SOUTH AFRICAN NUCLEAR ENERGY CORPORATION - TARGETS AND GOALS 09 July 2013 By: Isabel Steyn Senior Manager: SHEQ Department

Upload: others

Post on 28-Jul-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: TARGETS AND GOALS - Nucleus...Targets and Goals • Factors taken into account: – 18 DIs ≈ DIIR of 1.00 (DIIR at end March 2012 = 0,99 for 12 month moving average, (the < 0.50

SOUTH AFRICAN NUCLEAR ENERGY CORPORATION - TARGETS AND

GOALS

09 July 2013

By:

Isabel Steyn

Senior Manager: SHEQ Department

Page 2: TARGETS AND GOALS - Nucleus...Targets and Goals • Factors taken into account: – 18 DIs ≈ DIIR of 1.00 (DIIR at end March 2012 = 0,99 for 12 month moving average, (the < 0.50

Structure

Necsa

Requirements

Targets and Goals

Summary

2

Page 3: TARGETS AND GOALS - Nucleus...Targets and Goals • Factors taken into account: – 18 DIs ≈ DIIR of 1.00 (DIIR at end March 2012 = 0,99 for 12 month moving average, (the < 0.50

Necsa

Multi Facility Site:

41 Nuclear Installation Licenses

Research Reactor

Fuel Fabrication

Radioactive Waste facilities (Conditioning and storage)

Decommissioning & Decontamination Facilities

Liquid Treatment Facility

Subsidiaries inclusive of Medical Isotope production and Chemical facilities

3

Continues…

Page 4: TARGETS AND GOALS - Nucleus...Targets and Goals • Factors taken into account: – 18 DIs ≈ DIIR of 1.00 (DIIR at end March 2012 = 0,99 for 12 month moving average, (the < 0.50

Requirements

• Various Regulatory and Legislative Requirements

• Combination of radiological and conventional safety requirements

• In-house a suit of about 210 documents spelling out all requirements

• With specific reference to targets and goals:

– SHEQ-INS-0100 Necsa safety and environmental policy

– SHEQ-INS-0200 Necsa quality policy

– SHEQ-INS-0215 Necsa requirements for quality objectives

– SHEQ-INS-4130 Health, Safety, Environment and Quality Statistics

– SHEQ-INS-5201 SHEQ awareness system

– SHEQ INS-5301 SHEQ orientation and training

– SHEQ-INS-6310 Establishing significant environmental aspects, objectives and

targets

4

Page 5: TARGETS AND GOALS - Nucleus...Targets and Goals • Factors taken into account: – 18 DIs ≈ DIIR of 1.00 (DIIR at end March 2012 = 0,99 for 12 month moving average, (the < 0.50

Requirements

Responsibilities

• In accordance with King 111, the SHEQ and Technical Committee

of the Necsa Board is responsible for ensuring that Necsa has an

effectively implemented SHEQ management system.

5

Page 6: TARGETS AND GOALS - Nucleus...Targets and Goals • Factors taken into account: – 18 DIs ≈ DIIR of 1.00 (DIIR at end March 2012 = 0,99 for 12 month moving average, (the < 0.50

Requirements

• The terms of reference for the SHEQ and Technical Committee of the

Necsa Board states: – The Committee shall have the authority to investigate, at its discretion, any issues

relating to SHEQ, Security and Regulatory Framework including related nuclear matters

as applicable to any aspect of the Company’s activities;

– The Committee will provide guidance on the implications of the above matters to the

Board;

– The Committee shall monitor the following specifics:

• the implementation and management of SHEQ, Security and Regulatory Framework

and related nuclear issues;

• compliance to International Management Standards and applicable National

Legislation;

• the implementation of Safety Culture Enhancement program; and

• the promotion of continuous improvement.

6

Page 7: TARGETS AND GOALS - Nucleus...Targets and Goals • Factors taken into account: – 18 DIs ≈ DIIR of 1.00 (DIIR at end March 2012 = 0,99 for 12 month moving average, (the < 0.50

Requirements

– The Committee shall review and make recommendations to the Board pertaining

to the following:

• SHEQ, Security and Regulatory Framework and related nuclear issue

strategies, as proposed by Management, to ensure compliance;

• implementation of best practices and latest trends from both national and

international sources as applicable to the Company;

• Management’s views on identified and potential risks of SHEQ, Security and

Regulatory Framework and related nuclear issues;

• internal and/or external assessments and peer reviews of the SHEQ, Security

and Regulatory Framework and related nuclear issues management systems;

and

• internal adverse SHEQ, Security and Regulatory Framework and related

nuclear issue trends.

7

Page 8: TARGETS AND GOALS - Nucleus...Targets and Goals • Factors taken into account: – 18 DIs ≈ DIIR of 1.00 (DIIR at end March 2012 = 0,99 for 12 month moving average, (the < 0.50

Requirements

• The Necsa SHEQ committee is responsible for:

– Accepting and reviewing SHEQ performance and standards;

– Ensuring the effectiveness of SHEQ management efforts;

– Reviewing the adequacy and appropriateness of the SHEQ system and policy

for Necsa;

– Accepting SHEQ performance objectives and targets and performance

indicators;

– Recommending improvements to the SHEQ management

– The SHEQ element of the company business plan and the sustainability

review in the integrated annual report;

– Carrying out investigations into matters where inadequacies are identified or

as directed by the Board.

8

Page 9: TARGETS AND GOALS - Nucleus...Targets and Goals • Factors taken into account: – 18 DIs ≈ DIIR of 1.00 (DIIR at end March 2012 = 0,99 for 12 month moving average, (the < 0.50

Requirements

• SHEQ Department shall be responsible for :

– Establishing and developing the processes as identified in the SHEQ-INS

System;

– Assisting line management in the identification of significant aspects and

impacts;

– Chairing the SHEQ System Steering Committee. This committee ensures that

SHEQ system documents are reviewed for adequacy and appropriateness;

– Setting SHEQ performance objectives and targets and performance indicators;

– Assisting line management in setting SHEQ objectives and targets for

continues improvement;

– Reporting SHE performance in accordance with stated objectives and targets

and performance indicators.

9

Page 10: TARGETS AND GOALS - Nucleus...Targets and Goals • Factors taken into account: – 18 DIs ≈ DIIR of 1.00 (DIIR at end March 2012 = 0,99 for 12 month moving average, (the < 0.50

Targets and Goals

• Targets and goals are set for the following:

– Nuclear Events

– Average cumulative individual dose (mSv per person) for 12 months

– Number of persons who received a dose above 4 mSv (the ALARA goal)

– Disabling injury incidence rate (DIIR)

– Total Injury Rate (TIR)

– Maximum man-hours worked without a DI

– Events with cost (EWC)

– Events without loss (EWL)

– Environmental Event in Violation (EE (in V))

– Environmental Event no Violation (EE (no V))

– Public Dose

10

Page 11: TARGETS AND GOALS - Nucleus...Targets and Goals • Factors taken into account: – 18 DIs ≈ DIIR of 1.00 (DIIR at end March 2012 = 0,99 for 12 month moving average, (the < 0.50

Targets and Goals

11

NO DESCRIPTION

PERIOD AVERAGE LAST 3 FIN

YEARS

AGREED TARGETS FOR

2013/2014

2008/2009

2009/2010 2010/2011 2011/2012 2012/2013

1 Nuclear Events - INES rating = 0 - INES rating > 0

34 6

19 4

38 3

43 5

63 8

48 5.3

40.8 4.5

2 Average cumulative individual dose (mSv per person) for 12 months.

0.61 0.72 0.68 0.68 0.55 0.64 0.54

Number of persons who received a dose above 4 mSv (the ALARA goal)

54 1058 5.1%

72 1095 5.1%

64 1166 5.5%

72 1159 6.2%

53 1113 4.8%

63 1146 5.5%

4.67%

3 DIIR 0.89 0.86 0.52 1.03 0,6 0,72 < 0.50

4 TIR 5.8 5.54 4.17 5.48 3,48 4,38 3.7

5 Maximum man-hours worked without a DI

702 623 373 868 300 387 52721 1026 327 902 556 1083067

6 EWC 144 112 81 60 36 59 50

7 EWL 193 182 159 174 204 179 >600

8 EE (in V) - - - - - 0 0

9 EE (no V) 55 26 21 31 31 28 24

CALENDAR YEAR 2008 2009 2010 2011 2012 Average Last

3 Calendar Years

2013

10 Public Dose total µSv % 13.3 5.30%

6.38 2.55%

7.98 3.19%

9.22 3.69%

9.63 3.85%

8.94 50µSv

Page 12: TARGETS AND GOALS - Nucleus...Targets and Goals • Factors taken into account: – 18 DIs ≈ DIIR of 1.00 (DIIR at end March 2012 = 0,99 for 12 month moving average, (the < 0.50

Targets and Goals

• Factors taken into account:

– 18 DIs ≈ DIIR of 1.00 (DIIR at end March 2012 = 0,99 for 12 month moving

average, (the < 0.50 for the DIIR in the agreed targets for 2012/ 2013

correspond to 9 DIs.)

– 85% of last 3 financial years' average

– 1.2 x the average of last 3 financial years (Max hours worked without DI)

– Same approach as for Worker ALARA is followed, 20% of dose limit (20% of

public dose limit 250 µSv = 50 µSv)

– 600 Minor incidents (near misses) have the potential of 1 DI occurring.

12

Page 13: TARGETS AND GOALS - Nucleus...Targets and Goals • Factors taken into account: – 18 DIs ≈ DIIR of 1.00 (DIIR at end March 2012 = 0,99 for 12 month moving average, (the < 0.50

Summary

• Necsa is a very complex site

• Advisable to keep the Targets and goals as simple as possible

• From the Necsa site targets and goals, every facility is to derive at

facility specific targets and goals as to ensure that Necsa will comply

with the set site targets and goals

13

Page 14: TARGETS AND GOALS - Nucleus...Targets and Goals • Factors taken into account: – 18 DIs ≈ DIIR of 1.00 (DIIR at end March 2012 = 0,99 for 12 month moving average, (the < 0.50

Summary

• Together with setting Targets and Goals, SHEQ awareness techniques

are applied

– SHEQ training

– Orientation programme

– SHEQ statistics

– Safety notice boards

– Poster, video and Corporate Safety programmes

– Library and SHEQ journals

– SHEQ Digest, circulars, general notices, etc

– Monthly, quarterly and annual reports

– SHEQ colloquia and seminars

– Involvement with Health and Safety Committee meetings

14

Page 15: TARGETS AND GOALS - Nucleus...Targets and Goals • Factors taken into account: – 18 DIs ≈ DIIR of 1.00 (DIIR at end March 2012 = 0,99 for 12 month moving average, (the < 0.50

Summary

– Management meetings

– Injury and incident recall system

– Regular safety talks

– Task specific communication

– Idea scheme

– Quality circles / small group activities

– Job observation

– SHEQ recognition and incentive programmes, and settings of SHEQ targets

– SHEQ competitions

– Management involvement with SHEQ audits

– Plant visits and plant walk-abouts

– Off-the-job safety

15

Page 16: TARGETS AND GOALS - Nucleus...Targets and Goals • Factors taken into account: – 18 DIs ≈ DIIR of 1.00 (DIIR at end March 2012 = 0,99 for 12 month moving average, (the < 0.50