1 GUJARAT STATE ELECTRICITY CORPORATION LIMITED GUJARAT STATE ELECTRICITY CORPORATION LIMITED GUJARAT STATE ELECTRICITY CORPORATION LIMITED GUJARAT STATE ELECTRICITY CORPORATION LIMITED Wanakbori Thermal Power Station, Taluka:Galteshwar, Dist:Kheda– 388239. Ph. 91-2699-235622 Fax: 91-2699-235607,e-mail: [email protected]; [email protected],Website: www.gsecl.in AN ISO-9001:2008, ISO-14001:2004, OHSAS 18001:2007 Certified Power Plant CIN: CIN: CIN: CIN: U40100GJ1993SGC019988 U40100GJ1993SGC019988 U40100GJ1993SGC019988 U40100GJ1993SGC019988 TECHNICAL BID WEB TENDER NOTICE NO.:450/16/W RFQ NO.:37965 TENDER DOCUMENT FOR Name of work: Work of installation of new SAM make pump with fabrication /erection / modification of suction & discharge pipe (450 NB) in unit no 6, WTPS. ………………………

Upload: others

Post on 12-Mar-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: TECHNICAL BID WEB TENDER NOTICE NO.:450/16/W RFQ … · with fabrication /erection / modification of suction & discharge pipe (450 NB) in unit no 6, WTPS from Contractors who have

1

GUJARAT STATE ELECTRICITY CORPORATION LIMITEDGUJARAT STATE ELECTRICITY CORPORATION LIMITEDGUJARAT STATE ELECTRICITY CORPORATION LIMITEDGUJARAT STATE ELECTRICITY CORPORATION LIMITED

Wanakbori Thermal Power Station, Taluka:Galteshwar, Dist:Kheda– 388239. Ph. 91-2699-235622 Fax: 91-2699-235607,e-mail: [email protected]; [email protected] ,Website: www.gsecl.in

AN ISO-9001:2008, ISO-14001:2004, OHSAS 18001:2007 Certified Power Plant CIN: CIN: CIN: CIN: U40100GJ1993SGC019988U40100GJ1993SGC019988U40100GJ1993SGC019988U40100GJ1993SGC019988

TECHNICAL BID

WEB TENDER NOTICE NO.:450/16/W

RFQ NO.:37965

TENDER DOCUMENT FOR

Name of work : Work of installation of new SAM make pump with fabrication /erection / modification of suction & discharge pipe (450 NB) in unit no 6, WTPS.

………………………

Page 2: TECHNICAL BID WEB TENDER NOTICE NO.:450/16/W RFQ … · with fabrication /erection / modification of suction & discharge pipe (450 NB) in unit no 6, WTPS from Contractors who have

2

GUJARAT STATE ELECTRICITY CORPORATION LIMITEDGUJARAT STATE ELECTRICITY CORPORATION LIMITEDGUJARAT STATE ELECTRICITY CORPORATION LIMITEDGUJARAT STATE ELECTRICITY CORPORATION LIMITED

Wanakbori Thermal Power Station, Taluka:Galteshwar, Dist:Kheda– 388239. Ph. 91-2699-235522 Fax: 91-2699-235607e-mail: [email protected], [email protected] ,Website: www.gsecl.in

AN ISO-9001:2008 , ISO-14001:2004, OHSAS 18001:200 7 CERTIFIED POWER PLANT

TECHNICAL BID

Sub: Tender for the Work of installation of new SAM make pump with fabrication /erection / modification of suction & discharge pipe (450 NB) in unit no 6, WTPS.

Due on 8.12.2016 At 3.30 P.M. (if Possible)

EMD paid YES/NO

Please mention the EMD Receipt No. _____________________ Date: _____________________

OR D.D. No.______________ Date: _____________________ RFQ No. : 37965

Page 3: TECHNICAL BID WEB TENDER NOTICE NO.:450/16/W RFQ … · with fabrication /erection / modification of suction & discharge pipe (450 NB) in unit no 6, WTPS from Contractors who have

3

GUJARAT STATE GUJARAT STATE GUJARAT STATE GUJARAT STATE ELECTRICITY CORPORATION LIMITEDELECTRICITY CORPORATION LIMITEDELECTRICITY CORPORATION LIMITEDELECTRICITY CORPORATION LIMITED

Wanakbori Thermal Power Station, Taluka:Galteshwar, Dist:Kheda– 388239. Ph. 91-2699-235522 Fax: 91-2699-235607e-mail: [email protected], [email protected] ,Website: www.gsecl.in

AN ISO-9001:2008 , ISO-14001:2004, OHSAS 18001:200 7 CERTIFIED POWER PLANT

RFQ. NO:37965

Tender for the Work of installation of new SAM make pump with fabrication /erection / modification of suction & discharge pipe (450 NB) in unit no 6, WTPS.

INDEX

SL. NO DOCUMENT PAGE NO.

1 Technical Bid 2

2 Tender notice 5 to 7

3 Qualifying criteria 8

4 Performa for undertaking 9

5 Schedule A 10

6 Annexure – A (Scope of Work) & Special terms & conditions 11-12

7 Circular – 1 13

8 General condition of contract - I 14-16

9 General condition of contract – II 17-18

10 Safety Norms 19-21

11 Price Bid -Schedule - B 22

Issued to, _____________________________ _____________________________ _____________________________ _____________________________ Receipt No, for tender fees: _________________ Rs. Receipt No, for E.M.D. : __________________ Rs.

Chief Engineer (C & O) WTPS, GSECL

Page 4: TECHNICAL BID WEB TENDER NOTICE NO.:450/16/W RFQ … · with fabrication /erection / modification of suction & discharge pipe (450 NB) in unit no 6, WTPS from Contractors who have

4

GUJARAT STATE ELECTRICITY CORPORATION LIMITEDGUJARAT STATE ELECTRICITY CORPORATION LIMITEDGUJARAT STATE ELECTRICITY CORPORATION LIMITEDGUJARAT STATE ELECTRICITY CORPORATION LIMITED

Wanakbori Thermal Power Station, Taluka:Galteshwar, Dist:Kheda– 388239. Ph. 91-2699-235522 Fax: 91-2699-235607e-mail: [email protected], [email protected] ,Website: www.gsecl.in

AN ISO-9001:2008 , ISO-14001:2004, OHSAS 18001:200 7 CERTIFIED POWER PLANT

DETAILS OF DOCUMENTS/PROOF/DETAILS REQUIRED AS PER TENDER. Name of Bidder: M/s. Sub: Tender for the Work of installation of new SAM make pump with fabrication /erection /

modification of suction & discharge pipe (450 NB) in unit no 6, WTPS.

RFQ-37695 Ref: - Tender Notice No:- 450/16/W Sr.No.

REQUIRED DOCUMENTS/DETAILS REMARKS BY BIDDER

1 Experience of such type of fabrication work & copy of past orders executed for same type of work.

2 Bank solvency certificate of @ 20% estimated value of nationalized bank.

3 Assurance for the un-conditional tender on cover itself. 4 List of tools, tackles and technical personnel.

5 Details of PF code no. & Bank Account details as per Tender terms & conditions

6 Group insurance of all the contract labor duly engaged through out the contract period.

7 Copy of the contract labors license from the appropriate authorities duly obtained and for renewed for the entire contract period.

8 Details of tender fee and EMD paid and also quote the MR/DD no. on tender cover for payment of EMD.

9 Performa for undertaking for not black listed 10 Details of partnership deed in case it is partnership firm. 11 Copy of Service Tax Registration No.

Chief Engineer (C & O) WTPS, GSECL

Signature of contractor

Page 5: TECHNICAL BID WEB TENDER NOTICE NO.:450/16/W RFQ … · with fabrication /erection / modification of suction & discharge pipe (450 NB) in unit no 6, WTPS from Contractors who have

5

GUJARAT STATE ELECTRICITY CORPORATION LIMITEDGUJARAT STATE ELECTRICITY CORPORATION LIMITEDGUJARAT STATE ELECTRICITY CORPORATION LIMITEDGUJARAT STATE ELECTRICITY CORPORATION LIMITED

Wanakbori Thermal Power Station, Taluka:Galteshwar, Dist:Kheda– 388239. Ph. 91-2699-235522 Fax: 91-2699-235607e-mail: [email protected], [email protected] ,Website: www.gsecl.in

AN ISO-9001:2008 , ISO-14001:2004, OHSAS 18001:200 7 CERTIFIED POWER PLANT CIN : U40100GJ1993SGC019988

TENDER NOTICE TENDER NOTICE NO: 450/16/W RFQ.NO.37965 FOR WORKS Sealed percentage rate tenders are invited for the Work of installation of new SAM make pump with fabrication /erection / modification of suction & discharge pipe (450 NB) in unit no 6, WTPS from Contractors who have worked in GSECL/ Central / State Government / Railway/Semi. Govt. and who have executed works as per bid qualification criteria successfully.

RFQ No.

Name of Work Estimated Cost Rs.

Time Limit

Tender Fee Rs.

E.M.D. Rs.

37965

Work of installation of new SAM make pump with fabrication /erection / modification of suction & discharge pipe (450 NB) in unit no 6, WTPS.

361680

24 months from the date of

commencement of

work

500.00

3617.00

(1) Last date of issue of tender - (2) Last date for receipt of tender (Only by RPAD): (3) Date of opening of tender - (4) Security deposit - 5 % of the order value. Last date of submission of tender (technical & pric e bid) up to 14.00 Hrs.

8.12.2016

Date of Opening of technical bid. (in presence of willing bidders) at 15.30 Hrs. :

8.12.2016

Date of opening of Price – bid. (in presence of qualified bidders) :

Will be informed afterwards to technically qualified bidders.

Validity of tender from the date of opening of technical bid . 180 days

The full particulars can be had in the tender which can be obtained from the office of the Chief Engineer GSECL, Wanakbori Thermal Power Station Tal. Galteshwar, Dist. Kheda, Pin–388239. Issued to: __________________________ Earnest money deposits vide Receipt No.______________ dated _____________. The tenders are to be submitted by the intending bidders in two separate sealed and super scribed envelopes as listed below: Envelope No.1: Technical bid and Qualifying criteria data, details specification.

Envelope No.2: Price Bid. NOTE: - 1. D.D. for Tender fee & EMD should be placed in separate envelope which should attached separately

with Technical bid cover as per instructions contained in Tender documents. 2. Technical and qualifying criteria of bid details specification (envelope No.1) will be opened first and

subject to evaluation, based on the qualification criteria contained in the individual bid document. Price bids (Envelope No.2) of bidders who are assessed and declared as substantially technically

responsive on evaluation of the technical bid will be opened for further commercial evaluation.

Chief Engineer (C & O) WTPS, GSECL

Page 6: TECHNICAL BID WEB TENDER NOTICE NO.:450/16/W RFQ … · with fabrication /erection / modification of suction & discharge pipe (450 NB) in unit no 6, WTPS from Contractors who have

6

Gujarat State Electricity Corporation Limited Wanakbori Thermal Power Station – 388239, Tal. Galteshwar, Dist: Kheda

TERMS & CONDITIONS

It is necessary to specify the name of the work on closed cover while bidding the tender. The full particulars can be had in the tender, which can be obtained from the office of the CHIEF ENGINEER (C & O), Gujarat State Electricity Corporation Limited Wanakbori TPS, and Tal. Galteshwar, Dist. Kheda, Pin. 388239. Earnest Money Deposit will be accepted only in cash (up to Rs.20,000) or by demand draft or by Bank guarantee of any Nationalized Bank as per rules of GSECL in favour of GUJARAT STATE ELECTRICITY CORPORATION LIMITED Payable on DENA BANK at Wanakbori Thermal Power Station. Cheque is not accepted. The tender may be opened in the presence of contractors who wish to remain present at the time of opening. The GSECL reserves the right to reject any or all tenders without assigning any reasons thereof. Any clarification regarding the tender shall be obtained before opening the tender.

N.B.: 1. Tender will be accepted only by RPAD. Each tender should be posted separately. Tender

received late will not be accepted. Any alterations, modifications to bids received after opening of tender shall not be considered unless called for by the GSECL In negotiations.

2. It is necessary to produce the latest solvency certificate from nationalized bank of 20% value of estimated cost and Experience certificate or similar evidence for the works carried out in past at the time of purchasing of tender copy. All these certificates along with details of jobs carried out along with documentary evidence and /or satisfactory completion certificate from respective clients should be attached with technical bid for deciding of the opening of price bid.

3. (A) Guarantors issued by following banks will be accepted as SD/EMD on permanent basis.(1) All nationalized banks including the public sector ban- IDBI LTD.(2) Private sector banks- Axis bank, ICICI Bank & HDFC bank. (B) Guarantees issued by following banks will be accepted as SD/EMD for the period up to 31 st March 2017 . The validity cut off date in GR with respect to date of issue of Bank Guarantee irrespective of date of termination of Bank Guarantee. 1. Kotak Mahindra bank 2. RBL Bank (The Ratnakar bank Ltd) 3. Indusind Bank 4. Karur Vysya bank 5. DCB bank 6. Federal Bank 7. South Indian bank. 8. The Kalupur Commercial Co-operative bank ltd., 9. Rajkot Nagarik Sahakari Bank Ltd. 10. The Mehsana Urban Co-operative Bank Ltd., 11. Nutan Nagarik Sahakari bank Ltd. 12 Dena Gujarat Gramin Bank. 13. Saurastra Gramin Bank

4. Tenderers should also certify as unconditional tender on tender cover it self. The tender without payment of EMD will not be opened or considered, EMD will be accepted in cash up to Rs.20, 000.00 only up to 13.30 hrs up to the date of opening of the tender.

5. Tenderers shall note that they possess separate P.F. Code No. in their name (under Employee provident fund organization, Regional office, Ahmedabad directive) obtained from the concerned authorities of their respective jurisdictions. In the event of non-possession of the separate PF code number, No tender will be considered.

6. Submission of Account Details for Payments: The payments of the bills will be made by RTGS / NEFT ONLY. Hence, all the Tenderers will have to submit the following details at the time of submission of the tender its elf.

Page 7: TECHNICAL BID WEB TENDER NOTICE NO.:450/16/W RFQ … · with fabrication /erection / modification of suction & discharge pipe (450 NB) in unit no 6, WTPS from Contractors who have

7

i. Bank Account Number ( Full 11 digit Number) ii. Type of Account iii. Bank Name iv. Bank Name and Address v. Contact Number of the Branch vi. IFSC No.

It is mandatory to submit the above bank details wh ile submission of the tender as the same will be required for payment of your bills . No separate letter will be written by GSECL in this regard. Alternatively, Tenderers c an also submit Xerox copy of the one cancelled cheque which indicates the above bank details.

7. Issue of tender documents to any party will not automatically qualify the party as to its capability etc to execute the job and GSECL shall assess the capability of the party at the time of evaluation of technical bids.

8. Tenderers shall also certify that quoted tender is ‘UNCONDITIONAL’ on tender covers itself.

9. The tender’s documents are of two bid systems. [A] The technical bid, which is to be submitted in separate sealed envelope mentioning ‘TECHNICAL BID’ on envelope with details given special note for qualification criteria with mentioning of E.M.D. payment. [B] The commercial [price] bid, which is to be submitted with the rest page of tenders including Schedule-B in separate sealed envelope mentioning ‘COMMERCIAL BID’. Both the bids should be submitted in another separate sealed cover on due date of submission with name of work superscripted thereon and with note ‘TENDER - DO NOT OPEN’ written prominently.

10. No work order will be issued to party not possesses own Service Tax number. 11. Subletting of tender is not permitted. 12. DD No & bank Guarantee No. date should be mentioned on envelop invariably on technical

bid cover as well as main cover.

The exemption in payment of EMD shall be given to the small, Cottage & tiny industrial units registered under small scale industries of Gujarat state and holding subsequent registration with CSPO/NSIC/DGS&D registration certificates for manufacturing of item under tender. The payment of SD/PBG(where applicable) shall be considered 6 % of End cost in case of small, Cottage & tiny industrial units registered under small scale industries of Gujarat state and holding subsequent registration with CSPO/NSIC/DGS&D registration certificates for manufacturing of item under tender.

13. Vender registration with GSECL is not compulsory required for submitting the tender. 14. Bidders are advised to visit our above websites regularly up to opening of bid for

corrigendum if any & submit corrected copy of tender(otherwise their offer will not be considered for opening) & extension of due date.

15. SD will be released after issuance of NOC from user department. 16. Whichever terms conflict with “COMMERCIAL TERMS AND CONDITIONS” the terms

mentioned in “NIT” will be applicable. 17. Successful bidder shall have to enter into agreement with GSECL for order value (End

cost) above 5 lakhs. 18. Bidder shall have to submit their bid in three cover i.e. Tender Fee-EMD cover, Technical

bid cover and price bid cover. First the tender fee-EMD cover will be opened and if the documents towards payment of EMD and tender fee found ok, then only technical bid will be opened. Tenders submitted without tender fee-EMD by the firms, will be rejected without entering into further correspondence.

19. GSECL reserve the rights to accept/reject an or tenders without assigning any reasons thereof.

Chief Engineer (C & O) WTPS, GSECL

Sign Of contractor with seal & date

Page 8: TECHNICAL BID WEB TENDER NOTICE NO.:450/16/W RFQ … · with fabrication /erection / modification of suction & discharge pipe (450 NB) in unit no 6, WTPS from Contractors who have

8

Gujarat State Electricity Corporation Limited Wanakbori Thermal Power Station – 388239, Tal. Galteshwar, Dist: Kheda

Sub: Work of modification/fabrication/erection/commissioning of 450 NB suction and

discharge line with replacing new SAM make pump with foundation frame at unit no 6, stage-II, WTPS.

QUALIFYING CRITERIA

A. Party should have done such type of fabrication works during last Seven (07) years satisfactorily at any Thermal Power stations of GSECL, NTPC or other Electricity Board in the past. Documentary proof of having executed such type of orders will have to be produced along with Technical bid. However, submission of such documentary proof by party will not automatically qualify the party as to its capability to execute same orders and the Corporation shall assess the capability of the party at the time of evaluation of the Technical bid.

B. It is necessary for contractor to produce the latest solvency certificate from nationalized bank of 20% value of estimated cost.

C. It is necessary for contractor to possess separate P.F. Code No. in their name (under Employee provident fund organization, Regional office, Ahmedabad directive) obtained from the concerned authorities of their respective jurisdictions. Up-dated copy for the same shall have to be submitted. In the event of non-possession of the separate PF code number, No tender will be considered.

D. Contractor shall have to submit latest workman Group insurance policy covering all the labour who are going to work at WTPS site.

E. Contractor should possess own service tax number. Document for the same shall have to be submitted.

F. Contractor shall have to submit copy of PAN card. G. Contractor shall have to submit list of tools & tackles and men power. H. For fulfillment of all the Labour laws, liabilities before starting of the contract work,

contractor should give the assurance/indemnity bond on non judicial stamp paper of Rs. 100/- to GSECL, WTPS or as per the tender amount.

I. Tenderer MUST indicate their: Bank Name:_________________________ Name of the Branch:____________________, Banks IFSC Code:________________ These details are required for facilitation of payments.

J. Contractor MUST Indicate his GSECL SUPPLIER CODE No.________ K. Contractor has to fill undertaking Performa regard to stop deal / black list thereof

##############################

Page 9: TECHNICAL BID WEB TENDER NOTICE NO.:450/16/W RFQ … · with fabrication /erection / modification of suction & discharge pipe (450 NB) in unit no 6, WTPS from Contractors who have

9

Gujarat State Electricity Corporation Limited Wanakbori Thermal Power Station – 388239, Tal. Galteshwar, Dist: Kheda

UNDERTAKING IN REGARD TO STOP DEAL / BLACK LIST THEREOF All bidders will have to furnish the following undertaking duly filled in, signed and stamped for each quoted item of the tender along with the Technical Bid. I/We …………………………………………………………………………………...authorized

signature of

M/s……………………………………………………………………………………….here by certify

that M/s………………………………………………………………………………………is not stop

deal / black listed by GUVNL and or their any subsidiary company viz. GSECL /

GETCO/ DGVCL/MGVCL / UGVCL / PGVCL

##############################

Sign Of contractor with seal & date

Page 10: TECHNICAL BID WEB TENDER NOTICE NO.:450/16/W RFQ … · with fabrication /erection / modification of suction & discharge pipe (450 NB) in unit no 6, WTPS from Contractors who have

10

Gujarat State Electricity Corporation Limited Wanakbori Thermal Power Station – 388239, Tal. Galteshwar, Dist: Kheda

SCHEDULE - A

Sub: Work of installation of new SAM make pump with fabrication /erection / modification of

suction & discharge pipe (450 NB) in unit no 6, WTPS. GSECL SCOPE:

1. Required size 450 NB pipe, foundation frame, 8/10 mm MS plates, Supports, fasteners, gaskets & flanges will be issued by GSECL.

2. Required removal of concrete grouting for removing old foundation frame & re grouting the concrete after fixing of new frame will be in GSECL scope

3. Air, Water and Electricity are provided by GSECL at free of cost form the points decided by EIC. However, whenever electricity connections are needed by the contractor, they shall have to mandatorily furnish the complete details of their equipments in writing (citing work order number), to carry out the tendered work. This is a MUST.

4. Electricity is provided by GSECL at free of cost from the points decided by EIC. The lighting is to be arranged by the Party. The GSECL shall make Arrangement for providing Power Supply to the Contractor for working their Equipments, Tools etc. as and when required as decided Locations / Points by Engineer in Charge. ICTP Switches fuse; overload trip device, ELCBs and other electrical protection devices must be arranged by the Contractor at his own cost and risk. Further Distributions shall be at the Cost of Contractor. However Contractor shall arrange sufficient quantities of 100 Watts / 24 volt A.C. Bulbs with Bulb holders & its extension boards with @ 15 meter cable at their Cost.

CONTRACTOR SCOPE:

1. GSECL will issue the above required materials from GSECL stores. Party shall have to arrange to transport the material from main store/ sub store to work area at contract rate only.

2. Various consumable likes, Grinder machine with Grinding wheels, cotton waste, wire brush, etc. shall be arranged by the contractor.

3. Tool-tackles required for subject work like Welding Machine, Oxy-acetylene Cylinder, Cutting Torch, Grinding Tools, chipping hammer, required chain pulley blocks etc. shall be arranged by the contractor at their own cost only.

4. All the tools and tackles and consumable like cotton waste, rustoline required for this work will be brought by the contractor at his own cost.

5. Required Qty welding rods / Oxygen / DA gas etc. will be in party's scope 6. Party has to arrange welding machine with electrical certificates as per GSECL rules &

regulation. 7. Contractor shall have to arrange to apply two coat of red-oxide and followed two coat of

green paint of Asian, Narolac or Burger make and other painting related material at their own cost.

8. To & fro cost for fabrication of new 450 mm pipe is in party’s scope.

##############################

Sign Of contractor with seal & date

Page 11: TECHNICAL BID WEB TENDER NOTICE NO.:450/16/W RFQ … · with fabrication /erection / modification of suction & discharge pipe (450 NB) in unit no 6, WTPS from Contractors who have

11

Gujarat State Electricity Corporation Limited

Wanakbori Thermal Power Station – 388239, Tal. Galteshwar, Dist: Kheda ANNEXURE-A

Sub: Work of installation of new SAM make pump with fabrication /erection / modification of

suction & discharge pipe (450 NB) in unit no 6, WTPS. SCOPE OF WORK: For item sr no 1: Installation of new SAM make pump with fabrication /erection / modification

of suction & discharge pipe (450 NB) 1. Pump decouple work, removing of motor from frame & Disconnection of suction

/discharge flanges of pump volute casing. Removal of pump module, volute casing, motor from foundation frame & Removal of foundation frame.

2. Fixing of New foundation frame in its position & Leveling of foundation frame by micro level & also leveling of pump- motor set on new foundation frame. Installation of pump & motor on foundation frame, jacking the bolts for motor alignment & leveling the pump & motor.

3. Removal of old suction, discharge line & fabrication/ erection/ modification including preparing of new bends & reducers of new pipes. Connection of pipes with pump flanges.

4. Aligning of piping pieces, flanges, pipe, bend & reducer etc, providing extra support wherever necessary. After completion of aligning, provide full welding on each joint. New erected pipe line should be tension free.

5. After completion of full welding of suction & discharge pipe, contractor has to connect both flanges with pump & complete the proper alignment of motor & pump set as per instruction of EIC.

6. Required size 450 NB pipe, Supports, fasteners, foundation frames & flanges will be issued by GSECL. Removal of old concrete grouting & re grouting after fixing of new frame will be in GSECL scope

7. Welding rods / Oxygen / DA gas, colors, Red oxide, welding machines, grinders including all tools tackles will be in contractor’s scope.

8. After completion of work, party shall have to carry out one coats of Red Oxide and two coats of 'Asian / Berger / Nerolac' make synthetic enamel paint of approved shade from EIC on new erected line.

9. Any other work not specifically mentioned in this scope of work but if found necessary while execution of job has to be done by party.

10. Work is to be carried out by contractor as per instruction of EIC. 11. Contractor has to follow labour laws & safety rules as per GSECL’S procedure. 12. Any damages caused by the contractor during execution of work will be attended by

Contractor at his risk & cost 13. Shifting of material from main store to site & scrape if any after completion of work has to

be credited to main store will be arranged by party. 14. After completion of work if any defects found within Three month then party has to attend

the same on top priority without claiming any extra charges. For item sr no 2: Fabrication of new 450 NB pipe from 8/10 mm plate. 1. Cutting of 8/10 mm thick MS plates and bending for preparation of 450 mm diameter pipe

& welding on bended pipe joint for ACW pump suction/discharge pipe as per requirement. Approximate length of pipe piece is 2 meter.

2. Party has to collect 8/10 mm MS plate from store. 3. To & fro Transportation cost for preparing pipe will be in your scope. 4. 8/10 mm plate will be provided by GSECL.

GENERAL TERMS AND CONDITIONS FOR WORK:

1. PERFORMANCE GUARANTEE: The firm shall offer a guarantee for period 03 (Three) months from the date of commissioning of unit towards poor workmanship. The amount of

Page 12: TECHNICAL BID WEB TENDER NOTICE NO.:450/16/W RFQ … · with fabrication /erection / modification of suction & discharge pipe (450 NB) in unit no 6, WTPS from Contractors who have

12

SD deposited by the firm above shall be retained by GSECL till completion of guarantee period.

2. QUANTITY OF WORK: The estimated quantity of work given in Schedule `B’ is purely based on assumptions. Any of the items may be deleted completely or quantity may vary on either side depending upon the condition of the availability of old pump set to be removed but in any case on GSECL`s discretion.

3. VALIDITY OF THE CONTRACT: The validity of this work contract will be 24 months from date of commencement of work. GSECL can extend contract for further Three months after expiry of the time limit with the same rate, terms & conditions. Total time limit for the subject work is 20 days each work.

4. PENALTY: Any delay that may take place in the subjected work beyond contractual cutoff date/ stipulated period in the order shall be subjected to penalty (not liquidated damages) at the rate of 1/2% of the contract price/order price per day or part thereof.

5. Required scaffolding for carrying out work is in party's scope. However, necessary material for scaffolding will be provided by GSECL if available either from sub store or main store & transportation in party’s scope.

6. On completion of the work, the site shall be cleared by the contractor within the stipulated (two days) period by crediting scrap material & submit the GSECL material, tools & tackles, consumable items etc. which is provided by GSECL free of cost as per scope of work TMD-II store, failing which site will be cleared by departmentally or any loss of above mentioned items, the expenses occurred will be recovered from your RA Bills / pending dues.

7. Contractor has to handle the GSECL equipment / tools / tackles carefully otherwise the cost of damage / shortage will be recovered from the party’s bill.

8. Contractor has to follow all labour laws and safety rules as per GSECL procedure. 9. Contractors are fully responsible for any loss / damage / accident to his labours / material /

equipments which are being attended to. While doing the job, they should compulsorily make arrangements for proper care of all the items till completion of the work. While carrying out the work all the spares that are dismantled shall be kept under lock and key by them and in safe conditions from loss of any theft. In case of any discrepancy, GSECL’s competent authority’s decision is final.

10. Accommodation at GSECL guest house / hostel. Quarters will be provided if available and on chargeable basis as per GSECL rules.

11. Contractor has to appoint supervisor to supervise the work and to follow the instruction given by GSECL on round the clock basis.

12. Contractor shall have to submit daily progress report for work carried out during previous day failing to which Rs.100=00 per day shall be recovered from outstanding amount of bill for not submitting the progress report.

13. The contractor shall have to execute Agreement on stamp paper of Rs.100/- & Indemnity bond on stamp paper of Rs. 100/- in the prescribed form before commencement of work. The cost of stamp papers shall be borne by the contractor.

14. Contractor shall have to pay Security Deposit @ 5% of the order value within 10 days from the date of issue of LOI. The amount of SD shall be retained by GSECL till completion of Guarantee period @ 3 months.

15. Contractor shall have to mobilize their extra manpower within 2 days after instruction of EIC to attend breakdown work.

16. In case of injury/accident while working, it shall immediately be reported to safety department through EIC. The prescribed form no.21 may be obtained from EIC or safety officer. For any accident occurred but have no injury to any persons should also be informed to safety officer as Near Miss Incident

17. Contractor shall have invariably to submit “Fitness Certificate” of the working staff from qualified doctors having qualification of minimum MBBS to the EIC & safety officer before reporting to the work.

18. Payment will be made as per actual work done only. 19. No price escalation will be entitled.

##############################

Sign Of contractor with seal & date

Page 13: TECHNICAL BID WEB TENDER NOTICE NO.:450/16/W RFQ … · with fabrication /erection / modification of suction & discharge pipe (450 NB) in unit no 6, WTPS from Contractors who have

13

Gujarat State Electricity Corporation Limited

Wanakbori Thermal Power Station – 388239, Tal. Galteshwar, Dist: Kheda

CIRCULAR - I

Following are the major obligations to be fulfilled by the Contractors as per the Contract Labor (R&A) Act 1970 and rule mentioned there under: 1. License to be obtained before starting the Work where number of contract laborers in ten

or more. 2. Payment to contract laborers has to be made in presence of IRO/LWO. Wages rates for

contract laborers are applicable as per the terms and conditions of the license. The contractor shall have to pay wages to workers as notified by Government of Gujarat., from time to time

3. Every contractor shall have to maintain the muster roll and wages register in respect of his contract labor.

4. Every contractor is required to issue employment card, wages slip and attendance card to their laborers.

5. The contractor has to maintain the register No. 13 containing details of contract labors employed by him.

6. Earned leave register/ card as per the Factories Act. And Rules. 7. Other registers required under Contract Labor Rules and the Factories Act. And Rules. 8. Every contractor shall have to obtain insurance policy in respect of the contract labors

engaged by him to cover them under workmen’s Compensation Act. 9. To send half yearly return to licensing officer as per Rule 82 (1) as per schedule time. 10. Before starting the work as per the contract awarded to him, he should make arrangement

to enter into the agreement in the prescribed format on the stamp paper as applicable. Before fulfilling the above requirement the contractor is instructed not to start the work. The responsibility will be on his head in case he fails.

11. Contractor should posses separate P.F. code on their Firm name otherwise their offer may not be considered

All the contractors are informed to adhere to the rules and regulations applicable to them, particularly in respect of the laborers engaged by them, the contractor not fulfilling the obligations will not be allowed or continue with work/ not be held qualified to carry out the work at Wanakbori Thermal Power Station, TA- Galteshwar Dist.- Kheda

##############################

Sign Of contractor with seal & date

Page 14: TECHNICAL BID WEB TENDER NOTICE NO.:450/16/W RFQ … · with fabrication /erection / modification of suction & discharge pipe (450 NB) in unit no 6, WTPS from Contractors who have

14

Gujarat State Electricity Corporation Limited Wanakbori Thermal Power Station – 388239, Tal. Galteshwar, Dist: Kheda

GENERAL CONDITION OF CONTRACT-I

The following are the major obligations to be fulfilled by the Contractors as per the Contract Labor (R&A) Act 1970 and rule mentioned there under: 1. The contractor should not be allowed to engage ten or more contract labourers without initiating to obtain the labour license under the Contract Labour Act from the Assistant Commissioner of Labour Nadiad (the said number i.e., ten or more includes Supervisor and other staff.). 2. The contractors shall have to obtain group insurance under WC Act before starting the work. 3. All Contractors shall have to make the payment of wages to the Contract Labours engaged by them, on or before 7th of every month through Nearest Nationalized Bank compulsory, preferably situated in the premises of Wanakbori TPS area in case of ARC /BRC works Contract. The Contractor shall supply copy of Bank Statement duly stamped by the Concerned Bank as a token of proof towards payment of Wages to HR Department. In Case of Non ARC/ BRC works contract, it is also expected the same practice to be adopt by the contractor. If any problem arise for payment of wages through bank, same be informed to chief engineer (Gen) and after approval the payment shall be disbursed in presence of the GSECL representative and obtain their signature in Wages Register - Form No. XVII prescribed under the Contract Labour (R&A) Act, 1970. Prior to that Contractor shall intimate the Date, Time & Mode of Payment in advance to LWO / IRO. Contractor has also required to get the wage register of respective month certified from LWO / IRO as per the provision laid down under the Contract Labour (R&A) Act, 1970. 4. Payment to contract laborers has to be made through Bank/ Cheque/ RTGS only. Wages rates for contract laborers are applicable as per the terms and conditions of the license. The contractor shall have to pay wages to workers as notified by Government of Gujarat., from time to time. 5. It should be ensured that all the labours engaged by contractor are covered under the provident fund scheme and employee’s pension scheme and their contribution are remitted regularly to the concerned RPFC. The Xerox copies of challan along with ECR in this regards should be submitted regularly in G.S.E.C.L. office. 6. In case the contractor having more than one contract in the same TPS, the contractor shall have to submit contract wise separate list of the workmen to the concerned Officer. 7. The contractor shall have to pay wages to workers as notified by Government of Gujarat., from time to time. The above instructions should be followed scrupulously to avoid undue litigation for non compliance of Labour Law.

GENERAL CONDITIONS OF CONTRACT:- (1)LABOUR LAWS 1. Person below the age of 18 years and above 60 years should not be employed for the work. 2. No female worker shall be employed in the night shift between 7.00 P.M. to 6.00 A.M. 3. The contractor shall maintain a valid labour license under the contract labour (Regulation and

Abolition) Act for employing necessary man power to be required by contractor. In the absence of such license the contract shall be liable to be terminated without assigning any reasons thereof. The contractor shall at his own expense comply with all labour laws and keep the G.S.E.C.L. Indemnified in respect thereof. Some of the major liabilities under various labour and industrial laws, which the contractor shall have to comply, which are as under:

a. Payment of contribution by way of employee’s contribution towards provident fund, family pension scheme, deposit linked insurance scheme, administrative charge etc., at the rates made applicable from time to time by Govt. of Gujarat /Govt. of India and other statutory authorities.

b. Payment of deposit in respect of each contract labour at the rate applicable of with the offices of Commissioner of Labour as per the contract labour (Regulation and Abolition) Act.

c. License fee as prescribed under the contract labour (Regulation and Abolition) Act and rules framed there under depending upon the number of workmen employed by contractor.

d. Identity cards as prescribed under the factories Act shall be issued to workmen. e. Payment of retrenchment compensation, Notice pay and other liabilities as per Industrial

Disputes Act. Any payment to the contractor's employees arising out of any claim or disputes under the Industrial Dispute Act 1947 or any other labour laws.

f. Payment of compensation in case of accidental injury shall be made as per the WC Act. g. If the female workmen are more than 30 numbers engaged then provision of crèches, shall be

complied accordingly. h. Maternity leave as per the provision of the maternity benefit Act. The above are some of the major liabilities of the contractor in addition to other liabilities prescribed under the various labour laws in force from time to time from statutory Authorities like State Government / Government of India, which the contractor shall have to comply with. 2) PROVIDENT FUND AND FAMILY PENSION SCHEME: The contractor shall submit along with

Page 15: TECHNICAL BID WEB TENDER NOTICE NO.:450/16/W RFQ … · with fabrication /erection / modification of suction & discharge pipe (450 NB) in unit no 6, WTPS from Contractors who have

15

his bill (month wise) statement regarding deductions against employees’ provident fund and family pension scheme in respect of each concerned employee. Provident fund and family pension scheme at the rate of 12 % of wages (or at the rates made applicable by the Government time to time). The contractor’s contribution and his workers contribution towards provident fund and family pension scheme shall deposited by the contractor with Regional Provident Fund Commissioner, Ahmedabad. In case if the contractor deposits the contribution to the Assistant Provident Fund Commission, the zerox copy of challans and schedule must be submitted in the office. For maintaining the CPF Account of contractor’s employees the contractor will have to pay administrative charges as applicable of the emoluments of the employer of the contractor's every month. 3) GROUP INSURANCE SCHEME: The contractor has to take Group Insurance for all workmen engaged by him and copy of the same shall be produced to Concerned Officer. 4) PAID LEAVE FACILITY: Paid leave facility at the rate of one day for every 20 days worked by the contract, labour shall be provided the contractor to his workers. It shall be duly verified and approved/certified by the authorized officer of the GSECL. 5) The contractor shall employ adequate number of experienced staff at site for daily supervision and for maintaining of various registers and records required under the law and contracts. No payment for such supervision shall be admissible. 6) CONTRACTOR TO INDEMNIFY THE GSECL: The contractor shall indemnify and keep indemnified the GSECL, and every member, officer and employees of the GSECL, also Engineer-in-charge and his staff against all actions, proceedings, claims, demands, costs and expenses whatsoever arising out of or in connection with the matter referred in above clauses and elsewhere and against all actions, claims demands, cost and expenses which may be made against the GSECL by any workman/ employees of contractor or any sub contractor and or from any liability any wise to any workman/employees of the contractor or sub-contractor under any laws, rules or regulation having in force of law including but not limited to claims against the owner under workmen compensation Act, 1923. The Employee’s Provident Fund Act.1952, and/or the contract labour (Abolition and Regulation) Act, 1970. The GSECL shall not be liable for or in respect of or in consequence of any accident or injury to any workmen or other person in the employment of the contractor or his sub-contractor, and the contractor shall indemnify and keep indemnified the GSECL against all such damage and compensation and against all claims, demands proceedings costs, charges and expenses whatsoever in respect of or in relation thereto. 07) WORKMEN'S COMPENSATION & EMPLOYER'S LIABILITY INSUR ANCE: Insurance shall be affected for all the contractor’s employees engaged in the execution of these contracts. If any of the work is sublet, the contractor shall required the sub-contractor to provide workmen's compensation and Employer's liability insurance for the latter's employees unless such employees are covered under the contractor’s insurance. It shall be liability of contractor for employees of his sub-contractor. 08) Any other rules and regulation, conditions, Circulars etc., that are in force at present and that may be framed by the GSECL From time to time in connection with contracts will be binding and acceptable to contractor. 09) The contractor must possess separate P.F. code for the above subject work. 10) Attendance rolls shall be maintained up to date. All the written registers, Performa etc…shall be filled up and maintained up to date and kept ready for inspection at any time or submitted in-time to the concerned authorities as per contract labour etc. Factory Act. etc... By contractor 11) It is the responsibility of the contractor to ensure that contractor’s employees maintain strict discipline as regards security, methods of safe working etc, and not to cause any hindrance to smooth running of power station or in execution of duties by GSECL staff. Any lapse in this regard will be viewed seriously and contract is liable to be terminated. If any of contractor’s staff is found unsuitable or not behaving properly, the contractor shall have to remove him from the work-site on demand by GSECL. The contractor shall have to strictly observe the rules and conditions specified in the enclosed works contract booklet of the GSECL, which are not modified hereunder. To keep harmonious industrial relations amongst contract labours is the sole responsibility of the contractor. Any breach of the same will be viewed seriously. 12) Before starting the work, the contractor should contact Industrial Relation Officer/ Labour Welfare Officer for all formalities and obtaining the gate passes of all contract labourers and for other formalities. 13) The contractor shall deposit 15 days salary at the rate of last drawn salary for every completed two years of services for each worker for the liabilities of the gratuity ( * applicable to ARC/BRC works contract only) Follow the following procedure at each milestone for the execution of works contract. (A) On Commencement of Contractual Work: (1) The Contractors shall have to obtain Photo-Gate-Pass before the commencement of contractual work awarded. Contractor shall have to apply for the gate passes in triplicate in a

Page 16: TECHNICAL BID WEB TENDER NOTICE NO.:450/16/W RFQ … · with fabrication /erection / modification of suction & discharge pipe (450 NB) in unit no 6, WTPS from Contractors who have

16

prescribed application form which is to be available from Security Section for the entry of workmen in the premises. (2) Such application shall have to be proceed for the approval of Factory Manager. After obtaining approval of Competent Authority, contractor shall have to prepare the Gate Passes and obtain the signature of Factory Manager. (3) If Labours are required to be engaged in Emergency during Public Holiday , Contractors Can apply for Temporary Gate-Pass for the period of only three days with recommendation of respective EE/SE and the same shall have to be regularized after following the procedure of Gate Pass applications on the office working day from HR Department. It is to note that No Temporary Gate-Pass shall be issued for the work other than acute emergency to carry out the work in power station premises. (4) The Contractor shall have to obtain the Group Insurance Policy under the Employee Compensation Act, 1923 prior to commencement of work. (5) The Contractor who intend to engaged 10 or More than 10 labours to Carry out the awarded contractual work then necessary - Form No. V under the Contract Labour (R& A) Act, 1970 / Form No. VI under the Interstate Migrant worker (employment regulation) rule 1979 as applicable is to be obtained from HR Department for the purpose of obtaining Labour License from the Licensing Authority. (B) During Contractual Work under the progress: (1) Bill Recording Officer of User department shall have to ensure as to whether contractor has engaged minimum number of contract workmen per day as per the terms of work order. (2) All Contractors shall have to make the payment of wages to the Contract Labours engaged by them, on or before 7th of every month through Nearest Nationalized Bank compulsory, preferably situated in the premises of Wanakbori TPS area in case of ARC /BRC works Contract. The Contractor shall supply copy of Bank Statement duly stamped by the Concerned Bank as a token of proof towards payment of Wages to HR Department. In Case of Non ARC/ BRC works contract, it is also advisable the same practice to be adopted by the contractor. However in case of inconveniency in adopting such practice , Contractor shall have to disburse the wages to labours engaged by them on or before 7th of every month in presence of Company representative i.e. LWO/ IRO and obtain their signature in Wages Register - Form No. XVII prescribed under the Contract Labour (R&A) Act, 1970. Prior to that Contractor shall intimate the Date, Time & Mode of Payment in advance to LWO / IRO. Contractor has also required to get the wage register of respective month certified from LWO / IRO as per the provision laid down under the Contract Labour (R&A) Act, 1970. (3) All Contractors has to comply & maintain statutory documents / registers at site under the provision of labour laws & EPF Act. (C) Submission of Statutory documents to ensure the compliances: 1) The Contractor shall have to submit following statutory documents, work order wise, under the labour laws and EPF to the recording officer of user department for ensuring the compliances of provision of labour laws and EPF Act for the respective working period. • Copy of Attendance register – with name & address of establishment, Name of work and site (duly signed & stamp by Contractor ) - Form XVI • Copy of Wage Payment Sheet – with signature of workmen, duly signed & stamped by Contractor - Form XVII • Copy of Bank Statement of Wage Payment (duly signed & Stamp by Concern Bank) • Copy of PF Challan along with ECR Statement • Copy of Gate Pass Permission ( duly signed by Authorities ) - • Copy of Work Order ( First Time ) • Copy of Valid W.C. Policy ( First Time) • Copy of Valid Labour License ( If Applicable in case of More than 9 manpower Engaged by Contractor for said work ) ( First Time) • Form No. XIII – Register of workers employed by Contractor ( First Time) Prescribed under the Contract Labour (R&A) Act, 1970 Contractor shall specify the Name of Work, Place of Work and Work order number in Muster Roll- Form No. XVI & Wage Register – Form No XVII.

###########################

Sign Of contractor with seal & date

Page 17: TECHNICAL BID WEB TENDER NOTICE NO.:450/16/W RFQ … · with fabrication /erection / modification of suction & discharge pipe (450 NB) in unit no 6, WTPS from Contractors who have

17

Gujarat State Electricity Corporation Limited Wanakbori Thermal Power Station – 388 239, Tal. Galteshwar, Dist: Kheda

GENERAL CONDITIONS OF CONTRACT SECTION: -II 1. The contractor shall at their own expense make all necessary provision for housing water

supply and sanitary arrangement for their employee as well as for works and shall pay direct to the authorities concerned all rates and taxes.

2. The contractor shall make their own arrangements for the necessary approach road, for transport of their materials and be responsible for the Compensation on account of damage to crop on Corporations’ property.

3. All the royalty charges octroi other duties will be paid by the contractor and no extra could be claimed on this account.

4. The organization will supply articles at the place and rates mentioned in schedule ‘A’ of Tender form. In case of the materials issued either through or with the recommendation of this organization it will be absolutely necessary for the contractor to maintain a correct and honest record of the daily consumption of the said materials/with inside particular reference to the work during the day. The Engineer-in-charge of this department or his authorized agent shall have the right to inspect and check the stores containing these materials and the account for these materials shall be presented for inspection whenever asked for by them. Every facility shall be afforded by the contractors for all these inspections Engineer-in-charge will supply the materials in any quantity as deemed fit.

5. Godown of sheds hired or constructed for storage of controlled materials and more/ particularly of cement shall be such as would prevent the materials from getting damages in any way.

6. It will be absolutely incumbent o the contractors to have on the site of work only such of the materials as have been dully passed by the Engineer-in-charge Materials that have been rejected must on no account be allowed to remain on the side and in spite of written order to do so any such rejected material is on the site beyond a period of 48 hours, notice the Engineer-in-charge shall have the right to remove it at the risk and cost of the contractor and even destroy it.

7. It must be distinctly understood that the conditions of the contract and of claims in respect of extra work will not be allowed, unless the works to which they relate is clearly without the spirit and meaning of the specifications or unless such work are ordered in writing by the Engineer-in-charge and claimed for in specified manner.

8. On completion of the work, the site shall be cleared by the contractors within the stipulated period, and ground brought to original state and they shall not be entitled for any extra claim on this account.

9. General specification of the latest edition of the P.W.D. Hand Book volume I & II shall also apply.

10. DAMAGE CAUSES TO WORKS: The work whether fully constructed or not, and all materials, machinery plant tools, temporary building and other things connected there shall be at the risk and in the sole charge of the contractor until the works have been delivered, completed to the Engineer-in-charge and certificate from him to that effect obtained until such delivery the contractor shall at their own cost take all the precautions reasonably necessary to keep all the aforesaid works materials machinery, plant, tools, temporary building and other things connected with the work, free from any loss or damage and in the event to the same or any part there of being lost or damage shall from with within possible speed, reinstate and make good such loss or damage at contractor’s own cost.

11. Supply of controlled articles will be invariably recommended after the actual requirements have been carefully scrutinized. In the event of any such materials remaining in surplus in charge of the contract, on account of some modifications either in the design or changes in construction or any other reason will be returned to the department.

12. There will be generally no objection on the component parts of the works being given over to responsible sub contractors but it must be borne in mind that this department would under no circumstances recognize these sub contractors and responsibility of executing the work in accordance with the condition of the contract will entirely rest on the main

Page 18: TECHNICAL BID WEB TENDER NOTICE NO.:450/16/W RFQ … · with fabrication /erection / modification of suction & discharge pipe (450 NB) in unit no 6, WTPS from Contractors who have

18

contractors. The main contractors will therefore always have the very responsible member preferably a technical hand, present on the works with power to sign all work order issued on the site of work and to take requisite actions in the interest of very efficient execution of works.

13. The Engineer-in-charge will fix the hours of work and no work shall be executed beyond that period during night time or in absence of the Engineer-in-charge or his authorized agent. The box measures shall be filled only in the presence of the Engineer-in-charge or his authorized agent.

14. If any work is not executed according to the specifications and the directions of the Engineer-in-charge the same will be rejected or reduced rate will be allowed as deemed fit by the Engineer-in-charge.

15. Contract will have to communicate the name of his authorized agent who shall be presentation the works and shall be authorized to sign the materials requisitions receive instruction given verbally, or on the order book on behalf of the contractor.

16. The materials issued to the contractor as per schedule `A’ of the tender shall not be removed from the work and all surplus material at the end of the works which is considered serviceable shall be returned to the organization even the unserviceable material shall be removed only with the prior permission to the E.E. in writing.

17. This notice to tenders shall form a part of the contract. 18. The entire work is to be completed within the stipulated time limit from the date of work

order. The contractor will not be eligible for any extra for the idle period of work or waiting period that may be required to suit other considerations and no claim for compensation on account of such will be considered. However in case or delay due to circumstances beyond the control contractor either in date of commencement or due to waiting during construction extension time may be considered for completion of work.

19. In case contractor is unable to account for full quantity of materials issued to him from the department stores, recovery will be effected from him at cost rates or market rates prevailing at the time of issue whichever is higher, plus 15% to cover Corporation’s departmental supervision charges for all material unaccounted for.

20. Due consideration will be given in granting extension of time for completion of the work if found necessary on account of delay supply of materials. No claim for compensation or for damages for extension in time shall be entertained in this account. All materials inquired by the contractor shall be drawn from the stores by requisition given in writing by the contractor at least one week before the requirement of work. The recoveries will be affected in running payment for all material issued up to the date of measurements for the particular bill or the quantities used in the works measured at the description of the Executive Engineer in charge of work.

21. The contractor shall keep one full time qualified supervisor / engineer at site who shall be fully authorized to receive and comply with such instructions as given by the Executive Engineer. The names of such supervisor / engineer with his qualification and experience shall be intimated by the contractor. The E.E. shall have the right to demand the removal of any technical person. Skilled or unskilled work men who in his opinion are considered to cause bad workmanship in the execution of work or to cause indiscipline.

22. Bill shall be submitted by the contractor monthly on or before the date fixed by the E.E. for all works executed in the previous months.

23. The work will have to be carried out in co ordination with other Agencies on the same site on account of this in case the contractor has to stop or delay his works for same time he will not claim anything extra only Corporation may consider to give suitable extension in time limit if necessary on such account.

############################## Sign Of contractor with seal & date

Page 19: TECHNICAL BID WEB TENDER NOTICE NO.:450/16/W RFQ … · with fabrication /erection / modification of suction & discharge pipe (450 NB) in unit no 6, WTPS from Contractors who have

19

Gujarat State Electricity Corporation Limited Wanakbori Thermal Power Station – 388239, Tal. Galteshwar, Dist: Kheda

General Safety Rules / norms To Be Observed By the Contractors.

Safety measures regarding Fatal accident in the pro ject

All the contractors working at Thermal Power Station for Project Erection testing, commissioning shall strictly observe the following Safety Rules. Concerned Contractors are responsible for informing & observance of these rules by their supervisors/employees/ labours as well as the supervisors/ employees/ labours of agencies/ sub-Contractors engaged, if any, by them for the work contract awarded to them. Prior to commencement of the work, Contractor shall submit a written assurance on their letterhead to the concerned Sectional Head / Engineer-in-charge that they have thoroughly gone through these Rules, have educated their employees / employees of their sub contractor and will strictly observe the said Rules while execution of work under work contract awarded to them. They shall indemnify the Corporation for any loss or damage / accident / injury to the Corporation’s property / employee or employee of their own in default due to non - observing these rules.

1. Persons to be employed for carrying out the work shall possess required qualification, are fully trained and conversant for the works to be done. All persons should have gate pass. Register consisting the full details i.e. address, phone number nearest relative, of all persons to be maintained. During the work execution, one trained & competent supervisor shall always remain present at site.

2. The contractor shall take all the required safety measures prior to commencement of work on dangerous substances, machineries or area at which cautionary notice is displayed and obtain `Line Clear` or `Work Permit` through the concerned Department / Section.

3. Prior to carrying out welding, gas cutting, furnace heating or any other hot work job, remove all the inflammable material lying at or nearby worksite or cover it properly by suitable protective covering. Also, special care shall be taken before carrying out such job & see that all possible contributing factors to set fire shall be removed / vanished prior to commencement of the work. Advance intimation shall be given to concerned section / Fire Section to commence the work in fire prone areas. They should also keep ready all the First Aid & Fire Extinguishers / equipments & fire extinguishing media / material like sand / water buckets or other appropriate equipment at such place.

4. While carrying out work in confined space or inside vessel, obtain necessary `Confined Space/Vessel Entry Permit` from concerned department prior to commencement of the work. For lighting in such areas, only 24-volt (ISI certified & with proper guard) hand lamp shall be used. For taking care of the persons working inside the confined space / vessel, a supervisor / person capable to keep continuous watch on person(s) working inside, assist them in case of emergency or arrange to get immediate outside help, shall remain present at entry point. (Use full body safety belt without failed). While working inside sewage, trench or at-depth, a person to warn outsiders/entrants/ passers etc shall remain available near entry point or the entry point shall be cordoned by a barricade tape with a cautionary notice. After completion of the works, all the lids/covers / grills / grits opened, shall be re-fixed / re-placed in the original position as it were prior to commencement of the work and leave the work place in safe condition in all respect, so as to prevent accident to fellow workers.

5. Do not work on or block (by stacking material, spare parts, tools-tackles, equipments etc), any passages / walkways / gangways / aisles / staircases / ladders / lifts or any other approaches / roads leading to plans or its auxiliaries, on which there is traffic movement or possible traffic movement in case of emergency. Such passages are meant for safe escape in the event of emergency. If it is utmost necessary to carry out work in such area with blocking of passage, prior permission of Competent Authority or the Engineer-In-Charge shall be obtained. To demarcate / declare the area as UNSAFE, cordon it using barricading tape & display suitable caution notice or keep a person to restrict / divert the traffic on this route through other safe passage.

6. Prior to use of power / electrically operated hand tools / equipments / machines / gadgets like welding machine, hand grinder, hand drill etc, ensure for its safe operation & use it only if it is found safe to use. Do not use defective, unsafe or improperly maintained equipments. The electrical power supply required to run such equipments shall not be taken directly at their own but shall be obtained through concerned Electrical Maintenance Departments or their authorized persons or under their observations / guidance only. The Electrical Section shall

Page 20: TECHNICAL BID WEB TENDER NOTICE NO.:450/16/W RFQ … · with fabrication /erection / modification of suction & discharge pipe (450 NB) in unit no 6, WTPS from Contractors who have

20

provide temporary electrical connection up to contractor’s Mains Board on which it is compulsory to install mains switch, ELCB & fuses of adequate capacity. All such equipments shall invariably be earthed adequately to prevent electrical shock, sparking, short circuit etc. Power cord to be used shall be of adequate capacity, without any joint & shall consist of earth wire also. Hence, it is necessary to use adequate capacity 3-wire power cord for single & 5-wire power cord for three phase power connections. The plugs, receptacles, pins, holders etc shall be of adequate capacity & safe to use. All electrical & mechanical equipments / tools-tackles viz. welding machine, cutting machine, Grinder, Drill, Chain Pulley Blocks, Hook chooks etc required to be used during work execution shall be of standard make & bear ISI certification mark on it & party has to present required test certificates for machine & motors which are used in the works. The consumables like welding electrodes, grinding wheels / discs etc which has specific prescribed life span shall not be used in any case if its expiry date is over.

7. It is compulsory to use standard make Personal Protective Equipments (P.P.Es.) as per the job requirement. Do not work without use of required P.P.Es. Contractor is responsible to provide standard make (ISI approved) Personal Protective Equipments / Safety Gadgets suitable to give sufficient protection against hazards involved in their work / job to their staff, as per the job requirement and insist / enforce their staff to put on the same while at works. The ongoing work is liable to be stopped at any time if any staff is found working without P.P.Es. Following is the list of various P.P.Es. to be used for various works / worksites.

List of safety equipments

1 Industrial Safety Helmet. For protection of head against falling objects or during fall of person from height.

2 Safety Goggles (Grinding, Welding, Punk, Panorama etc).

For protection of eyes against flying particles / dust, chemical splash, spark, arc, flashover etc.

3 Face shield (Half or full). For protection of face against flying particles / dust, chemical splash, spark, arc, flashover etc.

4 Earplug / Ear muffs. For ear / hearing system protection while working in high noise level area.

5 Apron (Rubber /PVC / Asbestos / Leather / Cotton).

For body protection against chemicals, oils, sharp edged objects, heat, hot objects etc.

6 Gloves(Rubber/PVC, Asbestos, Leather, Electrical shock proof).

For protection of hands against chemicals, oils, sharp edged objects, heat, hot metals/objects, electricity etc.

7 Safety / Leather / Asbestos shoes, Gum Boots etc.

For protection of leg/feet against falling objects, sharp edged objects, heat, hot metals/objects, electricity etc.

8 Safety Belt(full body)/Rope/Life line/Fall prevention system etc.

For fall prevention while working at heights or in depth, working in vessel or in confined space.

9 Dust Respirator / Scarf. Protection of respiratory system against dust. 10 Chemical Cartridge Respirator Protection against chemical fume / vapor etc. 11 Canister Gas mask. Protection against toxic/poisonous fumes/gases. 12 Air supply respirators. Working in oxygen deficient zone.

8. Before using lifting machines/ tackles (like C.P.Bs., Hook chooks, winch, forklift, mobile crane,

EOT crane etc) & its attachments (like D-shackles, slings, U-clamps, Eye bolts or any fixtures), it shall be checked and used only if found safe to use. Also, ensure that these are tested, examined & certified in form no 9/10 by Competent Authority Person as per the Factory act-1948 and its validity not expired. Further, it shall be fixed properly and firmly prior to lifting the weight.

9. Scaffoldings to be used for working at height shall be of adequate size & capacity. Obtain the work permit when working at height. While climbing on such scaffolding or working on any structure at height, use of full body safety belt & Helmet is compulsory. It is also necessary to fasten chinstraps of the helmet.

10. Contractor or their employee shall not interfere in day-today routine plant activities / works except the work assigned to them, shall not loiter in the areas other than their work jurisdiction, as well as shall not temper / operate / touch the machineries/equipments/auxiliaries with which

Page 21: TECHNICAL BID WEB TENDER NOTICE NO.:450/16/W RFQ … · with fabrication /erection / modification of suction & discharge pipe (450 NB) in unit no 6, WTPS from Contractors who have

21

they are not concerned. Also, the contractor shall strictly instruct their staff for not to sit or take rest at/near/below running plants, auxiliaries, systems or any place which is risky, hazardous & prone to accident.

11. The cylinders containing poisonous / toxic or inflammable / explosive gas like Oxygen, Acetylene, LPG, Hydrogen, Ammonia, Chlorine, CO2 etc shall be handled safely taking due care. To handle / shift such cylinders a special trolley /cage meant for it must be used but in no case it should be rolled.

12. On completion of the work, cotton waste, spilled oil / grease, pieces of welding rod & other

waste material shall be removed from work site and the area shall be left safe, neat & clean. 13. In case of any injury / accident while working, it shall immediately be reported to Safety

Department through concerned Sectional Head / Engineer. The prescribed Form No.21 may be obtained from concern section or Safety Officer.

For any incident occurred but have no injury to any persons should also informed to safety officer as Near Miss Incident.

14. In all risky job, before start the work contractor should obtained General Safety Work Permit through concerned section from safety dept in well advance.

15. For performance evaluation of contractor safety factors of work accident, fire incident & near miss accident will be considered. Steps can be taken to review the job assignment up to cancellation for negligence.

16. In case of noticing smoke or fire during their work execution, they shall make immediate efforts to extinguish / control it and simultaneously inform the Fire Brigade on phone. Shift the casualty to nearby hospital after rendering first aid in case of accident.

17. Over & above these, contractor shall follow all the safety requirements / rules & regulations / norms and legal provisions laid down in various statutes. Particularly the provisions of The Factories Act-1948 & the Gujarat State Factories Rules-1963 (Amended up to date) shall be followed strictly. The contractor shall also obey the rules / regulations / instructions of the local Competent Authority for safety requirements.

18. Work permit system for (a) Hot job work (b) Working at height to be introduced. 19. One Safety Officer / Safety Supervisor to be deployed to look after safety measures at the site. 20. All accidents / incident to be reported immediately to C.E. (G) and safety officer. 21. Safety talks to all sub contractors workers to be delivered by site engineer of contractor

regarding safety measures and awaring hazards associated with work. 22. Safety Posters to be displayed at site of work to create awareness regarding safety to

contractor workers. 23. At site before starting the work precautionary sign Board to be displayed i.e., "Dangerous" work

is going on Do-not enter and area to be cordoned off with special tap. Contractor assured that from 1.12.2008 the site safety standard will improve.

24. All safety rules and norms to be followed and for communication to be improved amongst the workers and staff and with safety officers.

25. Flash back arrestor to be fixed in each welding / cutting gas cylinders sets. The above rules shall be scrupulously followed and where required, they may contact the Safety Officer in case of any ambiguity or needs further guidance in this regard.

26. In case of injury/accident while working, it shall immediately be reported to safety department through EIC. The prescribed form no.21 may be obtained from EIC or safety officer. For any accident occurred but have no injury to any persons should also be informed to safety officer as Near Miss Incident.

27. Contractor shall have invariably to submit “ Fitness Certificate” of the working staff from qualified doctors having qualification of minimum MBBS to the EIC & safety officer before reporting to the work.

##############################

Sign Of contractor with seal & date

Page 22: TECHNICAL BID WEB TENDER NOTICE NO.:450/16/W RFQ … · with fabrication /erection / modification of suction & discharge pipe (450 NB) in unit no 6, WTPS from Contractors who have

22

Gujarat State Electricity Corporation Limited Wanakbori Thermal Power Station – 388239, Tal. Galteshwar, Dist: Kheda

SCHEDULE – B

Subject: Work of installation of new SAM make pump with fabrication /erection / modification

of suction & discharge pipe (450 NB) in unit no 6, WTPS. Sr.No. Description Quantity Unit Rate Rs. Amount Rs. 1. Installation of new SAM make pump

with fabrication /erection / modification of suction & discharge pipe (450 NB) as per scope of work & instruction of EIC

Job 4 78000 312000

2. Fabrication of new 450 NB pipe from 8/10 mm plate as per scope of work & instruction of EIC

Kg 2700 18.4 49680

Total 361680.00/- (In words Rupees Three Lacs Sixty One Thousand Six Hundred Eighty only)

NOTE : 1. The rates are exclusive of service tax. However, service tax at prevailing rate, shall be

applicable vide notification No. 26/2012 & 30/2012 issued by GOI and amended from time to time. Further contractor must have to claim service tax extra in their invoice.

2. The payment will be made as per actual work done only. 3. GSECL Service Tax No.: AAACG6864FSD013 4. GSECL PAN No.: AAACG6864F 5. Your Service Tax No.: 6. Your PAN No.:

CHIEF ENGINER (C &O) GSECL WTPS