a28ab2034affe56/html5/thumbnails/2.jpg)
![Page 3: Tétris emea projects book 2013 light](https://reader033.vdocuments.us/reader033/viewer/2022052702/568bdbd61a28ab2034affe56/html5/thumbnails/3.jpg)
![Page 4: Tétris emea projects book 2013 light](https://reader033.vdocuments.us/reader033/viewer/2022052702/568bdbd61a28ab2034affe56/html5/thumbnails/4.jpg)
Tetris offers a range of interior it out related
services, delivering a “turnkey” lump
sum or “open book” solution. The Tetris
model provides a dedicated single point
of contact for the Client who will drive
the completion of the project, simplifying
the administrative process, optimising
the timeline and value for money offering.
The interior design / space planning can
be produced in house – ensuring speed
and control of the process.
The results oriented culture in Tetris is based
upon long term partnerships with reliable
contractors and suppliers who are selected
using rigorous criteria and then continuously
monitored. In particular, the Tetris team ensures
that each project is designed and constructed
in accordance with current best practices and
in compliance with statutory obligations and
landlord requirements, ensuring peace of mind
from the project’s inception to its completion
and beyond. The Client beneits from the
reduced time input required and hassle free
delivery of the refurbishment / it out project.
OFFER
RESULTS
![Page 5: Tétris emea projects book 2013 light](https://reader033.vdocuments.us/reader033/viewer/2022052702/568bdbd61a28ab2034affe56/html5/thumbnails/5.jpg)
KEY FACTSCountries 10
Offi ces 13
Employees 165
Projects in 2012 510
Turnover ($M) 2012 138
![Page 6: Tétris emea projects book 2013 light](https://reader033.vdocuments.us/reader033/viewer/2022052702/568bdbd61a28ab2034affe56/html5/thumbnails/6.jpg)
![Page 7: Tétris emea projects book 2013 light](https://reader033.vdocuments.us/reader033/viewer/2022052702/568bdbd61a28ab2034affe56/html5/thumbnails/7.jpg)
AMAZON
Location Madrid | Spain
Mission Refurbishment of Headquarters
Area 3 500 sqm
Duration 3 months
Delivery 2012
Other Locations Milan | Italy
Clichy | France
![Page 8: Tétris emea projects book 2013 light](https://reader033.vdocuments.us/reader033/viewer/2022052702/568bdbd61a28ab2034affe56/html5/thumbnails/8.jpg)
AUTODESK
Location Milan | Italy
Mission Refurbishment of Headquarters
Area 750 sqm
Duration 4 months
Delivery June 2012
![Page 9: Tétris emea projects book 2013 light](https://reader033.vdocuments.us/reader033/viewer/2022052702/568bdbd61a28ab2034affe56/html5/thumbnails/9.jpg)
![Page 10: Tétris emea projects book 2013 light](https://reader033.vdocuments.us/reader033/viewer/2022052702/568bdbd61a28ab2034affe56/html5/thumbnails/10.jpg)
![Page 11: Tétris emea projects book 2013 light](https://reader033.vdocuments.us/reader033/viewer/2022052702/568bdbd61a28ab2034affe56/html5/thumbnails/11.jpg)
ASTELLAS
Location Lisbon | Portugal
Mission Design and it-out
works of an innovative space
Area 900 sqm
Duration 3 months
Delivery May 2012
![Page 12: Tétris emea projects book 2013 light](https://reader033.vdocuments.us/reader033/viewer/2022052702/568bdbd61a28ab2034affe56/html5/thumbnails/12.jpg)
ATRADIUS
Location Antwerp | Belgium
Mission Fit-out works
Area 900 sqm
Duration 9 weeks
Delivery November 2012
![Page 13: Tétris emea projects book 2013 light](https://reader033.vdocuments.us/reader033/viewer/2022052702/568bdbd61a28ab2034affe56/html5/thumbnails/13.jpg)
![Page 14: Tétris emea projects book 2013 light](https://reader033.vdocuments.us/reader033/viewer/2022052702/568bdbd61a28ab2034affe56/html5/thumbnails/14.jpg)
![Page 15: Tétris emea projects book 2013 light](https://reader033.vdocuments.us/reader033/viewer/2022052702/568bdbd61a28ab2034affe56/html5/thumbnails/15.jpg)
BRIGHTPOINT
Location Barcelona | Spain
Mission Design and it-out works
Area 1 474 sqm
Duration 3 months
Delivery 2010
![Page 16: Tétris emea projects book 2013 light](https://reader033.vdocuments.us/reader033/viewer/2022052702/568bdbd61a28ab2034affe56/html5/thumbnails/16.jpg)
BUREAU VERITAS
Location Milan | Italy
Mission Fit-out works
Area 4 000 sqm
Duration 2 months
Delivery January 2013
![Page 17: Tétris emea projects book 2013 light](https://reader033.vdocuments.us/reader033/viewer/2022052702/568bdbd61a28ab2034affe56/html5/thumbnails/17.jpg)
![Page 18: Tétris emea projects book 2013 light](https://reader033.vdocuments.us/reader033/viewer/2022052702/568bdbd61a28ab2034affe56/html5/thumbnails/18.jpg)
![Page 19: Tétris emea projects book 2013 light](https://reader033.vdocuments.us/reader033/viewer/2022052702/568bdbd61a28ab2034affe56/html5/thumbnails/19.jpg)
CAUDEX MEDICAL
Location Oxford | United Kingdom
Mission Complete design & it-out
Area 680 sqm
Duration 6 weeks
Delivery January 2012
![Page 20: Tétris emea projects book 2013 light](https://reader033.vdocuments.us/reader033/viewer/2022052702/568bdbd61a28ab2034affe56/html5/thumbnails/20.jpg)
CHARTIS
Location Paris-La Defense | France
Mission General contractor for building services and architectural works
Area 5 900 sqm
Duration 4 months
Delivery June 2012
![Page 21: Tétris emea projects book 2013 light](https://reader033.vdocuments.us/reader033/viewer/2022052702/568bdbd61a28ab2034affe56/html5/thumbnails/21.jpg)
![Page 22: Tétris emea projects book 2013 light](https://reader033.vdocuments.us/reader033/viewer/2022052702/568bdbd61a28ab2034affe56/html5/thumbnails/22.jpg)
![Page 23: Tétris emea projects book 2013 light](https://reader033.vdocuments.us/reader033/viewer/2022052702/568bdbd61a28ab2034affe56/html5/thumbnails/23.jpg)
DOC GENERICI
Location Milan | Italy
Mission Fit-out works of their new premises
Area 1 200 sqm
Duration 4 months
Delivery September 2012
![Page 24: Tétris emea projects book 2013 light](https://reader033.vdocuments.us/reader033/viewer/2022052702/568bdbd61a28ab2034affe56/html5/thumbnails/24.jpg)
EPTISA
Location Madrid | Spain
Mission Fit-out of their Headquarters
Area 12 500 sqm
Duration 3 months
Delivery 2010
![Page 25: Tétris emea projects book 2013 light](https://reader033.vdocuments.us/reader033/viewer/2022052702/568bdbd61a28ab2034affe56/html5/thumbnails/25.jpg)
![Page 26: Tétris emea projects book 2013 light](https://reader033.vdocuments.us/reader033/viewer/2022052702/568bdbd61a28ab2034affe56/html5/thumbnails/26.jpg)
![Page 27: Tétris emea projects book 2013 light](https://reader033.vdocuments.us/reader033/viewer/2022052702/568bdbd61a28ab2034affe56/html5/thumbnails/27.jpg)
FUJITSU
Location Milan | Italy
Mission Design and Fit-out works
Area 1 900 sqm
Duration 2 months
Delivery November 2012
![Page 28: Tétris emea projects book 2013 light](https://reader033.vdocuments.us/reader033/viewer/2022052702/568bdbd61a28ab2034affe56/html5/thumbnails/28.jpg)
HEINEKEN
Location Rueil-Malmaison | France
Mission Fit-out of the new Headquarters
Area 9 000 sqm
Duration 6 months
Delivery September 2011
![Page 29: Tétris emea projects book 2013 light](https://reader033.vdocuments.us/reader033/viewer/2022052702/568bdbd61a28ab2034affe56/html5/thumbnails/29.jpg)
![Page 30: Tétris emea projects book 2013 light](https://reader033.vdocuments.us/reader033/viewer/2022052702/568bdbd61a28ab2034affe56/html5/thumbnails/30.jpg)
![Page 31: Tétris emea projects book 2013 light](https://reader033.vdocuments.us/reader033/viewer/2022052702/568bdbd61a28ab2034affe56/html5/thumbnails/31.jpg)
IHS
Location Paris | France
Mission Fit-out of the new Headquarters
Area 1 350 sqm
Duration 2 months
Delivery January 2011
![Page 32: Tétris emea projects book 2013 light](https://reader033.vdocuments.us/reader033/viewer/2022052702/568bdbd61a28ab2034affe56/html5/thumbnails/32.jpg)
INTEL
Location London | United Kingdom
Mission Complete design & it-out
Area 1 300 sqm
Duration 3 months
Delivery April 2012
Other Locations Bucarest | Romania Moscow | Russia Madrid | Spain Nantes, Nice, Toulouse | France
![Page 33: Tétris emea projects book 2013 light](https://reader033.vdocuments.us/reader033/viewer/2022052702/568bdbd61a28ab2034affe56/html5/thumbnails/33.jpg)
![Page 34: Tétris emea projects book 2013 light](https://reader033.vdocuments.us/reader033/viewer/2022052702/568bdbd61a28ab2034affe56/html5/thumbnails/34.jpg)
![Page 35: Tétris emea projects book 2013 light](https://reader033.vdocuments.us/reader033/viewer/2022052702/568bdbd61a28ab2034affe56/html5/thumbnails/35.jpg)
JLL
Location Moscow | Russia
Mission Interior it-out of Headquarters
Area 2 500 sqm
Duration 5 months
Delivery August 2012
Other Locations Lyon, Paris | France Madrid | Spain London | United Kingdom
![Page 36: Tétris emea projects book 2013 light](https://reader033.vdocuments.us/reader033/viewer/2022052702/568bdbd61a28ab2034affe56/html5/thumbnails/36.jpg)
LAVINIA
Location Paris La Defense | France
Mission Fit-out of a store
Area 235 sqm
Time 3 months
Delivery March 2011
Other Locations Paris | France Madrid | Spain
![Page 37: Tétris emea projects book 2013 light](https://reader033.vdocuments.us/reader033/viewer/2022052702/568bdbd61a28ab2034affe56/html5/thumbnails/37.jpg)
![Page 38: Tétris emea projects book 2013 light](https://reader033.vdocuments.us/reader033/viewer/2022052702/568bdbd61a28ab2034affe56/html5/thumbnails/38.jpg)
![Page 39: Tétris emea projects book 2013 light](https://reader033.vdocuments.us/reader033/viewer/2022052702/568bdbd61a28ab2034affe56/html5/thumbnails/39.jpg)
LEASEPLAN
Location Lisbon | Portugal
Mission Refurbishment of the cafeteria in their Headquarters
Area 3 700 sqm
Duration 5 months
Delivery July 2012
![Page 40: Tétris emea projects book 2013 light](https://reader033.vdocuments.us/reader033/viewer/2022052702/568bdbd61a28ab2034affe56/html5/thumbnails/40.jpg)
MARS
Location Casablanca | Morocco
Mission Fit-out of their new Headquarters
Area 200 sqm
Duration 6 weeks
Delivery December 2012
![Page 41: Tétris emea projects book 2013 light](https://reader033.vdocuments.us/reader033/viewer/2022052702/568bdbd61a28ab2034affe56/html5/thumbnails/41.jpg)
![Page 42: Tétris emea projects book 2013 light](https://reader033.vdocuments.us/reader033/viewer/2022052702/568bdbd61a28ab2034affe56/html5/thumbnails/42.jpg)
![Page 43: Tétris emea projects book 2013 light](https://reader033.vdocuments.us/reader033/viewer/2022052702/568bdbd61a28ab2034affe56/html5/thumbnails/43.jpg)
MULTIOPTICAS
Location Sintra | Portugal
Mission Refurbishment of a store
Area 200 sqm
Duration 1 month
Delivery second quarter of 2011
Other Locations 7 stores in Portugal
![Page 44: Tétris emea projects book 2013 light](https://reader033.vdocuments.us/reader033/viewer/2022052702/568bdbd61a28ab2034affe56/html5/thumbnails/44.jpg)
NAPAPIJRI
Location Paris | France
Mission Full renovation of the store according to the new concept
Area 250 sqm
Duration 2 weeks
Delivery August 2012
![Page 45: Tétris emea projects book 2013 light](https://reader033.vdocuments.us/reader033/viewer/2022052702/568bdbd61a28ab2034affe56/html5/thumbnails/45.jpg)
![Page 46: Tétris emea projects book 2013 light](https://reader033.vdocuments.us/reader033/viewer/2022052702/568bdbd61a28ab2034affe56/html5/thumbnails/46.jpg)
![Page 47: Tétris emea projects book 2013 light](https://reader033.vdocuments.us/reader033/viewer/2022052702/568bdbd61a28ab2034affe56/html5/thumbnails/47.jpg)
NVIDIA
Location Cambridge | United Kingdom
Mission Fit-out works
Area 580 sqm
Duration 7 weeks
Delivery September 2012
![Page 48: Tétris emea projects book 2013 light](https://reader033.vdocuments.us/reader033/viewer/2022052702/568bdbd61a28ab2034affe56/html5/thumbnails/48.jpg)
PANASONIC
Location Gennevilliers | France
Mission Design and Construction works
Area 3 470 sqm
Duration 3 months
Delivery August 2011
![Page 49: Tétris emea projects book 2013 light](https://reader033.vdocuments.us/reader033/viewer/2022052702/568bdbd61a28ab2034affe56/html5/thumbnails/49.jpg)
![Page 50: Tétris emea projects book 2013 light](https://reader033.vdocuments.us/reader033/viewer/2022052702/568bdbd61a28ab2034affe56/html5/thumbnails/50.jpg)
![Page 51: Tétris emea projects book 2013 light](https://reader033.vdocuments.us/reader033/viewer/2022052702/568bdbd61a28ab2034affe56/html5/thumbnails/51.jpg)
PUIG
Location Milan | Italy
Mission Refurbishment of Headquarters
Area 380 sqm
Duration 2 months
Delivery June 2011
![Page 52: Tétris emea projects book 2013 light](https://reader033.vdocuments.us/reader033/viewer/2022052702/568bdbd61a28ab2034affe56/html5/thumbnails/52.jpg)
ROBERT WALTERS
Location Brussels | Belgium
Mission Fit-out
Area 550 sqm
Duration 6 weeks
Delivery October 2012
![Page 53: Tétris emea projects book 2013 light](https://reader033.vdocuments.us/reader033/viewer/2022052702/568bdbd61a28ab2034affe56/html5/thumbnails/53.jpg)
![Page 54: Tétris emea projects book 2013 light](https://reader033.vdocuments.us/reader033/viewer/2022052702/568bdbd61a28ab2034affe56/html5/thumbnails/54.jpg)
![Page 55: Tétris emea projects book 2013 light](https://reader033.vdocuments.us/reader033/viewer/2022052702/568bdbd61a28ab2034affe56/html5/thumbnails/55.jpg)
SAP
Location Lisbon | Portugal
Mission Design and interior it-out works
Area 1 000 sqm
Duration 8 weeks
Delivery May 2012
Other Locations Hulpe | Belgium Moscow | Russia Paris | France
![Page 56: Tétris emea projects book 2013 light](https://reader033.vdocuments.us/reader033/viewer/2022052702/568bdbd61a28ab2034affe56/html5/thumbnails/56.jpg)
SCHWEPPES
Location Mardrid | Spain
Mission Design of a new concept for its ofices and it-out works
Area 3 500 sqm
Duration 2 months
Delivery September 2012
![Page 57: Tétris emea projects book 2013 light](https://reader033.vdocuments.us/reader033/viewer/2022052702/568bdbd61a28ab2034affe56/html5/thumbnails/57.jpg)
![Page 58: Tétris emea projects book 2013 light](https://reader033.vdocuments.us/reader033/viewer/2022052702/568bdbd61a28ab2034affe56/html5/thumbnails/58.jpg)
![Page 59: Tétris emea projects book 2013 light](https://reader033.vdocuments.us/reader033/viewer/2022052702/568bdbd61a28ab2034affe56/html5/thumbnails/59.jpg)
SONY FRANCE
Location Puteaux | France
Mission Full interior Fit-out of Headquarters
Area 8 900 sqm
Duration 3 months
Delivery July 2011
![Page 60: Tétris emea projects book 2013 light](https://reader033.vdocuments.us/reader033/viewer/2022052702/568bdbd61a28ab2034affe56/html5/thumbnails/60.jpg)
STANLEY BLACK & DECKER
Location Lisbon | Portugal
Mission Refurbishment of Headquarters
Area 1 058 sqm
Duration 3 months
Delivery September 2012
Other Locations Diegem, Mechelen | Belgium Dijon, Lyon, Paris, Strasbourg | France Spennymoor | United Kingdom Moscow | Russia
![Page 61: Tétris emea projects book 2013 light](https://reader033.vdocuments.us/reader033/viewer/2022052702/568bdbd61a28ab2034affe56/html5/thumbnails/61.jpg)
![Page 62: Tétris emea projects book 2013 light](https://reader033.vdocuments.us/reader033/viewer/2022052702/568bdbd61a28ab2034affe56/html5/thumbnails/62.jpg)
![Page 63: Tétris emea projects book 2013 light](https://reader033.vdocuments.us/reader033/viewer/2022052702/568bdbd61a28ab2034affe56/html5/thumbnails/63.jpg)
TORONTO STOCKEXCHANGE
Location London | United Kingdom
Mission Complete design & it-out
Area 510 sqm
Duration 9 weeks
Delivery April 2012
![Page 64: Tétris emea projects book 2013 light](https://reader033.vdocuments.us/reader033/viewer/2022052702/568bdbd61a28ab2034affe56/html5/thumbnails/64.jpg)
TUI
Location Levallois-Perret | France
Mission Fit-out works of their new Headquarters
Area 6 000 sqm
Duration 2 months
Delivery December 2012
![Page 65: Tétris emea projects book 2013 light](https://reader033.vdocuments.us/reader033/viewer/2022052702/568bdbd61a28ab2034affe56/html5/thumbnails/65.jpg)
![Page 66: Tétris emea projects book 2013 light](https://reader033.vdocuments.us/reader033/viewer/2022052702/568bdbd61a28ab2034affe56/html5/thumbnails/66.jpg)
![Page 67: Tétris emea projects book 2013 light](https://reader033.vdocuments.us/reader033/viewer/2022052702/568bdbd61a28ab2034affe56/html5/thumbnails/67.jpg)
Photos : Spaces and Places, Daniel Runacher, Alexis Paoli
![Page 68: Tétris emea projects book 2013 light](https://reader033.vdocuments.us/reader033/viewer/2022052702/568bdbd61a28ab2034affe56/html5/thumbnails/68.jpg)
CONTACT US
United Kingdom+44 0207 852 4050
Belgium+32 495 582 552
France+33 611 42 27 13
Italy+39 393 53 84 145
Luxembourg+32 495 582 552
Morocco+212 679 77 63 63
Netherlands+31 20 541 00 50
Portugal+351 91 035 53 50
Russia+7 495 739 2000
Spain+34 649 817 303