×
Log in
Upload File
Most Popular
Study
Business
Design
Technology
Travel
Explore all categories
The top documents tagged [luminosity optimization]
Beam Commissioning WG, 10 August 2010 1 Luminosity Scans in the LHC S. White
216 views
Evian summary 1 24-1-2011 Operational challenges (Feed forward from Evian LHC operation workshop) 7-9 December 2010 Day after last beam Two nights – 7
214 views
Summary
24 views
Operational challenges ( Feed forward from Evian LHC operation workshop)
44 views
Overview and alignment results of the BPM button collimator mock-up
30 views
NLC - The Next Linear Collider Project “Slow” Feedback Requirements: Deflections and Luminosity Linda Hendrickson IPBI Meeting, SLAC June 26, 2002
223 views
Fri 6 /4
33 views