team dea cpd presentation

33

Upload: hennings-moir

Post on 10-Jun-2015

270 views

Category:

Education


1 download

DESCRIPTION

Training Presentation to TEAM Domestic Energy Assesors

TRANSCRIPT

Page 1: Team dea cpd presentation
Page 2: Team dea cpd presentation

TEAM CPD Training Day

15th November 2011

Thursday 13 April 2023

Page 3: Team dea cpd presentation

Presentation title

Introduction

Northgate CPD Training

• Neal Gascoine - EA/EPC Quality Assurance Controller

Page 4: Team dea cpd presentation

Presentation title

Agenda

Tuesday 15th November• Introduction & Agenda• Green Deal• Audit Failure Issues• Modelling Extensions in RdSAP 9.90• Modelling Multiple Heating Systems in RdSAP

9.90• EA Ethics & Professionalism Questions

Page 5: Team dea cpd presentation

Presentation title

Green Deal

Green Deal• April 2012• NOS still to be agreed• Customer Facing issues to be resolved• Mandatory common CPD requirements• Due to go live October 2012

Page 6: Team dea cpd presentation

Presentation title

CPD Training

Audit Failure Issues• Most common audit failures over the

last three months are as follows;• Incorrectly classifying extensions.• Incorrect floor construction data.• Incorrect use of Mechanical Ventilation• Incorrect roof construction classification.• Incorrect DHW heating data.• Incorrect heating control data.

Page 7: Team dea cpd presentation

Presentation title

Audit Failure Issues

Incorrectly classifying extensions.• Integral Garages.

• Not dividing property when present.• Consistent error.• Small SAP variance from error.• Error easy to identify during audit.• Effects EPC property descriptions on the

EPC.

Page 8: Team dea cpd presentation

Presentation title

Audit Failure Issues

Incorrect floor construction data.• Integral Garages.

• Floor type – Above unheated space.• Dwelling above shops/commercial premises.

• Floor type – Above intermittently/partially heated space.

• Dwelling above open space to external elements.• Floor type – To external air.

• Effects EPC property descriptions on the EPC.

Page 9: Team dea cpd presentation

Presentation title

Audit Failure Issues

Incorrect use of Mechanical Ventilation.• When to use?

• RdSAP requires this selection if Whole House system present only

• RdSAP assumes individual extract fans are already present.

• Generally used for all properties where extract fans are found.

• Effects SAP rating and heating costs

Page 10: Team dea cpd presentation

Presentation title

Audit Failure Issues

Incorrect roof construction classification.• Roof Rooms.

• Most common audit failure.• DEA’s failing to follow conventions.• Conventions supplied to help a DEA.

• Effects SAP rating, recommendations and property descriptions on the EPC.

Page 11: Team dea cpd presentation

Presentation title

Audit Failure Issues

Room in a roof

Page 12: Team dea cpd presentation

Presentation title

Audit Failure Issues

Room in a roof

Roof room with dormer windows

Roof room with large dormer windows (chalet style)

Basic roof room Roof room with vaulted ceiling

Page 13: Team dea cpd presentation

Presentation title

Audit Failure Issues

Room in a roof

Less than1.8 m

Less than1.8 m

Roof room

At least 1.8 m

At least1.8 m

Separate storey, not roof room

Page 14: Team dea cpd presentation

Presentation title

Audit Failure Issues

Incorrect DHW heating data.• Immersion heater being specified incorrectly

• Main heating system present.• Several pipework runs to HWC.• Back-up Immersion installed.

• Effects SAP rating, recommendations and property descriptions on the EPC.• Look for Pumps adjacent to HWC.• Look for Three port valves to HWC• Above indicate heated from main boiler

not immersion.

Page 15: Team dea cpd presentation

Presentation title

Audit Failure Issues

Incorrect DHW heating data.

Page 16: Team dea cpd presentation

Presentation title

Audit Failure Issues

Incorrect Heating control data.• Boiler Energy managers.

• Control system very rare.• Weather compensation systems.• Generally selected when no Room Stat

present.• DEA does not understand what a Bypass

is!• Effects SAP rating, recommendations and

property descriptions on the EPC.

Page 17: Team dea cpd presentation

Presentation title

CPD Training

Modelling extensions in RdSAP 9.90.• DEA’s not using the multiple extension

options.• Incorrect floor descriptions being used.• Incorrect roof descriptions being used.• DEA’s still not dividing extensions due to

thermally different portions of the property.

• Effects SAP rating, recommendations and property descriptions on the EPC.

Page 18: Team dea cpd presentation

Presentation title

Modelling Extensions

What is an Extension in RdSAP?• In RdSAP an extension is classed as part of the

dwelling which is thermally different or has different characteristics from the main property e.g. Roof, floors or walls. The extensions must be heated and occupied for it to be recorded.

• If an extension is the same age, construction and insulation properties as the main house it must be included as part of the main dwelling.

Page 19: Team dea cpd presentation

Presentation title

Modelling Extensionss

To follow are various forms of extension that can be found;• Integral unheated garage where the main dwelling

extends over the unheated garage but is part of the original construction of the property.

Page 20: Team dea cpd presentation

Presentation title

Modelling Extensions

• Unheated garage adjacent to the main dwelling where a new extension has been created above the unheated garage.

Page 21: Team dea cpd presentation

Presentation title

Modelling Extensions

• Original construction single storey extension to the side of the main property (utility room?) that has now been extended above.

Page 22: Team dea cpd presentation

Presentation title

Modelling Extensions

• Integral garage conversion into a habitable room where the main dwelling extends over the originally unheated garage but is part of the original construction of the property.

Page 23: Team dea cpd presentation

Presentation title

Modelling Extensions

• 2 storey extension adjacent and above the existing main dwelling.

Page 24: Team dea cpd presentation

Presentation title

Modelling Extensions

• Dwelling with two separate roof room constructions above the main dwelling.

Page 25: Team dea cpd presentation

Presentation title

CPD Training

Modelling multiple heating systems in RdSAP 9.90.• DEA’s not using the multiple heating system

options correctly.• Incorrectly selecting Main Heating 2 for a

Secondary heating source.• Incorrectly selecting Main Heating 2 to

heat “living area” careful of % split.• Applying a percentage to a Main heating 2

system although only supplies heat for DHW.

• Effects SAP rating, recommendations and property descriptions on the EPC.

Page 26: Team dea cpd presentation

Presentation title

Modelling Multiple Heating Systems

Primary Heating 2 main heating systems• It is possible to have 2 main heating systems

modelled in RdSAP• RdSAP conventions explain how to model this type

of scenario correctly • Some simple options for two main heating systems

are to follow

Page 27: Team dea cpd presentation

Presentation title

Modelling Multiple Heating Systems

Primary Heating 2 main heating systems

Page 28: Team dea cpd presentation

Presentation title

Modelling Multiple Heating Systems

Primary Heating 2 main heating systems

Page 29: Team dea cpd presentation

Presentation title

Modelling Multiple Heating Systems

Primary Heating 2 main heating systems

Page 30: Team dea cpd presentation

Presentation title

Modelling Multiple Heating Systems

Primary Heating 2 main heating systems

Page 31: Team dea cpd presentation

Presentation title

CPD Training

EA Ethics & Professionalism Questions.• A variety of questions design to assess DEA

knowledge covering all areas of EPC production.

Page 32: Team dea cpd presentation

Presentation title

CPD Training

Question and Answer Session.

Page 33: Team dea cpd presentation