TELUS SIDCModular Data Center Program

Page 3: TELUS SIDC - 7x24exchange.org

Project Partners

Design/Build Approach

Collaborative Design Process

Integrated MEP with Manufacturing

Page 4: TELUS SIDC - 7x24exchange.org

Project CriteriaDevelop One Design for Two SitesDevelop One Design for Two SitesEast: Rimouski, QuebecWest: Kamloops, British Columbia

Create Flexible, Modular Deployment

Install Tier III Infrastructure

Support Variable Rack Densities8 – 40 kw per Rack8 40 kw per Rack

Provide up to 16.2 MW of Critical Power at 20 Year Ultimate Configuration

C t Hi h Effi i D iCreate High Efficiency DesignPUE < 1.2

Achieve LEED Gold Certification

Use Program to Drive IT Innovation and Standardization

Page 5: TELUS SIDC - 7x24exchange.org

The e-Comb® SystemPatented Modular CoolingPatented Modular Cooling System

Developed by Inertech in D b CTDanbury, CT

Can Cool up to 40 kw per Rack

Closed Loop System

Estimated Annual Average gPUE 1.18

Page 6: TELUS SIDC - 7x24exchange.org

The e-Comb® System

Page 7: TELUS SIDC - 7x24exchange.org

Pump Room &Pump Room & Electrical Distribution Electrical Spine

Mechanical Spine S P dp Server Pods

The Base Server ModuleEach Server Module Supports:

Up to 2 700 kw of Critical PowerUp to 2,700 kw of Critical PowerInitial IT Load of 1,135 kw

192 Racks

Page 8: TELUS SIDC - 7x24exchange.org

ServerCirculation Spine

Phase 3

Phase 5Phase 7

Phase 4

Phase 6

Server Modules

Server Modules

FluidCoolers

DRUPS Units

Phase 1 Phase 2FluidCoolers

Phase 1Phase 1

Switchgear RoomOffice/Admin. Area

Site Plan and Phasing

Up to 7 Possible PhasesUp to 7 Possible PhasesUp to 16.2 MW of Critical Power

192 Racks

Page 9: TELUS SIDC - 7x24exchange.org

Main Entrance

Page 10: TELUS SIDC - 7x24exchange.org

ConstructionRimouski, Quebec

Groundbreaking - August, 2011M d l F b i ti St t D b 2011Module Fabrication Starts - December, 2011

First Module Installed - March, 2012Building Completed - July, 2012

Commissioning Completed – August, 2012

Page 11: TELUS SIDC - 7x24exchange.org

Construction

Site Grading & Base Fill @ Module AreaThe Site Prior to Construction

Page 12: TELUS SIDC - 7x24exchange.org

Construction

Building Foundations

Foundation Insulation

Page 13: TELUS SIDC - 7x24exchange.org

Construction

Steel Framing at Switchgear RoomElectrical Duct Bank

Page 14: TELUS SIDC - 7x24exchange.org

Construction

Roof Framing Interior Ready for Slab Pour

Page 15: TELUS SIDC - 7x24exchange.org

Construction

First Module Section Installed DRUPS Fuel Cell

Page 16: TELUS SIDC - 7x24exchange.org

Construction

Module Roof Sections Setting Access and Server Modules

Page 17: TELUS SIDC - 7x24exchange.org

Construction

Roof Membrane Installation on Modules Switchgear Roomg

Page 18: TELUS SIDC - 7x24exchange.org

Construction

DRUPS U itDRUPS Units

Server Module “Hot” Aisle

Page 19: TELUS SIDC - 7x24exchange.org

Construction

Fi l T hServer Module “Cold” Aisle Final Touches

Page 20: TELUS SIDC - 7x24exchange.org

QuestionsQuestionsLeonard Ruff, AIA

Callison, LLCCallison, LLC206-623-4646

[email protected] comwww.callison.com