Taean IGCC Project Update Seungmin Kim, Manager, Future Energy Marketing Doosan Heavy Industries & Construction Gasification Technologies Conference 2015 October 12-14 , Colorado Springs This document is the informational asset of Doosan Heavy Industries & Construction. Unauthorized access, revision, distribution and/ or copying of this document are strictly prohibited.

Upload: lekiet

Post on 06-Feb-2018

288 views

Category:

Documents


3 download

TRANSCRIPT

Taean IGCC Project Update Seungmin Kim, Manager, Future Energy Marketing Doosan Heavy Industries & Construction

Gasification Technologies Conference 2015 October 12-14 , Colorado Springs

This document is the informational asset of Doosan Heavy Industries & Construction. Unauthorized access, revision, distribution and/ or copying of this document are strictly prohibited.

1

Doosan Heavy Industries & Construction’s Business

Business Group

Overseas Subsidiaries

Doosan HydroTech.

Doosan IMGB

Doosan HF Controls

Doosan Lentjes

DPSI

Doosan E&S

Škoda Power1

Doosan Babcock

Doosan VINA

Turbine/ Generator Nuclear EPC Water Casting &

Forging Boiler

Doosan Enpure

• Industrial materials and components

• Fabricates ~1,000MW boilers for power plants

• Gasification Plant in future energy business unit

• Nuclear power plant key equipment manufacturing and service

• Power Plant EPC • Seawater desalination

• Water treatment

• Designs and fabricates steam, gas, hydroelectric models

This document is the informational asset of Doosan Heavy Industries & Construction. Unauthorized access, revision, distribution and/ or copying of this document are strictly prohibited.

Global Projects since 1980

300 Total power generation capacity

170GW

2

Taean IGCC Project Overview

The first IGCC project in South Korea

Source: KOWEPO

Plant Owner: Korea Western Power

Net Power: 305 MWe (Overall Power: 380 MWe)

Plant Efficiency: 42% (Net, HHV)

− Coal Consumption: 2,670 TPD (as received)

− Clean Syngas to Power Block: 615 MJ/s (Process Design)

Selected Technology Providers

− Gasification: SCGP by Shell

− HCN/COS Hydrolysis: By Shell

− AGRU: Sulfinol-M by Shell

− SRU: Wet Sulfuric Acid by Haldor Topsoe

− ASU: Air Product

− GT/ST: 7FB Syngas GT by GE

Contractors

− Gasification EPC: Doosan Heavy Industries & Construction

− ASU EPC: Doosan E&C. This document is the informational asset of Doosan Heavy Industries & Construction. Unauthorized access, revision, distribution and/ or copying of this document are strictly prohibited.

3

Current Status of Taean IGCC project

The first coal firing through burner system was successfully carried out on 10 Sept. 2015 by Doosan’s commissioning team.

This document is the informational asset of Doosan Heavy Industries & Construction. Unauthorized access, revision, distribution and/ or copying of this document are strictly prohibited.

10 Sept. 2015

Gasification Island Project Key Milestone

Mar. 2016 Oct. 2008

Commercial operation

Sept. 2015

Initial Coal Firing

May 2015

: Completion Date

Selection of Gasification Licensor

FEED

EPC Contract and Ground Breaking

Gasifier, Syngas Coolers at the Site

Mechanical Completion

Performance Test Run

Dec. 2013 Nov. 2011 Mar.2010

POST FEED

Nov. 2010

Doosan’s Technical Support

Doosan’s Work Scope Doosan’s Technical Support

4

This document is the informational asset of Doosan Heavy Industries & Construction. Unauthorized access, revision, distribution and/ or copying of this document are strictly prohibited.

5

Taean IGCC Process Configuration

Source: KOWEPO

Syngas O2/N2 Water/Solvent Steam Solid

Fly Ash

Slag

Wet Scrubber

HPHT Filter

N2 O2

ASU

Slag Handling

Sys.

HCN/COS Hydrolysis

AGR

SRU

H2SO4

Condenser

ST

GT

To Stack

Saturator

GasifierSGC

Coal Milling and Drying

Coal Storage

This document is the informational asset of Doosan Heavy Industries & Construction. Unauthorized access, revision, distribution and/ or copying of this document are strictly prohibited.

Econo-mizer

6

Manufacturing Critical Equipment of Gasification Plant in Doosan

The most critical and complicated items of gasification plant, Gasifier and Syngas Coolers, were manufactured in Doosan’s own manufacturing base in Changwon, South Korea.

This document is the informational asset of Doosan Heavy Industries & Construction. Unauthorized access, revision, distribution and/ or copying of this document are strictly prohibited.

7

Installing Critical Equipment of Gasification Plant at the Site

This document is the informational asset of Doosan Heavy Industries & Construction. Unauthorized access, revision, distribution and/ or copying of this document are strictly prohibited.

8

This document is the informational asset of Doosan Heavy Industries & Construction. Unauthorized access, revision, distribution and/ or copying of this document are strictly prohibited.

A video clip Installation of Gasifier and Syngas Coolers at Taean Site.

Installing Critical Equipment of Gasification Plant at the Site

Namhae IGCC Project

9

Taean IGCC Plant

Gwangyang SNG plant

Gwangyang Port

Namhae IGCC Area

15.3 km

51.2 km

S. Korea

√ Location: Namhae-gun, Gyeongsangnam-do

√ Developer : POSCO E&C Doosan Heavy Industries & Construction √ Plant Capacity: > 300MWe (Net, HHV)

√ Project Schedule

- Feb.2015 : MOU with Namhae-gun - Jul. 2015 : List-up of Gov.’s 7th Basic Plan for long term electricity supply and demand of South Korea - 4Q. 2015: Pre-feasibility study completion - 1Q. 2019: Ground Breaking - 1Q. 2023: Commercial operation

Namhae IGCC perspective view

This document is the informational asset of Doosan Heavy Industries & Construction. Unauthorized access, revision, distribution and/ or copying of this document are strictly prohibited.

Namhae IGCC Plant

Doosan’s manufacturing

base in Changwon

10

Q&A Seungmin Kim