TELECOM NEEDS OF POWER SECTOR - TRANSMISSION P.K.Agarwal, Dy General Manager Power System Operation Corporation Ltd.

Upload: hatruc

Post on 27-Mar-2018

215 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: Telecom Needs of Power Sector - · PDF fileTELECOM NEEDS OF POWER SECTOR - TRANSMISSION ... requirements and other guideline made available by RLDC. ... •Lease line from other Telecom

TELECOM NEEDS OF

POWER SECTOR -

TRANSMISSIONP.K.Agarwal, Dy General Manager

Power System Operation Corporation Ltd.

Page 2: Telecom Needs of Power Sector - · PDF fileTELECOM NEEDS OF POWER SECTOR - TRANSMISSION ... requirements and other guideline made available by RLDC. ... •Lease line from other Telecom

Agenda

• Indian Power Transmission System.

• Evoluation of Communication Needs for Power System.

• Regulatory Provisions for Communication in Transmision.

• Communication Requirements of Up Comings Projects.

• Strategies and Plans.

29-May-12 Telecom Needs of Power Sector, 29-30 May 2012, New Delhi 2

Page 3: Telecom Needs of Power Sector - · PDF fileTELECOM NEEDS OF POWER SECTOR - TRANSMISSION ... requirements and other guideline made available by RLDC. ... •Lease line from other Telecom

INDIAN TRANSMISSION

SYSTEM

29-May-12 Telecom Needs of Power Sector, 29-30 May 2012, New Delhi 3

Page 4: Telecom Needs of Power Sector - · PDF fileTELECOM NEEDS OF POWER SECTOR - TRANSMISSION ... requirements and other guideline made available by RLDC. ... •Lease line from other Telecom

Power System in India – Large Footprint

• Federal Structure - Concurrent subject

• Pressure to meet demand even in the face of acute

shortages and freedom to deviate from the drawl.

schedules

• Increasing stakes on grid security

• Integration of renewable energy sources

• Increasing severity of impact of nature on power system

• Regulatory compliance requirements.

• Evolving market mechanisms

• Increasing number of market participants

29-May-12 Telecom Needs of Power Sector, 29-30 May 2012, New Delhi 4

Page 5: Telecom Needs of Power Sector - · PDF fileTELECOM NEEDS OF POWER SECTOR - TRANSMISSION ... requirements and other guideline made available by RLDC. ... •Lease line from other Telecom

NEW Grid

South

Grid

South

West

North

East

Northeast

Five Regional GridsFive Frequencies

October 1991

East and Northeast

synchronized

March 2003

West synchronized

With East & Northeast

August 2006

North synchronized

With Central Grid

Central GridFive Regional Grids

Two Frequencies

Evolution of Indian Transmission Grid

By 2013-14 – “One Nation One Grid”

Renewables: 22 GW

Installed Capacity: 190 GW

Inter – Regional Capacity: 23 GW

Page 6: Telecom Needs of Power Sector - · PDF fileTELECOM NEEDS OF POWER SECTOR - TRANSMISSION ... requirements and other guideline made available by RLDC. ... •Lease line from other Telecom

International Interconnections

6/5/2012

Maps not to scale

Bhutan

Tala: 1020 MW

Chukha: 336 MW

Kurichu: 60 MW

Nepal

Over 16 links of 132/33/11 KV

Radial links with Nepal

Bangladesh

(Proposed) 400 KV AC line

between Baharampur(India) and

Bheramara(Bangladesh) with 500

MW HVDC sub-station at

Bheramara

Sri – Lanka (Proposed)

Madurai(India) and Anura

dhapura(Sri-Lanka) through ±500

KV HVDC under sea cable

Page 7: Telecom Needs of Power Sector - · PDF fileTELECOM NEEDS OF POWER SECTOR - TRANSMISSION ... requirements and other guideline made available by RLDC. ... •Lease line from other Telecom

Managing Complex Grid

• Indian Grid is a Geographically Vast and Physically Complex network of transmission highways and switching terminus.

• It carries large power from generating centers to the load centers.

• To mange such large and complex grid, one requires:-• Seconds to second information on the state of the grid – Information

Technology..

• Reliable and speedy delivery of these information – Communication technology.

• Information requirements are met by innovative sensors and devices provided by modern electronics.

• Communications requirements are met by modern technologies like microwave, fiber optic etc.

29-May-12 Telecom Needs of Power Sector, 29-30 May 2012, New Delhi 7

Page 8: Telecom Needs of Power Sector - · PDF fileTELECOM NEEDS OF POWER SECTOR - TRANSMISSION ... requirements and other guideline made available by RLDC. ... •Lease line from other Telecom

EVOLUATION OF

COMMUNICATION FOR

POWER SYSTEM.

29-May-12 Telecom Needs of Power Sector, 29-30 May 2012, New Delhi 8

Page 9: Telecom Needs of Power Sector - · PDF fileTELECOM NEEDS OF POWER SECTOR - TRANSMISSION ... requirements and other guideline made available by RLDC. ... •Lease line from other Telecom

Evolution of Transmission Grid

• In early years - loads were fed from local generation.

• Subsequently, for reliability of power supply, generators

were interconenced with tie transmission lines.

• Initially, to manage interconnected generators, ony voice

communication was suffice.

• With the increase in demand, more & more elements

were added leading to formation of transmission grid.

• To manage transmission grid, requirement real time data

and a central control system was also felt along with voice

coomunication.

• Telecom needs of power sector is increasing with the

increase in the size and complexcity of the grid.

29-May-12 Telecom Needs of Power Sector, 29-30 May 2012, New Delhi 9

Page 10: Telecom Needs of Power Sector - · PDF fileTELECOM NEEDS OF POWER SECTOR - TRANSMISSION ... requirements and other guideline made available by RLDC. ... •Lease line from other Telecom

Information Needs of Power System

29-May-12 Telecom Needs of Power Sector, 29-30 May 2012, New Delhi 10

Page 11: Telecom Needs of Power Sector - · PDF fileTELECOM NEEDS OF POWER SECTOR - TRANSMISSION ... requirements and other guideline made available by RLDC. ... •Lease line from other Telecom

Communication Options

• PLCC - Power Line Carrier Communication is the oldest communication technology used for power system.

• Microwave – Is the second oldest communication system used for power system.

• Coper Wire – generally used for local area communication.

• Fiber Optic – Is the latest and most effcient communication system for modern power system aka smart grid.

29-May-12 Telecom Needs of Power Sector, 29-30 May 2012, New Delhi 11

Page 12: Telecom Needs of Power Sector - · PDF fileTELECOM NEEDS OF POWER SECTOR - TRANSMISSION ... requirements and other guideline made available by RLDC. ... •Lease line from other Telecom

Wideband Network for NR

29-May-12 Telecom Needs of Power Sector, 29-30 May 2012, New Delhi 12

Page 13: Telecom Needs of Power Sector - · PDF fileTELECOM NEEDS OF POWER SECTOR - TRANSMISSION ... requirements and other guideline made available by RLDC. ... •Lease line from other Telecom

REGULATOTRY PROVISIONS

FOR COMMUNICATION IN

TRANSMISION

29-May-12 Telecom Needs of Power Sector, 29-30 May 2012, New Delhi 13

Page 14: Telecom Needs of Power Sector - · PDF fileTELECOM NEEDS OF POWER SECTOR - TRANSMISSION ... requirements and other guideline made available by RLDC. ... •Lease line from other Telecom

Regulatory provisions - Data

Indian Electricity Grid Code4.6.2 Data and Communication Facilities

“………………………………………….

• All Users, STUs and CTU shall provide Systems to telemeter power system parameter such as flow, voltage and status of switches/ transformer taps etc. in line with interface requirements and other guideline made available by RLDC.

• The associated communication system to facilitate data flow up to appropriate data collection point on CTU’s system, shall also be established by the concerned User or STU as specified by CTU in the Connection Agreement

• ……………………….. “

29-May-12 Telecom Needs of Power Sector, 29-30 May 2012, New Delhi 14

Page 15: Telecom Needs of Power Sector - · PDF fileTELECOM NEEDS OF POWER SECTOR - TRANSMISSION ... requirements and other guideline made available by RLDC. ... •Lease line from other Telecom

Regulatory provisions - Voice

Indian Electricity Grid Code

5.2 System Security Aspects

(q) “Each User, STU, RLDC, NLDC and CTU shall provide

and maintain adequate and reliable communication

facility internally and with other Users/STUs

/RLDC/SLDC to ensure exchange of data/information

necessary to maintain reliability and security of the grid.

Wherever possible, redundancy and alternate path

shall be maintained for communication along important

routes, e.g., SLDC to RLDC to NLDC.”

29-May-12 Telecom Needs of Power Sector, 29-30 May 2012, New Delhi 15

Page 16: Telecom Needs of Power Sector - · PDF fileTELECOM NEEDS OF POWER SECTOR - TRANSMISSION ... requirements and other guideline made available by RLDC. ... •Lease line from other Telecom

COMMUNICATION NEEDS OF

UP COMMING PROJECTS

29-May-12 Telecom Needs of Power Sector, 29-30 May 2012, New Delhi 16

Page 17: Telecom Needs of Power Sector - · PDF fileTELECOM NEEDS OF POWER SECTOR - TRANSMISSION ... requirements and other guideline made available by RLDC. ... •Lease line from other Telecom

Major Up-coming Projects

• National Transmission Asset Monitoring

Centers (NTAMC).

• Unified Real time Dynamic Measurement

System URTDSM).

• Pilot Project on Smart City/Smart Grid

29-May-12 Telecom Needs of Power Sector, 29-30 May 2012, New Delhi 17

Page 18: Telecom Needs of Power Sector - · PDF fileTELECOM NEEDS OF POWER SECTOR - TRANSMISSION ... requirements and other guideline made available by RLDC. ... •Lease line from other Telecom

NTAMC - National Transmission

Asset Monitoring Center

29-May-12 Telecom Needs of Power Sector, 29-30 May 2012, New Delhi 18

• Aims for centralized Monitoring, Operation and

Management of all POWERGRID Substations.

• Remote operation and Management of

POWERGRID Transmission Assets leading to

unmanned substation

• Reduction of O&M cost

• Improved Reliability

Page 19: Telecom Needs of Power Sector - · PDF fileTELECOM NEEDS OF POWER SECTOR - TRANSMISSION ... requirements and other guideline made available by RLDC. ... •Lease line from other Telecom

NTAMC - Architecture

• NTAMC: Centralized Remote operation & control ( GIS S/S Gurgaon)

• Back-up NTAMC: Disaster Recovery for NTAMC (Yelhanka S/S, Bangalore)

• RTAMCs: Managing Maintenance activities & emergency operations & control - one for each region -(Location: Respective RHQ/nearby S/Stn).

• MSHs : Maintenance Service Hubs – Perform the maintenance activity (common for 3-4 substations) ( Locations: to be finalised)

29-May-12 Telecom Needs of Power Sector, 29-30 May 2012, New Delhi 19

Page 20: Telecom Needs of Power Sector - · PDF fileTELECOM NEEDS OF POWER SECTOR - TRANSMISSION ... requirements and other guideline made available by RLDC. ... •Lease line from other Telecom

NTAMC - Communication System

• Requirement of Bandwidth

• 100 Mbps between the various control centers and backbone network

• 10 Mbps between Substations and backbone network

• Redundancy required

• Procurement of Bandwidth

• Services from POWERTEL (MPLS technology, IP/Ethernet based, VPNs)

• Use of ULDC fibre network ( up to nearest S/S having connectivity with POWERTEL)

• Lease line from other Telecom Service Providers (up to nearest S/S having connectivity with POWERTEL)

• All the Central Sector Stations will be connected through FO network.

29-May-12 Telecom Needs of Power Sector, 29-30 May 2012, New Delhi 20

Page 21: Telecom Needs of Power Sector - · PDF fileTELECOM NEEDS OF POWER SECTOR - TRANSMISSION ... requirements and other guideline made available by RLDC. ... •Lease line from other Telecom

29-May-12 Telecom Needs of Power Sector, 29-30 May 2012, New Delhi 21

Page 22: Telecom Needs of Power Sector - · PDF fileTELECOM NEEDS OF POWER SECTOR - TRANSMISSION ... requirements and other guideline made available by RLDC. ... •Lease line from other Telecom

URTDSM - Unified Real Time Dynamic State

Measurement

The Project addresses several questions and concerns such as:

• How do we know what is going on in the grid where SCADA cannot monitor?

• Was there an Event? When, where, what kind, after-effects?

• Is the system really stressed? What are real-time margins?

• Are there unstable oscillatory modes in the system?

• What issues will arise when the percentage of Renewable Energy, an intermittent source of power, will increase to 20-30%?

29-May-12 Telecom Needs of Power Sector, 29-30 May 2012, New Delhi 22

Page 23: Telecom Needs of Power Sector - · PDF fileTELECOM NEEDS OF POWER SECTOR - TRANSMISSION ... requirements and other guideline made available by RLDC. ... •Lease line from other Telecom

URTDSM Architecture

29-May-12 Telecom Needs of Power Sector, 29-30 May 2012, New Delhi 23

• Total latency : about 100 ms

• Approximately 1 TB data per month from 120 PMUs

Page 24: Telecom Needs of Power Sector - · PDF fileTELECOM NEEDS OF POWER SECTOR - TRANSMISSION ... requirements and other guideline made available by RLDC. ... •Lease line from other Telecom

Data Flow in URTDSM

29-May-12 Telecom Needs of Power Sector, 29-30 May 2012, New Delhi 24

Page 25: Telecom Needs of Power Sector - · PDF fileTELECOM NEEDS OF POWER SECTOR - TRANSMISSION ... requirements and other guideline made available by RLDC. ... •Lease line from other Telecom

Development of Pilot Smart Grid/City

29-May-12 Telecom Needs of Power Sector, 29-30 May 2012, New Delhi 25

Page 26: Telecom Needs of Power Sector - · PDF fileTELECOM NEEDS OF POWER SECTOR - TRANSMISSION ... requirements and other guideline made available by RLDC. ... •Lease line from other Telecom

Smart Public Services for Smart City

Smart Water Management

Smart Security

Smart Transport

Smart Buildings & Homes

m-Governance

m-Education

m-Medical

29-May-12 Telecom Needs of Power Sector, 29-30 May 2012, New Delhi 26

Page 27: Telecom Needs of Power Sector - · PDF fileTELECOM NEEDS OF POWER SECTOR - TRANSMISSION ... requirements and other guideline made available by RLDC. ... •Lease line from other Telecom

Communication Requirement for Smart City

29-May-12 Telecom Needs of Power Sector, 29-30 May 2012, New Delhi 27

Page 28: Telecom Needs of Power Sector - · PDF fileTELECOM NEEDS OF POWER SECTOR - TRANSMISSION ... requirements and other guideline made available by RLDC. ... •Lease line from other Telecom

STRATEGIES & PLANS

29-May-12 Telecom Needs of Power Sector, 29-30 May 2012, New Delhi 28

Page 29: Telecom Needs of Power Sector - · PDF fileTELECOM NEEDS OF POWER SECTOR - TRANSMISSION ... requirements and other guideline made available by RLDC. ... •Lease line from other Telecom

Strategies and Plans

• Repelcement of microwave hops with Fibre Optic system.

• OPGW (Optical Ground Power) is to be used on

transmissions lines instead of normal earth wire.

• All substations are to be connected with fiber optic

communication.

• 25,000 Kms OPGW is existing and in-use.

• 20,000 Kms OPGW is being installed for replacing MW.

• 20,000 Kms OPGW is planned for connecting sub

stations.

• 10,000 Kms planned under Phase-II of URTDSM project.

29-May-12 Telecom Needs of Power Sector, 29-30 May 2012, New Delhi 29

Page 30: Telecom Needs of Power Sector - · PDF fileTELECOM NEEDS OF POWER SECTOR - TRANSMISSION ... requirements and other guideline made available by RLDC. ... •Lease line from other Telecom

THANKS