Project Bill of Quantities Bill No. 03a
Havelock City - Phase II Earthworks and Excavation
Block C & D
Item Description Unit Quantity Rate US Dollars
Note
[ 1 ] EARTHWORKS AND EXCAVATION
A EARTHWORK AND EXCAVATION
B EXCAVATION
C EARTHWORK SUPPORTING SYSTEM
D DISPOSAL
E DEWATERING
F TERMITE TREATMENT
G EARTH FILLING
H Others (Please Specify)
i)
ii)
Page 1 of 9
-
7/30/2019 Takeoff Check List
2/9
Project Bill of Quantities Bill No. 03b
Havelock City - Phase II Form Work
Block C & D
Item Description Unit Quantity Rate US Dollars
[ 2 ] FORMWORK
A SUBSTRUCTURE FORMWORK
B SUPERSTRUCTURE FORMWORK
C Others (Please Specify)
[ 3 ] CONCRETE WORK
A SUB STRUCTURE CONCRETE
B SUPER STRUCTURE CONCRETE
C Others (Please Specify)
[ 4 ] REINFORCEMENT
A SUBSTRUCTURE REINFORCEMENT
B SUPERSTRUCTURE REINFORCEMENT
C Others (Please Specify)
[ 5 ] MASONARY WORK
A MASONARY ALL WORKS
B Others (Please Specify)
[ 6 ] WATERPROOFING / INSULATION / ROOF COVERING
A WATERPROOFING
B Others (Please Specify)
Page 2 of 9
-
7/30/2019 Takeoff Check List
3/9
Project Bill of Quantities Bill No. 03g
Havelock City - Phase II Joinery
Block C & D
Item Description Unit Qty Rate US Dollars
[ 7 ] METAL WORK AND JOINERY
METAL WORK - ALUMINIUM AND OTHER FABRICATIONS
JOINERY
[ 8 ] Floor, Wall and Ceiling Finishes
Finishes (Wall / Ceiling / Floor etc)
INTERNAL FLOOR FINISHES
INTERNAL CEILING FINISHES
INTERNAL WALL FINISHES
EXTERNAL WALL FINISHES
OTHER FABRICATIONS, FINISHES & FITTINGS
[ 9 ] PAINTING AND DECORATION
INTERNAL PAINT
EXTERNAL PAINT
G Others (Please Specify)
Page 3 of 9
-
7/30/2019 Takeoff Check List
4/9
Project Bill of Quantities Bill No. 03j
Havelock City - Phase II Plumbing & Internal Drainage
Block C & D
Item Description Unit Quantity Rate US Dollars
[ 10 ] PLUMBING, SANITARY, LPG AND RAINWATER DRAINAGE SYSTEM
A COLD WATER SUPPLY AND DISTRIBUTION SYSTEM
B HOT WATER DISTRIBUTION SYSTEM
C SANITARY DRAINAGE SYSTEM
D INSTALLATION OF SANITARY APPLIANCES & PLUMBING
FIXTURES
E LPG SYSTEM
F RAIN WATER DRAINAGE SYSTEM
G
SUNDRY ITEMS (Inclusive of O/M Manuals, Testing, Main Connections,
Etc)
H Others (Please Specify)
i)
ii)
iii)
Page 4 of 9
-
7/30/2019 Takeoff Check List
5/9
Project Bill of Quantities Bill No. 03k
Havelock City - Phase II Fire Protection & Detection System
Block C & D
Item Description Unit Quantity Rate US Dollars
[ 11 ] FIRE PROTECTION AND DETECTION SYSTEM
A HOSEREEL SYSTEM
B WET RISER SYSTEM / HYDRANT SYSTEM
C FIRE ALARM SYSTEM
D PORTABLE FIRE EXTINGUISHERS
E GAS ALARM SYSTEM
F OTHERS - Testing and commissioning / maintenance / O&M
manuals
G Others (Please Specify)
i)
ii)
iii)
Page 5 of 9
-
7/30/2019 Takeoff Check List
6/9
Project Bill of Quantities Bill No. 03l
Havelock City - Phase II Electrical Installation
Block C & D
Item Description Unit Quantity Rate US Dollars
[ 12 ] SECURITY, DATA, VOICE AND ELECTRICAL INSTALLATION
SYSTEMS
Main Electrical Supply
It is the Contractor's responsibility to obtain the electricity supply
from the CEB station within the site and attending to all matters
related to main electrical connection. Note
Supply, Install, Commissioning and Maintaining
(Comprehensive Maintenance During Defects Liability
Period) of Generators
MATV SYSTEM
SECURITY SYSTEM - CCTV
A CCTV system
ELECTRICAL SERVICES
A HIGH VOLTAGE (HV) SWITCHBOARDS
B TRANSFORMERS
C HV CABLES
D STANDBY GENERATOR SYSTEM
E POWERGRID POWER FAILURE SIGNAL CABLES
F LOW VOLTAGE (LV) SWITCHBOARDS
G DISTRIBUTION BOARDS
H DISTRIBUTION SUBMAINS
I FINAL SUB-CIRUIT WIRING FOR POWER POINTS
J FINAL SUB-CIRCUIT WIRING FOR LIGHTING POINTS
Page 6 of 9
-
7/30/2019 Takeoff Check List
7/9
K LIGHT FITTINGS SUPPLY AND INSTALLATION
L LIGHTING PROTECTION SYSTEM
M MAIN EARTHING SYSTEM
N CATV SYSTEM
O TELEPHONE WIRING FACILITY
P AUDIO INTERCOM / CARD ACCESS CONTROL
Q CCTV SYSTEM
R SUNDRY ITEMS AND OTHERS Cost to include following services
1 Testing and commissioning of systems
2 Licensing
3 Comprehensive maintenance during defect liability period
4 Fire stops and fire proofing materials
5 Haunching of underground pipes
6 As built drawings
7 Painting and labouring
8 Any other element of work not specifically mentioned but are
necessary for completion of Electrial Services of Block C&D
S Others (Please Specify)
i)
ii)
iii)
TO SUB TOTAL US DOLLARS
Page 7 of 9
-
7/30/2019 Takeoff Check List
8/9
Project Bill of Quantities Bill No. 03m
Havelock City - Phase II Air Conditioning & Mechanical
Ventilation System
Block C & D
Item Description Unit Quantity Rate US Dollars
[ 13 ] AIR CONDITIONING AND MECHANICAL VENTILATION SYSTEMS
A AIR CONDITIONING
B MECHANICAL VENTILATION SYSTEM
C SUNDRY ITEMS / OTHERS (to include following)
D Others (Please Specify)
i)ii)
iii)
Page 8 of 9
-
7/30/2019 Takeoff Check List
9/9
Project Bill of Quantities Bill No. 03n
Havelock City - Phase II Elevators
Block C & D
Item Description Unit Quantity Rate US Dollars
[ 14 ] ELEVATORS
A ELEVATORS - SUPPLY AND INSTALLATION
B Others (Please Specify)
i)
ii)
iii)
Page 9 of 9