25 SEPTEMBER 2012 TASK D: METHODOLOGY 1 BE-AWARE risk assessment workshop, Tønsberg, 24-26 Sept. 2012 Task D: Methodology Albrecht Lentz Carsten Jürgensen

Upload: others

Post on 18-Jul-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Task D: Methodology - Bonn Agreement · D Methodology COWI E Area-wide traffic study MARIN F Sensitivity analysis MUMM G Risk assessment workshop Bonn Secretariat H Bonn Agreement-wide

25 SEPTEMBER 2012

TASK D: METHODOLOGY 1

BE-AWARE risk assessment workshop, Tønsberg, 24-26 Sept. 2012

Task D: Methodology

Albrecht Lentz

Carsten Jürgensen

Page 2: Task D: Methodology - Bonn Agreement · D Methodology COWI E Area-wide traffic study MARIN F Sensitivity analysis MUMM G Risk assessment workshop Bonn Secretariat H Bonn Agreement-wide

Project overview

25 SEPTEMBER 2012

TASK D: METHODOLOGY 2

Task Description Responsible

A Project management and communication Bonn Secretariat

B Kick-off meeting Bonn Secretariat

C Regional resource database Bonn Secretariat

D Methodology COWI

E Area-wide traffic study MARIN

F Sensitivity analysis MUMM

G Risk assessment workshop Bonn Secretariat

H Bonn Agreement-wide risk assessment COWI

I Case study MARIN

J Project conference Bonn Secretariat

Page 3: Task D: Methodology - Bonn Agreement · D Methodology COWI E Area-wide traffic study MARIN F Sensitivity analysis MUMM G Risk assessment workshop Bonn Secretariat H Bonn Agreement-wide

MODEL

Model flow

25 SEPTEMBER 2012

TASK D: METHODOLOGY 3

Hazard identification

& Scope

definition

Spill scenarios: - cause - substance - magnitude - location

Vulnerability

Emergency response to spills

Risk reduction measures

Ship traffic and other

ship activities

Types and quantities of

oil and chemicals

Risk of spill Risk of

spill effect

Risk of damage to

environment

Spreading, drift and fate

Future scenario

Page 4: Task D: Methodology - Bonn Agreement · D Methodology COWI E Area-wide traffic study MARIN F Sensitivity analysis MUMM G Risk assessment workshop Bonn Secretariat H Bonn Agreement-wide

Development of the methodology note

25 SEPTEMBER 2012

TASK D: METHODOLOGY 4

› General outline of the methodology

› Method seminar: Presentation and discussion (27 March 2012)

› Modification of the method

› Draft methodology note (3 July 2012)

› Comments from the project partners

› Methodology note, version 1.0 (2 August 2012)

Page 5: Task D: Methodology - Bonn Agreement · D Methodology COWI E Area-wide traffic study MARIN F Sensitivity analysis MUMM G Risk assessment workshop Bonn Secretariat H Bonn Agreement-wide

Methodology note

25 SEPTEMBER 2012

TASK D: METHODOLOGY 5

› E3 Cargo transport analysis

› E4 Future traffic model 2020

› E5 Offshore installation risk analysis

› H1.1 AIS traffic model

› H1.3 Modelling of accidents and oil releases

› H7 Qualitative assessment of HNS risks

› Defines the general scope

› Defines the method of

› Task E (Area-wide traffic and use study)

› Task H (Risk assessment)

Page 6: Task D: Methodology - Bonn Agreement · D Methodology COWI E Area-wide traffic study MARIN F Sensitivity analysis MUMM G Risk assessment workshop Bonn Secretariat H Bonn Agreement-wide

Modifications to the general scope (compared to BRISK)

25 SEPTEMBER 2012

TASK D: METHODOLOGY 6

Modifications as decided at the Method Seminar:

› Illegal spills not to be included

› Offshore installations to be analysed in more detail

Adjustments since the Method Seminar:

› None

Page 7: Task D: Methodology - Bonn Agreement · D Methodology COWI E Area-wide traffic study MARIN F Sensitivity analysis MUMM G Risk assessment workshop Bonn Secretariat H Bonn Agreement-wide

Method modifications to Task E3 (Cargo transport analysis)

25 SEPTEMBER 2012

TASK D: METHODOLOGY 7

Modifications as decided at the Method Seminar:

› 2008 cargo data from LLI

› 2011 cargo data from major ports

Adjustments since the Method Seminar:

› 2011 dangerous goods reports

› 2011 cargo data from major ports

› 2011 SafeSeaNet data from EMSA

Page 8: Task D: Methodology - Bonn Agreement · D Methodology COWI E Area-wide traffic study MARIN F Sensitivity analysis MUMM G Risk assessment workshop Bonn Secretariat H Bonn Agreement-wide

Method modifications to Task E4 (Future traffic model 2020)

25 SEPTEMBER 2012

TASK D: METHODOLOGY 8

Modifications as decided at the Method Seminar:

› Literature study on future wind parks to be included

Adjustments since the Method Seminar:

› Prognosis on filling rate of anchorage areas to be included

Page 9: Task D: Methodology - Bonn Agreement · D Methodology COWI E Area-wide traffic study MARIN F Sensitivity analysis MUMM G Risk assessment workshop Bonn Secretariat H Bonn Agreement-wide

Method modifications to Task E5 (Offshore installation risk analysis)

25 SEPTEMBER 2012

TASK D: METHODOLOGY 9

Modifications as decided at the Method Seminar:

› Collision risk based on COWI's AIS traffic data analysis (Task H1.1)

Adjustments since the Method Seminar:

› Collision risk based on both COWI's AIS traffic data analysis + MARIN's own AIS data analysis

Page 10: Task D: Methodology - Bonn Agreement · D Methodology COWI E Area-wide traffic study MARIN F Sensitivity analysis MUMM G Risk assessment workshop Bonn Secretariat H Bonn Agreement-wide

Method modifications to Task H1.1 (AIS traffic model)

25 SEPTEMBER 2012

TASK D: METHODOLOGY 10

Modifications as decided at the Method Seminar:

› None

Adjustments since the Method Seminar:

› Decision on whether to include fjords and estuaries: Postponed until preliminary results are ready

Page 11: Task D: Methodology - Bonn Agreement · D Methodology COWI E Area-wide traffic study MARIN F Sensitivity analysis MUMM G Risk assessment workshop Bonn Secretariat H Bonn Agreement-wide

Method modifications to Task H1.3 (Modelling of accidents and oil releases)

25 SEPTEMBER 2012

TASK D: METHODOLOGY 11

Modifications as decided at the Method Seminar:

› Ships at anchor to be included

› Drift grounding to be analysed with physical model (not just statistics)

Adjustments since the Method Seminar:

› None

Page 12: Task D: Methodology - Bonn Agreement · D Methodology COWI E Area-wide traffic study MARIN F Sensitivity analysis MUMM G Risk assessment workshop Bonn Secretariat H Bonn Agreement-wide

Method modifications to Task H7 (Qualitative assessment of HNS risks)

25 SEPTEMBER 2012

TASK D: METHODOLOGY 12

Modifications as decided at the Method Seminar:

› General information on what is transported on which ships

› Density plot for different groups of HNS

Adjustments since the Method Seminar:

› Packed HNS also to be taken into account

Page 13: Task D: Methodology - Bonn Agreement · D Methodology COWI E Area-wide traffic study MARIN F Sensitivity analysis MUMM G Risk assessment workshop Bonn Secretariat H Bonn Agreement-wide

13 25 SEPTEMBER 2012

TASK D: METHODOLOGY