tata chemical babrala

Upload: prakash-warrier

Post on 07-Jul-2018

213 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/18/2019 Tata Chemical Babrala

    1/33

    1

    N RUSTAGI

    BOILER O & M PRACTICES

    AT

    TATA CHEMICALS , BABRALA

  • 8/18/2019 Tata Chemical Babrala

    2/33

    2

    Presentation Structure

    1. Tata Chemicals,Babrala

      - Introduction- Production acilities.

      - Po!er and steam net!or"- #ilestones achie$ed

    %& '(erational Practices

    )& #aintenance Practices

  • 8/18/2019 Tata Chemical Babrala

    3/33

    3

    Introduction

    • Tata Chemicals *td. ounded in 1+)+.

    • Com(rises o t!o di$isions

    - Chemical i$ision located at #itha(ur, Guarat.

      - ertili/er i$ision located at Babrala, U.P.

    • ertili/er Com(le0 commissioned in ec. 1++  and com(rises o 

      - Ammonia Plant based on lo! ener23 (rocess o   4aldor To(soe, enmar".  - Urea Plant based on Snam(ro2etti, Ital3,  technolo23.

  • 8/18/2019 Tata Chemical Babrala

    4/33

    4

      - Related acilities o 'sites 5 Utilities consistin2Ca(ti$e Po!er 5 Steam Generation Plant,

      Coolin2 To!ers, # 6ater Plant, AmmoniaStora2e, Na(htha Stora2e, 7luent TreatmentPlant etc..

    • ertili/er Com(le0 at Babrala is one o the si0  inland located com(le0es based on a cross-countr3 4B8 94a/ira-Bia(ur-8a2dish(ur: natural

      2as (i(eline.

    Introduction

  • 8/18/2019 Tata Chemical Babrala

    5/33

    5

    Pri/es ba22ed in %;;%

    1.National 7ner23 Conser$ation A!ard - %;;% irstPri/e,instituted b3 the Bureau o 7ner237icienc3, #inistr3 o Po!er, G'I.

    %.AI runner-u( a!ard or

  • 8/18/2019 Tata Chemical Babrala

    6/33

    6

    Pri/es ba22ed in %;;%

    .7n$ironment, A2riculture and Rural e$elo(mentA!ard - %;;% 9rom the Indian #erchants<Chamber:.

    =. -STAR Ratin2 or saet3 b3 the British Saet3  Council-U.>.

  • 8/18/2019 Tata Chemical Babrala

    7/337

    Production acilities

    Ammonia

    Power & Steam Cooling Towers

    BaggingUrea

    Instrument Air De-mineralisation

    Ammonia Storage

     NH3

    CO2

    Dispat!

    H"#roar$ons

    Inert %as

    Urea

    Bagge#

    Urea

    B" oa#

    B" ail

  • 8/18/2019 Tata Chemical Babrala

    8/338

    Po!er 5 Steam Net!or"

    • ertili/er Com(le0 has an inte2rated ener23 net !or". • All the (o!er consumed in the com(le0 is 2eneratedinternall3 in the com(le0 in Gas Turbine Generators.

    • 6e ha$e t!o 1+.= #6 2as turbines or ull reliabilit3  on the (o!er ront !ithout ha$in2 UPS7B 2ridconnection..

    • The !aste heat rom GTGs e0haust 2as is utili/ed

    or 2eneratin2 steam in 4RUs. 4RUs are (ro$ided!ith su((lementar3 irin2.

  • 8/18/2019 Tata Chemical Babrala

    9/339

    Po!er 5 Steam Net!or"

    • All the su(erheated steam consumed in the com(le0is 2enerated in Ser$ice Boiler, 4eat Reco$er3 Unitso GTGs and 6aste 4eat Boilers o Ammonia Plant.

    • The entire amount o # 6ater used in the com(le0

      is (reheated in the Ammonia Plant and su((lied todeaerators o Ammonia Plant and Ca(ti$e Po!er 5

      Steam Generation Plant.

    • The total (o!er and steam 2eneration in CPSGP are

    a((ro0. 1+ #6 and 1); TP4 res(ecti$el3.

  • 8/18/2019 Tata Chemical Babrala

    10/3310

    Po!er 5 Steam Net!or"

    Ser'ie Boiler    %T% - (   HU - 2  HU - (   %T% - 2

    Power )or elet #ri'es((( ata* +(,, C steam

    H"#roar$ons

    aste Heat Boilers Super !eaters

    Ammonia Plant

    HP Steam to tur$ines

  • 8/18/2019 Tata Chemical Babrala

    11/33

    11

    Po!er 5 Steam Net!or"

    Ser'ie Boiler

    an# HU-(.2

    aste Heat

    Boilers

    D/ ater Pre-

    Heaters

    Deaerator in

    Ammonia Plant

    Deaerator in

    CPS%P

    Col# D/

    ater 

    Hot D/

    ater 

    B0

    Ammonia Plant

    B0 Pre-

    Heaters

  • 8/18/2019 Tata Chemical Babrala

    12/33

    12

     Ser$ice Boiler &

    • #A>7

    • ST7A# PR7SSUR7

    • ST7A# T7#P.

    • ST7A# CAPACIT?

    • T'TA* 47ATING AR7A

    • IBR N'.

    • RU# PS@ S7T PR7SS.• >S 47A7R PS@

    • Therma0 Babcoc" 5 6ilco0 *td.

    • 11= >2cm

    • =%;C

    • 11; #T4r #CR

    • %D+D #

    • UP =;+

    • 1)1 9S: 5 1)%9N: >2cm• 1%% >2cm

  • 8/18/2019 Tata Chemical Babrala

    13/33

    13

     Ser$ice Boiler &

    Area %)% #

    Area %=E.= #

    Area D.= #

    Area %E1%#

    Area DF#

    Air Preheater 

    Su(er heater- %

    7conomiser - 1

    Su(er heater- 1

    7conomiser - %

    Su(er heater- )

    Area %;%% #

    Ser$ice Boiler lo! ,ia2ram

    7$a(orator or

    urnace !ater

    Steam

    ,rum

    ,esu(er4eater-1

    ,esu(er

    4eater-%

    eed

    ater 

    >S Steam

    To

    Chimin3

    Na(htha

    NG

    , an

  • 8/18/2019 Tata Chemical Babrala

    14/33

    14

     Gas Turbine&

    GTG1 GTG%

    • #a"e & Thomassen International B$.

    • #odel & PG=)E1PA

    • Base 'ut(ut 9Natural Gas: & 1+==; >6

    • Base 'ut(ut 9istillate: & 1+1+; >6

    • Commissionin2 ate & eb1++ A(r1++• Control S3stem & #>-I@ #>-I@

    • ired Time 94rs: & E;DF1.= =EFF)

    • ired Starts & %%1 1+D

    1 ri$en 7Hui(ment #odel & Generator ABB, S!eden

    1 Accessor3 Gear #odel Sl.No & lender AA =1CA

    1  *oad Gear Bo0 #odelSl.No. & #aa2 G- F; RU

  • 8/18/2019 Tata Chemical Babrala

    15/33

    15

    Po!er 5 Steam Net!or" 9GTG4RU:

    T

    47AT

    R7C'-

    @7R?

    UNIT

    94RU:

    IN*7T AIR

    I*T7R

    AIR

    C

    AIR

    C'#PR7SS'R TURBIN7

    G7N7RAT'R

    C.C.

    *'A G7AR

    C'#BUSTI'N

    C4A#B7R

    U7*

    9NG4SNAP.:

    >S ST7A#

    77 6AT7RSTAG7-%

    STAG7-1

    I7S7*

    7NGIN7

    'R INITIA*

    START

    G

    9AUJ.IRING:

  • 8/18/2019 Tata Chemical Babrala

    16/33

    16

     4eat Reco$er3 Unit 94RU:&

    • #A>7

    • ST7A# PR7SSUR7

    • ST7A# T7#P.

    • ST7A# CAPACIT?

    • T'TA* 47ATING AR7A• IBR N'.

    4RU-1

    4RU-%

    • RU# PS@ S7T PR7SS.

    • >S 47A7R PS@

    • *5T

    • 11= >2cm

    • =%;C

    • +F.= #T4r 

    • )+11#

    . UP-=1;;

    . UP-=1+%

    • 1); 9S: 5 1)19N: >2cm

    • 1%% >2cm

  • 8/18/2019 Tata Chemical Babrala

    17/33

    17

    Po!er 5 Steam Net!or" 94RU:

    FEED WATER

    520°C

    SUPERHEATER - 1

    EVAPORATOR - 1

    EVAPORATOR - 2

    ECONOMISER - 1

    GT 7J4AUST

    STAG7-1 BURN7RS

    STAG7- %

    BURN7RS

    SUPERHEATER - 2

    ECONOMISER - 2

    ECONOMISER - 3

    RCP

    BLOW

    DOWN

    EXHAUST

    510°C652°C

    510°C

    350°

    C

    145°C121°C

    320!°C DRUM

  • 8/18/2019 Tata Chemical Babrala

    18/33

    18

    %;;;-;1 %;;1-;% %;;%-;)

    Co-2en. 7icienc3 o GTG4RU, K E+.E F+.) +1.+

    Ser$ice Boiler 7icienc3, K +.%+ +.% +=.==

    F%.EE +;.F; +%.+='$erall 7icienc3 o CPSGP, K

    #ilestones Achie$ed

    GTG 7icienc3, K %1.) %.)1 %=.%D

      - 4eat Reco$er3 Unit ;.))D ;.)%E ;.)))

      - Ser$ice Boiler ;.E)= ;.E) ;.E%=

    S(eciic 7ner23 Cons., Gcal#T

  • 8/18/2019 Tata Chemical Babrala

    19/33

    19

    '(erational Perormance & %;;; to %;;)

    • INCR7AS7 'P7RATI'NA* R7*IABI*IT? B?INC'RP'RATING #'II7 %) TRIP *'GIC 'R TRIPR7*AT7 PARA#7T7R ' S7R@IC7 B'I*7R, 4RUs ANGTGs.

    • 'P7RATI'N ' S7R@IC7 B'I*7R AT %= TP4 *'A 6IT4

    T6' BURN7RS IN 'P7RATI'N.• *'AING ' S7R@IC7 B'I*7R IN CAS7 ' 7#7RG7NC?

    B? AUT' IGNITI'N ' )rd 5 th BURN7RS.

    • 'P7RATI'N ' 4RU 6IT4 NG IN 1st STAG7 5 NAP4T4A IN%nd STAG7 AS U7*.

  • 8/18/2019 Tata Chemical Babrala

    20/33

    20

    '(erational Perormance & %;;; to %;;)

    CRITICA* ACTI@ITI7S *I>7 START UP, S4UT '6N,C4ANG7'@7R ' I*T7RS, 6AT7R 6AS4, U7* C4ANG7

    '@7R IN S7R@IC7 B'I*7R, 77 PU#P C4ANG7 '@7R

    7TC. 6IT4 C47C>*IST.

    • 'N7 GTG IS IN 'P7RATI'N 6IT4'UT AN? 7JT7RNA* GRI

    SUPP'RT.

    • 'P7RATI'N ' GTG AT @ARIAB*7 C'NTR'* ' IG@ AS

    P7R *'A.

    • 'P7RATI'N ' GTG 6IT4 7@AP'RATI@7 C''*INGURING SU##7R 5 PR7 47AT7R URING 6INT7R

    S7AS'N.

  • 8/18/2019 Tata Chemical Babrala

    21/33

    21

    '(erational Perormance &%;;; to %;;) E"#$%& C'"(#$)*+,'" - I",+,*+,)#( T*#".

    Ser$ice Boiler o(eration !ith to( t!o Burners on NG uel or 

    na(htha uel !ith ast *oadin2 acilit3 in case o 7mer2enc3

    b3 auto i2nition o )rd 5 th burners.

     

    - Achie$ed ma0imum ca(acit3 utili/ation o 4RU b3

      o(eratin2 Ser$ice Boiler on minimum load o %= TP4.

      - Achie$ed o$erall sa$in2 o 1%= N#)4R in 4RU and

      Ser$ice Boiler.

      - '032en anal3/er relocated rom Air Pre-4eater outlet to its

      inlet or eecti$e monitorin2 o e0cess air.

  • 8/18/2019 Tata Chemical Babrala

    22/33

    22

    '(erational Perormance &%;;; to %;;) E"#$%& C'"(#$)*+,'" - I",+,*+,)#( T*#".

    4RU dual uel o(eration i.e. 1st Sta2e burner on NG uel !hile

    %nd Sta2e on na(htha uel &

     

    - 4el(ed in o(timi/ed use o Natural Gas a$ailable rom GAI*.

  • 8/18/2019 Tata Chemical Babrala

    23/33

    23

    '(erational Perormance &%;;; to %;;) E"#$%& C'"(#$)*+,'" - I",+,*+,)#( T*#".

    '(eration o #otor ri$en Boiler eed 6ater Pum( in (lace o 

    Turbo ri$en Pum( &

      - Achie$ed the reduction in S(eciic 7ner23 consum(tion o

    Urea b3 use o (o!er in (lace o steam.

  • 8/18/2019 Tata Chemical Babrala

    24/33

    24

    '(erational Perormance &%;;; to %;;) E"#$%& C'"(#$)*+,'" - I",+,*+,)#( T*#".

    7ner23 Conser$ation due to sto((in2 o one GTG

      97ner23 sa$in2 o 1EE=1D Gcalannum : 

    • %) lo2ics !ere incor(orated in GTG4RSG or o(erational

    reliabilit3.

    • To!nshi( and *i2htnin2 load decreased b3 $arious

    initiati$es.

    • 4o!den 9lash Ammonia: Com(ressor reHuent startu(

    a$oided.

    • ACT (um( 9one number: sto((ed.

    • 'ne G@ (um( sto((ed.

  • 8/18/2019 Tata Chemical Babrala

    25/33

    25

    '(erational Perormance &%;;; to %;;) E"#$%& C'"(#$)*+,'" - I",+,*+,)#( T*#".

    GTG IGV kept ON AUTO MODE after adjusting cooling air 

    flows to wheel space

    • Net sa!ing "#dail$ a! %&&n'()hr sa!ing*+ ,,&&-

    Gcal)annu'

    • GTG NG consum(tion reduced rom DFF to D%FF nmLhr.

    9Net sa$in2 as (er Gail *4@ is %;; nmLhr:

    • 4RSG NG consum(tion reduced rom ))+ to ;)+. 9Net

    sa$in2 as (er Gail *4@ is );; nmLhr:• The 70haust Stac" tem( reduced rom 1=%c to 1)=c.

  • 8/18/2019 Tata Chemical Babrala

    26/33

    26

    #aintenance PracticesM

     .EAT /E0OVE/1 UNIT2 ) 2E/VI0E 3OI4E/ 5  DU/ING TU/NA/OUND 6O44O7ING MAINTENAN0E

    8/A0TI0E2 A/E 6O44O7ED

    ST7A# RU# INSP7CTI'N 'R INT7RNA*S.

    BURN7RS U7* B*'C> @A*@7S INSP7CTI'N ANPR7@7NTI@7 #AINT7NANC7.

    S7R@IC7 B'I*7R BURN7R R7RACT'R? INSP7CTI'N

    AN R7PAIRING.

    A** INSTRU#7NT CA*IBRATI'N. AN, AUJI*IAR? AIR AN 5 SCANN7R AN #'T'R

    PR7@7NTI@7 #AINT7NANC7.

  • 8/18/2019 Tata Chemical Babrala

    27/33

    27

    #aintenance PracticesM

    AN, AUJI*IAR? AIR AN 5 SCANN7R AN I#P7**7RC*7ANING.

    AN IN*7T A#P7R C'NTR'* #7C4ANIS#

    INSP7CTI'N AN PR7@7NTI@7 #AINT7NANC7.

    INSP7CTI'N AN #AINT7NANC7 ' 77 C'NTR'*

    @A*@7S.

    'N *IN7 SA7T? @A*@7 T7STING 9TRA@I T7ST:.

  • 8/18/2019 Tata Chemical Babrala

    28/33

    28

    AIR PR7 47AT7R TUB7 C*7ANING AN INSP7CTI'N

    BURN7R INSP7CTI'N AN I#7NSI'N #7ASUR7#7NT.

    #'T'R 'P7RAT7 @A*@7S RI@7 AN ACTUAT'R

    PR@7NTI@7 #AINT7NANC7.

    TRIP AN INT7R*'C> C47C>ING.

    #aintenance PracticesM

  • 8/18/2019 Tata Chemical Babrala

    29/33

    29

    Plannin2 o Ne! Initiati$es

    ./U ) 2E/VI0E 3OI4E/ 

    INSTA**ATI'N ' #AGN7TIC R7S'NAT'R IN NAP4T4A *IN7

    'P7RATI'N ' S7R@IC7 B'I*7R 'N A*T7RNAT7 C47AP7RU7*

  • 8/18/2019 Tata Chemical Babrala

    30/33

    30

    Plannin2 o Ne! Initiati$es

    GTG  SUCTI'N AIR I*T7RS R7P*AC7#7NT 9C7**U*'S7 T'

    S?NT47TIC:

    R7#'@A* A*T7RNAT7 ARRANG7#7NT 'R 7@AP'RATI@7AIR C''*7R T' R7UC7 PR7SSUR7 R'P .

    AT'#IING AIR C'#PR7SS'R 5 C''*7R R7#'@A*.

    G7N7RAT'R R7OU7NC? R7UCTI'N T' SA@7 7N7RG?.

  • 8/18/2019 Tata Chemical Babrala

    31/33

    31

     Need ?our 4el(MM.

    6e are acin2 some (roblems in our 4RU 5 GTG *i"e&

    • ISTURBANC7 IN IRING ' 4RU STAG7-II BURN7RS, N7AR7RT' SI7 6A**S, 'P7RATING 'N NAP4T4A U7*.

    • 4IG4 PR7SSUR7 R'P ACR'SS SUP7R47AT7R IN 4RU*7AING T' *I#ITATI'N IN 4IG47R ST7A# G7N7RATI'NRAT7.

    4IG4 6477* SPAC7 T7#P7RATUR7 AT #IN. IG@ P'SITI'NURING SU##7R.

  • 8/18/2019 Tata Chemical Babrala

    32/33

    32

     Need ?our 4el(MM.

    • 4IG4 PR7SSUR7 R'P ACR'SS IN*7T AIR I*T7RS ' GTGURING 'G AN RAIN? S7AS'N

    • C4'C>ING ' AT'#ISING AIR C''*7R IN GTG.

  • 8/18/2019 Tata Chemical Babrala

    33/33

    33

    Than" ?ou