technical installation

2
TECHNICAL INSTALLATION TECHNICAL INSTALLATION Location Chachoengsao, Th. Duration 3 Days Dimensions (m) Evaporator L23.6xW2.6xH2.8 Distillation L16xW1.4xH2.4 Separator L9.5xW2.6xH2.9 Pillar Fan L4.3xW3xH3.2 Weight Evaporator 28 T Distillation 4 T Separator 6.5 T Pillar Fan 8.5 T Total Tonnage 47 T SCOPE CEA Project Logistics completed a potentially difficult and technical installation for a well-known drinks manufacturer in Chachoengsao, Thailand. CEA provided Transportation, Lifting and the Installation of several parts of distillation columns, evaporators, separators and fans. All parts were discharged through the night at Laem Chabang Port and loaded on to several trailers. Due to its size and weight the Evaporator Chamber was loaded on to a multi-axle hydraulic trailer. The parts were transported and unloaded at the factory’s lay down area. After a site inspection two mobile cranes were moved into their positions. The Evaporator Chamber was lifted by both cranes until the chamber was vertical then the smaller crane was unhooked while the larger 500 T crane continued the lift into the facility. CEA teams ensured the safe lowering of the evaporator through the facility. CASE STUDY CS016 Technical Installation 1/2 EVAPORATOR CHAMBER TRANSPORTATION DISTILLATION CHAMBER TRANSPORTATION

Upload: cea-project-logistics

Post on 23-Jul-2016

223 views

Category:

Documents


0 download

DESCRIPTION

This case study features a very technical and potentially difficult installation at drinks factory in Thailand. Two cranes working in tandem were needed to complete the project. Several parts of the installation were of considerable weight and length.

TRANSCRIPT

Page 1: Technical Installation

TECHNICAL INSTALLATIONTECH

NICA

L INSTA

LLATION

Location Chachoengsao, Th.

Duration 3 Days

Dimensions (m)

Evaporator L23.6xW2.6xH2.8 Distillation L16xW1.4xH2.4 Separator L9.5xW2.6xH2.9 Pillar Fan L4.3xW3xH3.2

Weight

Evaporator 28 T Distillation 4 T Separator 6.5 T Pillar Fan 8.5 T

Total Tonnage 47 T

SCOPECEA Project Logistics completed a potentially difficult and technical installation for a well-known drinks manufacturer in Chachoengsao, Thailand. CEA provided Transportation, Lifting and the Installation of several parts of distillation columns, evaporators, separators and fans.All parts were discharged through the night at Laem Chabang Port and loaded on to several trailers. Due to its size and weight the Evaporator Chamber was loaded on to a multi-axle hydraulic trailer. The parts were transported and unloaded at the factory’s lay down area. After a site inspection two mobile cranes were moved into their positions.

The Evaporator Chamber was lifted by both cranes until the chamber was vertical then the smaller crane was unhooked while the larger 500 T crane continued the lift into the facility. CEA teams ensured the safe lowering of the evaporator through the facility.

CASE STUDY CS016Technical Installation 1/2

EVAPORATOR CHAMBER TRANSPORTATION DISTILLATION CHAMBER TRANSPORTATION

Page 2: Technical Installation

TECH

NIC

AL

INST

ALL

ATIO

N

CEA PROJECT LOGISTICS

41/13 M1 AO-UDOM ROAD

TUNGSUNGKHLA

SRI RACHA

CHONBURI 20230

THAILAND

+66 38 354 019

www.ceaprojects.com

The 16 metre distillation chamber was installed using the same lift technique as the Evaporator, CEA teams once again were located on several floors ensuring a safe installation and aligning it to the previously installed Evaporator. Smaller parts were unloaded and assembled at the installation site and lifted into the facility. All aspects of the project were completed in a timely and efficient manner and within budget.

CASE STUDY CS016Technical Installation 2/2

SEPARATOR LOWERED INTO POSITION

CHAMBER LOWERED THROUGH EACH FLOOR

SEPARATOR BEING READIED FOR LIFT

ALIGNING THE CHAMBER TO ITS BASE

THE W100 28 TONNE EVAPORATOR CHAMBER IS CAREFULLY LOWERED INTO THE FACILITY

CEA ON-SITE TOOLBOX TALK TWO CRANES LIFT THE EVAPORATOR

SMALLER PARTS LOWERED INTO POSITION BOTH MAIN CHAMBERS ALIGNED INSIDE