    DISTRIBUTION CODE REVIEW PANEL

    SULTANATE OF OMAN

    TECHNICAL CHECKLISTSFOR

    LT, 11KV & 33KV PRODUCTS & MATERIALS

    MAY-2012

    PRODUCT APPROVAL WORKING GROUP DCRP Note :- If any of the above Is not complied with

    the product approval application will not beaccepted.

  • 8/9/2019 Technical Checklist

    2/122

    PRODUCT APPROVAL WORKING GROUP DCRP Note :-If any of the above Is not complied with.

    the product approval application will not beaccepted.

    1

    CONTENTS

    SL. No. ITEM Page No.:

    UPART - I - 33 KV1 ON-LOAD DISCONNECTOR 42 AUTO RECLOSER 9

    3 STAY INSULATOR 124 XLPE CABLES 16

    5 LINE POST INSULATOR 18

    6 3.6, 10 & 20 MVA TRANSFORMERS 21

    7 OUT DOOR BREAKER 36

    UPART - II - II KV1 ON-LOAD DISCONNECTOR 40

    2 DROP OUT FUSE 453 AUTO RECLOSERS 484 INDOOR SWITCHGEAR 51

    5 DISTRIBUTION TRANSFORMERS 65

    6 RING MAIN UNIT 70

    7 XLPE CABLES 748 LINE POST INSULATORS 77

    9 STAY INSULATORS 80

    UPART - III - LT.1 800/1600 A FEEDERPILLARS 83

    2 400 A MINI FEEDER PILLARS 863 400 A CUTOUT BOX 894 CONSUMER UNIT 925 SHACKLE INSULATOR 956 STAY INSULATOR 977 XLPE CABLES 998 XLPE COVERED ALUMINIUM CONDUCTOR 1029 SINGLE PHASE/THREE PHASE KWH METERS 105

    UPART IV - GENERAL1 DISC INSULATOR 1082 ACSR CONDUCTORS 1113 TENSION CLAMP 1144 STAY WIRE FOR OVERHEAD LINES 1165 CABLE COVER TILES 1186 WOOD POLES 120

  • 8/9/2019 Technical Checklist

    3/122

    PRODUCT APPROVAL WORKING GROUP DCRP Note :-If any of the above Is not complied with.

    the product approval application will not beaccepted.

    2

    GENERAL REQUIREMENTS

    I. ALL PRODUCTS SHALL CONFORM TO THE LATEST OMAN ELECTRICAL STANDARD(OES) FOR THE RESPECTIVE ITEM.

    2. ALL PRODUCTS SHALL COMPLY WITH OES-II "GENERAL SPECIFICATION FORELECTRICAL MATERIALS AND EQUIPMENT" IN ADDITION TO THE RESPECTIVEAPPLICABLE STANDARD FOR THE PRODUCT.

  • 8/9/2019 Technical Checklist

    4/122

    PRODUCT APPROVAL WORKING GROUP DCRP Note :-If any of the above Is not complied with.

    the product approval application will not beaccepted.

    3

    PART I

    33 KV

  • 8/9/2019 Technical Checklist

    5/122

    PRODUCT APPROVAL WORKING GROUP DCRP Note :-If any of the above Is not complied with.

    the product approval application will not beaccepted.

    4

    33 KV ON-LOAD DISCONNECTOR

    Description Requirements

    1. Standard to comply with OES - 18

    2.Check List to be filled and submittedBy the manufacturer

    Check List No, 1

    3. Technical Literature to be submitted Technical Details of all components

    4. Drawings RequiredComplete Assembly Drawings with alldetails marked

    5.Installation and Operation instructionsIf applicable,

    Installation and Operation ManualRequired,

    6.Sample complying with the standardTo be submitted with the request

    Required,

    7.Test Certificates required fromIndependent and recognized testing

    Laboratory

    i) Type Test Certificate is requiredii) Routine Test certificates in accordance

    With BS 5253 are required,

    8.Installation in the system for accessingThe performance

    Not required

    9. Documents to be submitted with theApproval request,

    i) Check list signed and stomped bv theManufacturer

    ii) Technical literatureiii) Installation & Operation manualiv) Drawings

    v) Experience List

    vi) Test Certificatesvii) Sample

  • 8/9/2019 Technical Checklist

    6/122

    PRODUCT APPROVAL WORKING GROUP DCRP Note :-If any of the above Is not complied with.

    the product approval application will not beaccepted.

    5

    UPRODUCT APPROVAL WORKING GROUP

    UCHECK LIST NO.1

    U33 KV MAST HEAD ON-LOAD DISCONNECTOR

    MANUFACTURER :AGENT :

    DATE :

    SLNo.

    Items Requirement Subgmission Compliance

    01Type

    Outdoor Mounting on H-TypeWood Pole Structure

    02 Conforming To OES - 11 & 18

    03 Conforming To BS 5253

    04Mounting Heightof the Switch

    9000 MM

    05 Phase Centers 1200 MM

    06 Pole Centers 1800 MM

    07Mounting Heightof OperatingHandle

    1200 MM

    08 AssemblyComponents

    Load Interrupter Head. PhaseCoupling Rod. Operating Rod

    with well Treated WoodInsulation Inserted at 4500 MMfrom Ground Level. RodGuides. GalvanizedSupportingSteel Work, Bolts. Nuts andWorks.

  • 8/9/2019 Technical Checklist

    7/122

    PRODUCT APPROVAL WORKING GROUP DCRP Note :-If any of the above Is not complied with. the product approval application will not beaccepted.

    6

    Note :- If any of the above IS not complied with. the product approval application will not be accepted.

    SLNo.

    Items Requirement Submission Compliance

    09InterrupterHead

    Lined with Horn Fiber orHead equivalent for ARCQuenching and ContactsTipped with Copper TungstenARC Extinguishing contactfollower, Large VolumeExhaust Muffler.

    10 Off/On Indicator Required

    11 Pad Locking Required

    12Cree page of

    Insulators

    1320 MM

    13 Sheds of Insulator Aero foil Open Profile

    14 Load Breaking 400A at 0.70 pf

    15 On-Load Switching 400A at 0.70 pI

    16 Off Load Switching 30A at 0 . 15 pf

    17 Short Circuit Rating 25KA for 3 Sec.

    18 Current Rating 400A

    19Galvanizing of ToSteel Parts

    To BS 729 Min. Thickness127 Microns.

    20 Sample Required

    21OperationChecking

    Required

    22

    Test Certificate from

    IndependentAuthority

    Required

    23 Reference List Required

    Signature: Seal:

  • 8/9/2019 Technical Checklist

    8/122

    PRODUCT APPROVAL WORKING GROUP DCRP Note :-If any of the above Is not complied with.

    the product approval application will not beaccepted.

    7

    UPRODUCT APPROVAL WORKING GROUP

    UCHECK LIST NO. lA

    U33 KV ON-LOAD DISCONNECTOR - VERTICAL MOUNTING

    MANUFACTURER :AGENT :

    DATE :

    SLNo.

    Items Requirement Submission Compliance

    01Type

    Outdoor - Vertical Mounting onH-Type Wood Pole Structure

    02 Conforming To OES - 18 & 11

    03 Standard, BS 5253/ IEC 129

    04Mounting Heightof they Switch

    7700 MM

    05 Phase Centers 1200 MM

    06Wood PoleCenters H-TypeConstruction

    1800 MM

    07Mounting Heightof OperatingHandle

    1200 MM

    08 Assembly

    Components

    Load Interrupter Head, Phase

    Coupling Rod, Operating Rodwith Well Treated Wood In solution Inserted at 4500 MM

    from Ground Level, Rod IGuides, Supporting Steel Work.Bolts, Nuts and Washers,

  • 8/9/2019 Technical Checklist

    9/122

    PRODUCT APPROVAL WORKING GROUP DCRP Note :-If any of the above Is not complied with. the product approval application will not beaccepted.

    8

    Note :- If any of the above Is not complied with, the products approval application will not be accepted,

    SLNo.

    Items Requirement Submission Compliance

    09InterrupterHead

    Lined with Horn Fiber orHead equivalent for ARCQuenching and ContactsTipped with Copper TungstenARC Extinguishing contactfollower, Large VolumeExhaust Muffler.

    10 Off/On Indicator To be provided

    11 Pad Locking Required

    12Cree page ofInsulators 1320 MM

    13 Sheds of Insulator Aero foil Open Profile

    14 Load Breaking 400A at 0.70 pf

    15 On-Load Switching 400A at 0.70 pI

    16 Off Load Switching 30A at 0 . 15 pf

    17 Short Circuit Rating 25KA for 3 Sec.

    18 Current Rating 400A

    19Galvanizing of ToSteel Parts

    To BS 729 Min. Thickness 127Microns.

    20 Sample Required

    21OperationChecking

    Required

    22Test Certificate fromIndependentAuthority

    Required

    23 Reference List Required

    Signature: Seal:

  • 8/9/2019 Technical Checklist

    10/122

    PRODUCT APPROVAL WORKING GROUP DCRP Note :-If any of the above Is not complied with.

    the product approval application will not beaccepted.

    9

    U

    33 KV AUTO RECLOSERS

    Description Requirements

    1. Standard to comply with OES - 20

    2. Check List to be filled and submittedBy the manufacturer

    Check List No.2

    3. Technical literature to be submittedAll details pertaining to material. installationand operation

    4. Drawings RequiredGeneral Assembly Drawing Mountingarrangement Drawing Control andProtection Circuit Diagram

    5. Installation and Operation instructions

    If applicable.Required

    6. Sample complying with the standardTo be submitted with the request

    Required

    7. Test Certificates required fromIndependent and recognized testingLaboratory

    i) Sort Circuit Test Certificate is requiredii) Type Testsiii) Functional Test Certificate IS required

    8. Installation in the system for accessingThe performance

    Required

    9. Documents to be submitted with theApproval request.

    i) Check list Signed and stamped by theManufacturer

    ii) Technical literatureiii) Installation & Operation manual if

    applicableiv) Drawingsv) Experience Listvi) Test Certificatesvii) Sample

  • 8/9/2019 Technical Checklist

    11/122

    PRODUCT APPROVAL WORKING GROUP DCRP Note :-If any of the above Is not complied with.

    the product approval application will not beaccepted.

    10

    UPRODUCT APPROVAL WORKING GROUP

    UCHECK LIST NO.2

    U33 KV AUTO RECLOSER

    MANUFACTURER :AGENT :

    DATE :

    SLNo.

    Items Requirement Submission Compliance

    01Type

    Wood Pole Mounted SF6Insulating Medium and

    Vacuum Interrupter02 Service Voltage 33 KV

    03Highest SystemVoltage

    36 KV

    04Normal CurrentRating

    400 A

    05 Breaking Capacity 6 KA

    06 Impulse Withstand 170 KV

    07 Short Circuit Tests To IEC 56/BS 5311

    08Operating Duty

    Up to 4 Clearances inSuccession

    09Cree pageOf bushing

    1320 MM

    10

    Power FrequencyWithstand Test:-

    - Dry for 60 Sec.- Wet for 60 Sec 70 KV

    60 KV

    11 33 KV BushingPorcelain or Silicon RubberRequired

  • 8/9/2019 Technical Checklist

    12/122

    PRODUCT APPROVAL WORKING GROUP DCRP Note :-If any of the above Is not complied with.the product approval application will not beaccepted.

    11

    U33 KV AUTO RECLOSER

    Note :-If any of the above IS not complied with, the product approval application will not be accepted.

    SLNo.

    Items Requirement Submission Compliance

    12 Control

    1. Fully Micro-processorControlled and ProgrammableSettings. Controls and Settingsare to be Programmable byhand held device at Local/Site

    without PC or LaptopI

    2. Type

    13 Control Cable 6 Meter Length Required

    14 Power Supply forControl

    a). Battery Supply 15 V/12 V.10 Ahrs Non rechargeableBattery, replaceable after 10years use or 10000 operationsORb), 230 V A C 50 Hz Supply1), 11.5 KV /230 Voltage TXwith HRC Dropout Fuses on 11,5 KV Side and MCB for LT

    Side,2). Emergency Rechargeable12V / 15V, 10Ahrs Battery,Charge and Voltage aremaintained for 48 Hrs in theevent of failure of AC Supply,

    Signature: Seal:

  • 8/9/2019 Technical Checklist

    13/122

    PRODUCT APPROVAL WORKING GROUP DCRP Note :-If any of the above Is not complied with.the product approval application will not beaccepted.

    12

    U33 KV AUTO RECLOSER

    Note:- If any of the above Is not complied with. the product approval application will not be accepted.

    SLNo.

    Items Requirement Submission Compliance

    15 Protection:-- Over CurrentSetting- Over CurrentInstantaneous'- Over CurrentTime Multiplier- Earth FaultCurrent Setting- Earth FaultInstaneous

    (Selective)- Earth Fault TimeDelay- Recluse TimeSelectable- Reclaim TimeSelectable- Local Control

    25% - 200% in Steps of 25%

    4 20

    0,1 - 1.5 in Steps of 0,1

    10% - 80% In Steps of 10%

    4 20

    0.2 - 25 Secs,

    1 - 60 Secs

    1 - 180 Secs

    Local Control Operatedmanually with Hook StickComprising.A) Manual CloseB) Close and Lock-InC) Trip and Lock-Out

    D) Earth Fault In/Out

    16 Mounting Bracket Required

    17Painting andFinish

    Required

    18 Test CertificatefromIndependent

    Authority

    Required

    Signature: Seal:

  • 8/9/2019 Technical Checklist

    14/122

    PRODUCT APPROVAL WORKING GROUP DCRP Note :-If any of the above Is not complied with.

    the product approval application will not beaccepted.

    13

    U

    33 KV STAY WIRE INSULATOR

    Description Requirements

    1. Standard to comply with OES - 1

    2. Check List to be filled and submittedBy the manufacturer

    Check List No.3

    3. Technical literature to be submittedAll details pertaining to material. installationand operation

    4. Drawings RequiredGeneral Assembly Drawings with allDimensions marked

    5. Installation and Operation instructions

    If applicable.Installation Instructions Required.

    6. Sample complying with the standardTo be submitted with the request

    Required

    7. Test Certificates required fromIndependent and recognized testingLaboratory

    i) Dry Lightning Impulse Testii) Wet Power Frequency Withstand Testiii) Performance Testiv) Mechanical Failing Load Testv) Porosity Testvi) Galvanizing Test

    8. Installation in the system for accessingThe performance

    Not Required

    9. Documents to be submitted with theApproval request. i) Check list Signed and stamped by theManufacturer

    ii) Technical literature

    iii) Installation & Operation manual ifapplicable

    iv) Drawingsv) Experience Listvi) Test Certificatesvii) Sample

  • 8/9/2019 Technical Checklist

    15/122

    PRODUCT APPROVAL WORKING GROUP DCRP Note :-If any of the above Is not complied with. the product approval application will not beaccepted.

    14

    UPRODUCT APPROVAL WORKING GROUP

    U

    CHECK LIST NO.3

    U33 KV STAY WIRE INSULATOR

    MANUFACTURER :AGENT :

    DATE :

    Note ;. If any of the above Is not complied with. the product approval application will not be accepted.

    SLNo.

    Items Requirement Submission Compliance

    01 MaterialImpregnated Laminated Wood I

    or Fiber Polyester Resin

    02 Breaking Strength 12000 KG

    03 Steel Work To BS 1449

    04 GalvanizingTo BS 729. Minimum Thickness127 Microns

    05 DimensionsAs per Drawing

    No. MEW/OH/015A/0l5C

    06Test CertificateFrom IndependentAuthority

    Required

    07 Sample Required

    08 Reference List Required

    Signature: Seal:

  • 8/9/2019 Technical Checklist

    16/122

    PRODUCT APPROVAL WORKING GROUP DCRP Note :-If any of the above Is not complied with.

    the product approval application will not beaccepted.

    15

    U

    33 KV XLPE CABLES

    Description Requirements

    1. Standard to comply with OES - 2

    2. Check List to be filled and submittedBy the manufacturer

    Check List No.4

    3. Technical literature to be submittedAll details pertaining to cablemanufacturing process. technical data tobe submitted.

    4. Drawings Required Dimensional Cross Section Drawing

    5. Installation and Operation instructions

    If applicable.N/A

    6. Sample complying with the standardTo be submitted with the request

    Required

    7. Test Certificates required fromIndependent and recognized testingLaboratory

    i) High Voltage TestIi) Conductor Resistance TestIii) Galvanizing Test for ArmourIV) Insulation, Bedding and Sheath Testv) Accelerated Treeing Test

    8. Installation In the system for accessingThe performance

    Not Required

    9. Documents to be submitted with the

    Approval request.

    i) Check list signed and stamped by the

    ManufacturerIi) Technical literature

    iii) Installation & Operation manual ifapplicable

    iv) Drawingsv) Experience Listvi) Test Certificatesvii) Sample

  • 8/9/2019 Technical Checklist

    17/122

    PRODUCT APPROVAL WORKING GROUP DCRP Note :-If any of the above Is not complied with.

    the product approval application will not beaccepted.

    16

    UPRODUCT APPROVAL WORKING GROUP

    UCHECK LIST NO.4

    U

    33 KV XLPE CABLES

    MANUFACTURER :AGENT :

    DATE :

    SLNo.

    Items Requirement Submission Compliance

    01 Standard IEC 302 and OES - 2

    02Highest SystemVoltage

    36 KV

    03 ConductorCompact Circular as per IEC228 Class - 2

    04 Conductor ShieldExtruded Semi-ConductiveLayer

    05 Insulation Cross Linked Polyethylene

    06 Thickness 9MM

    07 Insulation Shield

    Extruded Semi-ConductingLayer, Phase Identification -Red, Yellow and Blue, BareCopper Shielding Tape appliedwith a Lap

    08

    Assembly

    Fillers and Bound with NonVulcanizable Tape suitable forConductor Temperature 900DEG,C

    09 Sheath Extruded PVC B 6746 - Table-I,Type-9

  • 8/9/2019 Technical Checklist

    18/122

    PRODUCT APPROVAL WORKING GROUP DCRP Note :-If any of the above Is not complied with. the product approval application will not beaccepted.

    17

    Note :- If any of the above is not complied with. the product approval application will not be accepted.

    SLNo.

    Items Requirement Submission Compliance

    10 Thickness of Sheath 2 MM

    11 BeddingOver the Sheath BeddingFabric Tape

    12Thickness ofBedding

    0.6 MM

    13 Armour Single Galvanized Steel WiresBS 1442. Aluminium ArmourWires for Single Core Cable

    14 Overall ServingExtruded PVC Type-9 TableBS6746

    15 Thickness3.0MMFire Retardant, TermiteResistant

    16Cross SectionalDrawing of the

    Cable

    To be submitted

    17Test Certificate FromIndependentAuthority

    To be Submitted

    18 Reference List Required

    19 Sample Required

    Signature: Seal:

  • 8/9/2019 Technical Checklist

    19/122

    PRODUCT APPROVAL WORKING GROUP DCRP Note :-If any of the above Is not complied with.

    the product approval application will not beaccepted.

    18

    U33 KV LINE POST INSULATOR

    1. Standard to comply with OES - 26 - B

    2. Check List to be filled and submittedBy the manufacturer

    Check List NO.6

    3. Technical Literature to be submitted Yes

    4. Drawings Required areDimensional Drawing with all details ofsheds, top, base etc.

    6. Installation and Operation instructionsIf applicable.

    N/A

    6. Sample complying with the standardTo be submitted with the request

    Required.

    7. Test Certificates required fromIndependent and Recognized TestingLaboratory

    1 . Dry lightning impulse withstand2. Wet power frequency withstand

    3. Performance Test

    4. Radio Interference Test6. Temperature Cycle Test6. Mechanical Failing load Test

    7. Porosity Test8. Galvanizing Test

    8. Installation in the system for accessingThe performance

    Not Required

    9. Documents to be submitted with theApproval request.

    a) Check list signed and stamped by theManufacturer

    b) Technical literaturec) Installation & Operation manual if

    applicabled) Drawingse) Experience Listf) Test Certificatesg) Sample

  • 8/9/2019 Technical Checklist

    20/122

    PRODUCT APPROVAL WORKING GROUP DCRP Note :-If any of the above Is not complied with.

    the product approval application will not beaccepted.

    19

    UPRODUCT APPROVAL WORKING GROUP

    UCHECK LIST NO.5

    U

    33 KV LINE POST INSULATORS

    MANUFACTURER :AGENT :

    DATE :

    SLNo.

    Items Requirement Submission Compliance

    01 Type Glazed Porcelain

    02Nominal SystemVoltage

    33 KV

    03System HighestVoltage

    36 KV

    04Minimum DryImpulse Withstand

    250 KV

    05Minimum WetPower FrequencyWithstand

    135 KV

    06MinimumMechanical FailingLoad

    11 KN

    07MinimumCree page

    1320 MM

    08

    ProfileAerodynamic Open ProfileSheds Top and Side GrovesUniform Sheds

    09 Metal Base Malleable Iron

  • 8/9/2019 Technical Checklist

    21/122

    PRODUCT APPROVAL WORKING GROUP DCRP Note :-If any of the above Is not complied with. the product approval application will not beaccepted.

    20

    Note :- If any of the above Is not complied with, the product approval application will not be accepted,

    SLNo.

    Items Requirement Submission Compliance

    10

    Fixing Stud :-

    - DIA- Length (A)- Length (B)- Thread (A)- Thread (B)

    16 MM

    - 86MM- 203MM- 71.4 MM- 102MM

    11Protection of HotFerrous Parts

    Hot DIP Galvanized BS 729Minimum Thickness 127Microns

    12 Marking Trade Mark Year FailingLoad

    13Test CertificateFrom IndependentAuthority

    Required

    14Sample PredictedFor Inspection

    Required

    15 Reference List Required

    Signature: Seal:

  • 8/9/2019 Technical Checklist

    22/122

    PRODUCT APPROVAL WORKING GROUP DCRP Note :-If any of the above Is not complied with.

    the product approval application will not beaccepted.

    21

    U3, 6, 10 & 20 MVA POWER TRANSFORMERS

    1. Standard to comply with OES - 6

    2. Check List to be filled and submittedBy the manufacturer

    Check List NO.6

    3. Technical Literature to be submittedTechnical Details of each sub-assemblyand technical data of each component

    4. Drawings Required

    1. General layout, elevation, plan and sideview with dimensions marked

    2. Rating and diagram plate drawing

    3. Cable box drawing4. Drawing of each individual part5. Core assembly7. Foundation drawing

    5. Installation and Operation instructionsIf applicable.

    NIA

    6. Sample complying with the standardTo be submitted with the request

    Not Required

    7. Test Certificates required fromIndependent and recognized testingLaboratory

    1. SIC Test Certificate required2. Impulse withstand Test Certificate3. Temperature rise Test Certificate4. Routine Test Certificates5. Power frequency High Voltage Test

    Certificate Required

    8. Installation in the system for accessingThe performance

    Not Required

    9. Documents to be submitted with theApproval request.

    i) Check list signed and stamped by theManufacturer

    ii) Technical literatureiii) Installation & Operation manual ifapplicableiv) Drawingsv) Experience Listvi) Test Certificatesvii) Sample

  • 8/9/2019 Technical Checklist

    23/122

    PRODUCT APPROVAL WORKING GROUP DCRP Note :-If any of the above Is not complied with.

    the product approval application will not beaccepted.

    22

    UPRODUCT APPROVAL WORKING GROUP

    UCHECK LIST NO.6

    U3,6, 10 & 20 MVA 33/11.5 KV TRANSFORMERSU(GENERAL RQUIREMENTS)

    MANUFACTURER :AGENT :

    DATE :

    SLNo.

    Items Requirement Submission Compliance

    01 StandardIEC 76BS 171

    02

    Temp. rise overAmbient of 50 Deg.C:-- 011 by Thermometer-Winding by Resistance

    40 Deg. C50 Deg. C

    03Maximumcontinuous Rating

    3/6/10/20 MVA

    04

    Duty under faultcondition S.C.Type TestCertificate

    Required

    05Impulse Level:-- 33 KV

    - 11 KV

    170 KV75 KV

    06HarmonicSuppression (3rdand 5PthP)

    Required

    07Vibration & NoiseLevel

    08Core Quality ofSteel.

    Low loss cold rolled grainoriented Electrical SteelLaminations

    09Flux Density Not to exceed 16000

    Lines/SQ. MM.

    10

    Power Frequency HighVoltage Level

    33 KV - 70 KV

    11 KV-50KV

  • 8/9/2019 Technical Checklist

    24/122

    PRODUCT APPROVAL WORKING GROUP DCRP Note :-If any of the above Is not complied with.

    the product approval application will not beaccepted.

    23

    SLNo.

    Items Requirement Submission Compliance

    10

    Core:-A) Core Plate/

    Lamination

    InsulationB) Core Clamping

    Bolts and PlateInsulation

    C) Core LiftingDevice

    D) Provision forsupport topreventmovementduring transport

    Required

    Required

    Required

    Required

    11

    Winding:-A) ConductorB) Max. Current

    densityC) Type of WindingD) Method of

    Bracing andClamping

    E) Ability towithstandshockduring handlingand transport

    High Conductivity ElectronicCopper not greater than2.6A/SQ.MM.

    12 Winding Insulation Class -A

    13Ability to withstandlightning surgesand switchingsurges

  • 8/9/2019 Technical Checklist

    25/122

    PRODUCT APPROVAL WORKING GROUP DCRP Note :-If any of the above Is not complied with.

    the product approval application will not beaccepted.

    24

    SLNo.

    Items Requirement Submission Compliance

    14

    Internal earthling

    arrangement forcore clampingSTR., dampingbolts and coilclamping ring

    15

    Earth Connectorcross sectionalarea

    Not less than 400 Sq. M.M.

    16 Main Tanks:-A) Lifting

    arrangementB) Accessibility to

    termination ofwindings andearthing pointwithout

    emptying the oiltank

    C) Tank withstandpressure when

    empty

    D) Painting Insidethe tank

    E) Jacking lugs - 4Nos.

    Required

    RequiredA vacuum of 50 CM ofmercury or vacuum requiredfor drying out whichever ISGreater

    Required

    50 CM above the groundlevel

  • 8/9/2019 Technical Checklist

    26/122

    PRODUCT APPROVAL WORKING GROUP DCRP Note :-If any of the above Is not complied with.

    the product approval application will not beaccepted.

    25

    U3 MVA 33/11.5 KV TRANSFORMERS

    U(PARTICULAR RQUIREMENTS)

    01 Type OMAN

    02 Voltage Ratio 33/11.5 KV

    03 Connections Delta/Star

    04 Vector Group Dyn 11

    05

    Tapping:

    - Range- Step

    Off Load

    + 5"10 to - 10"102.5"10

    06 Pad LockingFacilities

    Required

    07 Impedance6%

    08 Termination;- 33 KV Side

    Cree page

    ClearancePhase to Phase

    -11 KV Side

    ClearancePhase to PhaseNeutralCree page

    Outdoor Bushing

    40 MM/KV

    700MM

    Outdoor Bushing

    450MM

    Bushing40 MM/KV

    SLNo.

    Items Requirement Submission Compliance

  • 8/9/2019 Technical Checklist

    27/122

    PRODUCT APPROVAL WORKING GROUP DCRP Note :-If any of the above Is not complied with. the product approval application will not beaccepted.

    26

    Note :-If any of the above is not complied with, the product approval application will not be accepted.

    SLNo.

    Items Requirement Submission Compliance

    09 Fittings:-- Conservator Tank- Silicagel Breather

    - Ammeter 0 - 400Awith Hand Resetmaximumdemandindicator

    - Pressure reliefdevice

    - Oil Temp.Indicator

    - Lifting andJacking Lugs

    - ThermometerPocket- Earthing Terminals- Rating andDiagram Plates

    - Single PhaseCurrent T ransformer400/5Afitted on 11 KV "Y"Phase for AmmeterService

    10 Main TankThickness ofPlates:-

    - Top- Bottom- Sides- Radiator

    15 MM15MM8MM1.2 MM

    Signature: Seal:

  • 8/9/2019 Technical Checklist

    28/122

    PRODUCT APPROVAL WORKING GROUP DCRP Note :-If any of the above Is not complied with.

    the product approval application will not beaccepted.

    27

    U6 MVA 33/11.5 KV TRANSFORMERS

    U(PARTICULAR RQUIREMENTS)

    SLNo.

    Items Requirement Submission Compliance

    01 Type OMAN

    02 Voltage Ratio33/11,5 KV

    03 Connections Delta/Star

    04 Vector Group Dyn 11

    05

    Tapping:

    - Range- Step

    Off Circuit

    + 5% to - 10%2,5%

    06Pad LockingFacilities

    Required

    07 Impedance 6%

    08 Termination:

    - 33 KV Side

    Cree pageClearancePhase to Phase

    - 11 KV Side

    Clearance 450MMPhase to PhaseNeutral OutdoorBushingCreepage

    Outdoor Bushing

    40 MM/KV

    700MM

    Outdoor Bushing

    450MM

    Outdoor Bushing40 MM/KV

  • 8/9/2019 Technical Checklist

    29/122

    PRODUCT APPROVAL WORKING GROUP DCRP Note :-If any of the above Is not complied with. the product approval application will not beaccepted.

    28

    Note :- If any of the above Is not complied with, the product approval application will not be accepted,

    SLNo.

    Items Requirement Submission Compliance

    09Fittings:-- Conservator Tank

    - Silicagel Breather- Ammeter 0 - 400A

    with Hand Resetmaximum demandIndicator

    - Pressure reliefdevice

    -Oil Temp, RequiredIndicator

    - Lifting and RequiredJacking Lugs

    - ThermometerPocket- Earthing Terminals- Rating and

    Diagram Plates- Single PhaseCurrentTransformer 400/5fitted on 11 KVClass5PlO

    Required

    Required

    Required

    Required

    Required

    Required

    RequiredRequired

    RequiredRequired

    10

    Main TankThickness ofPlates:

    - Top- Bottom- Sides- Radiator

    15 MM15 MM8MM1.2 MM

    Signature: Seal:

  • 8/9/2019 Technical Checklist

    30/122

    PRODUCT APPROVAL WORKING GROUP DCRP Note :-If any of the above Is not complied with.

    the product approval application will not beaccepted.

    29

    U10 MVA 33/11.5 KV TRANSFORMERS

    U(PARTICULAR RQUIREMENTS)

    SLNo.

    Items Requirement Submission Compliance

    01 Type OMAN

    02 Voltage Ratio33/11,5 KV

    03 Connections Delta/Star

    04 Vector Group Dyn 11

    05

    Tapping:

    - Range- Step

    On Load

    + 5% to - 15%1.66%

    06 Impedance 7.5%

    07 Termination:-33 KV Side

    ClearanceCreepage

    - 11 KV Side

    Clearance

    Creepage ofBushing

    - Neutral

    Creepage ofBusing Creepage

    - Cable GlandsSuitable forabove cablewith associatedfittings

    Cable Box Suitable for 3C x

    300 Sqm X LPE Cable- 500 MM Creepage Phase toEarth - 400 MM 805MM

    Cable Box - Suitable for I1 C X 500 Sqms X LPE Cable

    Phase to Phase - 300 MMPhase to Earth - 170 MM

    Creepage of 295MM

    Bushing

    External Bushing

    440MM

    Required

  • 8/9/2019 Technical Checklist

    31/122

    PRODUCT APPROVAL WORKING GROUP DCRP Note :-If any of the above Is not complied with.

    the product approval application will not beaccepted.

    30

    SLNo.

    Items Requirement Submission Compliance

    08 CurrentTransformer

    33 KV Side '-

    1st) Separate C.T.Sfor differentialprotection

    - Ratio- Class

    - VK

    2 Double Core

    C.T. for OlC.ElF and meteringRatio,

    - Class

    11 KV Side -

    - REF Protection

    - Ratio- Class X

    - Standby ElF

    - Ref Relay- Ratio- Class

    200/1X330V

    200/1AClass-5PlO for protectionandClass - 1 for metering

    600/lA

    X

    600/lA5P 10

    09

    Main TankThickness ofPlates:

    - Top- Bottom- Sides- Radiator

    20 MM20 MM10 MM1.2 MM

  • 8/9/2019 Technical Checklist

    32/122

    PRODUCT APPROVAL WORKING GROUP DCRP Note :-If any of the above Is not complied with. the product approval application will not beaccepted.

    31

    Note :- If any of !he above is not complied with, the product approval application will not be accepted.

    SLNo.

    Items Requirement Submission Compliance

    10Buchholz RelayType and Make

    Required

    11On-Load TapChanger Type andMake

    12MarshallingKIOSK

    - Oil Temp. Indicator- Winding Temp. Indicator

    - Terminal Blocks and TestLinks

    - Local Tap Change Selectorand control SwitchLocal /Remote

    13

    Tap ChangerControl Panel

    -Tap Position IndicatorTap change raise and lowerSpring Load Switches or

    - Push Button

    Tap change control- Selectors/SwitchRemote I Supervisory

    - Tap change Indication I

    progress I- Lamp & BuzzerOut of step LampVoltage Regulations relayWith Time DelayOperating Coil

    30V DCI 11 OV DC

    Signature: Seal:

  • 8/9/2019 Technical Checklist

    33/122

    PRODUCT APPROVAL WORKING GROUP DCRP Note :-If any of the above Is not complied with.

    the product approval application will not beaccepted.

    32

    U20 MVA 33/11.5 KV TRANSFORMERS

    U(PARTICULAR RQUIREMENTS)

    SLNo. Items Requirement Submission Compliance

    01 Type ONAN

    02 Voltage Ratio 33/11.5 KV

    03 Elect. Connection Delta/Star

    04 Vector GroupDyn 11

    05

    Tapping:

    - Range- Step

    On Load

    + 5"10 to - 15"101.667"10

    06ImpedanceVoltage

    12.5%

    07 Terminations:- 33 KV Side:-

    Cable Box ToBS2562- Clearance:-Phase To PhasePhase to Earth

    - Creepage- Drawing

    - 11 KV Side:-Cable Box ToBS2562- Clearance:-Phase To PhasePhase to Earth

    - Creepage ofBushing

    - NeutralBusing Creepage

    Suitable for 3C X 300 Sq.M.M.XLPE Cable500MM400MM805MMRequired

    Suitable for 6 X 1 C500 Sq. MM. XLPE Cable

    300MM170 MM295MM

    440MM

  • 8/9/2019 Technical Checklist

    34/122

    PRODUCT APPROVAL WORKING GROUP DCRP Note :-If any of the above Is not complied with. the product approval application will not beaccepted.

    33

    Note :- If any of the above is not complied with, the product approval application will not be accepted,

    SLNo.

    Items Requirement Submission Compliance

    08

    CurrentTransformers.Particulars:-33 KV Side:-Separate3 Phase set of CT'sfor diff. Protection- Ratio- Class11 KV Side :-For REF- Ratio- Class2. Stand by E/F &

    Meters- Ratio- Class

    400/1A

    1200/1AX

    1200/15P10

    09

    Main Tank MaterialThickness

    - Top

    - Bottom

    - Sides

    - Radiator

    20 MM20 MM10 MM1,2 MM

    10

    Buchholz ProtectionFor Main TX

    On-Load Tap Changer

    - Type

    - MakeBuchholz Protectionfor On - Load,Tap ChangerRequired

    Required

    11

    Tap change MotorsSupply

    -ARV Relay

    - Type

    - Aux, Supply

    240VA.C.

    30V or 110 D,C.

    Signature: Seal:

  • 8/9/2019 Technical Checklist

    35/122

    PRODUCT APPROVAL WORKING GROUP DCRP Note :-If any of the above Is not complied with. the product approval application will not beaccepted.

    34

    Note :- If any of the above Is not complied with, the product approval application will not be accepted.

    SLNo.

    Items Requirement Submission Compliance

    12

    Marshalling KIOSK:-

    - Location

    - Winding Temp.Indicator

    - Oil TemperatureIndicator

    - Local/RemoteTap changeSelector

    Switches

    Adjacent or on the Top

    13Safety PressureRelease Devicefor Main TX.

    Operated By Spring LoadedMechanism Required,

    14 Safety PressureRelease Devicefor On- Load Tap

    Changer

    Diaphragm Rupturing Type-Required

    Signature: Seal:

  • 8/9/2019 Technical Checklist

    36/122

    PRODUCT APPROVAL WORKING GROUP DCRP Note :-If any of the above Is not complied with. the product approval application will not beaccepted.

    35

    Note:- If any of the above Is not complied with, the product approval application will not be accepted,

    SLNo.

    Items Requirement Submission Compliance

    15 Tap change 1 Digital Tap Position Indicator

    control Panel 2

    Tap Change Raise and lower

    Spring loaded switches or pushButton

    3Tap Changer Control SwitchRemote! /Supervisory

    4Tap Change in Progressindication and buzzer

    5 Out of Stop Lamp indication

    6Voltage Regulating Relay withTime Delay

    7Tap Changer ControlAuto/Non-Auto Selector Switch

    8 A VR Voltage ReferenceAdjuster

    9 VT Fail Alarm

    10Supply Voltage of OLTCfailure - Amber Lamp

    110-lS KV Voltmeter

    12Tap Changer Motor MCB OFFindication (Amber)

    13Emergency Stop Push Botton

    14Oil Temp. Alarm

    15Oil Temp, Trip

    16Winding Temp, Alarm

    17Winding Temp Trip

    18Buchholz Relay Alarm

    19 Buchholz Re-lay Trip

    20Oil Level Low Alarm

    21 Pressure Device Trip

    Signature: Seal:

  • 8/9/2019 Technical Checklist

    37/122

    PRODUCT APPROVAL WORKING GROUP DCRP Note :-If any of the above Is not complied with.

    the product approval application will not beaccepted.

    36

    U33 KV OUTDOOR BREAKER

    1. Standard to comply with OES - 34

    2. Check List to be filled and submittedBy the manufacturer

    Check List NO.7

    3. Technical Literature to be submittedTechnical Details of each assemblyand technical data.

    4. Drawings RequiredGeneral Assembly Drawing with allcomponents shown

    Foundation Drawing

    5. Installation and Operation instructionsIf applicable.

    Installation, Operation and MaintenanceManual

    6. Sample complying with the standardTo be submitted with the request

    Not Required

    7. Test Certificates required from

    Independent and recognized testingLaboratory

    1 , Type Test Certificate required

    2. Temperature Rise Test Certificate required3, Routine Test Certificate required

    8. Installation in the system for accessingThe performance

    Not Required

    9. Documents to be submitted with theApproval request.

    i) Check list signed and stamped by theManufacturer

    ii) Technical literatureiii) Installation & Operation manual if

    applicableiv) Drawingsv) Experience Listvi) Test Certificatesvii) Sample

    Note :- If any of the above Is not complied with, the product approval application will not be accepted.

  • 8/9/2019 Technical Checklist

    38/122

    PRODUCT APPROVAL WORKING GROUP DCRP Note :-If any of the above Is not complied with.

    the product approval application will not beaccepted.

    37

    UPRODUCT APPROVAL WORKING GROUP

    UCHECK LIST NO.7

    U

    33 KV OUT DOOR BREAKER

    MANUFACTURER :AGENT :

    DATE :

    SLNo.

    Items RequirementSubmiss

    ionCompliance

    01 TypeMetal Clad. Fully SF6 Breaker orVacuum Interrupter With SF6Insulating Medium

    02RupturingCapacity

    25 KA for 3" Duration

    03 Standard BS 5311/IEC 56 I OES - 34

    04Degree ofProtection

    IP 65

    05System NormalVoltage

    33 KV

    06Highest SystemVoltage

    36 KV

    07 Normal Current 600A / 1200A Feedes/ BusSection

    08 Impulse Level 170 KV

    09 Frequency 50 HZ

    10

    Operating

    Mechanism :-- SpringCharged Motor

    - Closing CoilVoltage

    - Shunt Trip Coil

    - Manual ChargingIndictor

    - On/Off ControlLocal/Remote

    240V 50 CIS

    110V or 30V DC

    110Vor 30V DCRequired

    Required

  • 8/9/2019 Technical Checklist

    39/122

    PRODUCT APPROVAL WORKING GROUP DCRP Note :-If any of the above Is not complied with. the product approval application will not beaccepted.

    38

    Note :- If any of the above IS not complied with. the product approval application will not be accepted.

    SLNo.

    Items Requirement Submission Compliance

    11

    11 A

    OperatingCubicle ;-

    - Weather Proof

    - Highest LivePart fromBottom 3.0 MTR

    Degree of Protecyion

    Required

    IP 55.

    12CurrentTransformers

    Required

    13 Labels and Fuses Required

    14 Heater Required

    15Type TestsCertificate fromIndependent Lab

    Required

    16

    Terminal Bushing

    - Type- Creepage

    - Clearance -Phase to Phase

    Aerofil Open Profile1320 MM

    470MM

    17 Breaker OperationCounter

    Required

    18 Terminals Copper

    19

    MountingStructure ;-- ProtectionagainstCorrosion

    Galvanizing Thickness 127Microns

    20 Smallurrings

    2.5Sqmm Stranded CopperPVC Insulated. Allterminations Filled WithFerrules and circuit number

    21 Earthing

    Two Earthing Terminal ofBrass or Stainless Steelsuitable for Connecting 10Sqmm Cu.Conductor

    Signature: Seal:

  • 8/9/2019 Technical Checklist

    40/122

    PRODUCT APPROVAL WORKING GROUP DCRP Note :-If any of the above Is not complied with.

    the product approval application will not beaccepted.

    39

    PART II

    11 KV

  • 8/9/2019 Technical Checklist

    41/122

    PRODUCT APPROVAL WORKING GROUP DCRP Note :-If any of the above Is not complied with.

    the product approval application will not beaccepted.

    40

    U11 KV ON - LOAD DISCONNECTOR

    1. Standard to comply with OES 17

    2. Check List to be filled and submittedBy the manufacturer

    Check List NO.21

    3. Technical Literature to be submittedAll details pertaining to material, installationand operation

    4. Drawings RequiredComplete Assembly Drawings with allDimensions marked

    5. Installation and Operation instructionsIf applicable.

    Installation and Operation ManualRequired,

    6. Sample complying with the standardTo be submitted with the request

    Required

    7. Test Certificates required fromIndependent and recognized testingLaboratory

    i) Type Test Certificate is requiredIi) Routine Test Certificates in accordance

    with BS 5253 are required

    8. Installation in the system for accessingThe performance

    Not Required

    9. Documents to be submitted with theApproval request.

    i) Check list signed and stamped by theManufacturer

    ii) Technical literatureiii) Installation & Operation manual ifapplicableiv) Drawingsv) Experience Listvi) Test Certificates

  • 8/9/2019 Technical Checklist

    42/122

    PRODUCT APPROVAL WORKING GROUP DCRP Note :-If any of the above Is not complied with.

    the product approval application will not beaccepted.

    41

    UPRODUCT APPROVAL WORKING GROUP

    UCHECK LIST NO. 21

    U11 KV MAST HEAD ON-LOAD DISCONNECTOR

    MANUFACTURER :AGENT :

    DATE :

    SLNo.

    Items RequirementSubmiss

    ionCompliance

    01 Type Outdoor for Mounting on "H"Type Wood Pole Structure

    02General RequirementConformingTo

    OES - 11

    03 Standard BS 5253

    04Mounting Heightof the Switch

    9000 MM

    05 Phase Centers1050 MM

    06 Pole Centers 1800 MM

    07Mounting Heightof Operating

    Handle

    1200 MM

    08AssemblyComponents

    Load Interrupter Head, PhaseCoupling Rod, Operating Rodwith well Treated WoodInsulator Inserted at 450 MMfrom Ground Level, RodGuides, Galvanized SupportingSteel Work, Bolts, Nuts andWashers

  • 8/9/2019 Technical Checklist

    43/122

    PRODUCT APPROVAL WORKING GROUP DCRP Note :-If any of the above Is not complied with. the product approval application will not beaccepted.

    42

    Note :- If any of the above Is not complied with, the product approval application will not be accepted,

    SLNo.

    Items RequirementSubmiss

    ionCompliance

    09Interrupter

    Head

    Contacts Tipped with CopperHead or Tungsten, Long Life areresistant Horn Fiber Bore Lining

    ARC Extinguishing contactfollower, Large Volume ExhaustMuffler,

    10 Off/On Indicator Required

    11Pad LockingFaculties

    Required

    12Creepage ofInsulators

    440MM

    13 Sheds of Insulator Aero foil Open Profile

    14Load BreakingCapacity

    400A at 0,70 pf

    15 On-Load Switching 400A at 0 .70 pi

    16 Off Load Switching 30A at 0 , 15 pf

    17 Short Circuit Rating 25KA for 3 Sec,

    18 Current Rating 400A

    19Galvanizing ofSteel Parts

    To BS 729 Min, Thickness 127Microns,

    20 Sample Required

    21 Operation Required

    22Test Certificatefrom Independent

    Authority

    Required

    23 Reference List Required

    Signature: Seal:

  • 8/9/2019 Technical Checklist

    44/122

    PRODUCT APPROVAL WORKING GROUP DCRP Note :-If any of the above Is not complied with.

    the product approval application will not beaccepted.

    43

    UPRODUCT APPROVAL WORKING GROUP

    UCHECK LIST NO. 21 A

    U

    11 KV ON-LOAD DISCONNECTOR - VERTICAL MONTING

    MANUFACTURER :AGENT :

    DATE :

    SLNo.

    Items RequirementSubmiss

    ionCompliance

    01 TypeOutdoor Vertical Mounting on

    H-Type Wood Pole Structure

    02GeneralRequirementConforming To

    OES - 11

    03 Standard BS 5253

    04Mounting Heightof the Switch

    7700 MM

    05 Phase Centres 1050 MM

    06Wood PoleCenters H-TypeConstruction

    1800 MM

    07Mounting Heightof OperatingHandle

    1200 MM

    08AssemblyComponents

    Load Interrupter Head, PhaseCoupling Rod, Operating Rodwith well Treated Wood InsulationInserted at 4500 MM from. Ground Level, Rod Guides,

    Supporting Steel Work, Bolts, ,Nuts and Works.

  • 8/9/2019 Technical Checklist

    45/122

    PRODUCT APPROVAL WORKING GROUP DCRP Note :-If any of the above Is not complied with. the product approval application will not beaccepted.

    44

    Note :- If any of the above Is not complied with. the product approval application will not be accepted.

    SLNo.

    Items RequirementSubmiss

    ionCompliance

    09Interrupter

    Head

    Lined with Horn Fiber orequivalent for ARC Quenchingand Contacts Tipped with

    Copper Tungsten; ARCExtinguishing contact follower;Large Volume Exhaust Muffler.

    10 Off/On Indicator To be Provided

    11 Pad Locking Required

    12Creepage ofInsulators

    440MM

    13 Sheds of Insulator Aero foil Open Profile

    14 Load Breaking 400 A at 0.70 pf

    15 On-Load Switching 400 A at 0.70 pf

    16 Off Load Switching 30A at 0 .15 pf

    17 Short Circuit Rating 18.4 KA for 3 Secs.

    18 Current Rating 400A

    19Galvanizing ofSteel Parts

    To BS 729 Min. Thickness 127Microns.

    20 Sample Required

    21OperationChecking

    Required

    22 Test Certificatefrom IndependentAuthority

    Required

    23 Reference List Required

    Signature: Seal:

  • 8/9/2019 Technical Checklist

    46/122

    PRODUCT APPROVAL WORKING GROUP DCRP Note :-If any of the above Is not complied with.

    the product approval application will not beaccepted.

    45

    U11 KV DROP OUT FUSE

    1. Standard to comply with OES 8

    2. Check List to be filled and submittedBy the manufacturer

    Check List NO.22

    3. Technical Literature to be submittedAll details pertaining to material, installationand operation

    4. Drawings RequiredAreComplete Assembly Drawings detailed

    parts Drawing are required

    5. Installation and Operation instructionsIf applicable.

    Required,

    6. Sample complying with the standardTo be submitted with the request

    Required

    7. Test Certificates required fromIndependent and recognized testingLaboratory

    Type Test Certificate is required

    8. Installation in the system for accessingThe performance

    Not Required

    9. Documents to be submitted with theApproval request.

    i) Check list signed and stamped by theManufacturer

    ii) Technical literatureiii) Installation & Operation manual ifapplicableiv) Drawingsv) Experience Listvi) Test Certificatesvii) Sample

  • 8/9/2019 Technical Checklist

    47/122

    PRODUCT APPROVAL WORKING GROUP DCRP Note :-If any of the above Is not complied with.

    the product approval application will not beaccepted.

    46

    UPRODUCT APPROVAL WORKING GROUP

    UCHECK LIST NO. 22

    U11 KV DROP OUT FUSE

    MANUFACTURER :AGENT :

    DATE :

    SLNo.

    Items RequirementSubmiss

    ionCompliance

    01

    Rating ;-- Nominal Volt.

    - Max. Voltage

    - Bill

    - Cont. Current

    - InterruptingCurrent

    - LeakageSymmetrical

    Distance ofSupportInsulators

    - Characteristics

    11 KV12.5 KV95 KVDifferent for Different Rating(KV A) for distributionTransformers4.5 KA440MM

    Fast acting (Fuse should Blowfirst for Short Circuit insideTransformer)

    02 Construction 1. Single Vent at the bottom ofFuse Tube

    2. Screw Cap3. Two Insulation Support4. Base Channel5. Live Parts Cemented to

    Insulators

    03 Live PartsContact Silver Plated. StainlessSteel Spring

    04 Ferrous PartsHot Dip Galvanized minimumthickness of Galvanizing 127Microns

  • 8/9/2019 Technical Checklist

    48/122

    PRODUCT APPROVAL WORKING GROUP DCRP Note :-If any of the above Is not complied with. the product approval application will not beaccepted.

    47

    Note :- If any of the above Is not complied with, the product approval application will not be accepted,

    SLNo.

    Items RequirementSubmiss

    ionCompliance

    05

    Fuse Tube - Epoxy Fiber Glass Liner withHorn Fiber

    - Outer surface protectedwith an Ultra-Violetresistance finish

    - Fire retardant

    - Lifting ring for handling witha hook stick

    06

    Arcing Horn- Galvanized Malleable iron

    adjustable 4 CM to 8 CM- Clearance 6 CM fromInsulator Shed

    07Centre Distancefrom SupportInsulators

    394MM

    08 Phase Centers 1050 MM

    09Test Certificatefrom IndependentAuthority

    Required

    10 Reference List

    Required

    11 SampleRequired

    12 Operation Check

    Required

    Signature: Seal:

  • 8/9/2019 Technical Checklist

    49/122

    PRODUCT APPROVAL WORKING GROUP DCRP Note :-If any of the above Is not complied with.

    the product approval application will not beaccepted.

    48

    U11 KV AUTO RECLOSERS

    1. Standard to comply with OES 20

    2. Check List to be filled and submittedBy the manufacturer

    Check List NO.23

    3. Technical Literature to be submittedAll details pertaining to material, installationand operation

    4. Drawings RequiredComplete Assembly Drawings MountingDrawing Control Circuit Diagram

    5. Installation and Operation instructionsIf applicable.

    Required,

    6. Sample complying with the standardTo be submitted with the request

    Required

    7. Test Certificates required fromIndependent and recognized testingLaboratory

    i) Short Circuit Test Certificate is required

    ii) Functional Test Certificate is requirediii) High Voltage Power Frequency Test

    Certificate Required.iv) Impulse Voltage Test Certificate

    Required.

    8. Installation in the system for accessingThe performance

    Required

    9. Documents to be submitted with the

    Approval request.

    i) Check list signed and stamped by the

    Manufacturerii) Technical literatureiii) Installation & Operation manual ifapplicableiv) Drawingsv) Experience List

    vi) Test Certificates from Independent Labvii) Sample (when requested)

  • 8/9/2019 Technical Checklist

    50/122

  • 8/9/2019 Technical Checklist

    51/122

    PRODUCT APPROVAL WORKING GROUP DCRP Note :-If any of the above Is not complied with. the product approval application will not beaccepted.

    50

    Note :- If any of the above is not complied with. the product approval application will not be accepted.

    SLNo.

    Items RequirementSubmiss

    ionCompliance

    11

    Protection :-

    - Over Current Setting

    - Over Current TimeMultiplier

    - Earth Fault CurrentSetting

    - Earth FaultInstantaneous

    (Selective)- Earth Fault Time Delay

    - Recluse TimeSelectable- Reclaim TimeSelectable

    - Local Control

    25"10 - 200"10 in Steps of 25"10

    0.1 - 1.5 in Steps of 0.1

    l 10%

    80 - 120 Ms.

    0.2 - 25 Secs.

    1 To 60 Secs.

    1 To 180 Secs.

    Local Control Operatedmanually with Hook StickComprising:To be SubmittedA) Manual CloseB) Close and Lock InC) Trip and Lock outD) Auto/Non-Auto

    E) Earth Fault in/out

    12 Mounting Bracket Required

    13 Painting and Finish Required

    14Test Certificatefrom IndependentAuthority

    Required

    15 Reference List Required

    16Performance overone Load Cycle

    Required

    Signature: Seal:

  • 8/9/2019 Technical Checklist

    52/122

    PRODUCT APPROVAL WORKING GROUP DCRP Note :-If any of the above Is not complied with.

    the product approval application will not beaccepted.

    51

    U11 KV SWITCHGEAR

    1. Standard to comply with OES 14

    2. Check List to be filled and submittedBy the manufacturer

    Check List NO.24

    3. Technical Literature to be submittedTechnical details of all equipment, rating.operation and maintenance

    4. Drawings Required are1. General Assembly, Layout of the Panels2. Circuit Diagram of Controls & Protection3. Foundation drawing

    5. Installation and Operation instructionsIf applicable. o & Manual required

    6. Sample complying with the standardTo be submitted with the request

    Not Required

    7. Test Certificates required fromIndependent and recognized testingLaboratory

    1. Test Certificate of complete SwitchgearPanel is required2. Temperature rise, Feeder Panel,Transformer Panel and Switchgear Panel TestCertificates are required

    8. Installation in the system for accessingThe performance

    Not Required

    9. Documents to be submitted with the

    Approval request.

    i) Check list signed and stamped by the

    Manufacturerii) Technical literatureiii) Installation & Operation manual ifapplicableiv) Drawingsv) Experience Listvi) Test Certificatesvii) Sample

  • 8/9/2019 Technical Checklist

    53/122

    PRODUCT APPROVAL WORKING GROUP DCRP Note :-If any of the above Is not complied with.

    the product approval application will not beaccepted.

    52

    UPRODUCT APPROVAL WORKING GROUP

    UCHECK LIST NO. 24

    U

    11 KV SWITCHGEAR (INDOOR)

    MANUFACTURER :AGENT :

    DATE :

    SLNo.

    Items RequirementSubmiss

    ionCompliance

    01 TypeIndoor Metal Clad

    Compartmental

    02 Standard BS 5227 / lEC 298

    03

    Rating:-

    - Normal Voltage

    - Highest Voltage

    - S,S,C, Voltage

    - Impulse

    11 KV12,5 KV18,4 KA75 KV

    04

    Current Rating:-For FeederFor TransformerFor Bus SectionFor Bus Bar

    400A1200 A

    2000 A

    05 For Bus BarHard Drawn High ConductivityCopper Bar Silicon RubberInsulated Bus Bar

    06 Circuit Breaker ;-

    - Type- RupturingCapacity 11 KV

    Vacuum350 MVAMotor AC240 VSpring Closing30VDCRequiredRequiredRequiredRequiredRequired

  • 8/9/2019 Technical Checklist

    54/122

    PRODUCT APPROVAL WORKING GROUP DCRP Note :-If any of the above Is not complied with.

    the product approval application will not beaccepted.

    53

    SLNo.

    Items RequirementSubmiss

    ionCompliance

    07 Circuits :-

    No. of PanelsStandardArrangement ofS.G. Panels

    - Panel No.1and 16

    - Panel No.2

    - Panel Nos. 3 To

    7&l1To15

    - Panel No.8and 10 Control

    - Panel No.9

    16

    CapacitorControlStn. Tx. Control

    Feeder Control

    For 20 MVA Tx. Incomer

    Bus Section

    08Feeder ControlPanel:-A) One Circuit

    BreakerB) Three Current

    Transformers(Double Core)

    C) One Cable Boxfor 11 KV

    D) One CiruitBreaker ControlSwitch Locatedon Front thePanel

    E) CB. "Closed"and "Open"Red and GreenIndicationLamps 5 Watts

    RequiredRequired

    Required

    Required

  • 8/9/2019 Technical Checklist

    55/122

    PRODUCT APPROVAL WORKING GROUP DCRP Note :-If any of the above Is not complied with.

    the product approval application will not beaccepted.

    54

    SLNo.

    Items RequirementSubmiss

    ionCompliance

    F) One Local!RemoteSelector Switchon Front ofPanel

    G) One HealthyTrip IndicationLamp 5 Watts,30V DC withResistance and

    Push ButtonH) Auto Trip Amber

    IndicationLamp5W,30VDC

    I) Two over Currentand One EarthFault IDMTRelays

    J) One AmmeterScaled 0-400

    AMPS 400/5AK) Single Shot Auto

    Reclose Relay30V DC withTime Delay of

    O To 5 MinutesL) Integral EarthingM) One Blank

    Circuit Label30CMX8CMMounted on

    Front of Paneland a SmallBlank CircuitLabel on Rearof Panel

    Required

    Required

    5W, 30V DC

    Required

    Required

    Required

    RequiredRequired

  • 8/9/2019 Technical Checklist

    56/122

    PRODUCT APPROVAL WORKING GROUP DCRP Note :-If any of the above Is not complied with.

    the product approval application will not beaccepted.

    55

    SLNo.

    Items RequirementSubmiss

    ionCompliance

    09Aux.TransformerControl Panel:-

    A) One CircuitBreaker 350MVA 3 Phase 11KV. 400 AMPS

    B) Three CurrentTransformers

    Double core100/50/5A 15VAcapacityClass 1 - meteringClass 5 PlOprotection

    C) One Cable Box11 KV 3 CoreCross LinkedPolyethyleneSteel Wire

    Armored PVCSheathed -Cable Size 50Sq. MM

    D) One CircuitBreaker ControlSwitchMounted onFront of thePanel

    E) One Local/RemoteSelector SwitchMounted on

    Front of the Panel ,F) One Healthy Trip

    IndicationLamp

    Required

    5w. 30 VDC withResistance and Push Button

  • 8/9/2019 Technical Checklist

    57/122

    PRODUCT APPROVAL WORKING GROUP DCRP Note :-If any of the above Is not complied with.

    the product approval application will not beaccepted.

    56

    SLNo.

    Items RequirementSubmiss

    ionCompliance

    09Aux.TransformerControl Panel:-

    A) One CircuitBreaker 350MVA 3 Phase 11KV. 400 AMPS

    B) Three CurrentTransformers

    Double core100/50/5A 15VAcapacityClass 1 - meteringClass 5 PlOprotection

    C) One Cable Box11 KV 3 CoreCross LinkedPolyethyleneSteel Wire

    Armored PVCSheathed -Cable Size 50Sq. MM

    D) One CircuitBreaker ControlSwitchMounted onFront of thePanel

    E) One Local/RemoteSelector SwitchMounted on

    Front of the Panel ,F) One Healthy Trip

    IndicationLamp

    Required

    5w. 30 VDC withResistance and Push Button

  • 8/9/2019 Technical Checklist

    58/122

    PRODUCT APPROVAL WORKING GROUP DCRP Note :-If any of the above Is not complied with.

    the product approval application will not beaccepted.

    57

    SLNo.

    Items RequirementSubmiss

    ionCompliance

    10 Bus Section Panel:-

    A) One C.B.

    B) Three CurrentTransformers

    C) One C.B,Control Switchlocated on frontof the Panel

    D) One Local/RemoteSelector SwitchMounted onFront of thePanel

    E) C.B, "Closed"and "Open" Redand GreenIndicationLamps

    F) One Healthy TripIndication Lamp

    G) Auto Trip AmberIndication Lamp

    H) One ThreePole over Relay

    I) One BlankCircuit Label30CM X8 CMMounted onfront of Panel

    and one SmallBlank CircuitLabel on Rear ofPanel

    350 MV A 1600 Amps. 3 Phase11 KVRatio 1200/-, 5A 15VA MinimumCapacity

    Required

    Required

    5W, 30V DC

    5W, 30 V DC With SeriesResistance and Push Button

    5W,30VDC

    IDMT 50 To 200%

  • 8/9/2019 Technical Checklist

    59/122

    PRODUCT APPROVAL WORKING GROUP DCRP Note :-If any of the above Is not complied with.

    the product approval application will not beaccepted.

    58

    SLNo.

    Items RequirementSubmiss

    ionCompliance

    11 20MVA 33/11 .5KVIncomerTransformerControl Panel:-

    A) One C.B.

    B) Three CurrentTXS. Class "X" for

    overall biaseddifferential TX.Protection with1200/lAmp.Ratio with CTCharacteristicsto suit theCharacteristics of theCurrent TX. Son33 KV side whichshall have a ratio

    of 400/1A

    C) Double CoreCurrent Transformers.

    One Core forRestricted EarthFault ProtectionRatio 1200/1AMP, Class "X"and to matchwith Line CTS.The other coreFor SBEF protection1200/1 A 5PlO.

    D) Three DoubleCore Current TX.

    Ratio 12oo/1A15VA Class 5PlOAccuracy forDirectional O/CProtection andOther CoreClass I for Metering

    350 MVA . 3 Phase 11 KV1200Amps

    Required

    Required

    Required

  • 8/9/2019 Technical Checklist

    60/122

    PRODUCT APPROVAL WORKING GROUP DCRP Note :-If any of the above Is not complied with.

    the product approval application will not beaccepted.

    59

    SLNo.

    Items RequirementSubmiss

    ionCompliance

    E) One Cable BoxPointingVertically Downwardssuitableto receive sixsingle Core 500SQ, MM, Crosslinked PolyethyleneAluminumStrip Armored

    Cablescomplete withCable Lugs,Gland, allnecessaryTerminationMaterialsand Sundries fora completeTermination,

    F) One Circuit

    Breaker ControlSwitch Locatedon Front of thePanel.

    G) One Local /Remote SelectorSwitch on Frontof the Panel.H) Circuit Breaker"Closed" and"Open" Red andGreenIndicationLamps,

    I) One Healthy TripIndication LampJ)Auto Trip AmberIndication Lamp

    Required

    Required

    5W 30V DC

    5W 30V DC with Seriesresistance and push button30V DC 5W

  • 8/9/2019 Technical Checklist

    61/122

    PRODUCT APPROVAL WORKING GROUP DCRP Note :-If any of the above Is not complied with.

    the product approval application will not beaccepted.

    60

    SLNo.

    Items Requirement Submission Compliance

    K) One Pilot WireProtection RelayPanel with 15 KVIsolatingTransformer withInter Trip Guardand Pilot SupervisionEquipmentto Match ExistingSolkar RF Pilot

    Wire Protectionat sending endSubstation, TheProtection toOperate from 3Nos,400/1A.33KV CT's Class"X" Provided onthe 33KV Side of20MVA. 33/11.5KV Transformer(in the cases of33 KV CabieFeeder only),

    L) One Duo-Biasdifferential Relaywith HarmonicResistant,

    M) One HighImpedancerestricted EarthFault Relay

    N) One Three

    Element Directional O/CRelay with 90

    Deg,-45 Deg,connection and45 Deg, MTA - 5To 15% settings)with time delay,

    O) One standbyEarth Fault relayIDMT 10 To 40%

    Required

    Required

    Required

    Required

    Required

  • 8/9/2019 Technical Checklist

    62/122

    PRODUCT APPROVAL WORKING GROUP DCRP Note :-If any of the above Is not complied with.

    the product approval application will not beaccepted.

    61

    SLNo.

    Items RequirementSubmiss

    ionCompliance

    P) One Ammeter

    Q) One ThreePhase VoltageTransformer

    R) One Voltmeter

    S) One VoltmeterSelector SwitchTo ReadVoltagesbetween Phasesand NeutralOne Blank CircuitLabel30CMMounted on Front

    of the Panel and aSmall Blank CircuitLabel on Rear ofPanel.

    Scaled 0-1200 Amps. SuitableConnection to 1200/1 Amp.C.T's with Selector Switch.Star/Star 11000/\13 110/\13Volts 200VA Per Phase Class "I"Accuracy connected on11 KV incoming supply from20MVA Tx.

    Scaled 0-15KV To Operate from

    Voltage Transformer.

    Required

    Required

  • 8/9/2019 Technical Checklist

    63/122

    PRODUCT APPROVAL WORKING GROUP DCRP Note :-If any of the above Is not complied with.

    the product approval application will not beaccepted.

    62

    SLNo.

    Items Requirement Submission Compliance

    12 Capacitor ControlPanel:-A) One Circuit

    BreakerB) Three Double Ratio

    Current Transformers400/5A 15VA Min.Capacity. Accuracy Class5P 10 for over Current andEarth Fault Protection and

    Class 1 for Metering.C) One Cable

    compartmentfor 11 KV 3C 240SQ, MM XLPEIPVC/SWA/PVC

    D) One CircuitBreaker ControlSwitch Locatedon Front of thePanel

    E) Circuit Breaker"Close" and"Open" Red andGreenIndicationLamps.

    F) One Local/Remote SelectorSwitch on Frontof Panel

    G) One Healthy TripIndication Lamp

    H) Auto Trip AmberIndication Lamp

    I) Two Over Currentand One EarthFault IDMT Relays

    J) One AmmeterScaled0-400Amps withSelect or Switch

    350 MV A 3 Phase 11 KV400 A

    Required

    Required

    Required

    5W30VDC

    5W 3V DC with Series

    Resistanceand Push Button5W30VDC

    Required

    Required

  • 8/9/2019 Technical Checklist

    64/122

  • 8/9/2019 Technical Checklist

    65/122

    PRODUCT APPROVAL WORKING GROUP DCRP Note :-If any of the above Is not complied with. the product approval application will not beaccepted.

    64

    Note ;- If any of the above is not complied with, the product approval application will not be accepted,

    SLNo.

    Items Requirement Submission Compliance

    F) Metal Instrumentand Relay casesconnected toEarth Bar by 2,5Sq, MM, CopperWire

    G) Heaters of eachPanel CAC 240V)

    H) Instruments:-Voltmeter and Ammeter.

    I) Auxiliary Switchfor DC Supply

    J) Spare Way Aux,SwitchK) Indication Lamp

    L) Local/Remote, Select, SW,M) Test TerminalBlocksN) Remote Alarm

    Required

    Required

    Dial TypeType: Flush Mounting

    Moving IronDeflection: 270Size 96 x 96

    MCB2 N,C, & 2 N,O, MCB5 W 30V DC

    RequiredRequiredRequired

    15

    AdditionalEquipment:-Testing PlugsTool CabinetKey CupboardPermit To workLocking offBoxes

    16 Test Certificatefrom IndependentAuthority

    Required

    Signature: Seal:

  • 8/9/2019 Technical Checklist

    66/122

    PRODUCT APPROVAL WORKING GROUP DCRP Note :-If any of the above Is not complied with.

    the product approval application will not beaccepted.

    65

    U11 KV /433 V DISTRIBUTION TRANSFORMERS

    1. Standard to comply with OES 5

    2. Check List to be filled and submittedBy the manufacturer

    Check List NO.25

    3. Technical Literature to be submittedAll details pertaining to material, installationand operation

    4. Drawings Required

    1. General Assembly,2. Cable Box Drawing3. Terminal Bushing Drawing

    4. Core and Winding Assembly Drawing5. Foundation Drawing

    5. Installation and Operation instructionsIf applicable.

    Installation and Operation Manual Required

    6. Sample complying with the standardTo be submitted with the request

    Sample is required after approval of theDrawing (l No. 315KVA. and 1 No. 1000 KVA

    7. Test Certificates required fromIndependent and recognized testingLaboratory

    i) SIC Test Certificate is required

    ii) Impulse Withstand Test Certificates isrequirediii) Temperature Rise Test Certificate is

    Requirediv) High Voltage Power Frequency Test

    Certificate is Required

    8. Installation in the system for accessingThe performance

    Not Required

    9. Documents to be submitted with the

    Approval request.

    i) Check list signed and stamped by the

    Manufacturerii) Technical literatureiii) Installation & Operation manual ifapplicableiv) Drawingsv) Experience Listvi) Test Certificatesvii) Sample

  • 8/9/2019 Technical Checklist

    67/122

    PRODUCT APPROVAL WORKING GROUP DCRP Note :-If any of the above Is not complied with.

    the product approval application will not beaccepted.

    66

    UPRODUCT APPROVAL WORKING GROUP

    UCHECK LIST NO. 25

    U11 KV /433 DISTRIBUTION TRANSFORMERS

    MANUFACTURER :AGENT :

    DATE :

    SLNo.

    Items Requirement Submission Compliance

    01 Standard OES-5

    02Rating underOman Condition

    100/200/315/500/1 000 KVA

    03 Voltage Ratio 11000/433V

    04

    Temperature Rise:-

    - Oil

    - Winding40 Deg. C50 Deg. C

    05Off-CircuitTapping LockingFacilities

    + 5% To - 5%In Steps of 2.5%

    06 Vector Group DYN 11

    07 Impedance 4.75%

    08System HighestVoltage

    12.5 KV

    09 Winding InsulationClass - ABS 2751

    10Tank MinimumThicknessBottomSidesTopRadiator/Fins

    5MM4MM5MM1.2 MM

  • 8/9/2019 Technical Checklist

    68/122

    PRODUCT APPROVAL WORKING GROUP DCRP Note :-If any of the above Is not complied with.

    the product approval application will not beaccepted.

    67

    SLNo.

    Items Requirement Submission Compliance

    11 TerminalArrangement1 ) Pole Mounted

    TransformerOutdoorBushingCreepageInsulator ShedClearancesPhase toPhaseHVLVTerminalsSuitable for

    2) Ground

    MountedTransformerCable BoxPhase ToPhaseHVLVPhase to EarthHVBushingTerminalSuitable for

    Cable Size

    LV

    440MM

    Aerofoil Open Profile

    270 MM150 MM50 SQ. M. M Copperconductfor HV Side4C X 185 SQ. M. M For100 & 200 KVA TXTwo 4C X 185 SQ. MM For315 KV A. TX on LV Side

    180 MM120 MMHV 100 MM4C X 50 SQ. M. M Side630 SQ. MM2 Single Core/Phase +Neutralfor 1000 KV A. TX. One

    SingleCore 630 Sqmm / Phase +NeutralFor 500 KV A TX

  • 8/9/2019 Technical Checklist

    69/122

    PRODUCT APPROVAL WORKING GROUP DCRP Note :-If any of the above Is not complied with.

    the product approval application will not beaccepted.

    68

    SLNo.

    Items Requirement Submission Compliance

    12Length of Pole MountedTransformer

    < 1400 MM

    13Two EarthingTerminals

    Required

    14

    Fittings:-1) Conservator

    Vessel

    Complete withFilling Cap andDrain Valve

    2) Lifting Lugs3) Oil Level Gauge4) Main Tank Drain

    Valve5) Conservator To Main

    Tank Valve6) Dial Type

    Thermometer

    with MaximumReading Pointer

    7) ThermometerPocket

    8) Rating Diagram Plates9) Silicagel

    BreatherContainerVandal Proofand Tansparen

    Required

    RequiredRequiredRequired

    Required

    Required

    Required

    Required

    Required

    15 Gaskets Cork or Similar Material as

    BaseBonded by Oil ResistanceSynthetic Material or RubberinOne Piece

  • 8/9/2019 Technical Checklist

    70/122

    PRODUCT APPROVAL WORKING GROUP MEW Note :-If any of the above Is not complied with.the product approval application will not beaccepted.

    69

    Note :- If any of the above Is not complied with, the product approval application will not be accepted,

    SLNo.

    Items Requirement Submission Compliance

    16

    Mounting of SilicagelBreatherin the PoleMountedTransformer

    20 CM from the Bottom

    17Insulation of Endconnection ofWinding

    Required

    18Earthing of Core

    Required

    19 Clamping Bracketfor Core

    To be Provided

    20Clamping CoreBolt Insulation

    To be Provided

    21Insulation Barnerbetween Windings

    To be Provided

    22 Sample Required

    23Test Certificatefrom IndependentAuthority

    Required

    24 Reference List Required

    25PerformanceChecking throughLoad Cycle

    Required

    Signature: Seal:

  • 8/9/2019 Technical Checklist

    71/122

    PRODUCT APPROVAL WORKING GROUP DCRP Note :-If any of the above Is not complied with.

    the product approval application will not beaccepted.

    70

    U11 KV RING MAIN UNIT

    1. Standard to comply with OES 09

    2. Check List to be filled and submittedBy the manufacturer

    Check List NO.26

    3. Technical Literature to be submittedAll details pertaining to material, installationand operation

    4. Drawings Required

    1. General Assembly Drawing2. Control and Protection Circuit

    Drawing3. Fuse Assembly Drawing4. Foundation Drawing

    5. Installation and Operation instructionsIf applicable.

    Installation and Operation Manual Required

    6. Sample complying with the standardTo be submitted with the request

    Sample is required after approval of theDrawing

    7. Test Certificates required fromIndependent and recognized testingLaboratory

    i) SIC Test Certificate requirediI) Impulse Withstand Test Certificatesiii) Power Frequency Withstand Test

    Certificate required

    8. Installation in the system for accessingThe performance

    Required after approval of sample

    9. Documents to be submitted with the

    Approval request.

    i) Check list signed and stamped by the

    Manufacturerii) Technical literatureiii) Installation & Operation manual ifapplicableiv) Drawingsv) Experience Listvi) Test Certificatesvii) Sample

  • 8/9/2019 Technical Checklist

    72/122

    PRODUCT APPROVAL WORKING GROUP DCRP Note :-If any of the above Is not complied with.

    the product approval application will not beaccepted.

    71

    UPRODUCT APPROVAL WORKING GROUP

    UCHECK LIST NO. 26

    U11 KV RING MAIN UNIT

    MANUFACTURER :AGENT :

    DATE :

    SLNo.

    Items Requirement Submission Compliance

    01GeneralRequirements

    OES - 11

    02 AssemblyTwo 3 Phase Ring MainSwitches 400 A and One 3Phase Tee off Switch 150 A

    03

    Switches & FuseAssy. Oil Immersedor SF6 Gas Insulationand CurrentInterruption witheither H RC Fuses

    in Air or SF6 CircuitBreaker

    Required

    04 Metal Clad

    05Degree ofProtection

    IP 54

    06 Extensible

    07

    Switches/Co B.Position

    - On- Off/Earth off

    - Earth

    08 Pad Locking Required

    09 Rated Voltage 11 KV

    10 Highest SystemVoltage

    12.5 KV

  • 8/9/2019 Technical Checklist

    73/122

    PRODUCT APPROVAL WORKING GROUP DCRP Note :-If any of the above Is not complied with.

    the product approval application will not beaccepted.

    72

    SLNo.

    Items Requirement Submission Compliance

    11 Impulse WithstandVoltage

    75 KV

    12Power FrequencyTest

    27 KV

    13

    Rated NormalCurrent (SiteRating)

    - Ring MainSwitch

    - Tee off Switch/Circuit Breaker

    400A

    150 A

    14Fusing Rating of Teeoff Switch Fuse

    63A

    15Tee off Circuit Trans-former Rating

    1000 KVA

    16Rated BreakingCurrent of RingMain Switch

    400A

    17Foul Rating (Lineand Earth Switch

    350 MV A at 11 KV

    18 Rated Short TimeCurrent for 3 Secs.

    -All Switchesincluding Ring

    Main EarthSwitches

    - Tee off EarthSwitch

    18.4 KA

    2 KA

  • 8/9/2019 Technical Checklist

    74/122

    PRODUCT APPROVAL WORKING GROUP DCRP Note :-If any of the above Is not complied with. the product approval application will not beaccepted.

    73

    Note :- If any of the above Is not complied with. the product approval application will not be accepted.

    SLNo.

    Items Requirement Submission Compliance

    19 Operating andInterlocks As per OES 19

    20SF6 Switchgear:-Pressure GaugeGas Leak

    Less than 1% per Annum

    21

    Cable Boxes

    Ring Main Circuit

    T-Off Circuit

    Suitable for Dry TypeTermination

    3C X 185 To 300 SQ. MMXLPE Cable

    3C X 50 Sq. MM. XLPE Cble

    22 Test Plugs To be Approved

    23

    Earth Fault Indicator

    together with theRelative CoreBalance CurrentTransformer

    24 Sample Required

    25Test Certificate fromIndependentAuthority

    Required

    26 Reference List Required

    Signature: Seal:

  • 8/9/2019 Technical Checklist

    75/122

    PRODUCT APPROVAL WORKING GROUP DCRP Note :-If any of the above Is not complied with.

    the product approval application will not beaccepted.

    74

    U11 KV CABLES

    1. Standard to comply with OES 2

    2. Check List to be filled and submittedBy the manufacturer

    Check List NO.27

    3. Technical Literature to be submittedAll details pertaining to cablemanufacturing process and technical datato be submitted.

    4. Drawings Required Dimensional Cross Section Drawing

    5. Installation and Operation instructionsIf applicable.

    N/A

    6. Sample complying with the standardTo be submitted with the request

    Required.

    7. Test Certificates required fromIndependent and recognized testingLaboratory

    i) High Voltage TestiI) Conductor Resistance Testiii) Galvanizing Test for Amouriv) Insulation, Bedding and Sheath Testv) Accelerated Treeing Test

    8. Installation in the system for accessingThe performance

    Required after approval of sample

    9. Documents to be submitted with theApproval request.

    i) Check list signed and stamped by theManufacturer

    ii) Technical literatureiii) Installation & Operation manual ifapplicableiv) Drawingsv) Experience Listvi) Test Certificatesvii) Sample

  • 8/9/2019 Technical Checklist

    76/122

    PRODUCT APPROVAL WORKING GROUP DCRP Note :-If any of the above Is not complied with.

    the product approval application will not beaccepted.

    75

    UPRODUCT APPROVAL WORKING GROUP

    UCHECK LIST NO. 27

    U11 KV CABLES

    MANUFACTURER :AGENT :

    DATE :

    SLNo.

    Items Requirement Submission Compliance

    01 Standard IEC 502

    02Highest SystemVoltage

    12.5 KV

    03 ConductorCompact Circular IEC 228Class - 2

    04 Conductor Shield

    Extruded Semi Conductivity

    Layer

    05InsulationThickness

    Cross Linked Polyethylene3.4MM

    06 Insulation Shield

    Extruded Semi ConductivityLayer. Phase Identification - ABare Copper Shielding TapeApplied with Tape

    07 Assembly

    Non Hygroscopic Filler bound

    with Non Vulcanisable TapeTemp. 90 Deg. C.

    08 Sheath ThicknessExtruded PVC BS 6746 Table-lType-9.2mm

    09Bedding

    Thickness

    Over the Sheath Bedding FabricTape0.5mm

  • 8/9/2019 Technical Checklist

    77/122

    PRODUCT APPROVAL WORKING GROUP DCRP Note :-If any of the above Is not complied with. the product approval application will not beaccepted.

    76

    Note :- If any of the above is not complied with, the product approval application will not be accepted,

    SLNo.

    Items Requirement Submission Compliance

    10 ArmourSingle Galvanized Steel WiresBS 1442. Aluminum Armour forSingle Core Cable

    Overall Serving

    Thickness

    Extruded PVC Type-9Table - 1 BS 6762,8 MM

    Fire Retardant Termite

    Resistant

    Cross SectionalDrawing of theCable

    To be submitted

    Test Certificatefrom IndependentAuthority

    Required

    Reference List

    Sample

    Required

    Required

    Signature: Seal:

  • 8/9/2019 Technical Checklist

    78/122

    PRODUCT APPROVAL WORKING GROUP DCRP Note :-If any of the above Is not complied with.

    the product approval application will not beaccepted.

    77

    U11 KV LINE POST INSULATOR

    1. Standard to comply with OES - 26-C

    2. Check List to be filled and submittedBy the manufacturer

    Check List No. 28

    3. Technical Literature to be submitted Yes

    4. Drawings Required are

    Dimensional Drawings with all details of

    Sheds, top, base etc.

    5. Installation and Operation instructionsIf applicable.

    N/A

    6. Sample complying with the standardTo be submitted with the request

    Required.

    7. Test Certificates required fromIndependent and recognized testingLaboratory

    1) Dry Lighting Impulse Withstand

    2,) We Power Frequency Withstand3) Performance Test4) Radio Interference Test5) Temperature Cycle Test6) Mechanical Failing Load Test7) Porosity Test8) Galvanizing Test

    8. Installation in the system for accessingThe performance

    Not Required

    9. Documents to be submitted with the

    Approval request.

    i) Check list signed and stamped by the

    Manufacturerii) Technical literatureiii) Installation & Operation manual ifapplicableiv) Drawingsv) Experience Listvi) Test Certificatesvii) Sample

  • 8/9/2019 Technical Checklist

    79/122

    PRODUCT APPROVAL WORKING GROUP DCRP Note :-If any of the above Is not complied with.

    the product approval application will not beaccepted.

    78

    UPRODUCT APPROVAL WORKING GROUP

    UCHECK LIST NO. 28

    U

    11 KV LINE POST INSULATOR

    MANUFACTURER :AGENT :

    DATE :

    SLNo.

    Items Requirement Submission Compliance

    01 Type Glazed Porcelain

    02Nominal SystemVoltage

    11 KV

    03System HighestVoltage

    12.5 KV

    04

    Minimu DryImpulse withstand(Peak)

    110 KV

    05Minimum WetPower FrequencyWithstand

    50 KV

    06MechanicalFailing Load 11 KV

    07 Creepage 440MM

    08 Profile

    Aero Dynamic Open ProfileSheds Top and Side GrovesUniformSheds

    09 Metal Base Malleable, lron

  • 8/9/2019 Technical Checklist

    80/122

    PRODUCT APPROVAL WORKING GROUP DCRP Note :-If any of the above Is not complied with. the product approval application will not beaccepted.

    79

    Note:- If any of the above Is not complied with, the product approval application will not be accepted.

    SLNo.

    Items Requirement Submission Compliance

    10

    Fixing Stud:-

    - Length CA)

    - Length CB)

    - Thread CA)

    - Thread CB)

    54MM191 MM39.7 MM102 MM

    11Protection ofFerrous Parts

    Hot Dip Galvanized BS 729Ferrous Thickness 127 Microns

    12 Marking Trade Mark !Year /Failing Load

    13Test Certificatefrom IndependentAuthority

    Required

    14Sample ProducedFor Inspection

    Required

    15 Reference List Required

    dddd

    Signature: Seal:

  • 8/9/2019 Technical Checklist

    81/122

    PRODUCT APPROVAL WORKING GROUP DCRP Note :-If any of the above Is not complied with.

    the product approval application will not beaccepted.

    80

    U11 KV STAY INSULATOR

    1. Standard to comply with OES - 26-D

    2. Check List to be filled and submittedBy the manufacturer

    Check List No. 29

    3. Technical Literature to be submitted Yes

    4. Drawings Required are Dimensional Drawings with all details ofSheds, top, base etc.

    5. Installation and Operation instructionsIf applicable.

    N/A

    6. Sample complying with the standardTo be submitted with the request

    Required.

    7. Test Certificates required fromIndependent and recognized testingLaboratory

    1) Dry Lighting Impulse Withstand2,) We Power Frequency Withstand3) Performance Test4) Radio Interference Test5) Temperature Cycle Test6) Mechanical Failing Load Test7) Porosity Test8) Galvanizing Test

    8. Installation in the system for accessingThe performance

    Not Required

    9. Documents to be submitted with the

    Approval request.

    i) Check list signed and stamped by the

    Manufacturerii) Technical literatureiii) Installation & Operation manual ifapplicableiv) Drawingsv) Experience Listvi) Test Certificatesvii) Sample

  • 8/9/2019 Technical Checklist

    82/122

    PRODUCT APPROVAL WORKING GROUP DCRP Note :-If any of the above Is not complied with. the product approval application will not beaccepted.

    81

    UPRODUCT APPROVAL WORKING GROUP

    UCHECK LIST NO. 29

    U

    11 KV STAY INSULATORMANUFACTURER :AGENT :

    DATE :

    Note :- If any of the above is not complied with. the product approval application will not be accepted.

    SLNo.

    Items Requirement Submission Compliance

    01 Standard BS 137

    02 Material Glazed Porcelain

    03

    Performance Requirement:-- Nominal

    System Voltage

    - System HighestVoltage

    - 50 Cycles DryFlashover

    - 50 Cycles WetFlashover

    - Leakage Distance

    - Tensile Strength

    11 KV

    12.5 KV

    40 KV

    22 KV

    80MM90 KN

    04 AppearanceSmoothly Glazed Free fromDefects and Blemishes

    05 Co lour Brown/Chocolate

    06 Marking:-- Manufacturer's Name- Year of Manufacture- Mechanical Failing Load

    07Test Certificatefrom IndependentAuthority

    Required

    08 Sample Required

    09 Reference List Required

    Signature: Seal:

  • 8/9/2019 Technical Checklist

    83/122

    PRODUCT APPROVAL WORKING GROUP DCRP Note :-If any of the above Is not complied with.

    the product approval application will not beaccepted.

    82

    PART 111

    L.T.

  • 8/9/2019 Technical Checklist

    84/122

    PRODUCT APPROVAL WORKING GROUP DCRP Note :-If any of the above Is not complied with.

    the product approval application will not beaccepted.

    83

    U800 A/1600 A FEEDER PILLARS

    1. Standard to comply with OES - 21

    2. Check List to be filled and submittedBy the manufacturer

    Check List No. 41

    3. Technical Literature to be submittedAll Details Pertaining to Material.Installation and Operation

    4. Drawings Required1. General Arrangement Drawing2. Foundation Drawing

    5. Installation and Operation instructionsIf applicable.

    N/A

    6. Sample complying with the standardTo be submitted with the request

    Sample is Required after Approval ofDrawing

    7. Test Certificates required fromIndependent and recognized testingLaboratory

    SIC Test Certificate

    8. Installation in the system for accessingThe performance

    Not Required

    9. Documents to be submitted with theApproval request.

    i) Check list signed and stamped by theManufacturer

    ii) Technical literatureiii) Installation & Operation manual ifapplicableiv) Drawingsv) Experience Listvi) Test Certificatesvii) Sample

  • 8/9/2019 Technical Checklist

    85/122

    PRODUCT APPROVAL WORKING GROUP DCRP Note :-If any of the above Is not complied with.

    the product approval application will not beaccepted.

    84

    UPRODUCT APPROVAL WORKING GROUP

    UCHECK LIST NO. 41

    U800/1600 A FEEDER PILLARS

    MANUFACTURER :AGENT :

    DATE :

    SLNo.

    Items Requirement Submission Compliance

    01 Test Certificate

    02Short Circuit Test:-- 46 KA for 0,3 Sec,

    03 DoorsDouble Leaf Opening 180Deg,

    04Degree ofProtection

    IP 55

    05 Thickness of Sheet 2MM

    06 Danger Plate Enameled Arabic/English

    07Door OperatedInternal Light and13 A Socket Outlet

    Required

    08 Lifting Lugs Required

    09 Earthing TerminalsRequired

    10

    A) Incoming UnitRating

    B) 3 C.T,'s

    C) Max, DemandIndicators

    D) 1 KWH MeterThree PotentialCircuit Fuses

    E) Terminals forSingle Core 630Sq, MM, XLPE Aluminum

    F) Spacing between theTermination andBottom Plate

    80011600 A Site Rating800/5 or1600/5 Class -1 MouldedType

    400MM

  • 8/9/2019 Technical Checklist

    86/122

    PRODUCT APPROVAL WORKING GROUP DCRP Note :-If any of the above Is not complied with. the product approval application will not beaccepted.

    85

    Note :- If any of the above is not complied with, the product approval application will not be accepted,

    SLNo.

    Items Requirement Submission Compliance

    11

    Outgoing Ways No.of Bays 6/8:-

    - Glands withEarth Tap andPlastic Shroud

    - Clearance- Fuse Grip

    Handle

    - Phase Barriers- Spacing

    Termination

    and BottomPlate

    45MM

    Flame and arc resistance

    450MM

    12

    Bus Bars:-A) PhaseB) NeutralC) Earth Bar

    50 X 10/100 X 10 MM

    50X5/50X l0 MM25 X 5/50 X 5 MM

    13 Painting Five Year Guarantee

    14 Pad Locking andHandle

    To be Provided

    Signature: Seal:

  • 8/9/2019 Technical Checklist

    87/122

    PRODUCT APPROVAL WORKING GROUP DCRP Note :-If any of the above Is not complied with.

    the product approval application will not beaccepted.

    86

    U400 A MINI FEEDER PILLAR

    1. Standard to comply with OES - 21

    2. Check List to be filled and submittedBy the manufacturer

    Check List No. 42

    3. Technical Literature to be submitted Technical Details of all Components

    4. Drawings Required1. General Arrangement Drawing2. Foundation Drawing

    5. Installation and Operation instructionsIf applicable.

    N/A

    6. Sample complying with the standardTo be submitted with the request

    Required.

    7. Test Certificates required fromIndependent and recognized testingLaboratory

    SIC Test Certificate

    8. Installation in the system for accessingThe performance

    Not Required

    9. Documents to be submitted with theApproval request.

    i) Check list signed and stamped by theManufacturer

    ii) Technical literatureiii) Installation & Operation manual ifapplicableiv) Drawingsv) Experience Listvi) Test Certificatesvii) Sample

  • 8/9/2019 Technical Checklist

    88/122

    PRODUCT APPROVAL WORKING GROUP DCRP Note :-If any of the above Is not complied with.

    the product approval application will not beaccepted.

    87

    UPRODUCT APPROVAL WORKING GROUP

    UCHECK LIST NO. 42

    U400 A 6 WAY MINI FEEDER PILLAR

    MANUFACTURER :AGENT :

    DATE :

    SLNo.

    Items Requirement Submission Compliance

    01 Test Certificate Independent Authority

    02S.c. Test 46 KV for0.3 Sec.

    46 KV for 0.3 Sec.

    03 DoorsSingle Door 180 Deg.Opening

    04Degree ofProtection

    IP 55

    05 Thickness of Sheet 2MM

    06 Danger PlateArabic and EnglishEnameled

    07Door OperatedInternal Light

    Required

    08 Lifting LugsRemovable Lifting DeviceRequired

    09 Earthing Terminals12 MM" 2 Nos.

    10 Name Plate Engraved Name Plate :-1) SI. No.2) Year3) Normal CT Rating of Bus

    Bar 925 X 10 MM)4) Normal CT Rating of

    Incoming Unit (400 A)5) Cross Weight6) Manufacturer's Name and

    Ref. No.

  • 8/9/2019 Technical Checklist

    89/122

    PRODUCT APPROVAL WORKING GROUP DCRP Note :-If any of the above Is not complied with. the product approval appl