team icarus final project presentation aj knapp, kyle marek-spartz, lucas chowen, max sjöberg, mike...

50
Team icarus Final Project Presentation AJ Knapp, Kyle Marek-Spartz, Lucas Chowen, Max Sjöberg, Mike Hill AEM 1905 – Nov. 24 th 2009

Post on 15-Jan-2016

212 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Team icarus Final Project Presentation AJ Knapp, Kyle Marek-Spartz, Lucas Chowen, Max Sjöberg, Mike Hill AEM 1905 – Nov. 24 th 2009

Team icarusFinal Project Presentation

AJ Knapp, Kyle Marek-Spartz, Lucas Chowen, Max Sjöberg, Mike Hill

AEM 1905 – Nov. 24th 2009

Page 2: Team icarus Final Project Presentation AJ Knapp, Kyle Marek-Spartz, Lucas Chowen, Max Sjöberg, Mike Hill AEM 1905 – Nov. 24 th 2009

Mission Overview

Page 3: Team icarus Final Project Presentation AJ Knapp, Kyle Marek-Spartz, Lucas Chowen, Max Sjöberg, Mike Hill AEM 1905 – Nov. 24 th 2009

Mission Overview• Optical Experiment

• Ballooning as a cost effective alternative for Day-time astronomy• Video camera + shots to compare from the ground• Block cameras direct view of sun to attempt capture of coronal features

• Inertial Measurement Unit• IMU• Borrowed from Augsburg• Measures movement and rotational inertia• Test flight for the engineering of the unit

Page 4: Team icarus Final Project Presentation AJ Knapp, Kyle Marek-Spartz, Lucas Chowen, Max Sjöberg, Mike Hill AEM 1905 – Nov. 24 th 2009

Mission Overview (cont.)

• Predictions• Optics

• Attempt to show that ballooning is a cost effective alternative

• Able to get good quality images of the sun

• Magnetometer• Altitude has a lot/a little/no substantial impact on the

magnetic field• Tracking and analyzing those, if any, changes

Page 5: Team icarus Final Project Presentation AJ Knapp, Kyle Marek-Spartz, Lucas Chowen, Max Sjöberg, Mike Hill AEM 1905 – Nov. 24 th 2009

Team Organization

Page 6: Team icarus Final Project Presentation AJ Knapp, Kyle Marek-Spartz, Lucas Chowen, Max Sjöberg, Mike Hill AEM 1905 – Nov. 24 th 2009

Team Organization: AJ Knapp

• Writing• Introduction, Payload Design

• Oral Presentation• Flight Readiness Review

• Payload Build• Box Build• Camera Experiment

• Launch Day• Photographer

Page 7: Team icarus Final Project Presentation AJ Knapp, Kyle Marek-Spartz, Lucas Chowen, Max Sjöberg, Mike Hill AEM 1905 – Nov. 24 th 2009

Team Organization: Kyle Marek-Spartz

• Writing• Project Management, Payload Photos

• Oral Presentation• Conceptual Design Review

• Payload Build• Photographer• IMU

• Launch Day• Prediction/Tracking Assistant

Page 8: Team icarus Final Project Presentation AJ Knapp, Kyle Marek-Spartz, Lucas Chowen, Max Sjöberg, Mike Hill AEM 1905 – Nov. 24 th 2009

Team Organization:Lucas Chowen

• Writing• Mission Overview, Expected Science Results

• Payload Build• Weather Station Build• HOBO (Payload “Health” Monitoring)

• Launch Day• Balloon Filling and Release assistant

Page 9: Team icarus Final Project Presentation AJ Knapp, Kyle Marek-Spartz, Lucas Chowen, Max Sjöberg, Mike Hill AEM 1905 – Nov. 24 th 2009

Team Organization:Mike Hill

• Writing• Launch and Recovery, Conclusions

• Oral Presentation• Conceptual Design Review

• Payload Build• Flight Computer• Programmer

• Launch Day• Recovery Specialist

Page 10: Team icarus Final Project Presentation AJ Knapp, Kyle Marek-Spartz, Lucas Chowen, Max Sjöberg, Mike Hill AEM 1905 – Nov. 24 th 2009

Team Organization:Max Sjöberg

• Writing• Project Budgets, Test Plan and Results

• Oral Presentations• Flight Readiness Review

• Payload Build• Team Lead

• Launch Day• Payload/Stack Handling Specialist

Page 11: Team icarus Final Project Presentation AJ Knapp, Kyle Marek-Spartz, Lucas Chowen, Max Sjöberg, Mike Hill AEM 1905 – Nov. 24 th 2009

Design Overview

Page 12: Team icarus Final Project Presentation AJ Knapp, Kyle Marek-Spartz, Lucas Chowen, Max Sjöberg, Mike Hill AEM 1905 – Nov. 24 th 2009

Design Overview: Material• White Foam Core w/ Black Foam cushion•Flip Video Camera•Inertial Measurement Unit

•Includes magnetometer•Strapping Tape

•Hinge•Epoxy and Hot glue•Heater circuit•Power Supplies•HOBO•Flight computer•Weather Station

Page 13: Team icarus Final Project Presentation AJ Knapp, Kyle Marek-Spartz, Lucas Chowen, Max Sjöberg, Mike Hill AEM 1905 – Nov. 24 th 2009

Design Overview: Layout

ORIGINAL DESIGN LAYOUT

A: Flight ComputerB: HeaterC: Camera(changed to FLIP Video)D: BatteriesE: BatteryF: HOBOG: Magnetometer (changed to IMU)

Page 14: Team icarus Final Project Presentation AJ Knapp, Kyle Marek-Spartz, Lucas Chowen, Max Sjöberg, Mike Hill AEM 1905 – Nov. 24 th 2009

Design Overview: Conceptual Diagram

StructureStructure

Flight Computer

Flight Computer

Weather Station

Weather Station

HOBOHOBO

Temperature Sensor

Temperature Sensor

Flip HD Video

Flip HD Video

Inertial Measurement Unit

Data LoggerData

LoggerAccelerometers +

GyrometersAccelerometers +

Gyrometers

HeaterHeater

PowerPower

PowerPowerPowerPower PowerPower

PowerPower

Page 16: Team icarus Final Project Presentation AJ Knapp, Kyle Marek-Spartz, Lucas Chowen, Max Sjöberg, Mike Hill AEM 1905 – Nov. 24 th 2009

Design Overview: ConstructionComponents inside payload

Attachment of Camera and Heater

Heater activation switch

Page 17: Team icarus Final Project Presentation AJ Knapp, Kyle Marek-Spartz, Lucas Chowen, Max Sjöberg, Mike Hill AEM 1905 – Nov. 24 th 2009

Design Overview: Construction

Page 18: Team icarus Final Project Presentation AJ Knapp, Kyle Marek-Spartz, Lucas Chowen, Max Sjöberg, Mike Hill AEM 1905 – Nov. 24 th 2009

Design Overview: Programming

• IMU• Pre-programmed• Read sensor data 10 times / sec• Write to data logger

• Flight Computer• Read sensor data every 15 seconds• Write to memory

Page 19: Team icarus Final Project Presentation AJ Knapp, Kyle Marek-Spartz, Lucas Chowen, Max Sjöberg, Mike Hill AEM 1905 – Nov. 24 th 2009

Design Overview: BudgetsITEMS COST (in USD) MASS (in Kg)

White Foam Core 9.00 0.150

Miscellaneous (tape, etc) 5.00 0.050

Heater Circuit 5.00 0.027

Flight Computer 30.00 0.033

Weather Station 40.00 0.015

Compass Module 150.00 0.015

Flip Video Camera 170.00 0.175

HOBO 130.00 0.048

Battery: Heater 6.00 0.150

Battery: Flight Computer 2.00 0.046

TOTALS 546.00 0.710

DOES NOT INCLUDE IMU MASS

Page 20: Team icarus Final Project Presentation AJ Knapp, Kyle Marek-Spartz, Lucas Chowen, Max Sjöberg, Mike Hill AEM 1905 – Nov. 24 th 2009

Design Overview: Art

Page 21: Team icarus Final Project Presentation AJ Knapp, Kyle Marek-Spartz, Lucas Chowen, Max Sjöberg, Mike Hill AEM 1905 – Nov. 24 th 2009

Payload Pre-flight Testing

Page 22: Team icarus Final Project Presentation AJ Knapp, Kyle Marek-Spartz, Lucas Chowen, Max Sjöberg, Mike Hill AEM 1905 – Nov. 24 th 2009

Testing• Drop Box

• Results were good• Sturdy construction

• Circuit tests• Connections were good, except one• That connection was fixed by Dr. Flaten

• Heater Test• Functions

• Camera Test• Operational

• IMU• Tested data recording capabilities• Passed

Page 23: Team icarus Final Project Presentation AJ Knapp, Kyle Marek-Spartz, Lucas Chowen, Max Sjöberg, Mike Hill AEM 1905 – Nov. 24 th 2009

Additional Testing

• Cold soak test• Made sure that payload can handle extreme temperature• Passed

• Day-in-the-life Weather test• Attempt to alter weather station data to test function• Passed

• Yank Test• Make sure that the box stays together• Passed

Page 24: Team icarus Final Project Presentation AJ Knapp, Kyle Marek-Spartz, Lucas Chowen, Max Sjöberg, Mike Hill AEM 1905 – Nov. 24 th 2009

Results of Testing

Our Payload was Ready to Go!(w/ few modifications)

Page 25: Team icarus Final Project Presentation AJ Knapp, Kyle Marek-Spartz, Lucas Chowen, Max Sjöberg, Mike Hill AEM 1905 – Nov. 24 th 2009

Escape of the Zombicarus:… or Flight Day

Page 26: Team icarus Final Project Presentation AJ Knapp, Kyle Marek-Spartz, Lucas Chowen, Max Sjöberg, Mike Hill AEM 1905 – Nov. 24 th 2009

Pre-Flight Checks

Page 27: Team icarus Final Project Presentation AJ Knapp, Kyle Marek-Spartz, Lucas Chowen, Max Sjöberg, Mike Hill AEM 1905 – Nov. 24 th 2009

Filling the Balloon

Page 28: Team icarus Final Project Presentation AJ Knapp, Kyle Marek-Spartz, Lucas Chowen, Max Sjöberg, Mike Hill AEM 1905 – Nov. 24 th 2009

Release

Page 29: Team icarus Final Project Presentation AJ Knapp, Kyle Marek-Spartz, Lucas Chowen, Max Sjöberg, Mike Hill AEM 1905 – Nov. 24 th 2009

Flight Day

• Status of the payload after the recovery was basically the same. Minor scratches from the tree landing. Landed roughly 25-30 feet in the air in a tree. Retrieved with bolo.• Payload was still securely sealed and all the instruments seemed to be working inside.• Disconnected all batteries and turned off IMU

Page 30: Team icarus Final Project Presentation AJ Knapp, Kyle Marek-Spartz, Lucas Chowen, Max Sjöberg, Mike Hill AEM 1905 – Nov. 24 th 2009

Science Results

Page 31: Team icarus Final Project Presentation AJ Knapp, Kyle Marek-Spartz, Lucas Chowen, Max Sjöberg, Mike Hill AEM 1905 – Nov. 24 th 2009

Expected Science Results

• HOBO + Weather Station (WS)• Sensors:

• Internal temperature (HOBO)• External temperature (HOBO + WS)• Relative Humidity (HOBO) • Pressure (WS)

• These sensors will record data similar to Paul Verhage’s

Page 32: Team icarus Final Project Presentation AJ Knapp, Kyle Marek-Spartz, Lucas Chowen, Max Sjöberg, Mike Hill AEM 1905 – Nov. 24 th 2009

Paul Verhage’s HOBO + WS data

Page 33: Team icarus Final Project Presentation AJ Knapp, Kyle Marek-Spartz, Lucas Chowen, Max Sjöberg, Mike Hill AEM 1905 – Nov. 24 th 2009

Expected Science Results• Optical Experiment

• Solar Observation• Our hypothesis is:

• It will not be cost effective• It may produce quality images of the sun that may be difficult to recreate on ground• Whether or not we get a good glimpse of the sun is arguable

• IMU• Acceleration and movement tracking test• Our hypothesis:

• After launch there will be little change• Post-burst will be violent, and we will be able to track it through the IMU

Page 34: Team icarus Final Project Presentation AJ Knapp, Kyle Marek-Spartz, Lucas Chowen, Max Sjöberg, Mike Hill AEM 1905 – Nov. 24 th 2009
Page 35: Team icarus Final Project Presentation AJ Knapp, Kyle Marek-Spartz, Lucas Chowen, Max Sjöberg, Mike Hill AEM 1905 – Nov. 24 th 2009
Page 36: Team icarus Final Project Presentation AJ Knapp, Kyle Marek-Spartz, Lucas Chowen, Max Sjöberg, Mike Hill AEM 1905 – Nov. 24 th 2009
Page 37: Team icarus Final Project Presentation AJ Knapp, Kyle Marek-Spartz, Lucas Chowen, Max Sjöberg, Mike Hill AEM 1905 – Nov. 24 th 2009
Page 38: Team icarus Final Project Presentation AJ Knapp, Kyle Marek-Spartz, Lucas Chowen, Max Sjöberg, Mike Hill AEM 1905 – Nov. 24 th 2009
Page 39: Team icarus Final Project Presentation AJ Knapp, Kyle Marek-Spartz, Lucas Chowen, Max Sjöberg, Mike Hill AEM 1905 – Nov. 24 th 2009
Page 40: Team icarus Final Project Presentation AJ Knapp, Kyle Marek-Spartz, Lucas Chowen, Max Sjöberg, Mike Hill AEM 1905 – Nov. 24 th 2009
Page 41: Team icarus Final Project Presentation AJ Knapp, Kyle Marek-Spartz, Lucas Chowen, Max Sjöberg, Mike Hill AEM 1905 – Nov. 24 th 2009
Page 42: Team icarus Final Project Presentation AJ Knapp, Kyle Marek-Spartz, Lucas Chowen, Max Sjöberg, Mike Hill AEM 1905 – Nov. 24 th 2009
Page 43: Team icarus Final Project Presentation AJ Knapp, Kyle Marek-Spartz, Lucas Chowen, Max Sjöberg, Mike Hill AEM 1905 – Nov. 24 th 2009
Page 44: Team icarus Final Project Presentation AJ Knapp, Kyle Marek-Spartz, Lucas Chowen, Max Sjöberg, Mike Hill AEM 1905 – Nov. 24 th 2009
Page 45: Team icarus Final Project Presentation AJ Knapp, Kyle Marek-Spartz, Lucas Chowen, Max Sjöberg, Mike Hill AEM 1905 – Nov. 24 th 2009

In-Flight

Page 46: Team icarus Final Project Presentation AJ Knapp, Kyle Marek-Spartz, Lucas Chowen, Max Sjöberg, Mike Hill AEM 1905 – Nov. 24 th 2009

Conclusions

• External Temperature vs. Time Temperature dropped to about -50 degrees

Celsius until about the 50 minute mark, then the payload entered part of the atmosphere where it started heating up to about -15 degrees Celsius, which at that point was close to burst, and following the burst the temperature rapidly fell to the lowest of the flight of -55 degrees Celsius.

Page 47: Team icarus Final Project Presentation AJ Knapp, Kyle Marek-Spartz, Lucas Chowen, Max Sjöberg, Mike Hill AEM 1905 – Nov. 24 th 2009

Conclusions

• Relative Humidity vs. Altitude According the graph, as altitude increased, humidity decreased,

to as low at 5% around the 80,000 foot mark.

• Pressure vs. Altitude As altitude increases the pressure decreases

• Solar Observation: Did not exactly work, need a better way of blocking out the sun.

• IMU results will come later

Page 48: Team icarus Final Project Presentation AJ Knapp, Kyle Marek-Spartz, Lucas Chowen, Max Sjöberg, Mike Hill AEM 1905 – Nov. 24 th 2009

Conclusions

• Change anything about payload to fly again?• Yes, better strategy to block out the sun with our HD video

camera to get better results.

• Project Successes: • Pumpkin design, which ultimately boosts morale of the team,

which in turn makes them happy, thus, makes them work better.

• Other successes: • Payload stayed intact, all instruments functioned properly.

• Final Project Successfulness: • Relatively successful

Page 49: Team icarus Final Project Presentation AJ Knapp, Kyle Marek-Spartz, Lucas Chowen, Max Sjöberg, Mike Hill AEM 1905 – Nov. 24 th 2009

Words of Wisdom

• Don’t drink too much water on the chase, you never know when you are going to stop.

• Think BIG• If you assume, you make an a** out of “u”

and “me”• If you think it might be cold, then it probably

will be

Page 50: Team icarus Final Project Presentation AJ Knapp, Kyle Marek-Spartz, Lucas Chowen, Max Sjöberg, Mike Hill AEM 1905 – Nov. 24 th 2009

Thank You to the Following

• Thanks to the rest of our class for providing a forum for bouncing around ideas

• Thanks to our TAs, Amy and Phillip for assisting the construction

• Thanks to Chris from Augsburg for helping with the IMU

• Thanks to Professor Flaten for guiding us during these past few months