telecommunications strategy and solutions for smart grid ... · 1. fault location, isolation &...
TRANSCRIPT
Telecommunications Strategy and Solutions
for Smart grid Implementation
Anthony S Rajamanickam
Sr. Specialist (Telecommunications System)
ICT Division
Tenaga Nasional Berhad
SCOPE
Metering, Billing/CRM Asia 2013, 22-23 May, Bangkok, Thailand 2
TNB’s smart grid plans/demonstration project
TNB’s telecommunications strategy and solutions
Phase 1 (2010-2011)
• Improve Reliability
• Improve Operational Efficiency • DA/DMS
• Integrated customer information system
• Field crew automation
Phase 2 (2011-2014)
• Increase Customer Participation
• Improve Energy and Asset Efficiency • AMI
• Demand side management/DR
• Volt/VAR Control
• Online condition monitoring
• Increase T&D asset utilization
Phase 3 (2014-2015)
• Reduce CO2 emission • RE sources
• Solar / LED Street Lightings
• PHEV charging stations
TNB’s Smart Grid Plan
Metering, Billing/CRM Asia 2013, 22-23 May, Bangkok, Thailand 3
Implement Demonstration Project
To gain valuable experience and knowledge to:
• Evaluate cost and benefits to determine cost effective Smart Grid technologies for adoption
• Formulate TOU Tariff schemes
• Learn about customers’ behaviour and expectations
• Formulate TNBs’ smart grid roadmap
Objectives
• Improve reliability
• Increase operational efficiency
• Improve energy and asset efficiency
• Increase customer participation
• Reduce CO2 emission
Smart Grid Initiative Plans
Metering, Billing/CRM Asia 2013, 22-23 May, Bangkok, Thailand 4
2011 2012 2013 2014 2015
Phase 1 Phase 2 Phase 3
ACTIVITY 1 DA/DMS 1. Fault location,
isolation &
restoration
2. Automatic feeder
reconfiguration
AMI 1. Install 1000
Smart Meters at
Test Sites
ICT Infrastructure and System
Integration 1. System integration SMART GRID
DEMONSTRATION
PROJECT
(TNB)
1. TNB Smart Grid Maturity Model and Roadmap
1. Smart Grid Information Centre
2. Test Bed for Future Smart grid Applications
3. RE & EV
4. Intelligent Microgrid
ACTIVITY 2
INITIATIVES FOR
LONG TERM
SMART GRID
DEVELOPMENT
STRATEGIES
(TNB Research)
COMPLETED
Demand Response 1. Study DR implementation
2. Conduct trial
Smart Meter Rollout (Ph. 1) 1. Install 200,000 Smart Meters
ACTIVITY 3
Smart Grid Initiative Updates
Smart Grid Demonstration Project
• Distribution SCADA/DMS /condition monitoring
• Bayan Lepas (Penang), Bukit Bintang (Kuala Lumpur)
• Medini (Johore)
• AMI Demonstration Project (1000 smart meters)
• Putra Jaya (200 meters )
• Melaka State (800 meters)
Phase 1 AMI Rollout (200,000 smart meters)
• Implementation planned in Q4 2013 in Kuala Lumpur and Selangor areas
• Installed under meter replacement program
• Reduced AMI features
DMS tested and ready for use
Tender issued for AMI solution on 17 May 2013
Feasibility study and implementation plan being
carried out
5 Metering, Billing/CRM Asia 2013, 22-23 May, Bangkok, Thailand
AMI Demonstration Project System
Architecture
AMI Services
Fibre Optic
Concentrator/ Headend
Smart Meter
Customer Premise
Distribution Network
Transmission/Core Network
Corporate Data Centre
ESB
CIS & Billing
Web Portal
CMC/ OMS
HAN FAN/NAN WAN
ZigBee
• Billing
• Load Profile
• Non-technical loss detection
• Supply Automation
• Web Portal
• Smart Billing
• TOU Pricing
• Outage Notification
• DR/DSM
Telco Network GPRS/3G
WiMax/4G
Public Network
TNB Private
Network
AMI Services
Communications Network IT System
PLC RF Mesh
IHD
MDMS
Load Profile
Email/CMS
6 Metering, Billing/CRM Asia 2013, 22-23 May, Bangkok, Thailand
• Reliable
• Secure
• Scalable
• Future proof
• Cost effective
• Supports real time critical control applications
• Open standards based
• Managed 24X7 Smart Grid Communications
HAN
BPLC
ZigBee
NAN
RF Mesh
PLC
GPRS/3G
WiMAX/4G WAN
IP/MPLS
SDH
xDWDM
WiMAX
Smart Grid Telecommunications Network Requirements
Metering, Billing/CRM Asia 2013, 22-23 May, Bangkok, Thailand 7
Telecommunications Strategy
Metering, Billing/CRM Asia 2013, 22-23 May, Bangkok, Thailand 8
Use internal network infrastructure – pilot cables, fibre optics
– Fibre optics network for backbone traffic – SDH, DWDM
– IP MPLS data network for data
– Separate network for critical real time applications – teleprotection, PMU, IEC61850, SCADA
Build & Operate private access network
– AMI Network • RF Mesh for dispersed residences/premises
• PLC for dense residences/apartments/condominiums
– DA Network • Licensed/Unlicensed wireless network
Use public network when internal networks unavailable
Use single integrated network for AMI, SCADA, DA etc
Monitor/manage network 24X7 from NOC
Outsource operations/maintenance
Network Technology Platform
Metering, Billing/CRM Asia 2013, 22-23 May, Bangkok, Thailand 9
TDM Technology
• Teleprotection
• SCADA (Telecontrol)
• Voice services for grid systems operations
• Legacy applications
• PMU/Synchrophasor/WAIS
• IEC61850
Critical Grid System Operations
Packet Network Technology
• AMI/AMR
• Condition monitoring
• PQMS
• Fault/disturbance recorders
• CCTV
• Corporate IT services
• ERP
• CIS/Billing
• GIS
• Internet Access
Corporate IT and Non-Critical Operations
IP/MPLS Network Utility SDH
Wireless Network: Public vs Private
Metering, Billing/CRM Asia 2013, 22-23 May, Bangkok, Thailand 10
• No SLG/SLA
• Unreliable for control applications
• Designed for mass public requirements
• Catered for mobile communications, broadband, social networking, internet access, gaming etc
• Unsuitable for legacy low bandwidth services
• Cost effective for small deployment
• Utilities tied down with telco technology lifecycle
Licensed Wireless Network
• Higher reliability
• Suitable for control applications
• Designed for utility legacy and low bandwidth applications
• Cost effective for large deployment
• Longer life cycle
• Frequency and license availability and constraints
License Free Wireless Network
• Cost effective solution
• Self healing technology
• Suitable for non control applications
• Subject to interference
Public Network
Private Network
• Hybrid Network Technology • Wired & Wireless • Public & Private
Wireless Mesh
HQ Home Distribution Substation
Transmission Substation
Fibre Optics
Fibre Optics
Telco WAN
(GPRS/3G/WiMax/4G)
Zigbee
/WiFi/
BPLC
Wireless Mesh/ PLC
Fibre Optics/GRPS/3G/WiMax/4G
Fibre Optics
Fibre Optics/
GRPS/3G/WiMax/
DSL/BPLC/RF
DSL – Digital subscriber line BPLC- broadband PLC
concentrator
Meter/Gateway
Home Area Network
Neighbourhood Area Network
Wide Area Network
AMI Network Solution
11 Metering, Billing/CRM Asia 2013, 22-23 May, Bangkok, Thailand
Network Solution for SCADA/DA and Condition Monitoring
Metering, Billing/CRM Asia 2013, 22-23 May, Bangkok, Thailand 12
Distribution Substation (PE)
PLC/GPRS
Access network
HQ/Data Centre/Control Centre
Distribution Substation (PPU)
Transmission Substation
Fibre Optics/DSL/PLC
Fibre Optics
Telco WAN
(GPRS/3G/WiMAx/4G)
PLC
Fibre Optics/GRPS/3G/WiMax/4G
Wide Area Network
Fibre Optics
Fibre Optics/
GPRS/
DSL/PLC/RF
DSL – Digital subscriber line BPLC- broadband PLC
Lease Line
Telecommunications Standards
Metering, Billing/CRM Asia 2013, 22-23 May, Bangkok, Thailand 13
Standards ensures: • Interoperability between devices • Seamless data integration • Vendor independent solution • Competitive pricing
PLC Standards
IEEE 1901 BPLC (HomePlug)
• 500Mbps speeds, 500m range
ITU G.hn/ ITU-T G.9960-1
• 1 Gbps speeds
ITU G.hnem/ ITU-T G.9955/9956
ITU-T G. 9904
• PRIME ALLIANCE
• G3 PLC
ETSI
• M/441
• OSGP
RF Standards
IEEE 802.15.4 • Low power consumption • PHY & MAC layer ZigBee • 250Kbps • Adds NETWORK & APPLICATION Layers to IEEE
802.15.4 WiFi - IEEE 802.11b/g/n
Cyber Security
Challenges • Prevent Cyber attacks
• Secure Smart Grid data
• Protect data loss/integrity
• Prevent attacks on ICT infrastructure
Measures
• Implement and enforce Cyber security policy and standards (e.g.
NISTIR 7628) through governance and compliance
• Obtain certification (ISO 27001 series/NERC CIP Standards)
• Establish prevention and intrusion detection mechanisms
• Address risks during all stages of smart grid life cycle
14 Metering, Billing/CRM Asia 2013, 22-23 May, Bangkok, Thailand
Operations and Maintenance
Metering, Billing/CRM Asia 2013, 22-23 May, Bangkok, Thailand 15
24X7 NOC for monitoring and operations
– AMI Network
– WAN
– MPLS Network
Challenges • Vast number of network elements
• Widely dispersed network
• Shortage of skilled workforce
• New skill sets/new technologies
• Workflow management
Conclusion
Metering, Billing/CRM Asia 2013, 22-23 May, Bangkok, Thailand 16
• Hybrid network solution is required
• Open standards, scalable and future proof technologies important features
• Integrated network for cost effective and efficient asset utilisation
• Cyber security policies and governance are crucial
• IP/MPLS technology suitable backbone network
• Private network provides long term solution for utility operations
• 24x7 network operations from NOC is critical
• Consider outsourcing network operations and maintenance services
Metering, Billing/CRM Asia 2013, 22-23 May, Bangkok, Thailand 18