    Project Bill of Quantities Bill No. 03a

    Havelock City - Phase II Earthworks and Excavation

    Block C & D

    Item Description Unit Quantity Rate US Dollars

    Note

    [ 1 ] EARTHWORKS AND EXCAVATION

    A EARTHWORK AND EXCAVATION

    B EXCAVATION

    C EARTHWORK SUPPORTING SYSTEM

    D DISPOSAL

    E DEWATERING

    F TERMITE TREATMENT

    G EARTH FILLING

    H Others (Please Specify)

    i)

    ii)

    Page 1 of 9

  • 7/30/2019 Takeoff Check List

    2/9

    Project Bill of Quantities Bill No. 03b

    Havelock City - Phase II Form Work

    Block C & D

    Item Description Unit Quantity Rate US Dollars

    [ 2 ] FORMWORK

    A SUBSTRUCTURE FORMWORK

    B SUPERSTRUCTURE FORMWORK

    C Others (Please Specify)

    [ 3 ] CONCRETE WORK

    A SUB STRUCTURE CONCRETE

    B SUPER STRUCTURE CONCRETE

    C Others (Please Specify)

    [ 4 ] REINFORCEMENT

    A SUBSTRUCTURE REINFORCEMENT

    B SUPERSTRUCTURE REINFORCEMENT

    C Others (Please Specify)

    [ 5 ] MASONARY WORK

    A MASONARY ALL WORKS

    B Others (Please Specify)

    [ 6 ] WATERPROOFING / INSULATION / ROOF COVERING

    A WATERPROOFING

    B Others (Please Specify)

    Page 2 of 9

  • 7/30/2019 Takeoff Check List

    3/9

    Project Bill of Quantities Bill No. 03g

    Havelock City - Phase II Joinery

    Block C & D

    Item Description Unit Qty Rate US Dollars

    [ 7 ] METAL WORK AND JOINERY

    METAL WORK - ALUMINIUM AND OTHER FABRICATIONS

    JOINERY

    [ 8 ] Floor, Wall and Ceiling Finishes

    Finishes (Wall / Ceiling / Floor etc)

    INTERNAL FLOOR FINISHES

    INTERNAL CEILING FINISHES

    INTERNAL WALL FINISHES

    EXTERNAL WALL FINISHES

    OTHER FABRICATIONS, FINISHES & FITTINGS

    [ 9 ] PAINTING AND DECORATION

    INTERNAL PAINT

    EXTERNAL PAINT

    G Others (Please Specify)

    Page 3 of 9

  • 7/30/2019 Takeoff Check List

    4/9

    Project Bill of Quantities Bill No. 03j

    Havelock City - Phase II Plumbing & Internal Drainage

    Block C & D

    Item Description Unit Quantity Rate US Dollars

    [ 10 ] PLUMBING, SANITARY, LPG AND RAINWATER DRAINAGE SYSTEM

    A COLD WATER SUPPLY AND DISTRIBUTION SYSTEM

    B HOT WATER DISTRIBUTION SYSTEM

    C SANITARY DRAINAGE SYSTEM

    D INSTALLATION OF SANITARY APPLIANCES & PLUMBING

    FIXTURES

    E LPG SYSTEM

    F RAIN WATER DRAINAGE SYSTEM

    G

    SUNDRY ITEMS (Inclusive of O/M Manuals, Testing, Main Connections,

    Etc)

    H Others (Please Specify)

    i)

    ii)

    iii)

    Page 4 of 9

  • 7/30/2019 Takeoff Check List

    5/9

    Project Bill of Quantities Bill No. 03k

    Havelock City - Phase II Fire Protection & Detection System

    Block C & D

    Item Description Unit Quantity Rate US Dollars

    [ 11 ] FIRE PROTECTION AND DETECTION SYSTEM

    A HOSEREEL SYSTEM

    B WET RISER SYSTEM / HYDRANT SYSTEM

    C FIRE ALARM SYSTEM

    D PORTABLE FIRE EXTINGUISHERS

    E GAS ALARM SYSTEM

    F OTHERS - Testing and commissioning / maintenance / O&M

    manuals

    G Others (Please Specify)

    i)

    ii)

    iii)

    Page 5 of 9

  • 7/30/2019 Takeoff Check List

    6/9

    Project Bill of Quantities Bill No. 03l

    Havelock City - Phase II Electrical Installation

    Block C & D

    Item Description Unit Quantity Rate US Dollars

    [ 12 ] SECURITY, DATA, VOICE AND ELECTRICAL INSTALLATION

    SYSTEMS

    Main Electrical Supply

    It is the Contractor's responsibility to obtain the electricity supply

    from the CEB station within the site and attending to all matters

    related to main electrical connection. Note

    Supply, Install, Commissioning and Maintaining

    (Comprehensive Maintenance During Defects Liability

    Period) of Generators

    MATV SYSTEM

    SECURITY SYSTEM - CCTV

    A CCTV system

    ELECTRICAL SERVICES

    A HIGH VOLTAGE (HV) SWITCHBOARDS

    B TRANSFORMERS

    C HV CABLES

    D STANDBY GENERATOR SYSTEM

    E POWERGRID POWER FAILURE SIGNAL CABLES

    F LOW VOLTAGE (LV) SWITCHBOARDS

    G DISTRIBUTION BOARDS

    H DISTRIBUTION SUBMAINS

    I FINAL SUB-CIRUIT WIRING FOR POWER POINTS

    J FINAL SUB-CIRCUIT WIRING FOR LIGHTING POINTS

    Page 6 of 9

  • 7/30/2019 Takeoff Check List

    7/9

    K LIGHT FITTINGS SUPPLY AND INSTALLATION

    L LIGHTING PROTECTION SYSTEM

    M MAIN EARTHING SYSTEM

    N CATV SYSTEM

    O TELEPHONE WIRING FACILITY

    P AUDIO INTERCOM / CARD ACCESS CONTROL

    Q CCTV SYSTEM

    R SUNDRY ITEMS AND OTHERS Cost to include following services

    1 Testing and commissioning of systems

    2 Licensing

    3 Comprehensive maintenance during defect liability period

    4 Fire stops and fire proofing materials

    5 Haunching of underground pipes

    6 As built drawings

    7 Painting and labouring

    8 Any other element of work not specifically mentioned but are

    necessary for completion of Electrial Services of Block C&D

    S Others (Please Specify)

    i)

    ii)

    iii)

    TO SUB TOTAL US DOLLARS

    Page 7 of 9

  • 7/30/2019 Takeoff Check List

    8/9

    Project Bill of Quantities Bill No. 03m

    Havelock City - Phase II Air Conditioning & Mechanical

    Ventilation System

    Block C & D

    Item Description Unit Quantity Rate US Dollars

    [ 13 ] AIR CONDITIONING AND MECHANICAL VENTILATION SYSTEMS

    A AIR CONDITIONING

    B MECHANICAL VENTILATION SYSTEM

    C SUNDRY ITEMS / OTHERS (to include following)

    D Others (Please Specify)

    i)ii)

    iii)

    Page 8 of 9

  • 7/30/2019 Takeoff Check List

    9/9

    Project Bill of Quantities Bill No. 03n

    Havelock City - Phase II Elevators

    Block C & D

    Item Description Unit Quantity Rate US Dollars

    [ 14 ] ELEVATORS

    A ELEVATORS - SUPPLY AND INSTALLATION

    B Others (Please Specify)

    i)

    ii)

    iii)

    Page 9 of 9