Corporate Profile Sanol Engineering Consultants Ltd. * Consulting Engineers * Development Consultants * Project Managers 1 TABLE OF CONTENTS S/NO. DESCRIPTION 1. Contact Us 2. Firm’s Brief 3. Major Illustrative Assignments 4. Consultant Past Experiences 5. List of Equipment and Facilities 6. List of Key Personnel 7. Company’s Registration Certificates 8. Tax Clearance Certificate 9. VAT Registration Certificate 10. Evidence of Registration with Federal Ministry of Works 11. Evidence of Pension Remittances 12. Evidence of Financial Capability 13. Certificates of Key Personnel 14. Curriculum Vitae of Key Personnel 15. Company Audited Reports

Upload: vodan

Post on 15-Apr-2018

258 views

Category:

Documents


9 download

TRANSCRIPT

Corporate Profile Sanol Engineering Consultants Ltd.

* Consulting Engineers * Development Consultants * Project Managers

1

TABLE OF CONTENTS

S/NO. DESCRIPTION

1. Contact Us

2. Firm’s Brief

3. Major Illustrative Assignments

4. Consultant Past Experiences

5. List of Equipment and Facilities

6. List of Key Personnel

7. Company’s Registration Certificates

8. Tax Clearance Certificate

9. VAT Registration Certificate

10. Evidence of Registration with Federal Ministry of Works

11. Evidence of Pension Remittances

12. Evidence of Financial Capability

13. Certificates of Key Personnel

14. Curriculum Vitae of Key Personnel

15. Company Audited Reports

Corporate Profile Sanol Engineering Consultants Ltd.

* Consulting Engineers * Development Consultants * Project Managers

2

Contact Us

Name of the Firm Sanol Engineering Consultant Ltd

Corporate Office Address Plot 470, Aminu Kano Crescent, Wuse II, Abuja

Telephone +2348033626454, +23492091038

Fax +23492091038

Website www.sanolengineering.org

E-mail [email protected] [email protected]

Contact Persons

ENGR. (DR.) SANMI O. BANKOLE Principal Partner 08033626454 [email protected]

Office Addresses Corporate Office

Plot 470, Aminu Kano Crescent, Wuse II,Abuja Fax: 23492091038/ 08033626454 Website: www.sanolengineering.org E-mail: [email protected] [email protected]

Akure Branch Suite 25, Sayyou Plaza, 104, Oyemekun Road Akure, Ondo State E-mail: [email protected] Areas of Specialization

v Highway and Transportation v Bridges v Structures and Geotechnics

v Water Supply and Waste Water

v Irrigation v Sewage and Solid Waste

Corporate Profile Sanol Engineering Consultants Ltd.

* Consulting Engineers * Development Consultants * Project Managers

3

FIRM’S BRIEF

Sanol Engineering Consultants is a conglomerate of seasoned engineers of various Engineering disciplines with high experience gained over the years in their chosen fields of specialization.

Our activities cover such areas as feasibility studies, Design, Training, Supervision and Project Management of the following branches of Engineering:

1. Highway and Transportation

2. Bridges

3. Structures and Geotechnics

4. Water supply and waste water

5. Irrigation

6. Sewage and solid waste management

The partnership began operation in the year 1995 and was registered with Corporate Affairs Commission in the year 1999 as Sanol Blessed Ventures. It was subsequently re-registered as Sanol Engineering Consultants in the year 2004 and finally incorporated with Corporate Affairs Commission in the year 2006. It presently has over twenty (20) qualified engineers and professionals.

Our professional registration includes membership of COREN, NSE, ASCE, ACEN and MNI.Struct. E. as both individual and firm member.

Our ability to deliver to time a good quality work has endeared us to our numerous clients over the years.

Corporate Profile Sanol Engineering Consultants Ltd.

* Consulting Engineers * Development Consultants * Project Managers

4

Major Illustrative Assignments – ENGINEERING DESIGN S/No Projects Clients Status

(A.) HIGHWAYS 1. Consultancy Services for the Engineering Design of the

Siluko-Iguobazuwa-Okada-Ogbese Road in Edo State. (FMW – 2013) – N52.8m

Federal Ministry of Works

On-going

2. Engineering Design for the Construction of Bridge at Onuebonyi – Ishinwo Ukawu – Onicha L.G.A. Ebonyi State. (FMW – 2014) – N58.90m

Federal Ministry of Works

On-going

3. Technical Proposal for the engineering design of Yebu-Kuje Road (FMW – 2014) – N28.90m

Federal Capital Territory Administration

On-going

4. Engineering Design for the Rehabilitation of Abayi-Ogbuligba-Umuojima-Ogbu Road with spur at Umuagba (FMW – 2014) – N25.40m

Federal Ministry of Works

On-going

5. Consultancy Services For Detailed Engineering Design Safeguards Studies and Preparation Of Bidding Documents For Prioritized 222.83KM Rural Roads in Osun State of Nigeria. (FPMU – 2012) – N42.7m & $187.3

Federal Project Management Unit (RAMP 2)

Completed

6. Transaction Advisory Services for Lagos – Iseyin – Keshi – Kaiama Road in Lagos, Oyo and Kwara States, – In JV with Voyants Solutions PVT. Ltd. (PPP – 2011) – N65.8m

Federal Ministry of Works

Completed

7. Transaction Advisory Services for Kaiama – Bahama – Kaoje – Gwambu – Fokku - Sokoto Road in Kwara, Niger, Kebbi and Sokoto States. – In JV with Voyants Solutions PVT. Ltd. (PPP – 2011) – N60.1m

Federal Ministry of Works

Completed

8. Engineering Design for the Rehabilitation of Omu Aran – Isanlu Road in Kwara State, (PPP – 2011) – N23.9m

Federal Ministry of Works

Completed

9. Consultancy Services for the Survey & Design of Machina to Kanamma Route in Yobe State, (YSMW – 2010) – N210.5m

Yobe State Ministry of Works,

Completed

10. Consultancy Services for The Engineering Design Of Enugu-Nara-Isu-Onicha-Okposi-Amasiri-Oso-Owuta-Ohafia Junction in Abia State, (FMW – 2010) – N39.35m

Federal Ministry of Works

Completed

11. Consultancy Services For The Engineering Design Of The 62km Ashige – Alawagana – Gidan Buba – Fadama Bauna – Arikya – Wamba Road in Nasarawa State, (NSMW&T – 2010) – N50m

Nasarawa State Ministry of Works and Transport

Completed

12. Consultancy Services on the Engineering Design of Gombe-Wuyo (Borno State Border) Road in Gombe State, (FMW – 2010) – N22.22m

Federal Ministry of Works, Housing and Urban Development

Completed

13. Consultancy Services for Rapid Study and Preparation of Bidding Documents for Output and Performance Based Road Contract – OPRC for Abuja to Keffi Road. (FERMA – 2009) – N7.1m

Federal Roads Maintenance Agency

Completed

Corporate Profile Sanol Engineering Consultants Ltd.

* Consulting Engineers * Development Consultants * Project Managers

5

Major Illustrative Assignments – ENGINEERING DESIGN S/No Projects Clients Status

14. Consultancy Services on the Engineering Design of Lafia-Doma-Rutu-Bassa-Rafin Gabas-Nasarawa-Orozo Road in Nasarawa State.(NSMW&T – 2009) – N70m

Nasarawa State Min. of Works and Transport

Completed

15. Consultancy Services on the Engineering Design of the Dualisation of Lafia – AkurbaRoad in Nasarawa State. (NSMW&T – 2009) – N10m

Nasarawa State Ministry of Works and Transport

Completed

16. Engineering Design of Taraku-Aondona-Naka-Agagbe-Abiam-Agatu Road in Benue State. (BSMWH&T – 2008) – N59.6m

Benue State Ministry of Works, Housing and Transport

Completed

17. Engineering Design of Nasarawa-Toto-Abaji Road in Nasarawa State. (FMW – 2006) – N49m

Federal Ministry of Works

Completed

18. Engineering Design of Uba-Askira-Mbalala Road in Borno State. (FMW – 2006) – N28m

Federal Ministry of Works

Completed

19. Engineering Design of Akungba–Ikare–Omuo Road with 2 No. Bridges in Ondo State. (FMW – 2006) – N22.22m

Federal Ministry of Works

Completed

20. Engineering Design for the Limited Rehabilitation of Ado-Ekiti-Aramoko-Ijero-Efon Alaaye Road in Ekiti State. (FMW – 2006) – N16m

Federal Ministry of Works

Completed

21. Route Condition Survey and Road Safety Audit for Selected (9 Border) Roads towards the implementation of the international vehicle transit charge. (FERMA – 2006) – N6m

Federal Roads Maintenance Agency

Completed

22. Design of the Limited Rehabilitation of Onitsha End–Onitsha–Enugu Road in Anambra State. (FMW – 2006) – N4m

Federal Ministry of Works

Completed

23. Engineering Design of Road Network at Industrial Development Centre Oshogbo (FMI – 2005) – N4m

Federal Ministry of Industry

Completed

24. Engineering Design of Estate Road Network at Kuje Housing Estate, Abuja. (FMI – 2005) – N4m

Cambial Limited Completed

25. Engineering Design for the Rehabilitation of Udi-Ozalla-Ubani Road in Enugu State. (In association with Clem-George (Nig.) Ltd.) (FMW – 2008) – N12.3m

Federal Ministry of Works

Completed

26. Engineering Design for the Rehabilitation of Jega-Sokoto Road in Kebbi/Sokoto States. (In association with Park Associates Inc.) (FMW – 2008) – N30.4m

Federal Ministry of Works

Completed

27. Engineering Design of Aba-Azumini-Ohanbele-Ugwunagbo-Ihie Expressway in Abia State. (In association with Clem-George (Nig.) Ltd.) (FMW – 2005) – N49m

Federal Ministry of Works

Completed

28. Engineering design of Gumel-Maigatari Road in Jigawa State. (In association with CLS Ltd.) (FMW–2005) – N21m

Federal Ministry of Works

Completed

29. Design of Ila-Ashi-Oyan-Konta Road in Osun State (In association withProfen Consultancy Inc.) (1999)

Osun State Government Completed

30. Design of Ila-Ajaba-Imesi-Ile junction Road in Osun State for Osun State Government. (In association withProfen Consultancy Inc.) (1999)

Osun State Government Completed

Corporate Profile Sanol Engineering Consultants Ltd.

* Consulting Engineers * Development Consultants * Project Managers

6

Major Illustrative Assignments – ENGINEERING DESIGN S/No Projects Clients Status

(B.) BRIDGES 31. Design of 4-15m long Bridge at Ch.80+300 along Nasarawa -

Toto-Abaji Road in Nasarawa State. (FMW – 2006). Federal Ministry of Works

Completed

32. Design of 5 No. bridges along Langtang-Lalin-Tunkins-Shedam Road in Plateau State. (In association withPentagon Engineering Consultants Ltd.)

Federal Ministry of Works

Completed

33. Design of 7 No. multi-span bridges along Lafia-Doma-Rutu-Bassa-Rafin Gabas-Nasarawa-Orozo Road in Nasarawa State.(NSMW&T – 2009) – N70m

Nasarawa State Ministry of Works and Transport

Completed

34. Design of 4 No. bridges along Taraku-Aondona-Naka-Agagbe-Abiam-Agatu Road in Benue State. (BSMWH&T – 2008) – N59.6m

Benue State Ministry of Works, Housing and Transport

Completed

35. Design of 8 No. multi-span bridges along Ashige – Alawagana – Gidan Buba – Fadama Bauna – Arikya – Wamba Road in Nasarawa State, (NSMW&T – 2010) – N50m

Nasarawa State Ministry of Works and Transport

Completed

36. Design of 8 No. multi-span bridges along Enugu-Nara-Isu-Onicha-Okposi-Amasiri-Oso-Owuta-Ohafia Junction in Abia State, (FMW – 2010) – N39.35m

Federal Ministry of Works

Completed

37. Design of 100m long bridge over River Mabolo along Ankpa-Oyegade road in kogi State (FMW). (In association withPentagon Engineering Consultants Ltd.)

Federal Ministry of Works

Completed

38. Design of 2 No. Bridges along Akungba–Ikare–Omuo-Ekiti Road in Ondo State

Federal Ministry of Works

Completed

39. Design of 800m long Post-Tensioned Prestressed Concrete Box Girder Bridge over River Niger at Nupeko along Bida-Sacci-Nupeko Road in Niger/Kogi State. (In association withPentagon Engineering Consultants Ltd.)

Federal Ministry of Works

Completed

40. Design of 10 No. Bridges along Bida-Sacci-Nupeko Road in Niger/Kogi State. (FMW). (In association withPentagon Engineering Consultants Ltd.)

Federal Ministry of Works

Completed

41. Design of 6 No. bridges along Ayangba-Shintaku Road in Kogi State, (FMW – 2008)

Federal Ministry of Works

Completed

(C.) STRUCTURES 44. Structural Integrity Assessment of Proposed Skye Bank

Plc., Karu Branch, Abuja Skye Bank Plc.

Completed

45. Structural Integrity Assessment of Skye Bank Plc., Jalingo Branch,

Skye Bank Plc. Completed

46. Structural Integrity Assessment of Skye Bank Plc., Life Camp Branch, Abuja

Skye Bank Plc. Completed

47. Engineering Design and Supervision of Retaining Wall and River Channelization at the Collapsed Fence of Skye Bank Plc., Karu Branch, Abuja

Skye Bank Plc. Completed

48. Design of Comprehensive Development for Proposed Bankys Private Schools, Abuja. (2011) N500 Million

Bankys Private Schools Completed

49. Consultancy Services for Design of a Modern Befitting, Functional and Cost Effective State Office Complex to

Min. of Niger Delta Affairs

Completed

Corporate Profile Sanol Engineering Consultants Ltd.

* Consulting Engineers * Development Consultants * Project Managers

7

Major Illustrative Assignments – ENGINEERING DESIGN S/No Projects Clients Status

Accommodate About 150 Staff Strength in Ondo State. (MNDA – 2009) N650 Million

50. Design of 4-storey Administrative building at LAUTECH, Ogbomoso. (LAUTECH – 2003) N600 Million

Ladoke Akintola University of Technology, Ogbomoso.

Completed

51. Design of 4-Bedroom duplex , Abuja N100 Million Cambal Ltd Completed

52. Design of 5000 capacity Church building, Apata, Ibadan. (CLCA – 1998) – N550 Million

Christ Life Church Completed

53. Design of Ondo State University Christian Union Chapel, Ado-Ekiti. (OSUACU – 1993) N20 Million

Ondo State University Christian Union

Completed

(D.) GIS 54. Revision and Upgrading of Highways Maintenance Manual.

(FMWH&UD – 2010) Federal Min. of Works, Housing and Urban Dev.

Completed

55. Building a Due Diligence Micro Site for FERMA (FERMA – 2008) – N2.93m

Federal Roads Maintenance Agency

Completed

56. Study for the development of traffic park FERMA (FERMA – 2008).

Federal Roads Maintenance Agency

Completed

57. Retainership Contract for GIS Mapping and IT Consultancy Services. (FERMA – 2008)

Federal Roads Maintenance Agency

Completed

58. Retainership Contract for GIS Mapping and IT Consultancy Services. (FERMA – 2007) – N19m

Federal Roads Maintenance Agency

Completed

59. Development of Federal Road Map of Nigeria Showing earth roads, Performance Based Maintenance Management Roads and Projects Schedule for Systematic Pavement Strengthening and Enhancement in 2008 Fiscal Year. (FERMA – 2008)

Federal Roads Maintenance Agency

Completed

60. Production of Federal Road Maps of Nigeria Showing FERMA’s 4 Years Intervention Programme – 2008 – 2011. (FERMA – 2006) – N3m

Federal Roads Maintenance Agency

Completed

Corporate Profile Sanol Engineering Consultants Ltd.

* Consulting Engineers * Development Consultants * Project Managers

8

Major Illustrative Assignments – ENGINEERING SUPERVISION S/No Projects Clients Status

(E.) HIGHWAYS 1. Independent Project Monitoring Consultancy Supervisor

Services to Edo State Government. (ESG – 2010). Edo State Government Completed

2. Consultancy Engineering Supervision for the Rehabilitation ofOba-Nnewi Road (Section 1) in Anambra State, (FMW – 2010) – N40.15m

Federal Ministry of Works, Housing and Urban Development

Completed

3. Consultancy Services for Rapid Study and Preparation of Bidding Documents for Output and Performance Based Road Contract – OPRC for Abuja to Keffi Road. (FERMA – 2009) – N7.1m

Federal Roads Maintenance Agency

Completed

4. Consultancy Services for Design and Supervision of Taraku-Aondona-Naka-Agagbe-Abiam-Agatu Road in Benue State. (BSMWH&T – 2008) – N59.6m

Benue State Ministry of Works, Housing and Transport

Completed

5. Consultancy Services and Construction Supervision of all Federal Roads in Nasarawa State. (FERMA – 2008) – N5.4m

Federal Roads Maintenance Agency

Completed

6. Construction Supervision of Nasarawa-Toto-Abaji Road in Nasarawa State. (FMW – 2006) – N75m

Federal Ministry of Works

Completed

7. Route Condition Survey and Road Safety Audit for Selected (9 Border) Roads towards the implementation of the international vehicle transit charge. (FERMA – 2006) – N6m

Federal Roads Maintenance Agency

Completed

8. Construction Supervision of the Limited Rehabilitation of Onitsha End–Onitsha–Enugu Road in Anambra State. (FMW – 2006) – N4m

Federal Ministry of Works

Completed

9. Construction Supervision of Road Network at Industrial Development Centre Oshogbo (FMI – 2005) – N4m

Federal Ministry of Industry

Completed

10. Construction Supervision of Estate Road Network at Kuje Housing Estate, Abuja. (FMI – 2005) – N4m

Cambial Limited Completed

(F.) BRIDGES 11. Construction Supervision of 4-15m long Bridge at

Ch.80+300 along Nasarawa -Toto-Abaji Road in Nasarawa State. (FMW – 2006).

Federal Ministry of Works

Completed

12. Construction Supervision of 5 No. bridges along Langtang -Lalin-Tunkins-Shedam Road in Plateau State. (In association withPentagon Engineering Consultants Ltd.)

Federal Ministry of Works

Completed

13. Construction supervision of Ondo State University Christian Union Chapel, Ado-Ekiti. (OSUACU – 1993) N20 Million

Ondo State University Christian Union

Completed

Brief Assignment Details Below

Corporate Profile Sanol Engineering Consultants Ltd.

* Consulting Engineers * Development Consultants * Project Managers

9

The consultant past experiences Assignment Name: Engineering Design of the Siluko – Iguobazuwa – Okada – Ogbese Road in Edo State.

Approx. Value of the Contract (in current Naira): N52.8m

Country: Nigeria Location within Country: EdoState

Duration of Assignment (month): 4 months

Name of Client: Federal Ministry of Works.

Total No of Staff-Months of Assignment: 20 Months

Address of Client: Mabushi, Abuja

Approx. Value of Services Provided (in current Naira): N52.8m

Start Date: January. 2013 Completion Date: May 2013

No of Professional Staff Provided by Associated Consultants: Nil

Name of Associated Consultant(s): Nil Name of Senior Professional Staff of your firm involved and Functions Performed: Engr. Eke Ogbonna C. – Project Manager

Narrative Description of Project: The Project begins at the Siluko village to Ogbese River boundary between Edo State and Ondo State passing through Iguomon, Ugbuwe, Ebeta and Uhen town to mention just a few to link – up with newly constructed 100m long bridge (5 spans of 20m each bridge) which had reached 70% completion. The bridge is being constructed by Ondo – state Government. If the bridge is completed, it will serve as a linkage between Edo and Ondo –State towns such as Ute, Arimojija, Imoru, Ijagba and Ifon respectively. The road is located between longitudes 6030”E and 70E latitude 50N and 60N. The Road is 7.3m wide, the shoulders and verges have been overgrown by weeds. It is two lane laterites base carriageways road, 30mm thick asphalt and overlay with another 30mm thick asphalt. The overlay existing asphalt thickness is 60mm thick. The road crossed the new and old Benin – Lagos road at Ofusu/ Egboha junction and Okada respectively. The sub and base course materials were made of laterites and it is all together 300mm thick. Description of Actual Services Provided by Your Staff Within the Assignment: Services provided include: - Engineering Design and Production of Tender Documents - Feasibility Study - Traffic Study - Pavement Evaluation - Preliminary Design - Geometric Design - Pavement Design - Condition Survey of Road Facilities - Safety Audit of Road.

Corporate Profile Sanol Engineering Consultants Ltd.

* Consulting Engineers * Development Consultants * Project Managers

10

Consultancy Services For Detailed Engineering Design Safeguards Studies and Preparation Of Bidding Documents For Prioritized 222.83km Rural Roads in Osun State of Nigeria. 222.83km

Approx. Value of the Contract (in current Naira): N42.7m& $187.3

Country: Nigeria Location within Country: Osun State

Duration of Assignment (month): 6 months

Name of Client: (FPMU – 2012).

Total No of Staff-Months of Assignment: 12 Months

Address of Client: Mabushi, Abuja

Approx. Value of Services Provided (in current Naira): N65.8m

Start Date: Feb. 2012. Completion Date: August 2012.

No of Professional Staff Provided by Associated Consultants: 6

Name of Associated Consultant(s): Nil Voyants Solutions PVT. Ltd.

Name of Senior Professional Staff of your firm involved and Functions Performed: Engr.(Dr.) Bankole I.O – Highway Manager

Narrative Description of Project: The entire project is divided into three clusters which represent three different locations as cluster 1 roads are within Iwo, cluster 2 roads are at Ile-Ife while cluster 3 roads are at Ilesa.

The roads in these clusters form a network of roads within farm settlements and farmlands. The project roads are earth roads traversing various communities and villages. The topography of the project corridors are relatively flat, undulating and in some sections mountainous . There are presences of water bodies like streams that have made some communities inaccessible by vehicles Description of Actual Services Provided by Your Staff Within the Assignment: Services provided include: - Feasibility Study - Traffic Study - Pavement Evaluation - Condition Survey of Road Facilities - Safety Audit of Road. - Survey of the roads, soil and matrials testing, detailed Engineering design, drainage structure design; - Preparation of detailed working drawings and bidding documents as well Bill of Engineering Measuremetn

and Evaluation (BEME) and confidential cost estimates; - Environmental and Social Impact Assessment (ESIA) for the road rehabilitation works – to gether with the

associated Environmental management Plan and a Resettlemetn Action Plan (RAP)

Corporate Profile Sanol Engineering Consultants Ltd.

* Consulting Engineers * Development Consultants * Project Managers

11

Assignment Name: Transaction Advisory Services for Lagos – Iseyin – Keshi – Kaiama Road in Lagos, Oyo and Kwara States. (396km)

Approx. Value of the Contract (in current Naira): N65.8m

Country: Nigeria Location within Country: Lagos, Oyo and Kwara States

Duration of Assignment (month): 6 months

Name of Client: Federal Ministry of Works.

Total No of Staff-Months of Assignment: 12 Months

Address of Client: Mabushi, Abuja

Approx. Value of Services Provided (in current Naira): N65.8m

Start Date: April. 2011 Completion Date: September 2011

No of Professional Staff Provided by Associated Consultants: 6

Name of Associated Consultant(s): Nil Voyants Solutions PVT. Ltd.

Name of Senior Professional Staff of your firm involved and Functions Performed: Engr.(Dr.) Bankole I.O – Highway Manager

Narrative Description of Project: The project road is an A5 road of the Federal Highway department classification. It is approximately 396km long and It lies between latitude 6o25’ and 9o 47’ North of the Equator and Longitude 3o11’ and 4o10’ East of the Meridian.

The project road which starts at Western Avenue, Surulere, Lagos, an A1 road of the Federal Highway department classification, connects Agege Motor Road on A5 through Abeokuta Expressway on A5 passing through Otta, Abeokuta, Igbo Ora, Addo, Iseyin, Okaka, Igboho through Kishi to Kaiama an A7 road classification by the Federal Highway department.

From Agege to Abeokuta is approximately 76km long, Abeokuta to Iseyin is approximately 104km long while from Iseyin to Kaiama is approximately 216km long Description of Actual Services Provided by Your Staff Within the Assignment: Services provided include: - Feasibility Study - Traffic Study - Pavement Evaluation - Condition Survey of Road Facilities - Safety Audit of Road.

Corporate Profile Sanol Engineering Consultants Ltd.

* Consulting Engineers * Development Consultants * Project Managers

12

Assignment Name: Transaction Advisory Services for Kaiama – Bahama – Kaoje – Gwambu – Fokku - Sokoto Road in Kwara, Niger, Kebbi and Sokoto States. (490km)

Approx. Value of the Contract (in current Naira): N60.1m.

Country: Nigeria Location within Country: Kwara, Niger, Kebbi and Sokoto States

Duration of Assignment (month): 6 months

Name of Client: Federal Ministry of Works.

Total No of Staff-Months of Assignment: 12 Months

Address of Client: Mabushi, Abuja

Approx. Value of Services Provided (in current Naira): N60.1m.

Start Date: April. 2011 Completion Date: August 2011

No of Professional Staff Provided by Associated Consultants: 6

Name of Associated Consultant(s): Nil Voyants Solutions PVT. Ltd.

Name of Senior Professional Staff of your firm involved and Functions Performed: Engr.(Dr.) Bankole I.O – Highway Manager

Narrative Description of Project: The project road is about 490km long. It starts at Kaiama (F201) and connects an A1 road at Bin Yauri through Leshibe, Luma, Agwama to Jega through Koko, Libba to Sokoto through Jabo

It lies between latitude 9o47’ and 12o57’ North of the Equator and Longitude 4o10’ and 5o11’ East of the Meridian.

The distance between Kaiama and Jega is approximately 380km while distance between Jega and Sokoto is approximately 110km

Description of Actual Services Provided by Your Staff Within the Assignment: Services provided include: - Feasibility Study - Traffic Study - Pavement Evaluation - Condition Survey of Road Facilities - Safety Audit of Road.

Corporate Profile Sanol Engineering Consultants Ltd.

* Consulting Engineers * Development Consultants * Project Managers

13

Assignment Name: Engineering Design for the Rehabilitation of Omu Aran – Isanlu Road in Kwara State, (10.1km)

Approx. Value of the Contract (in current Naira): N23.9m

Country: Nigeria Location within Country: Kwara State

Duration of Assignment (month): 6 months

Name of Client: Federal Ministry of Works.

Total No of Staff-Months of Assignment: 30 Months

Address of Client: Mabushi, Abuja

Approx. Value of Services Provided (in current Naira): N23.9m

Start Date: April. 2011 Completion Date: September 2011

No of Professional Staff Provided by Associated Consultants: Nil

Name of Associated Consultant(s): Nil Name of Senior Professional Staff of your firm involved and Functions Performed: Engr.(Dr.) Bankole I.O – Project Manager

Narrative Description of Project: The work involves the engineering design for a 2-lane carriageway connecting Omu Aran (km0+000) with Isanlu Isin (10+100) in Kwara State The project road runs from Omu Aran (km0+000) via with Isanlu Isin (10+100) in Kwara state of Nigeria. The existing 10.1km long road is located between latitudes 8° 03′ and 8° 25′ north of the equator and between longitude 5° 03′ and 5° 55′ east of the meridian. It is located in the middle belt part of Nigeria.

Description of Actual Services Provided by Your Staff Within the Assignment: Services provided include: - Engineering Design and Production of Tender Documents - Feasibility Study - Traffic Study - Pavement Evaluation - Preliminary Design - Geometric Design - Pavement Design - Condition Survey of Road Facilities - Safety Audit of Road.

Corporate Profile Sanol Engineering Consultants Ltd.

* Consulting Engineers * Development Consultants * Project Managers

14

Assignment Name: Consultancy Services for the Survey & Design of Machina to Kanamma Route in Yobe State. (253.6km)

Approx. Value of the Contract (in current Naira): N210.5m

Country: Nigeria Location within Country: Yobe State

Duration of Assignment (month): 4 months

Name of Client: Yobe State Ministry of Works.

Total No of Staff-Months of Assignment: 2 Months

Address of Client: Damaturu, Yobe State

Approx. Value of Services Provided (in current Naira): N210.5m

Start Date: August. 2010 Completion Date: December 2010

No of Professional Staff Provided by Associated Consultants: Nil

Name of Associated Consultant(s): Nil Name of Senior Professional Staff of your firm involved and Functions Performed: Engr.(Dr.) Bankole I.O – Project Manager

Narrative Description of Project: Machina to Kanamma Road is a 253.6km road connecting Machina (Western End of the state) through Kumagannam with Kanamman(Eastern End of the state) in Yobe state. The project road is located between latitudes 13O 05’ and 13O 25’ North of the equator and between longitude 10O 25’ and 12O 15’ East of the meridian. It is located in the North - Eastern part of Nigeria. The road which is a state road begins from Gumsi road junction with the Nguru – Machina Township road at the entrance of Machina Town and terminates at the junction of the project road with Kanamma Township road and Menesarao road of Niger republic.

Description of Actual Services Provided by Your Staff Within the Assignment: Services provided include: - Engineering Design and Production of Tender Documents - Feasibility Study - Traffic Study - Pavement Evaluation - Preliminary Design - Geometric Design - Pavement Design - Condition Survey of Road Facilities - Safety Audit of Road.

Corporate Profile Sanol Engineering Consultants Ltd.

* Consulting Engineers * Development Consultants * Project Managers

15

Assignment Name: Consultancy Services for The Engineering Design Of Enugu-Nara-Isu-Onicha-Okposi-Amasiri-Oso-Owuta-Ohafia Junction in Abia State

Approx. Value of the Contract (in current Naira): N39.35m

Country: Nigeria Location within Country: Abia State

Duration of Assignment (month): 6 months

Name of Client: Federal Ministry of Works.

Total No of Staff-Months of Assignment: 30 Months

Address of Client: Mabushi, Abuja

Approx. Value of Services Provided (in current Naira): N39.35m

Start Date: Dec. 2010 Completion Date: June. 2011

No of Professional Staff Provided by Associated Consultants: Nil

Name of Associated Consultant(s): Nil Name of Senior Professional Staff of your firm involved and Functions Performed: Engr.(Dr.) Bankole I.O – Project Manager

Narrative Description of Project: Th e Exi sting E nu gu-N ara- I su-O nic ha-Okposi -Amasir i -Os o-Owut a-O hafia j unction R oa d in En ugu/Eb onyi /Abia S tates is a 91.5km road connecting Agbani town in Enugu State with Ohafia in Abia state. The 91.5km road section traverses Agbani (Ch.0+000), Amauzam (Ch.5+000), Nara (Ch.13+900), Ndaigu (Ch.18+350), Isiogbo (Ch.21+450), Mgbaleze (Ch.25+950), Amanato(Ch.32+450) Achiagu (Ch.39+300), Umubo (41+150), Eleagu (Ch.42+500), Onicha(Ch.43+300), Okposi(Ch.47+250), Amenu(Ch.54+250), Ezeke(Ch.59+450), Amasiru(Ch.64+850), Amangwu Edda(Ch.74+650), Owuta(77+050), Etiti Edda(Ch.80+550), Amaigbo(Ch.81+700), Ekeje Edda(Ch.83+400), Amaiyi(Ch.84+350), Uguzu Edda(Ch.86+950) all along the same route to Ohafia in Abia state. The road which is a Federal road begins from Agbani town (Enugu) and terminates at Ohafia junction. The existing pavement along the road can be divided into three (3) main types based on the pavement types and failure characteristics viz asphaltic wearing course, surface dressed and earth road. The road is infested with various types of defects such as alligator cracks, potholes, depressions, eroded shoulders, bleeding, corrugation and eroded embankments especially at the rural section of the road, traversing many commercial and agriculturally predominant towns and villages in Enugu/Abia states. The project road is located between latitudes 5O 30’ and 6O 35’ North of the equator and between longitude 8o 00’and 8o 30’ East of the meridian. It is located in the South - Eastern part of Nigeria. Description of Actual Services Provided by Your Staff Within the Assignment: Services provided include: - Engineering Design and Production of Tender Documents - Feasibility Study - Traffic Study - Pavement Evaluation - Preliminary Design - Geometric Design - Pavement Design - Condition Survey of Road Facilities - Safety Audit of Road.

Corporate Profile Sanol Engineering Consultants Ltd.

* Consulting Engineers * Development Consultants * Project Managers

16

Assignment Name: Consultancy Services For The Engineering Design Of The 62km Ashige – Alawagana – Gidan Buba – Fadama Bauna – Arikya – Wamba Road in Nasarawa State, (62km)

Approx. Value of the Contract (in current Naira): N50m

Country: Nigeria Location within Country: Nasarawa State

Duration of Assignment (month): 2 months

Name of Client: Nasarawa State Ministry of Works and Transport.

Total No of Staff-Months of Assignment: 10 Months

Address of Client: Lafia, Nasarawa State

Approx. Value of Services Provided (in current Naira): N50m

Start Date: June 2010 Completion Date: August. 2010

No of Professional Staff Provided by Associated Consultants: Nil

Name of Associated Consultant(s): Nil Name of Senior Professional Staff of your firm involved and Functions Performed: Engr.(Dr.) Bankole I.O – Project Manager

Narrative Description of Project: Ashige – Alawagana – Gidan Buba – Fadama Bauna – Arikya – Wamba Road cuts across four (4) local government areas of Nasarawa State, namely:- Nasarawa, Toto, Gbadabuke and Abaji Local government areas. The project road is located between latitudes 8O 30’ and 8O 55’ North of the equator and between longitude 8O 30’ and 8O 45’ East of the meridian. It is located in the North - Central part of Nigeria. The project is an earth road passing through undulating and hilly terrains in some section while marshy area was encountered at river location. The road follows a definite alignment in some section while foot paths define the alignment in some other section There are three (3nos) Spur Roads along the project road.

Description of Actual Services Provided by Your Staff Within the Assignment: Services provided include: - Engineering Design and Production of Tender Documents - Feasibility Study - Traffic Study - Pavement Evaluation - Preliminary Design - Geometric Design - Pavement Design - Condition Survey of Road Facilities - Safety Audit of Road.

Corporate Profile Sanol Engineering Consultants Ltd.

* Consulting Engineers * Development Consultants * Project Managers

17

Assignment Name: Consultancy Services on the Engineering Design of Gombe-Wuyo (Borno State Border) Road in Gombe State. (63.2km)

Approx. Value of the Contract (in current Naira): N22.22m

Country: Nigeria Location within Country: Gombe State

Duration of Assignment (month): 4 months

Name of Client: Federal Ministry of Works, Housing and Urban Development.

Total No of Staff-Months of Assignment: 20 Months

Address of Client: Mabushi, Abuja

Approx. Value of Services Provided (in current Naira): N22.22m

Start Date: Oct. 2009 Completion Date: Feb. 2010

No of Professional Staff Provided by Associated Consultants: Nil

Name of Associated Consultant(s): Nil Name of Senior Professional Staff of your firm involved and Functions Performed: Engr.(Dr.) Bankole I.O – Project Manager

Narrative Description of Project:

Gombe – Wuyo (Borno State Boundary) Road is a 63.2km road connecting Gombe, Liji, Kwadon, Baure, Dabin Kowa, Kanti, in Gombe State with Jauro and Wuyo in Borno State of Nigeria. The designed section of the road which starts from the end of the dualised section is 57.8Km since the first 5.4Km of the road had just been newly dualised and completed by the Gombe State Government.

The road is made up of asphaltic concrete wearing course 2-lane carriageway 7.3m wide and 2.75m shoulder both side, characterized by different categories of failure. However, most of the existing shoulders along the road are totally eroded into the carriageway itself. In some places, failure types such as cracks and depressions characterize the project road.Road pavement is at various stage of distress and is infested with potholes, alligator cracks and washouts at the edges, with depression and corrugation at various sections of the road. Th e proj ect r oa d i s located b etw ee n l at i tudes 10O 16 ’ 56” and 10O 22 ’ 2 7” Nort h of th e equa t or a nd between l ongi tud e 1 1 O 1 0’ 29” an d 1 1 O 41 ’ 43 ” E as t of the mer i di a n. I t i s locat ed i n th e North - Ea stern p art of Ni ger i a Description of Actual Services Provided by Your Staff Within the Assignment: Services provided include: - Engineering Design and Production of Tender Documents - Feasibility Study - Traffic Study - Pavement Evaluation - Preliminary Design - Geometric Design - Pavement Design - Condition Survey of Road Facilities - Safety Audit of Road.

Corporate Profile Sanol Engineering Consultants Ltd.

* Consulting Engineers * Development Consultants * Project Managers

18

Assignment Name: Consultancy Services on the Engineering Design of Lafia-Doma-Rutu-Bassa-Rafin Gabas-Nasarawa-Orozo Road in Nasarawa State. (174.10km)

Approx. Value of the Contract (in current Naira): N70m

Country: Nigeria Location within Country: Nasarawa State

Duration of Assignment (month): 3 months

Name of Client: Nasarawa State Ministry of Works and Transport.

Total No of Staff-Months of Assignment: 15 Months

Address of Client: Mabushi, Abuja

Approx. Value of Services Provided (in current Naira): N70m

Start Date: Jan. 2009 Completion Date: Mar. 2009

No of Professional Staff Provided by Associated Consultants: Nil

Name of Associated Consultant(s): Nil Name of Senior Professional Staff of your firm involved and Functions Performed: Engr.(Dr.) Bankole I.O – Project Manager

Narrative Description of Project: The Lafia-Doma-Rutu-Bassa-Rafin Gabas-Nasarawa-OrozoRoad is a 145.8 km road connecting Lafia with Nasarawa town and the Federal Capital Territory in Karshi. The road which is a federal road begins from Doma road junction with the Lafia – Markurdi road in Lafia Township.

Road pavement existed only between the Lafia Doma section of the road (23 km) leaving the remaining length of the road as earth road passing through hilly and rocky terrains and foot paths. The Project road section can therefore be divided into three different sections based on the existing condition of the pavements and the rehabilitation/construction requirements of the road. Description of Actual Services Provided by Your Staff Within the Assignment: Services provided include: - Engineering Design and Production of Tender Documents - Feasibility Study - Traffic Study - Pavement Evaluation - Preliminary Design - Geometric Design - Pavement Design - Condition Survey of Road Facilities - Safety Audit of Road.

Corporate Profile Sanol Engineering Consultants Ltd.

* Consulting Engineers * Development Consultants * Project Managers

19

Assignment Name: Engineering Design and Construction Supervision of Taraku-Aondona-Naka-Agagbe-Abiam-Agatu Road in Benue State.(57.038km)

Approx. Value of the Contract (in current Naira): N59.7m

Country: Nigeria Location within Country: Benue State

Duration of Assignment (month): 6 months

Name of Client: Benue State Ministry of Works, Housing and Transport.

Total No of Staff-Months of Assignment: 44 Months

Address of Client: Makurdi, Benue State

Approx. Value of Services Provided (in current Naira): N59.7m

Start Date: April 2006 Completion Date: October 2006

No of Professional Staff Provided by Associated Consultants: Nil

Name of Associated Consultant(s): Nil Name of Senior Professional Staff of your firm involved and Functions Performed: Engr.(Dr.) Bankole I.O – Project Director/ Co-ordinator

Narrative Description of Project: The Taraku – Aondona – Naka – Agagbe – Abiam – Agatu Road in Benue State is a 84.7km road connecting Taraku with Mbaba, Aondona, Gbabi, Atukpu, Naka, Agbanu, Nagi, Tsea wunah, Agagbe, Abiam to terminate at Okokulo Village all in Benue State of Nigeria. The road begins from the T-Junction with Otukpo – Alaide road inside Taraku Township Passing through the above named towns and villages before terminating at the cross Junction connecting Obagaji road with Ugbopo and Abogbe roads inside Okokulo Town of Agatu LGA in Benue State. The fieldwork commences from 10th of July 2008 to 18th of July 2008, while Laboratory test commences from 20th of July 2007 to 3rd of August 2008. The project road is an earth road whose alignment is properly defined through out the entire stretch. The section of the road from Taraku (Ch.0+000) to Agagbe (Ch.59+500) is well defined and motorable, while the section from Agagbe (Ch.59+500) – Abiam (Ch.72+000) is an earth road overgrown with tall grasses, the alignment follow the existing footpath. The section of the road from Abiam (Ch.72+000) – Okokulo (Agatu -Ch.84+780) is also an earth road whose surface is characterized of gully erosion. Traversing many commercial and agriculturally predominant towns and villages in Benue State, the Road runs North-Westerly from Taraku to Abiam town.

The project road is located between latitudes 7O 15’ and 7O 45’ North of the equator and between longitude 8O 05’ and 8O 20’ East of the meridian. It is located in the North - Central part of Nigeria

Description of Actual Services Provided by Your Staff Within the Assignment: Services provided include: - Engineering Design and Production of Tender Documents - Feasibility Study - Traffic Study - Pavement Evaluation - Preliminary Design - Geometric Design - Pavement Design - Condition Survey of Road Facilities - Safety Audit of Road.

Corporate Profile Sanol Engineering Consultants Ltd.

* Consulting Engineers * Development Consultants * Project Managers

20

Assignment Name: Consultancy Services on the Engineering Design of the Dualisation of Lafia – AkurbaRoad in Nasarawa State. (8km)

Approx. Value of the Contract (in current Naira): N10m

Country: Nigeria Location within Country: Nasarawa State

Duration of Assignment (month): 3 months

Name of Client: Nasarawa State Ministry of Works and Transport.

Total No of Staff-Months of Assignment: 15 Months

Address of Client: Mabushi, Abuja

Approx. Value of Services Provided (i in current Naira): N10m

Start Date: Jan. 2009 Completion Date: Mar. 2009

No of Professional Staff Provided by Associated Consultants: Nil

Name of Associated Consultant(s): Nil Name of Senior Professional Staff of your firm involved and Functions Performed: Engr.(Dr.) Bankole I.O – Project Manager

Narrative Description of Project: Lafia – Akurba Road in Lafia Township of Nasarawa State is a 8.0 km road connecting Lafia with Akurba in Nasarawa State of Nigeria.

The road is made up of asphaltic concrete wearing course carriageway 7.3m wide and 2.75m shoulder throughout the entire stretch. However, most of the existing shoulders along the road are totally eroded into the carriageway itself. In some places, failure types such as cracks, potholes and depressions characterize the project road. Road pavement is at early stage of distress and is infested with few potholes, alligator cracks and isolated failures due to poor drainage system. The road which was constructed in the late seventies by Broni-Prono had been overlaid to an asphaltic concrete thickness of between 70-100mm. The road is in good condition with the exception of some failures at its shoulders The project road is located between latitudes 8O 30’ and 8O 35’ North of the equator and between longitude 8O 35’ and 8O 40’ East of the meridian. It is located in the North - Central part of Nigeria Description of Actual Services Provided by Your Staff Within the Assignment: Services provided include: - Engineering Design and Production of Tender Documents - Feasibility Study - Traffic Study - Pavement Evaluation - Preliminary Design - Geometric Design - Pavement Design - Condition Survey of Road Facilities - Safety Audit of Road.

Corporate Profile Sanol Engineering Consultants Ltd.

* Consulting Engineers * Development Consultants * Project Managers

21

Assignment Name: Engineering Design of Uba-Askira-Mbalala Road in Borno State.(57.038km)

Approx. Value of the Contract (in current Naira): N28.9m

Country: Nigeria Location within Country: Borno State

Duration of Assignment (month): 6 months

Name of Client: Federal Ministry of Transportation, Abuja.

Total No of Staff-Months of Assignment: 44 Months

Address of Client: Mabushi, Abuja

Approx. Value of Services Provided (in current Naira): N28.9m

Start Date: April 2006 Completion Date: October 2006

No of Professional Staff Provided by Associated Consultants: Nil

Name of Associated Consultant(s): Nil Name of Senior Professional Staff of your firm involved and Functions Performed: Engr.(Dr.) Bankole I.O – Project Director/ Co-ordinator

Narrative Description of Project: The UBA-ASKIRA-MBALALA ROAD IN BORNOSTATE is a 57.038km road connecting Uba, Wamdeo, Rumirgo, Yirmir-Ali, Aribi, Askira, Ngarma-Jajel with Mbalala in Borno State of Nigeria. The road which begins from the Uba-Askira Junction with the Yola- Maiduguri road at Uba traverses two (2) local Govt. areas namely Askira and Mbalala local govt. council of Borno state through the above named towns and villages and finally terminates at Mbalala.

The road, made up of basically double coat surface dressing wearing course through the various towns, has width varying between 6m and 6.5m along its stretch. Road pavement is at various stage of distress and is infested with potholes, cracks and washouts at the edges. Earth shoulder of 2.5m width lined both sides of the road and is at various states of failure.

The project road is located between latitudes 10O 27’ and 10 O 47’ North of the equator and between longitude 12O 52’ and 13 O 13’ east of the meridian. It is located in the North- Eastern part of Nigeria

Description of Actual Services Provided by Your Staff Within the Assignment: Services provided include: - Engineering Design and Production of Tender Documents - Feasibility Study - Traffic Study - Pavement Evaluation - Preliminary Design - Geometric Design - Pavement Design - Condition Survey of Road Facilities - Safety Audit of Road.

Corporate Profile Sanol Engineering Consultants Ltd.

* Consulting Engineers * Development Consultants * Project Managers

22

Assignment Name: Engineering Design of Akungba–Ikare–Omuo Road with 2 No. Bridges in Ondo State.

Approx. Value of the Contract (in current Naira): N22.22m

Country: Nigeria Location within Country: Ondo State

Duration of Assignment (month): 4 months

Name of Client: Federal Ministry of Transportation Total No of Staff-Months of Assignment: 40 Months

Address of Client: Mabushi, Abuja

Approx. Value of Services Provided (in current Naira): N22.22m

Start Date: June. 2006 Completion Date: Dec. 2007

No of Professional Staff Provided by Associated Consultants: Nil

Name of Associated Consultant(s): Nil Name of Senior Professional Staff of your firm involved and Functions Performed: Engr.(Dr.) Bankole I.O – Project Manager

Narrative Description of Project: The work in this project involves the design of the 35.5km road and Two (2) No substandard bridges at Km 26+400 and Km 27+900 along the project road. The existing bridges are 3.5m wide with no guard rail or any form of protection for motorist. The road which begins from Akungba in Ondo state passes through towns and village such as Ikare, Arigidi Akoko, Oyin Akoko, Omuo Ekiti before terminating at Kabba town in Kogi state .

Description of Actual Services Provided by Your Staff Within the Assignment: Services provided include: - Engineering Design and Production of Roads and Bridges - Feasibility Study - Traffic Study - Pavement Evaluation - Preliminary Design - Geometric Design - Pavement Design - Condition Survey of Road Facilities - Safety Audit of Road.

Corporate Profile Sanol Engineering Consultants Ltd.

* Consulting Engineers * Development Consultants * Project Managers

23

Assignment Name: Engineering Design for the Limited Rehabilitation of Ado Ekiti- Aramoko–Ijero-Efon Alaaye Road.

Approx. Value of the Contract (in current Naira): N16m

Country: Nigeria Location within Country: Ekiti State

Duration of Assignment (month): 2 months

Name of Client: Federal Ministry of Transportation, Abuja.

Total No of Staff-Months of Assignment: 12 Months

Address of Client: Mabushi, Abuja

Approx. Value of Services Provided (in current Naira): N16m

Start Date: May. 2007 Completion Date: July. 2007

No of Professional Staff Provided by Associated Consultants: Nil

Name of Associated Consultant(s): Nil Name of Senior Professional Staff of your firm involved and Functions Performed: Engr.Boladale Bolajoko – Project Manager

Narrative Description of Project: The ADO-EKITI – ARAMOKO – IJERO – EFON-ALAAYE ROAD (Ado-Ekiti – Aramoko Section) is a 60.4 km road connecting Ado-Ekiti, Iyin, Igede, Aramoko, Erio, Ita-wure and Efon-Alaaye of 48.2km with a spur road from Aramoko – Ijero Ekiti of 12.2km all in Ekiti State of Nigeria. The road which begins from the the Round About at Adekunle Fajuyi Park inside Ado-Ekiti is made up of 4.2km dualized road, characterized by asphaltic concrete wearing course carriageway, 9.2m wide, which runs to the adjacent drain both side of the road while the remaining section of the road is made of asphaltic concrete wearing course also with carriageway of 7.3m wide, and 1.5m shoulder through various towns along its stretch. The project road is located between latitudes 7o25’ and 7 o55’ North of the equator and between longitude 4 o50’ and 5 o45’ east of the meridian. It is located in the South-Western part of Nigeria. Description of Actual Services Provided by Your Staff Within the Assignment: Services provided include: - Road Inventory - Bridge Inventory - Condition Survey - Pavement Assessment - Alignment Design - Production of Contract Documents

Corporate Profile Sanol Engineering Consultants Ltd.

* Consulting Engineers * Development Consultants * Project Managers

24

Assignment Name: Consultancy Services for Rapid Study and Preparation of Bidding Documents for Output and Performance Based Road Contract – OPRC for Abuja to Keffi Road. (50.1km)

Approx. Value of the Contract (in current Naira): N7.1m

Country: Nigeria Location within Country: Nasarawa State/FCT

Duration of Assignment (month): 3 months

Name of Client: Federal Roads Maintenance Agency.

Total No of Staff-Months of Assignment: 15 Months

Address of Client: Mabushi, Abuja

Approx. Value of Services Provided (in current Naira): N7.1m

Start Date: Oct. 2009 Completion Date: Dec. 2009

No of Professional Staff Provided by Associated Consultants: Nil

Name of Associated Consultant(s): Nil Name of Senior Professional Staff of your firm involved and Functions Performed: Engr.(Dr.) Bankole I.O – Project Manager

Narrative Description of Project: Abuja–Keffi Road dual carriageway lies between latitude 9o 09’ N/longitude 7o 09’ E and latitude 8o 50’ N/longitude 7o 52’ E. It starts from A.Y.AAsokoro junction Abuja in the FCT It is a dualized asphaltic concrete carriageway. It is a combination of two and three lanes carriageway. Its carriageway width varies between 7.3m on each side of the carriageway at the 2-lane section and 10.95m at the 3-lane section. It also consists of 190mm laterite sub base, 200mm crushed stone base, 60mm asphaltic concrete binder course and 40mm asphaltic concrete wearing course. The shoulder comprises of 150mm thick natural occurring material, 90mm – 150mm of compacted laterite, 18mm crushed rock chippings. The carriageway has 1.8m and 2.75m inner and outer surface dressed shoulders respectively. There is no inner shoulder at the 3-lane section. The road is characterized by minor cracks and a few potholes. There are also edge damages at some section while some sections of the shoulders have undergone erosion and loss of materials.

Description of Actual Services Provided by Your Staff Within the Assignment: Services provided include: - Engineering Design and Production of Tender Documents - Feasibility Study - Traffic Study - Pavement Evaluation - Preliminary Design - Geometric Design - Pavement Design - Condition Survey of Road Facilities - Safety Audit of Road.

Corporate Profile Sanol Engineering Consultants Ltd.

* Consulting Engineers * Development Consultants * Project Managers

25

Assignment Name: Consultancy Engineering Supervision for the Rehabilitation ofOba-Nnewi Road (Section 1) In Anambra State. (36.6km)

Approx. Value of the Contract (in current Naira): N40.15m

Country: Nigeria Location within Country: Nasarawa State

Duration of Assignment (month): 12 months

Name of Client: Federal Ministry of Works, Housing and Urban Development.

Total No of Staff-Months of Assignment: 60 Months

Address of Client: Mabushi, Abuja

Approx. Value of Services Provided (in current Naira): N40.15m

Start Date: Fed. 2010 Completion Date: Feb. 2011

No of Professional Staff Provided by Associated Consultants: Nil

Name of Associated Consultant(s): Nil Name of Senior Professional Staff of your firm involved and Functions Performed: Engr.(Dr.) Bankole I.O – Project Manager

Narrative Description of Project: Oba-Nnewi Road (Section 1) In Anambra State is a 36.6km road in the eastern part of Nigeria.

Description of Actual Services Provided by Your Staff Within the Assignment: Services provided include: - Redesign of any portion of work - Resident Supervision of Construction Works - Quality Control of Materials Used - Ensuring Compliance with Specifications - Project Management - Advising the Client on technical aspects of work - Joint measurement of work done - Signing of Interim Statements.

Corporate Profile Sanol Engineering Consultants Ltd.

* Consulting Engineers * Development Consultants * Project Managers

26

Assignment Name: Independent Project Monitoring Consultancy Supervisory Services to Edo State Government. (24.15km)

Approx. Value of the Contract (in current Naira):

Country: Nigeria Location within Country: Edo State

Duration of Assignment (month): 4 months

Name of Client: Edo State Government.

Total No of Staff-Months of Assignment: 20 Months

Address of Client: Mabushi, Abuja

Approx. Value of Services Provided (in current Naira):

Start Date: Oct. 2009 Completion Date: Feb. 2010

No of Professional Staff Provided by Associated Consultants: Nil

Name of Associated Consultant(s): Nil Name of Senior Professional Staff of your firm involved and Functions Performed: Engr.(Dr.) Bankole I.O – Project Manager

Narrative Description of Project: The project covers three roads in Edo State. The Iyamho – Ayora Road begins from a small settlement called Iyamho. The village is 3.2km off Benin – Okene Federal Road. The road transverses the bush to cross the Benin – Okene road and ends in Ayora which is also a small village North-East of Auchi township. The total length of the Auchi Central Roadis 13.3km and made up of 2 – lane carriageway in its existing state. The proposed construction works is for the dualization of the first 8km section of the road into a 4 – lanes of 3.65m width per lane lined on both sides with a covered lined drain and 1.8m pedestrian walkway. The remaining 5.3km section of the road is to be rehabilitated, overlayed with asphaltic concrete surfacing and reinstatement of the 2.75km failed shoulder along this sectionAuchi Central Road The Jattu-Ayua Road prior to the award existed as an earth road, but during our visit seven months into the construction period, the construction work has gone up to base course, with the drainages well constructed along the longitudinal and traverse direction. The first 760m is an existing asphalted road of 7.3m carriageway, 1.5m shoulders at each side Description of Actual Services Provided by Your Staff Within the Assignment: Services provided include: - Redesign of any portion of work - Resident Supervision of Construction Works - Quality Control of Materials Used - Ensuring Compliance with Specifications - Project Management - Advising the Client on technical aspects of work - Joint measurement of work done - Signing of Interim Statements.

Corporate Profile Sanol Engineering Consultants Ltd.

* Consulting Engineers * Development Consultants * Project Managers

27

Assignment Name: Construction Supervision of Nasarawa-Toto-Abaji Road. (98km)

Approx. Value of the Contract (in current Naira): N75m

Country: Nigeria Location within Country: Nasarawa State

Duration of Assignment (month): 36 months

Name of Client: Federal Ministry of Transportation, Abuja.

Total No of Staff-Months of Assignment: 180 Months

Address of Client: Mabushi, Abuja

Approx. Value of Services Provided (in current Naira): N75m

Start Date: Dec. 2005 Completion Date: Oct. 2008

No of Professional Staff Provided by Associated Consultants: Nil

Name of Associated Consultant(s): Nil Name of Senior Professional Staff of your firm involved and Functions Performed: Engr.(Dr.) Bankole I.O – Project Manager

Narrative Description of Project: Nasarawa-Toto-Abaji Road cuts across four (4) local government areas of Nasarawa State, namely:- Nasarawa, Toto, Gbadabuke and Abaji Local government areas The project areas is situated between longitude 7o45’ and 6o50’N of the equator and between latitude 8o40’ and 8o30’E of the meridian. The road starts from Nasarawa town and transverses many major towns and villages such as Nakuse, Loko Goma, Gbadabuke, Toto before Terminating at the Abaji junction with Lokoja-Abuja road.

Description of Actual Services Provided by Your Staff Within the Assignment: Services provided include: - Redesign of any portion of work - Resident Supervision of Construction Works - Quality Control of Materials Used - Ensuring Compliance with Specifications - Project Management - Advising the Client on technical aspects of work - Joint measurement of work done - Signing of Interim Statements.

Corporate Profile Sanol Engineering Consultants Ltd.

* Consulting Engineers * Development Consultants * Project Managers

28

Assignment Name: Design and Construction Supervision of limited Rehabilitation of Onitsha End- Onitsha -Enugu Road.

Approx. Value of the Contract (in current Naira): N4m

Country: Nigeria Location within Country: Enugu State

Duration of Assignment (month): 3 months

Name of Client: Federal Ministry of Transportation, Abuja.

Total No of Staff-Months of Assignment: 9 Months

Address of Client: Mabushi, Abuja

Approx. Value of Services Provided (in current Naira): N4m

Start Date: March. 2006 Completion Date: July. 2006

No of Professional Staff Provided by Associated Consultants: Nil

Name of Associated Consultant(s): Nil Name of Senior Professional Staff of your firm involved and Functions Performed: Engr.Boladale Bolajoko – Project Manager

Narrative Description of Project: The project starts from Zik roundabout and terminates at the old toll gate. It cuts across two major markets in the metropolis. The road is within the built up area of the city and its heavily trafficked to the commercial and industrial activities of the city. The project road starts the major link between Awka (The state capital), Enugu, Ebonyi and Abia State.

Description of Actual Services Provided by Your Staff Within the Assignment: Services provided include: - Redesign of any portion of work - Resident Supervision of Construction Works - Quality Control of Materials Used - Ensuring Compliance with Specifications - Project Management - Advising the Client on technical aspects of work - Joint measurement of work done - Signing of interim.

Corporate Profile Sanol Engineering Consultants Ltd.

* Consulting Engineers * Development Consultants * Project Managers

29

Assignment Name: Consultancy Services for the Federal Roads in Nasarawa State.

Approx. Value of the Contract (in current Naira): N5.4m

Country: Nigeria

Location within Country: Nasarawa State

Duration of Assignment (month): 6 months

Name of Client: FERMA Total No of Staff-Months of Assignment: 24 months

Address of Client: Abuja

Approx. Value of Services Provided (in current Naira): N5.4m

Start Date: June 2008

Completion Date: Nov. 2008

No of Professional Staff Provided by Associated Consultants: Nil

Name of Associated Consultant(s): Nil Name of Senior Staff Involved and Functions Performed: Engr.Barth Goewam – Principal Engineer.

Narrative Description of Project: The project covers all the sixteen (16) federal roads in Nasarawa state. The consulting services provided include project monitoring and BEME preparation for all the roads.

Description of Actual Services Provided by Your Staff Within the Assignment: Services provided include: - Regular inspection and data collection for all roads - Development of road maintenance templates - Preparation of condition survey on federal roads in the state - Monitoring of on-going projects - Preparation of BEME/proposal for repair works - Technical advise to the Agency and innovative services.

Corporate Profile Sanol Engineering Consultants Ltd.

* Consulting Engineers * Development Consultants * Project Managers

30

Assignment Name: Engineering Design of Aba-Azumini-Ohanbele-Ugwunagbo IhieExpressway in Abia State

Approx. Value of the Contract (in current Naira): N49m

Country: Nigeria Location within Country: Abia State

Duration of Assignment (month): 6 months

Name of Client: Federal Ministry of Transportation, Abuja.

Total No of Staff-Months of Assignment: 40 Months

Address of Client: Mabushi, Abuja

Approx. Value of Services Provided (in current Naira): N49m

Start Date: Oct. 2005 Completion Date: March 2006

No of Professional Staff Provided by Associated Consultants: 5

Name of Associated Consultant(s): Clem-George Nig. Ltd.

Name of Senior Professional Staff of your firm involved and Functions Performed: Engr. Ojo Ezekiel – Project Director/ Co-ordinator

Narrative Description of Project: The Aba-Azumini-Ohanbele-Obohia-Ugwunagbo-Ihie Expressway road in Abia State, is a 56.2km road connecting Aba with Azumini, Obohia, Ugwunagbo, Ihie among others in Abia State of Nigeria, the road begins from Ogbo Hill in Aba Town passing through three (3) local Govt. areas namely Obingwa, Nkwa East and Ugwunagbo local govt. council of Abia State, through other towns and villages such as Ovom 1, Ovom Amata, Akpaa Mbato,Akirika Uku, Akanu Ndoki, Azumini, Ohanbele, Obohia, Uhuru, Obiaja, Ugwunagbo, Umuka, Umuodo,Umuaruku, Asa Umuakwa and finally terminates at Ihie.

The road, which is made up of asphaltic concrete, surface dressing and earth road through various towns, has width varying between 4m and 8m along its stretch.

Between Obohia (Ch. 34+000) and Ugwunagbo (Ch. 50+000) is surface dressing road, which has completely failed and no longer motorable, having been encroached upon by weeds in most parts.

The remaining part of the road is an earth road with no sign of previous construction activities. However, none of these three sections of the road has a shoulder.

The project road is located between latitudes 4O 55’ and 5O 10’ North of the equator and between longitude 7O 16’ and 7O 29’ east of the meridian. It is located in the South- Eastern part of Nigeria.

Description of Actual Services Provided by Your Staff Within the Assignment: Services provided include: - Engineering Design and Production of Tender Documents - Feasibility Study - Traffic Study - Pavement Evaluation - Preliminary Design - Geometric Design - Pavement Design - Condition Survey of Road Facilities - Safety Audit of Road.

Corporate Profile Sanol Engineering Consultants Ltd.

* Consulting Engineers * Development Consultants * Project Managers

31

Assignment Name: Engineering Design of Udi-Ozalla-Agbani Road in Enugu State

Approx. Value of the Contract (in current Naira): N12.3m

Country: Nigeria Location within Country: Enugu State

Duration of Assignment (month): 6 months

Name of Client: Federal Ministry of Transportation, Abuja.

Total No of Staff-Months of Assignment: 30 Months

Address of Client: Mabushi, Abuja

Approx. Value of Services Provided (in current Naira): N12.3m

Start Date: Feb. 2008 Completion Date: Aug. 2008

No of Professional Staff Provided by Associated Consultants: 15

Name of Associated Consultant(s): Clem-George Nig. Ltd.

Name of Senior Professional Staff of your firm involved and Functions Performed: Engr. Ojo Ezekiel – Project Director/ Co-ordinator

Narrative Description of Project:

The existing Udi – Ozalla – Agbani Road in Enugu State is a 19.4km road connecting Udi, Umuoka, Umuezeka, Ozalla, Umueze and Agbani township all in Enugu State of Nigeria. The road begins from the T-Junction with Onitsha - Enugu Expressway inside Udi Township Passes through the above named towns and villages and finally terminates at round about at the outskirt of Agbani town in Enugu State.

The road is made up of asphaltic concrete wearing course carriageway 7.3m wide and 1.5m shoulder from Ch.0+000 – Ch.2+200. While the section from Ch. 2+200 - Ch. 10+650 is made up of surface dress road characterized of different categories of failure. The section of the road from Ch.10+650 - Ch.19+425 is a made up of asphaltic concrete wearing course dual carriageway of 7.3m and 1.5m shoulder either side separated with 1m wide median. However, most of the existing shoulders along the road are totally eroded into the carriageway itself. In some places, failure types such as cracks and depressions characterize the project road.

Description of Actual Services Provided by Your Staff Within the Assignment: Services provided include: - Feasibility Study - Traffic Study - Pavement Evaluation - Preliminary Design - Geometric Design - Pavement Design - Condition Survey of Road Facilities - Safety Audit of Road.

Corporate Profile Sanol Engineering Consultants Ltd.

* Consulting Engineers * Development Consultants * Project Managers

32

Assignment Name: Engineering Design and Construction Supervision of Roads, Drainages and Buildings for Cambial Nig. Ltd. Kuje Estate.

Approx. Value of the Contract (in current Naira): N4m

Country: Nigeria

Location within Country: Kuje, Abuja

Duration of Assignment (month): 3 months

Name of Client: Cambial Limited Abuja Total No of Staff-Months of Assignment: 12 months

Address of Client: Kuje, Abuja

Approx. Value of Services Provided (in current Naira): N4m

Start Date: May 2005

Completion Date: June 2005

No of Professional Staff Provided by Associated Consultants: Nil

Name of Associated Consultant(s): Nil Name of Senior Professional Staff of your firm involved and Functions Performed: Engr.(Dr.) Bankole I.O – Project Director/ Co-ordinator

Narrative Description of Project: The project was basically the design of Roads, Drainages and Building. Cambial Estate is located at Kuje in Abuja. It is a land of about 40 hectares with infrastructures such as roads, buildings, drainages, electricity etc. Description of Actual Services Provided by Your Staff Within the Assignment: Services provided include: - Construction Supervision - Topographical survey of land - Drainage design - Culvert design - Estate road design - Soil investigation etc.

Corporate Profile Sanol Engineering Consultants Ltd.

* Consulting Engineers * Development Consultants * Project Managers

33

Assignment Name: Engineering Design of Gumel-Maigatari Road in Jigawa State.

Approx. Value of the Contract (in current Naira): N21m

Country: Nigeria Location within Country: Jigawa State

Duration of Assignment (month): 6 months

Name of Client: Federal Ministry of Transportation, Abuja.

Total No of Staff-Months of Assignment: 36 Months

Address of Client: Mabushi, Abuja

Approx. Value of Services Provided (in current Naira): N21m

Start Date: Feb. 2006 Completion Date: July 2006

No of Professional Staff Provided by Associated Consultants: 10 months

Name of Associated Consultant(s): CLS Nig. Ltd.

Name of Senior Staff Involved and Functions Performed: Engr.Barth Goewam – Principal Engineer.

Narrative Description of Project: The GUMEL – MAIGATARI ROAD IN JIGAWASTATE is a 23.85km road connecting Gumel with Maigatari in Jigawa state, it is situated in the northern part of Dutse, the capital of Jigawa state and on the north eastern section of Kano state. The road which starts at Oando Filling Station junction along the Kano – Hadejia road in Gumel town traverses towns and villages such as MalDabara, Shabarawa, Daguma, Matoya, Jarinladan and Maigatari town, before terminating at the Nigeria border with Niger Republic. The pavement is constructed in asphaltic concrete wearing course finish. Carriageway width is approximately 7.3m along the entire stretch of the project road, while the shoulder, 1.5m width is badly eroded. Kerbs were built at some locations along the road to control erosion. Traversing many agriculturalllly predominant towns and villages in Jigawa state, the Road which runs north from Gumel to Maigatari passes through two Local Government Areas of Jigawa State Namely; Gumel and Maigatari Local Government Area Councils.

The project road is located between latitudes 12o 37’ and 12o 48’ North of the equator and between longitude 9o 23’ and 9o 27’ of the meridian. It is located in the North-Eastern part of Nigeria

Description of Actual Services Provided by Your Staff Within the Assignment: Services provided include: - Feasibility Study - Traffic Study - Pavement Evaluation - Preliminary Design - Geometric Design - Pavement Design - Condition Survey of Road Facilities - Safety Audit of Road.

Corporate Profile Sanol Engineering Consultants Ltd.

* Consulting Engineers * Development Consultants * Project Managers

34

Assignment Name: Engineering Design of Jega-Sokoto Road in Sokoto State.

Approx. Value of the Contract (in current Naira): N30.4m

Country: Nigeria Location within Country: Sokoto State

Duration of Assignment (month):

Name of Client: Federal Ministry of Transportation, Abuja.

Total No of Staff-Months of Assignment:

Address of Client: Mabushi, Abuja

Approx. Value of Services Provided (in current Naira): N30.4m

Start Date: Feb. 2008 Completion Date: July 2008

No of Professional Staff Provided by Associated Consultants: 5 months

Name of Associated Consultant(s): Park Associates Ltd.

Name of Senior Staff Involved and Functions Performed: Engr.Boladale Bolajoko – Project Manager.

Narrative Description of Project:

The Jega – Sokoto road in Kebbi/Sokoto State is a 125km road connecting Jega and Aliero, in KebbiState with Tambawal, Malisa, Kajiji, Sifawa, Shagari and Sokoto in SokotoState of Nigeria. The road begins from the round-about inside JegaTownship with Birnin Kebbi and Yauri road in Kebbi State Passesthrough the above named towns and villages and finally terminates at round about at the entrance of Sokoto in SokotoState.

The road is made up of asphaltic concrete wearing course carriageway 7.3m wide throughout the entire stretch of the road. However, most of the existing shoulders along the road are totally eroded into the carriageway itself. In some places, failure types such as cracks and depressions characterize the project road.

Road pavement is at various stage of distress and is infested with potholes, alligator cracks and washouts at the edges, with depression, corrugation and eroded embankment at various sections of the road. Traversing many commercial and agriculturally predominant towns and villages in Kebbi/Sokoto State, the Road runs North-Easterly from Jega to Sokoto town.

The project road is located between latitudes 12O 10’ and 13O 05’ North of the equator and between longitude 4O 20’ and 5O 25’ East of the meridian. It is located in the North - Western part of Nigeria.

Description of Actual Services Provided by Your Staff Within the Assignment: Services provided include: - Feasibility Study - Traffic Study - Pavement Evaluation - Preliminary Design - Geometric Design - Pavement Design - Condition Survey of Road Facilities - Safety Audit of Road.

Corporate Profile Sanol Engineering Consultants Ltd.

* Consulting Engineers * Development Consultants * Project Managers

35

Assignment Name: Structural Design of 4-StoreyAdmin Block for LAUTECH in Oyo State.

Approx. Value of the Contract (in current Naira):

Country: Nigeria Location within Country: Ogbomosho,Oyo State

Duration of Assignment (month): 4 months

Name of Client: Ladoke Akintola University of Technology

Total No of Staff-Months of Assignment: 20 months

Address of Client: Ogbomosho, Oyo State

Approx. Value of Services Provided (in current Naira):

Start Date: Dec. 2004 Completion Date: April 2005

No of Professional Staff Provided by Associated Consultants: Nil

Name of Associated Consultant(s): Arki-Consult (Architectural firm).

Name of Senior Staff Involved and Functions Performed: Engr.Bankole I.O – Team Leader.

Narrative Description of Project:

The project is the design of a 4-storey circular shape administrative building for Ladoke Akintola University of Technology. The building was built on pad foundation with reinforced concrete construction and steel roof.

Description of Actual Services Provided by Your Staff Within the Assignment: Services provided include: Structural Design of: - Pad Foundation - Concrete Slab - Columns and Beams - Steel roof Truss - Aluminum Roofs - Access Roads etc.

Corporate Profile Sanol Engineering Consultants Ltd.

* Consulting Engineers * Development Consultants * Project Managers

36

Assignment Name: Condition Survey and Traffic Study for Ten (10 No.) Selected Federal Roads for FERMA PPP Project.

Approx. Value of the Contract (in current Naira): N6m

Country: Nigeria Location within Country: All over the country

Duration of Assignment (month): 2 months

Name of Client: FERMA

Total No of Staff-Months of Assignment: 25 months

Address of Client: Abuja

Approx. Value of Services Provided (in current Naira): N6m

Start Date: Completion Date:

No of Professional Staff Provided by Associated Consultants: Nil

Name of Associated Consultant(s): Nil.

Name of Senior Staff Involved and Functions Performed: Engr.Bankole I.O – Project Director/Co-ordinator.

Narrative Description of Project:

Condition survey of the eight (8No.) roads was carried out to determine their present condition and maintenance requirement as a pre-condition for evaluating the cost of concession.

Description of Actual Services Provided by Your Staff Within the Assignment: Services provided include: - Road Inventory - Road Condition Survey - Traffic Studies - Road Safety Audits.

Corporate Profile Sanol Engineering Consultants Ltd.

* Consulting Engineers * Development Consultants * Project Managers

37

Assignment Name: Engineering Design of Road Network at Industrial Development Centre, Oshogbo.

Approx. Value of the Contract (in current Naira):

Country: Nigeria Location within Country: Oshogbo, Osun State

Duration of Assignment (month): 3 months

Name of Client: Federal Ministry of Industries.

Total No of Staff-Months of Assignment: 9 months

Address of Client: Old Federal Secretariat, Abuja

Approx. Value of Services Provided (in current Naira):

Start Date: Sept. 2006 Completion Date: Nov. 2006

No of Professional Staff Provided by Associated Consultants: nil

Name of Associated Consultant(s): Nil.

Name of Senior Staff Involved and Functions Performed: Engr.Boladale Bolajoko – Project Director.

Narrative Description of Project:

It involves the topographical survey, and design of 2km length estate roads within the industrial development centre, Oshogbo. The road is 6m wide asphaltic concrete wearing course with no shoulder.

Description of Actual Services Provided by Your Staff Within the Assignment: Services provided include: - Feasibility Study - Pavement Evaluation - Preliminary Design - Pavement Design - Culvert Design - Road Condition Survey - Mapping etc.

Corporate Profile Sanol Engineering Consultants Ltd.

* Consulting Engineers * Development Consultants * Project Managers

38

Assignment Name: Engineering Design of Ila-Ashi-oyan-Konta Road in Osun State.

Approx. Value of the Contract (in current Naira):

Country: Nigeria Location within Country: Osun State

Duration of Assignment (month): 6 months

Name of Client: Osun State Ministry of Works.

Total No of Staff-Months of Assignment: 42 Months

Address of Client: Oshogbo, Osun State

Approx. Value of Services Provided (in current Naira):

Start Date: May1999 Completion Date: Nov.1999

No of Professional Staff Provided by Associated Consultants: 36 months

Name of Associated Consultant(s): Profen Consultants Inc.

Name of Senior Professional Staff of your firm involved and Functions Performed: Engr.(Dr.) Bankole I.O – Project Design Engineer

Narrative Description of Project: The ila-Ashi-Oyan-Konta road is a major road in Osun State. The existing road was redesigned to a 7.3m carriageway with 1.5m width shoulder on both sides of the carriageway

Description of Actual Services Provided by Your Staff Within the Assignment: Services provided include: - Feasibility Study - Traffic Study - Pavement Evaluation - Preliminary Design - Geometric Design - Pavement Design - Condition Survey of Road Facilities - Safety Audit of Road.

Corporate Profile Sanol Engineering Consultants Ltd.

* Consulting Engineers * Development Consultants * Project Managers

39

Assignment Name: Route Condition Survey and Road Safety Audit for Nine (9No.) Selected Border Roads

Approx. Value of the Contract (in current Naira): N6m

Country: Nigeria Location within Country: North West, North East, South West, South South and North Central Nigeria

Duration of Assignment (month): 2 months

Name of Client: FERMA

Total No of Staff-Months of Assignment: 20 Months

Address of Client: Abuja

Approx. Value of Services Provided (i in current Naira): N6m

Start Date: October 2008 Completion Date: November 2008

No of Professional Staff Provided by Associated Consultants: Nil

Name of Associated Consultant(s): Nil Name of Senior Professional Staff of your firm involved and Functions Performed: Engr. Boladale Bolajoko– Team Leader

Project involves the condition survey and road safety audit for selected nine (9No.) border roads in Nigeria.

Description of Actual Services Provided by Your Staff Within the Assignment: Services provided include: - Feasibility Study - Condition Survey of Road Facilities - Safety Audit of Road - Pavement Condition Analysis

Corporate Profile Sanol Engineering Consultants Ltd.

* Consulting Engineers * Development Consultants * Project Managers

40

Assignment Name: Engineering Design of langtang-lalin-Tunkus-Shendam Road in Plateau State.

Approx. Value of the Contract (in current Naira):

Country: Nigeria Location within Country: Plateau State

Duration of Assignment (month):

Name of Client: Federal Ministry of Transportation, Abuja.

Total No of Staff-Months of Assignment:

Address of Client: Mabushi, Abuja

Approx. Value of Services Provided (in current Naira):

Start Date: Sept. 2003 Completion Date: Feb. 2004

No of Professional Staff Provided by Associated Consultants:

Name of Associated Consultant(s): Pentagon Engineering Consultants

Name of Senior Professional Staff of your firm involved and Functions Performed: Engr.(Dr.) Bankole I.O – Project Manager

Narrative Description of Project: This project involves the design of the 52km long road. The existing road is an earthroad and bush tracks which was redesigned. Pavements were 7.3m carriageway with 2.75m shoulder

Description of Actual Services Provided by Your Staff Within the Assignment: Services provided include: - Feasibility Study - Traffic Study - Pavement Evaluation - Preliminary Design - Geometric Design - Pavement Design - Condition Survey of Road Facilities - Safety Audit of Road.

Corporate Profile Sanol Engineering Consultants Ltd.

* Consulting Engineers * Development Consultants * Project Managers

41

Assignment Name:

Structural Integrity Assessment of Proposed Skye

BankPlc.,Karu Branch, Abuja.

Approx. Value of the Contract (in current Naira):

N1m

Country: Nigeria

Location within Country: Abuja

Duration of Assignment (Week): 2 Weeks

Name of Client:

Skye Bank Plc.

Total No of Staff-Months of Assignment:

Address of Client:

Victoria Island, Lagos

Approx. Value of Services Provided (in current

Naira): N1m

Start Date: Nov. 2013

Completion Date: Nov. 2013

No of Professional Staff Provided by Associated

Consultants: Nil

Name of Associated Consultant(s):

Nil

Name of Senior Professional Staff of your firm

involved and Functions Performed:

Engr.(Dr.) Bankole I.O – Team Leader

Narrative Description of Project:

Non-destructive structural integrity test of proposed Skye Bank Karu Branch building

Description of Actual Services Provided by Your Staff Within the Assignment:

Services provided include:

§ Structural evaluation of beams, columns and slab of the building

§ Assessment of roof structure,

§ Foundation type determination and integrity test

§ Non-structural elements integrity test

§ Water table monitoring to determine risk of seepage into foundation

§ Determination of remaining life of the building based on current state dilapidation

§ Recommendation and remedial works proposal.

Corporate Profile Sanol Engineering Consultants Ltd.

* Consulting Engineers * Development Consultants * Project Managers

42

Assignment Name:

Structural Integrity Assessment of Skye Bank

Plc.,Jalingo Branch.

Approx. Value of the Contract (in current Naira):

N1m

Country: Nigeria

Location within Country: Abuja

Duration of Assignment (Week): 2 Weeks

Name of Client:

Skye Bank Plc.

Total No of Staff-Months of Assignment:

Address of Client:

Victoria Island, Lagos

Approx. Value of Services Provided (in current

Naira): N1m

Start Date: June. 2014

Completion Date:June.2014

No of Professional Staff Provided by Associated

Consultants: Nil

Name of Associated Consultant(s):

Nil

Name of Senior Professional Staff of your firm

involved and Functions Performed:

Engr.(Dr.) Bankole I.O – Team Leader

Narrative Description of Project:

Non-destructive structural integrity test of proposed Skye Bank Karu Branch building

Description of Actual Services Provided by Your Staff Within the Assignment:

Services provided include:

§ Structural integrity test on building components

§ Non-structural element assessment

§ Water ingress study

§ Foundation integrity check of the building

§ Determination of remaining life of the building based on current state dilapidation

§ Recommendation and remedial works proposal.

Corporate Profile Sanol Engineering Consultants Ltd.

* Consulting Engineers * Development Consultants * Project Managers

43

Assignment Name:

Structural Integrity Assessment of Skye Bank Plc.,

Life Camp Branch, Abuja.

Approx. Value of the Contract (in current Naira):

N1m

Country: Nigeria

Location within Country: Abuja

Duration of Assignment (Week): 2 Weeks

Name of Client:

Skye Bank Plc.

Total No of Staff-Months of Assignment:

Address of Client:

Victoria Island, Lagos

Approx. Value of Services Provided (in current

Naira): N1m

Start Date: June. 2014

Completion Date: June.2014

No of Professional Staff Provided by Associated

Consultants: Nil

Name of Associated Consultant(s):

Nil

Name of Senior Professional Staff of your firm

involved and Functions Performed:

Engr.(Dr.) Bankole I.O – Team Leader

Narrative Description of Project:

Non-destructive structural integrity test of proposed Skye Bank Karu Branch building

Description of Actual Services Provided by Your Staff Within the Assignment:

Services provided include:

§ Structural evaluation of beams, columns and slab of the building

§ Assessment of roof structure,

§ Foundation type determination and integrity test

§ Non-structural elements integrity test

§ Water table monitoring to determine risk of seepage into foundation

§ Determination of remaining life of the building based on current state dilapidation

§ Recommendation and remedial works proposal.

Corporate Profile Sanol Engineering Consultants Ltd.

* Consulting Engineers * Development Consultants * Project Managers

44

Assignment Name: Design of Comprehensive Development for Proposed Bankys Private Schools, Abuja.

Approx. Value of the Contract (in current Naira): N63m

Country: Nigeria Location within Country: Abuja

Duration of Assignment (month): 6 Months

Name of Client: Bankys Private Schools.

Total No of Staff-Months of Assignment:

Address of Client: Abuja

Approx. Value of Services Provided (in current Naira): N500m

Start Date: 2011 Completion Date:2011

No of Professional Staff Provided by Associated Consultants:

Name of Associated Consultant(s): Nil

Name of Senior Professional Staff of your firm involved and Functions Performed: Engr.(Dr.) Bankole I.O – Project Manager

Narrative Description of Project: This project involves the design of an educational institution

Description of Actual Services Provided by Your Staff Within the Assignment: Services provided include: § Design Management § Detailed Architectural Design of Office § Detailed Electromechanical Design & Drawings § Project Scheduling & budgeting § Quality Assurance & Control § Preparation of Contract Documents and Bill of Engineering Measurement and Evaluation

(BEME) § Contract Packaging § Complete Project Management & Construction Supervision

Corporate Profile Sanol Engineering Consultants Ltd.

* Consulting Engineers * Development Consultants * Project Managers

45

Assignment Name: Consultancy Services for Design of a Modern Befitting, Functional and Cost Effective State Office Complex to Accommodate About 150 staff in Ondo State.

Approx. Value of the Contract (in current Naira): N63m

Country: Nigeria Location within Country: Ondo State

Duration of Assignment (month): 6 Months

Name of Client: Ministry of Niger Delta Affairs, Abuja.

Total No of Staff-Months of Assignment:

Address of Client: Abuja

Approx. Value of Services Provided (in current Naira): N63m

Start Date: Sept. 2009 Completion Date:2010

No of Professional Staff Provided by Associated Consultants:

Name of Associated Consultant(s): Nil

Name of Senior Professional Staff of your firm involved and Functions Performed: Engr.(Dr.) Bankole I.O – Project Manager

Narrative Description of Project: This project involves the design of a Modern Befitting, Functional and Cost Effective State Office Complex to Accommodate About 150 staff

Description of Actual Services Provided by Your Staff Within the Assignment: Services provided include: § Design Management § Detailed Architectural Design of Office § Detailed Electromechanical Design & Drawings § Project Scheduling & budgeting § Quality Assurance & Control § Preparation of Contract Documents and Bill of Engineering Measurement and Evaluation

(BEME) § Contract Packaging § Complete Project Management & Construction Supervision

Corporate Profile Sanol Engineering Consultants Ltd.

* Consulting Engineers * Development Consultants * Project Managers

46

Assignment Name: Design of 4-storey Administrative building for Ladoke Akintola University of Technology, (LAUTECH), Ogbomoso.

Approx. Value of the Contract (in current Naira): N3m

Country: Nigeria Location within Country: Oyo State

Duration of Assignment (month):

Name of Client: LAUTECH,

Total No of Staff-Months of Assignment:

Address of Client: Ogbomoso, Oyo State.

Approx. Value of Services Provided (in current Naira): N3m

Start Date: 2003 Completion Date: 2004

No of Professional Staff Provided by Associated Consultants:

Name of Associated Consultant(s): Pentagon Engineering Consultants

Name of Senior Professional Staff of your firm involved and Functions Performed: Engr.(Dr.) Bankole I.O – Project Manager

Narrative Description of Project: This project involves the design of 4-storey Administrative building for Ladoke Akintola University of Technology

Description of Actual Services Provided by Your Staff Within the Assignment: Services provided include: § Design Management § Structural Design and Drawings § Project Scheduling & budgeting § Quality Assurance & Control § Contract Packaging § Site Monitoring § Certifying Progress of work § Certifying milestone § Complete Project Management & Construction Supervision § Final Bill § Project Close Out

Corporate Profile Sanol Engineering Consultants Ltd.

* Consulting Engineers * Development Consultants * Project Managers

47

Assignment Name: Engineering Design of 5000 Capacity Church Building.

Approx. Value of the Contract (in current Naira): N0.5m

Country: Nigeria Location within Country: Oyo State

Duration of Assignment (month): 3 Months

Name of Client: Christ Life Church, Apata, Ibadan.

Total No of Staff-Months of Assignment:

Address of Client: Apata, Ibadan

Approx. Value of Services Provided (in current Naira): N0.5m

Start Date: 1998 Completion Date: 1998

No of Professional Staff Provided by Associated Consultants:

Name of Associated Consultant(s): Nil

Name of Senior Professional Staff of your firm involved and Functions Performed: Engr.(Dr.) Bankole I.O – Project Manager

Narrative Description of Project: This project involves the design of 5000 Capacity Church Building.

Description of Actual Services Provided by Your Staff Within the Assignment: Services provided include: § Structural Design and Production of Contract Documents § Project Supervision § Project Advisory Management

Corporate Profile Sanol Engineering Consultants Ltd.

* Consulting Engineers * Development Consultants * Project Managers

48

Assignment Name: Engineering Design and Construction Supervision of Ondo State University Christian Union (OSUACU) Chapel.

Approx. Value of the Contract (in current Naira): N0.2m

Country: Nigeria Location within Country: Ekiti State

Duration of Assignment (month):

Name of Client: OSUACU, Ado-Ekiti.

Total No of Staff-Months of Assignment:

Address of Client: Ado-Ekiti, Ekiti State

Approx. Value of Services Provided (in current Naira): N0.2m

Start Date: 1993 Completion Date: 2000

No of Professional Staff Provided by Associated Consultants:

Name of Associated Consultant(s): Nil

Name of Senior Professional Staff of your firm involved and Functions Performed: Engr.(Dr.) Bankole I.O – Project Manager

Narrative Description of Project: This project involves the Engineering Design and Construction Supervision of Ondo State University Christian Union (OSUACU) Chapel.

Description of Actual Services Provided by Your Staff Within the Assignment: Services provided include: § Design Management § Structural Design and Drawings § Project Scheduling & budgeting § Quality Assurance & Control § Contract Packaging § Site Monitoring § Certifying Progress of work § Certifying milestone § Complete Project Management & Construction Supervision § Final Bill § Project Close Out

Corporate Profile Sanol Engineering Consultants Ltd.

* Consulting Engineers * Development Consultants * Project Managers

49

Assignment Name: Retainership Contract for GIS Mapping & IT Consultancy services.

Approx. Value of the Contract (in current Naira): N19m

Country: Nigeria Location within Country: Abuja

Duration of Assignment (month):

Name of Client: Federal Road Maintenance Agency (FERMA)

Total No of Staff-Months of Assignment:

Address of Client: Abuja

Approx. Value of Services Provided (in current Naira): N19m

Start Date: 2007 Completion Date: 2010

No of Professional Staff Provided by Associated Consultants:

Name of Associated Consultant(s): Nil

Name of Senior Professional Staff of your firm involved and Functions Performed: Engr.(Dr.) Bankole I.O – Project Manager

Narrative Description of Project: This project involves the design and production of maps for all the federal roads in Nigeria

Description of Actual Services Provided by Your Staff Within the Assignment: Services provided include:

• Development of a Geographical Information System (GIS) software for managing all the federal road infrastructures.

• Website development and supports for the Agency • Development of Federal Road Maps of Nigeria showing the Agency’s operation • Map Production and Printing for the Agency • Upgrading of the FERMA GIS software to accommodate new developments. • Website management and supports. • Management of the Agency’s network • Upgrading of the Agency’s database software to accommodate new data and operations • Training in current engineering and professional softwares available in the industry • Other IT related support services

Corporate Profile Sanol Engineering Consultants Ltd.

* Consulting Engineers * Development Consultants * Project Managers

50

Assignment Name: Production of Federal Road Maps of Nigeria showing FERMA’s Operations.

Approx. Value of the Contract (in current Naira): N3.5m

Country: Nigeria Location within Country: Abuja.

Duration of Assignment (month):

Name of Client: FERMA, Abuja.

Total No of Staff-Months of Assignment:

Address of Client: Abuja

Approx. Value of Services Provided (in current Naira): N3.5m

Start Date: 2006 Completion Date: 2009

No of Professional Staff Provided by Associated Consultants:

Name of Associated Consultant(s): Nil

Name of Senior Professional Staff of your firm involved and Functions Performed: Engr.(Dr.) Bankole I.O – Project Manager

Narrative Description of Project: This project involves the design and production of maps for all the federal roads in Nigeria showing FERMA’s operations

Description of Actual Services Provided by Your Staff Within the Assignment: Services provided include:

• Development and Production of Federal Road Map of Nigeria showing: • Operation 500 Roads • 4-Years intervention Programme • Retainership Contract for year 2006, 2007 and 2008 • Bond Funding • FERMA Operations

• Map Printing for the Agency

Corporate Profile Sanol Engineering Consultants Ltd.

* Consulting Engineers * Development Consultants * Project Managers

51

Assignment Name: Building a Due Diligence Micro Site for FERMA

Approx. Value of the Contract (in current Naira): N2.932m

Country: Nigeria Location within Country: Abuja

Duration of Assignment (month):

Name of Client: Federal Road Maintenance Agency (FERMA), Abuja.

Total No of Staff-Months of Assignment:

Address of Client: Abuja

Approx. Value of Services Provided (in current Naira): N2.932m

Start Date: Mar. 2008 Completion Date: Mar. 2008

No of Professional Staff Provided by Associated Consultants:

Name of Associated Consultant(s): Nil

Name of Senior Professional Staff of your firm involved and Functions Performed: Engr.(Dr.) Bankole I.O – Project Manager

Narrative Description of Project: This project involves the Building a Due Diligence Micro Site for FERMA

Description of Actual Services Provided by Your Staff Within the Assignment: Services provided include:

• Website development and supports for the Agency • Website management and supports. • Website upgrade • Creating new search pages for different types of documents

Corporate Profile Sanol Engineering Consultants Ltd.

* Consulting Engineers * Development Consultants * Project Managers

52

Assignment Name: Comprehensive Study for the Development of Traffic Park in the South-Western States.

Approx. Value of the Contract (in current Naira): N7m

Country: Nigeria Location within Country: Plateau State

Duration of Assignment (month):

Name of Client: Federal Road Maintenance Agency (FERMA), Abuja.

Total No of Staff-Months of Assignment:

Address of Client: Abuja

Approx. Value of Services Provided (in current Naira): N7m

Start Date: Mar. 2008 Completion Date: June 2008

No of Professional Staff Provided by Associated Consultants:

Name of Associated Consultant(s): Nil

Name of Senior Professional Staff of your firm involved and Functions Performed: Engr.(Dr.) Bankole I.O – Project Manager

Narrative Description of Project: This project involves the Comprehensive Study for the Development of Traffic Park in the South-Western States.

Description of Actual Services Provided by Your Staff Within the Assignment: Services provided include:

• Study and analysis of truck parking patterns in the South-West; Lagos, Orile, Apapa; Ogun State, Ogere, Ibafon and Oyo State – Ojoo Toll Gate.

§ Review of data collected and development of financial analysis for financing construction of truck parks

§ Road Inventory § Road Management § Roadside Development & Road Property Management § Toll Management § Financial Management System § Bridge Inventory & Management § Environment and Social Impact Assessments § Document Management § Traffic Data § Road Safety/ Accident Information

Corporate Profile Sanol Engineering Consultants Ltd.

* Consulting Engineers * Development Consultants * Project Managers

53

Assignment Name: Route Condition Survey and Road Safety Audit for Selected (9 Border) Roads towards the implementation of the international vehicle transit charge.

Approx. Value of the Contract (in current Naira): N9m

Country: Nigeria Location within Country: Abuja

Duration of Assignment (month):

Name of Client: Federal Ministry of Transportation, Abuja.

Total No of Staff-Months of Assignment:

Address of Client: Mabushi, Abuja

Approx. Value of Services Provided (in current Naira): N9m

Start Date: 2008 Completion Date:2008

No of Professional Staff Provided by Associated Consultants:

Name of Associated Consultant(s): Nil

Name of Senior Professional Staff of your firm involved and Functions Performed: Engr.(Dr.) Bankole I.O – Project Manager

Narrative Description of Project: This project involves the Route Condition Survey and Road Safety Audit for Selected (9 Border) Roads towards the implementation of the international vehicle transit charge.

Description of Actual Services Provided by Your Staff Within the Assignment: Services provided include:

§ Review of Earlier Reports § Reconnaissance Survey, Traffic Studies and Traffic Demand Forecasting § Inventory and Condition Survey of Roads, Bridges, Culverts, etc. § Detailed Topographical Survey. § Soil and Material Survey § Drainage Studies § Hydraulic and Hydrological Investigations

Corporate Profile Sanol Engineering Consultants Ltd.

* Consulting Engineers * Development Consultants * Project Managers

54

Assignment Name: Revision and Upgrading of Highway Maintenance Manual.

Approx. Value of the Contract (in current Naira): N9.5m

Country: Nigeria Location within Country: Abuja

Duration of Assignment (month):

Name of Client: Federal Ministry of Works, Abuja.

Total No of Staff-Months of Assignment:

Address of Client: Mabushi, Abuja

Approx. Value of Services Provided (in current Naira): N9.5m

Start Date: July 2009 Completion Date: October 2009

No of Professional Staff Provided by Associated Consultants:

Name of Associated Consultant(s): Nil

Name of Senior Professional Staff of your firm involved and Functions Performed: Engr.(Dr.) Bankole I.O – Project Manager

Narrative Description of Project: This project involves the Revision and Upgrading of Highway Maintenance Manual.

Description of Actual Services Provided by Your Staff Within the Assignment: Services provided include:

§ Data Collection and Review of Existing Manual § Upgrading of Existing Manual and Updating the Highway Register (Volume 1) giving full details of all

roads within the Federal Roads Network of Nigeria. § Submission of all approved Manuals, Documents and final copy of the reviewed highway

maintenance manual in CD-ROM format § Give information on working procedures and methods of carrying out highway maintenance § Outline acceptable and suitable requirements for labour, materials and equipment used in highway

maintenance § Give full detail of information and instruction of working procedures and methods to be used in

cost accounting for highway maintenance works

Corporate Profile Sanol Engineering Consultants Ltd.

* Consulting Engineers * Development Consultants * Project Managers

55

LIST OF EQUIPMENT AND FACILITIES Sanol Engineering Consultants is a fully computerized outfit. The firm is equipped with the latest in information technology such as computers of different configurations, in addition to other engineering equipment listed below:

A. Design Office i. 9 No Pentium Computer with various programmes such as

a) AutoCAD 2009 b) Road Cad, PageMaker, Microsoft Word, Corel Draw etc. c) STRAP (for structural analysis and Bridge design) d) Soft dest (for Highway design and drawing) e) Civil CAD 2009 (for highway designs) f) Road Cad

ii. 4 No Laptops of Various Configurations iii. 1 No HP Design Jet 500 Plotter (Ao Size) iv. 1 No HP Colour LaserJet 5550N (A3 Size) v. 1 No HP Colour LaserJet CM1312nfi (A4 Size) vi. 1 No HP Colour LaserJet 2600N (A4 Size) vii. 1 No HP Photosmart C3183 (A4 Size) viii. 1 No HP LaserJet 4250 (A4 Size) ix. 1 No HP LaserJet 4015N (A4 Size) x. 2 No HP LaserJet 1020 (A4 Size) xi. 1 No HP DeskJet 5743 (A4 Size) xii. 1 No HP DeskJet 1220C (A3 Size) xiii. 1 No HP DeskJet 1280 (A3 Size) xiv. 1 No HP Scanner 3970 (A4 Size) xv. Programmable pocket calculators xvi. Miscellaneous office furniture and communication facilities

B. Engineering Road Survey 1. Total Stations with GPS. 2. Theodolites 3. Dumpy levels 4. Ranging poles and staff 5. Measuring Tapes & Chain etc.

Corporate Profile Sanol Engineering Consultants Ltd.

* Consulting Engineers * Development Consultants * Project Managers

56

C. Engineering Soil Survey 1. Anger Drilling Rig with its accessories 2. Diggers and Shovels 3. Sample Bags 4. Shell by tube

D. Laboratory Equipment and Materials for i. Liquid Limit Device (Hand Operated) ii. Grooving Tool ASTM iii. Spatula 200mm iv. Spatula 100mm v. Glass plate 500mm x 500mm x 10mm vi. Semi-Automatic Balance 25kg vii. Top-Loading Electronic Balance 15kg x 0.1kg viii. Surcharge weight (Split Type) ix. Surcharge weight (Solid Type) x. Scoop (Medium) xi. Measuring Cylinder 1000ml Plastic xii. Measuring Cylinder 500ml Plastic xiii. Cube Moulds 150mm x 150mm xiv. Slump Cone Test Set xv. Mixing Tray 700mm x 6+50mm xvi. Speedy Absorbent 500g xvii. Moisture Content Tins xviii. Sand Pouring Cylinder 100mm xix. Digging Tray 100mm xx. Calibrating Can 100mm xxi. Compaction Rammer 2.5kg xxii. Compaction Rammer 4.6kg xxiii. Thermostically Controlled Water bath (Asphalt) xxiv. Centrifuge Extractor 1500g (Asphalt) xxv. Glass Thermometer -10+110oc (Asphalt) xxvi. Asphalt Thermometer 0+250oc (Asphalt) xxvii. Glass Breaker 500ml (Asphalt) xxviii. Density Basket (Asphalt) xxix. Marshall stability Machine (Asphalt) xxx. Rain Gauge (Splayed Base) (Asphalt) xxxi. CBR mould

Corporate Profile Sanol Engineering Consultants Ltd.

* Consulting Engineers * Development Consultants * Project Managers

57

LIST OF KEY PERSONNEL

In order to render the best professional Engineering services to the satisfaction of our clients we have succeeded in putting together a team of competent and capable Nigerian engineers with extensive and varied experience in their chosen field of specialization as given below:

S/N Names Years of Experience Qualifications Positions Tel. Nos.

1. Engr. (Dr.) Bankole Ilesanmi O 18

B.Engr. (Hons) M.Sc, Ph.D. (Civil Engr.) M.NSE, ACEN Registered, M.N.I Struct. E. M.ASCE, AMLP (Oxford), COREN (Reg. No.: R.8591)

Principal Partner/ Highway Engineer 08033626454

2. Engr. Eke Ogbonna 11

B.Engr. (Civil Engr.) M.NSE, COREN (Reg. No.: R.14218)

Principal Engineer (Bridges/ Structures)

08033079982

3. Engr. Ezekiel Olukayode Ojo 25

HND, P.G.D (Civil Engr.) M.BA M.NSE,COREN (Reg. No.: R.7565)

Partner & Project Manager

4. Engr. Kenny Odulade 16 HND, P.G.D (Civil Engr.) M.N.S.E. COREN (Reg. No.: R.17735)

Chief Engineer (Highways) 08034744971

5. Efosa Okeaye-Inne 4 B.Engr. (Hons) (Civil Engr.) Design Engineer 07039469169

6. Engr. Ajayi Oluwole 18 B.Eng. (Mech.), M.Sc. (UNIBEN) COREN (Reg. No.: R.8619)

Chief Engineer (Mechanical)

08074705568

7. Engr. Boladale Bolajoke I.O. 13

B.Eng., M.BA (Project Management) COREN (Reg. No.: R.9912)

Chief Engineer (Geotechnical) 08035432058

8. Engr. Bartholomew Goewam

12 B.Sc. (Civil Engr.) M.N.S.E., COREN (Reg. No.: R.17009)

Principal Engineer 08039733343

9. Engr. Oke Joshua 11 HND (Civil Engr.) Civil Engineer 10. Eihebholo Humphrey 6 B.Engr. (Hons) (Civil Engr.) Civil Engineer 07069756840 11. Engr. M.O.Komolafe 23 HND (Civil) Building Engineer 08050775747 12. Solomon Guruzu 5 B.Engr. (Hons) (Civil Engr.) Civil Engineer

13. Engr. Kola Eruosanyin 17 B.Sc. (Electrical Engr.). Project Manager (Electrical)

14. Adesimi Sunday 4 B.Sc. (Mech. Engr.) Mechanical Engineer

15. Favour Joseph 16 B.Sc. (B. Admin), PGDE Admin Secretary 08032328542

16. Bankole Joseph Alegbe 6 B.Sc. Ed. (Biology) Transport

Manager 08032310622

17. Mr. Ahmed 29 - Supervisor (Building)

Corporate Profile Sanol Engineering Consultants Ltd.

* Consulting Engineers * Development Consultants * Project Managers

58

S/N Names Years of Experience Qualifications Positions Tel. Nos.

18. Fayinto Olamuyiwa 17 HND (Civil Engr.) Structural Engineer

19. Alhassan E. Christian 15 ND, HND (Surveying) Surveyor/Geo-Informat

08038926363

20. Mrs. Akinola Yemisi 11 HND (Quantity Surveyor) Quantity Surveyor

21. Olanipekun Sunday 34 Diploma Geotechnical Specialist 08038327776

22. Oyedele Eruosanyin 5 B.Sc. (Geologist) Geologist

23. Babalola B. G. 32 B. Dip Surveying AMSST (London)

Land Surveyor

24. Ayodele Eniolorunda 5 B.Sc. (Accts) Accountant 08032911588

Other Non-Technical Personnel = 20 Nos.

Corporate Profile Sanol Engineering Consultants Ltd.

Corporate Profile Sanol Engineering Consultants Ltd.

Corporate Profile Sanol Engineering Consultants Ltd.

Corporate Profile Sanol Engineering Consultants Ltd.

Corporate Profile Sanol Engineering Consultants Ltd.

Corporate Profile Sanol Engineering Consultants Ltd.

Corporate Profile Sanol Engineering Consultants Ltd.

Corporate Profile Sanol Engineering Consultants Ltd.

Corporate Profile Sanol Engineering Consultants Ltd.

Corporate Profile Sanol Engineering Consultants Ltd.

Corporate Profile Sanol Engineering Consultants Ltd.

Corporate Profile Sanol Engineering Consultants Ltd.

Corporate Profile Sanol Engineering Consultants Ltd.

Corporate Profile Sanol Engineering Consultants Ltd.

Corporate Profile Sanol Engineering Consultants Ltd.

Corporate Profile Sanol Engineering Consultants Ltd.

Corporate Profile Sanol Engineering Consultants Ltd.

Corporate Profile Sanol Engineering Consultants Ltd.

Corporate Profile Sanol Engineering Consultants Ltd.

Corporate Profile Sanol Engineering Consultants Ltd.

Corporate Profile Sanol Engineering Consultants Ltd.

Corporate Profile Sanol Engineering Consultants Ltd.

Corporate Profile Sanol Engineering Consultants Ltd.

Corporate Profile Sanol Engineering Consultants Ltd.

* Consulting Engineers * Development Consultants * Project Managers

82

Name of Firm : Sanol Engineering Consultants Ltd.

Name of Staff Member : Bankole, Ilesanmi O.

Position : Principal Partner

Date of Birth : 1st Nov. 1969

Nationality : Nigerian

Yearsof Experience : 21 Years

Membership of Professional Societies • Member, Nigerian Society of Engineers (M.N.S.E.) • Member, Council for the Regulation of Engineering in Nigeria (COREN). • Member, Nigerian Institution of Structural Engineer (M.N.I Struct. E.) • Member, American Society of Civil Engineers (ASCE)

Detailed Tasks Assigned: • Overall responsible for monitoring of all the activities of his staff. • Responsible for quality assurance of all inspected materials and shall maintain close communication with

Employer/Client • He will be the Authorized Representative of the Firm and shall interact with its Clients on behalf of the Firm.

Key Qualifications Engineer (Dr.) Bankole Ilesanmi O. holds a Doctorate Degree in Civil Engineering with 21 years of experience. This entire experience has been in the usage of CAD software to draw and design buildings, bridge and road projects, feasibility studies and consultancy services for preparation of proposals. He equally developed a Computer program on road and culvert designs.

He has had extensive experience of engineering design and construction supervision of major Nigerian Roads and Bridges.

Education: • Ph.D. (Structural Engineering) University of Ibadan. (2007) • M.Sc. (Civil Engineering) University of Ibadan. (2000) • B.Sc. (Civil Engineering) (First Class Hons.) Former Ondo State University, Ado Ekiti (1994) • National Diploma (Land Surveying) – Federal Polytechnic Ado- Ekiti (1998)

Employment Record:

June 1999 Till Date Sanol Engineering Consultants Ltd. Principal Partner/Team Leader

(A) Highways

• Engineering Design for the Construction of Bridge at Onuebonyi – Ishinwo Ukawu – Onicha L.G.A. Ebonyi State. (FMW – 2014) – N58.90m

• Technical Proposal for the engineering design of Yebu-Kuje Road (FMW – 2014) – N28.90m • Engineering Design for the Rehabilitation of Abayi-Ogbuligba-Umuojima-Ogbu Road with spur at Umuagba

(FMW – 2014) – N25.40m • Consultancy Services for the Engineering Design of the Siluko-Iguobazuwa-Okada-Ogbese Road in Edo State.

(FMW – 2013) – N52.8mConsultancy Services for Detailed Engineering Design Safeguards Studies and Preparation of Bidding Documents for Prioritized 222.83KM. Rural Roads in Osun State of Nigeria. (FPMU – 2012) – N42.7m & $187.3

• Transaction Advisory Services for Lagos – Iseyin – Keshi – Kaiama Road in Lagos, Oyo and Kwara States, – In JV with Voyants Solutions PVT. Ltd. (PPP – 2011) – N65.8m

• Transaction Advisory Services for Kaiama – Bahama – Kaoje – Gwambu – Fokku - Sokoto Road in Kwara, Niger, Kebbi and Sokoto States. – In JV with Voyants Solutions PVT. Ltd. (PPP – 2011) N60.1m

Corporate Profile Sanol Engineering Consultants Ltd.

* Consulting Engineers * Development Consultants * Project Managers

83

• The Consultancy Services For The Survey & Design of Machina to Kanamma Route in Yobe State (YSMW – 2010) – N210.5m.

• Consultancy Services For The Engineering Design Of The 62km Ashige – Alawagana – Gidan Buba – Fadama Bauna – Arikya – Wamba Road in Nasarawa State, (NSMW&T – 2010) – N50m.

• Consultancy Engineering Supervision for the Rehabilitation ofOba-Nnewi Road (Section 1) In Anambra State, (FMWH&UD – 2010) – N40.15m.

• Consultancy Services For The Engineering Design Of Enugu-Nara-Isu-Onicha-Okposi-Amasiri-Oso-Owuta-Ohafia Junction in Abia State, (FMW – 2010) – N39.35m.

• Independent Project Monitoring Consultancy Services to Edo State Government. (ESG – 2010). • Consultancy Services on the Engineering Design of Gombe-Wuyo (Borno State Border) Road in Gombe State,

(FMWH&UD – 2010) – N22.22m. • Consultancy Services for Rapid Study and Preparation of Bidding Documents for Output and Performance

Based Road Contract – OPRC for Abuja to Keffi Road. (FERMA – 2009) – N7.1m • Consultancy Services on the Engineering Design of Lafia-Doma-Rutu-Bassa-Rafin Gabas-Nasarawa-Orozo

Road in Nasarawa State. (NSMW&T – 2009) – N70m • Consultancy Services on the Engineering Design of the Dualisation of Lafia – AkurbaRoad in Nasarawa State.

(NSMW&T – 2009) – N10m • Engineering Design and Construction Supervision of Taraku-Aondona-Naka-Agagbe-Abiam-Agatu Road in

Benue State. (BSMWH&T – 2008) – N59.6m • Consultancy Services and Construction Supervision of all Federal Roads in Nasarawa State. (FERMA – 2008)

– N5.4m • Engineering Design of Nasarawa-Toto-Abaji Road in Nasarawa State. (FMW – 2006) – N49.79m. • Construction Supervision of Nasarawa-Toto-Abaji Road in Nasarawa State. (FMW – 2006) – N75m. • Engineering Design of Uba-Askira-Mbalala Road in Borno State. (FMW – 2006) – N28m • Engineering Design of Akungba–Ikare–Omuo Road with 2 No. Bridges in Ondo State. (FMW – 2006) –

N22m • Engineering Design for the Limited Rehabilitation of Ado-Ekiti-Aramoko-Ijaro-Afon Alaaye Road in Ekiti State.

(FMW – 2007) – N16m. • Route Condition Survey and Road Safety Audit for Selected (9 Border) Roads towards the implementation of

the international vehicle transit charge. (FERMA – 2006) – N6m • Design and Construction Supervision of the Limited Rehabilitation of Onitsha End–Onitsha–Enugu Road in

Anambra State. (FMW – 2006) – N4m • Engineering Design and Construction Supervision of Road Network at Industrial Development Centre

Oshogbo for the Federal Ministry of Industries. (2005) – N4m • Engineering Design and Construction Supervision of Estate Road Network for Cambial Limited at Kuje

Housing Estate, Abuja. (2004) • Engineering Design for the Rehabilitation of Udi-Ozalla-Ubani Road in Enugu State. (FMW – 2008) –

N12.3m. (In Collaboration withClem-George Nig. Ltd.) • Engineering Design for the Rehabilitation of Jega-Sokoto Road in Kebbi/Sokoto States. (FMW – 2008) –

N30.4m. (In Collaboration withPark Associates Inc.) • Engineering Design of Aba-Azumini-Ohanbele-Ugwunagbo-Ihie Expressway in Abia State. (FMW – 2005) –

N49m. (In Collaboration withClem-George Nig. Ltd.) • Engineering design of Gumel-Maigatari Road in Jigawa State. (FMW – 2005) – N21m. (In Collaboration

withCLS Ltd.) • Design of Ila-Ashi-Oyan-Konta Road in Osun State for Osun State Government (1999). (In Collaboration

withProfen Consultancy Inc.) • Design of Ila-Ajaba-Imesi-Ile junction Road in Osun State for Osun State Government. (In Collaboration

withProfen Consultancy Inc.)

Corporate Profile Sanol Engineering Consultants Ltd.

* Consulting Engineers * Development Consultants * Project Managers

84

• Design, production of drawings and contract documents for Langtang-Lalin-Tunkus-Shendam road in Plateau state. Construction supervision of Langtang-Lalin-Tunkus-Shendam road in Plateau state. (FMW). (In Collaboration withPentagon Engineering Consultants Ltd.)

(B) Bridges • Design of 7 No. Multispan bridges along the 62km Ashige – Alawagana – Gidan Buba – Fadama Bauna –

Arikya – Wamba Road in Nasarawa State, (NSMW&T – 2010) – N50m. • Design of 8 No. Multispan bridges along Lafia-Doma-Rutu-Bassa-Rafin Gabas-Nasarawa-Orozo Road in

Nasarawa State. (NSMW&T – 2009) – N70m

• Design of 4-15m long Bridge at Ch.80+300 along Nasarawa -Toto-Abaji Road in Nasarawa State. (FMW – 2006)

• Design of 2 No. Bridges along Akungba–Ikare–Omuo-Ekiti Road in Ondo State. (FMW – 2006) • Design of 800m long Post-Tension Prestressed Concrete Box Girder Bridge over River Niger at Nupeko along

Bida-Sacci-Nupeko Road in Niger/Kogi State. (FMW – 2002). (In Collaboration withPentagon Engineering Consultants Ltd.)

• Design of 100m long Bridge over River Mabolo along Ankpa Onyegade Road in Ankpa, Kogi State. (FMW). (In Collaboration withPentagon Engineering Consultants Ltd.)

• Design of 5 No. bridges along Langtang-Lalin-Tunkins-Shedam Road in Plateau State. (FMW – 2001). (In Collaboration withPentagon Engineering Consultants Ltd.)

(C) Structures

• Structural Integrity Assessment of Proposed Skye Bank Plc., Karu Branch, Abuja • Structural Integrity Assessment of Skye Bank Plc., Jalingo Branch • Structural Integrity Assessment of Skye Bank Plc., Life Camp Branch, Abuja • Engineering Design and Supervision of Retaining Wall and River Channelization at the Collapsed Fence of

Skye Bank Plc., Karu Branch, AbujaConsultancy Services for Design of a Modern Befitting, Functional and Cost Effective State Office Complex to Accommodate About 150 Staff Strength in Ondo State. (Min. of Niger Delta Affairs – 2009) – N63m

• Design of 4-storey Administrative building for Ladoke Akintola University of Technology, Ogbomoso, (LAUTECH – 2004).

• Design of 4-Bedroom duplex for Kambal Ltd in Abuja • Design of many residential buildings. • Design of 4-storey office complex for Idea Consult, Ibadan • Design of 5000 capacity Church building for Christ Life Church Apata,Ibadan • Design and construction supervision of steel hoist for Procter and Gambles Nig. Ltd Ibadan. (In Collaboration

withPentagon Engineering Consultants Ltd.) • Design and Construction supervision of Abeni House – An ultramodern Office/Hall Complex at Oluyole

Estate, Ibadan. (In Collaboration withPentagon Engineering Consultants Ltd.) • Design and construction supervision of Ondo State University Christian Union Chapel, Ado-Ekiti.

(D) Gis & Mapping • Revision and Upgrading of Highways Maintenance Manual. (FMWH&UD – 2010) – N9.5m • Retainership contract for GIS mapping & IT Consultancy services (FERMA – 2008), (N8m). • Retainership contract for GIS mapping & IT Consultancy services (FERMA – 2007), (N5.2m). • Production of Federal Road Maps of Nigeria showing FERMA 4–year intervention programme. (2008 –

2011), (N3m). • Study for the Development of Traffic Park. (FERMA – 2008), (N7.6m). • Development of Federal Road Map of Nigeria showing Bond Funding and Printing of Federal Road Map of

Nigeria depicting FERMA’s operations. (FERMA – 2008), (N5m).

Corporate Profile Sanol Engineering Consultants Ltd.

* Consulting Engineers * Development Consultants * Project Managers

85

• Development of Federal Road Map of Nigeria showing Earth Roads, Performance Based Maintenance Management Roads and Projects Schedule for Systematic Pavement Strengthening and Enhancement in 2008 Fiscal Year. (FERMA – 2008), (N2m).

• Development of Federal Road Map of Nigeria showing Observation and Service Camps Locations. (FERMA – 2008), (N1m).

• Building a Due Diligence Micro Site for FERMA (2008 – N2.9m)

Responsibilities: • General project management, coordination of construction activities and project implementation. • Preparation, design, cost estimate and evaluation of tender documents (technical Specifications BEME

and Bill of Quantities) • Consultancy Services for Engineering Design, Survey& Construction Supervision. • Road Inventory, Road Condition Survey, Traffic Studies and Safety Audits.

1995 Till 1999 Pentagon Engineering Consultants Senior Engineer and CAD Specialist

• Engineering Consultants. In charge of all design and detailing using CAD software

• Design, production of computer Aided drawings of many residential and industrial building.

• Partook in the design, drawings, production of Tender and contract document for Ibadan-Akaran-Ogun state Boundary Road Project.

• Partook in the Design, drawings and production of tender and contract document on Labo-Olomi-Olurinde-Olojuoro road with spur to Kudeti-idi Arere, in Oyo state.

• Design, production of AutoCAD drawings on Bida-Sacci-Nupeko-patigi road with bridge over river Niger at Nupeko (54km).

• Design of 10 Nos. Bridge of various spans along Bida Sacci-Nupeko-Panti road.

• Design of 800m long prestressed concrete Box-girder bridge over River Niger at Nupeko.

• Construction supervision of the Rehabilitation of 5.4km long Wema Bank Apata – Oluyole Estate road in Ibadan.

• Construction supervision of Ibadan-Akanran-Ogun State Boundary road project.

• Develop a computer program on reinforced concrete box culvert design.

• Develop a computer program on vertical and horizontal alignment of road design.

• Design, production of drawing of 2-12m long bridge over river Kudeti, Idi-Arere in Ibadan.

• Construction supervision of many building projects.

• Detailed engineering design of Bida-Sacci-Nupeko-Panti road with 5 bridges (45km) in Niger/Kwara state (Federal Government of Nigeria Financed).

• Detailed engineering design of 800m long bridge over River Niger at Nupeko (Client Federal Government of Nigeria).

• Detailed Engineering design of Guyuk-Chikila-Lafia road: 50km in Adamawa state (Client: Federal Government of Nigeria).

• Detailed Engineering design of Tank Farm incorporating a jetty for Obat Nig. Ltd.

• Detailed Engineering design of Langtang-Tunkun-Lailain-Shandam road with spur to Federal government Girls College, Langtang in Plateau state 45km (Client Federal Government of Nigeria).

• Study and detailed engineering design of 100m long bridge over Ankpa in Kogi state. (Client: Federal Government of Nigeria).

Corporate Profile Sanol Engineering Consultants Ltd.

* Consulting Engineers * Development Consultants * Project Managers

86

• New Eye Clinic/Kitchen and Canteen, Randle Health Center, Surulere, Lagos. Abeni House – an ultra modern Office Complex for pentagon Engineering Consultant.

• Construction of Hostel block at School of Hygiene, Eleyele Ibadan.

• Supervision and project management of much maintenance.

• Construction project at Procter and gamble Nig. Ltd, Ibadan.

• Computer proficiency in AutoCAD Rel. 2002, Drafix-CAD, Word Perfect, Microsoft word, Microsoft Publishers, Corel Draw, Microsoft Excel.

Responsibilities: • Project appraisal/processing and monitoring • Coordinate the design process and liaising with client. • Consultancy Services for Engineering Design, Survey& Construction Supervision. • Feasibility Study, Traffic Study, Pavement Evaluation, Preliminary Design, Geometric Design, Pavement

Design, Condition Survey of Road Facilities and Safety Audit of Road.

Publications: § Use of Laterite Brick for low cost housing- (B. Eng Thesis, 1994) § Comparative analysis of Wingwall Cantilever Abutment Bridge and Bank-Seat Abutment Bridge. (M. Sc

Thesis, 1999) § Modeling the Structural Behaviour of Non-Prismatic Slab Bridges. (P.hd. Thesis, 2007)

Languages Speaking Reading Writing English Excellent Excellent Excellent Yoruba Excellent Excellent Excellent

Corporate Profile Sanol Engineering Consultants Ltd.

* Consulting Engineers * Development Consultants * Project Managers

87

Name of Firm : Sanol Engineering Consultants Ltd.

Name of Staff Member : Ojo, Ezekiel Olukayode

Position : Partner and Project Manager

Date of Birth : 21st March, 1962

Nationality : Nigerian

Yearsof Experience : 28 Years

Membership of Professional Societies • Member, Nigerian Society of Engineers (M.N.S.E.) – 1997. • Member, Council for the Regulation of Engineering in Nigeria (COREN)R.7567.

Detailed Tasks Assigned: • Establishment of site offices • Assist the employer in the interpretation of provision in the Contract documents and technical specifications • Modify and issue detailed drawings to the Client • Regular supervision of works • Evolve and implement quantity and quality control procedures • Prepares quarterly project budgets and estimates • Conducts monthly progress meetings • Completes monthly progress reports • Strictly ,monitors the progress of work for timely completion of the work project • Completion inspections • Verify and certify contractor’s statements at completion • Time schedule and management of team’s resources • Advising the Employer in all matters related to the progress of works, with particular reference to delays,

possible reasons and mitigating measures

Key Qualifications Engineer Ojo, Ezekiel Olukayode holds a Post Graduate Degree in Civil Engineering with 28 years of experience. This entire experience has been in interacting with his Clients on behalf of the Fir, the design and construction supervision of several highway projects in Nigeria and the designs of residential buildings and road projects.

He has had extensive experience of engineering project managements.

He is of sound health and mind

Education: • H.N,D (Civil Engineering) – Polytechnic, Ibadan. (1986) • P.G.D (Civil Engineering) – Enugu (formerly Anambra) state

University of Science & Technology, Enugu. (1989) • M.B.A. - University of Ibadan, Oyo State. (1999)

Employment Record:

1999 Till Date Sanol Engineering Consultants Ltd. Partner and Project Manager

(A) Highways

• Engineering Design for the Construction of Bridge at Onuebonyi – Ishinwo Ukawu – Onicha L.G.A. Ebonyi State. (FMW – 2014) – N58.90m

• Technical Proposal for the engineering design of Yebu-Kuje Road (FMW – 2014) – N28.90m • Engineering Design for the Rehabilitation of Abayi-Ogbuligba-Umuojima-Ogbu Road with spur at Umuagba

(FMW – 2014) – N25.40m • Consultancy Services for the Engineering Design of the Siluko-Iguobazuwa-Okada-Ogbese Road in Edo State.

(FMW – 2013) – N52.8mConsultancy Services for Detailed Engineering Design Safeguards Studies and

Corporate Profile Sanol Engineering Consultants Ltd.

* Consulting Engineers * Development Consultants * Project Managers

88

Preparation of Bidding Documents for Prioritized 222.83KM. Rural Roads in Osun State of Nigeria. (FPMU – 2012) – N42.7m & $187.3

• Consultancy Services for the Engineering Design of the Siluko-Iguobazuwa-Okada-Ogbese Road in Edo State. (FMW – 2013) – N52.8m Consultancy Services for Detailed Engineering Design Safeguards Studies and Preparation of Bidding Documents for Prioritized 222.83KM. Rural Roads in Osun State of Nigeria. (FPMU – 2012) – N42.7m & $187.3

• Consultancy Services for Detailed Engineering Design Safeguards Studies and Preparation of Bidding Documents for Prioritized 222.83KM. Rural Roads in Osun State of Nigeria. (FPMU – 2012) – N42.7m & $187.3

• The Consultancy Services For The Survey & Design of Machina to Kanamma Route in Yobe State (YSMW – 2010) – N210.5m.

• Consultancy Services For The Engineering Design Of The 62km Ashige – Alawagana – Gidan Buba – Fadama Bauna – Arikya – Wamba Road in Nasarawa State, (NSMW&T – 2010) – N50m.

• Consultancy Engineering Supervision for the Rehabilitation ofOba-Nnewi Road (Section 1) In Anambra State, (FMWH&UD – 2010) – N40.15m.

• Consultancy Services For The Engineering Design Of Enugu-Nara-Isu-Onicha-Okposi-Amasiri-Oso-Owuta-Ohafia Junction in Abia State, (FMW – 2010) – N39.35m.

• Independent Project Monitoring Consultancy Services to Edo State Government. (ESG – 2010). • Consultancy Services on the Engineering Design of Gombe-Wuyo (Borno State Border) Road in Gombe State,

(FMWH&UD – 2010) – N22.22m. • Consultancy Services for Rapid Study and Preparation of Bidding Documents for Output and Performance

Based Road Contract – OPRC for Abuja to Keffi Road. (FERMA – 2009) – N7.1m • Consultancy Services on the Engineering Design of Lafia-Doma-Rutu-Bassa-Rafin Gabas-Nasarawa-Orozo

Road in Nasarawa State. (NSMW&T – 2009) – N70m • Consultancy Services on the Engineering Design of the Dualisation of Lafia – AkurbaRoad in Nasarawa State.

(NSMW&T – 2009) – N10m • Engineering Design and Construction Supervision of Taraku-Aondona-Naka-Agagbe-Abiam-Agatu Road in

Benue State. (BSMWH&T – 2008) – N59.6m • Consultancy Services and Construction Supervision of all Federal Roads in Nasarawa State. (FERMA – 2008)

– N5.4m • Engineering Design of Nasarawa-Toto-Abaji Road in Nasarawa State. (FMW – 2006) – N49.79m. • Construction Supervision of Nasarawa-Toto-Abaji Road in Nasarawa State. (FMW – 2006) – N75m. • Engineering Design of Uba-Askira-Mbalala Road in Borno State. (FMW – 2006) – N28m • Engineering Design of Akungba–Ikare–Omuo Road with 2 No. Bridges in Ondo State. (FMW – 2006) –

N22m • Engineering Design for the Limited Rehabilitation of Ado-Ekiti-Aramoko-Ijaro-Afon Alaaye Road in Ekiti State.

(FMW – 2007) – N16m. • Route Condition Survey and Road Safety Audit for Selected (9 Border) Roads towards the implementation of

the international vehicle transit charge. (FERMA – 2006) – N6m • Design and Construction Supervision of the Limited Rehabilitation of Onitsha End–Onitsha–Enugu Road in

Anambra State. (FMW – 2006) – N4m • Engineering Design and Construction Supervision of Road Network at Industrial Development Centre

Oshogbo for the Federal Ministry of Industries. (2005) – N4m • Engineering Design and Construction Supervision of Estate Road Network for Cambial Limited at Kuje

Housing Estate, Abuja. (2004) • Engineering Design for the Rehabilitation of Udi-Ozalla-Ubani Road in Enugu State. (FMW – 2008) –

N12.3m. (In Collaboration withClem-George Nig. Ltd.) • Engineering Design for the Rehabilitation of Jega-Sokoto Road in Kebbi/Sokoto States. (FMW – 2008) –

N30.4m. (In Collaboration withPark Associates Inc.)

Corporate Profile Sanol Engineering Consultants Ltd.

* Consulting Engineers * Development Consultants * Project Managers

89

• Engineering Design of Aba-Azumini-Ohanbele-Ugwunagbo-Ihie Expressway in Abia State. (FMW – 2005) – N49m. (In Collaboration withClem-George Nig. Ltd.)

• Engineering design of Gumel-Maigatari Road in Jigawa State. (FMW – 2005) – N21m. (In Collaboration withCLS Ltd.)

• Design of Ila-Ashi-Oyan-Konta Road in Osun State for Osun State Government (1999). (In Collaboration withProfen Consultancy Inc.)

• Design of Ila-Ajaba-Imesi-Ile junction Road in Osun State for Osun State Government. (In Collaboration withProfen Consultancy Inc.)

• Design, production of drawings and contract documents for Langtang-Lalin-Tunkus-Shendam road in Plateau state. Construction supervision of Langtang-Lalin-Tunkus-Shendam road in Plateau state. (FMW). (In Collaboration withPentagon Engineering Consultants Ltd.)

(B) Bridges • Design of 7 No. Multispan bridges along the 62km Ashige – Alawagana – Gidan Buba – Fadama Bauna –

Arikya – Wamba Road in Nasarawa State, (NSMW&T – 2010) – N50m. • Design of 8 No. Multispan bridges along Lafia-Doma-Rutu-Bassa-Rafin Gabas-Nasarawa-Orozo Road in

Nasarawa State. (NSMW&T – 2009) – N70m

• Design of 4-15m long Bridge at Ch.80+300 along Nasarawa -Toto-Abaji Road in Nasarawa State. (FMW – 2006)

• Design of 2 No. Bridges along Akungba–Ikare–Omuo-Ekiti Road in Ondo State. (FMW – 2006) • Design of 800m long Post-Tension Prestressed Concrete Box Girder Bridge over River Niger at Nupeko along

Bida-Sacci-Nupeko Road in Niger/Kogi State. (FMW – 2002). (In Collaboration withPentagon Engineering Consultants Ltd.)

• Design of 100m long Bridge over River Mabolo along Ankpa Onyegade Road in Ankpa, Kogi State. (FMW). (In Collaboration withPentagon Engineering Consultants Ltd.)

• Design of 5 No. bridges along Langtang-Lalin-Tunkins-Shedam Road in Plateau State. (FMW – 2001). (In Collaboration withPentagon Engineering Consultants Ltd.)

(C) Structures

• Structural Integrity Assessment of Proposed Skye Bank Plc., Karu Branch, Abuja • Structural Integrity Assessment of Skye Bank Plc., Jalingo Branch • Structural Integrity Assessment of Skye Bank Plc., Life Camp Branch, Abuja • Engineering Design and Supervision of Retaining Wall and River Channelization at the Collapsed Fence of

Skye Bank Plc., Karu Branch, AbujaConsultancy Services for Design of a Modern Befitting, Functional and Cost Effective State Office Complex to Accommodate About 150 Staff Strength in Ondo State. (Min. of Niger Delta Affairs – 2009) – N63m

• Design of 4-storey Administrative building for Ladoke Akintola University of Technology, Ogbomoso, (LAUTECH – 2004).

• Design of 4-Bedroom duplex for Kambal Ltd in Abuja • Design of many residential buildings. • Design of 4-storey office complex for Idea Consult, Ibadan • Design of 5000 capacity Church building for Christ Life Church Apata,Ibadan • Design and construction supervision of steel hoist for Procter and Gambles Nig. Ltd Ibadan. (In Collaboration

withPentagon Engineering Consultants Ltd.) • Design and Construction supervision of Abeni House – An ultramodern Office/Hall Complex at Oluyole

Estate, Ibadan. (In Collaboration withPentagon Engineering Consultants Ltd.) • Design and construction supervision of Ondo State University Christian Union Chapel, Ado-Ekiti.

(D) Gis & Mapping • Revision and Upgrading of Highways Maintenance Manual. (FMWH&UD – 2010) – N9.5m

Corporate Profile Sanol Engineering Consultants Ltd.

* Consulting Engineers * Development Consultants * Project Managers

90

• Retainership contract for GIS mapping & IT Consultancy services (FERMA – 2008), (N8m). • Retainership contract for GIS mapping & IT Consultancy services (FERMA – 2007), (N5.2m). • Production of Federal Road Maps of Nigeria showing FERMA 4–year intervention programme. (2008 –

2011), (N3m). • Study for the Development of Traffic Park. (FERMA – 2008), (N7.6m). • Development of Federal Road Map of Nigeria showing Bond Funding and Printing of Federal Road Map of

Nigeria depicting FERMA’s operations. (FERMA – 2008), (N5m). • Development of Federal Road Map of Nigeria showing Earth Roads, Performance Based Maintenance

Management Roads and Projects Schedule for Systematic Pavement Strengthening and Enhancement in 2008 Fiscal Year. (FERMA – 2008), (N2m).

• Development of Federal Road Map of Nigeria showing Observation and Service Camps Locations. (FERMA – 2008), (N1m).

• Building a Due Diligence Micro Site for FERMA (2008 – N2.9m)

Responsibilities: • Assist the Employer in the evaluation of Contractor’s claims • Verify and certify Contractor’s Interim Certificates for approval by the Client • Monitors Physical and financial progress of the works • Feasibility Study, Traffic Study, Pavement Evaluation, Preliminary Design, Geometric Design, Pavement

Design, Condition Survey of Road Facilities and Safety 1990 to 1995 Tobi (Nig.) Ltd.) Project Engineer

• Supervision of Emergency Repairs of several highways projects:

• Gusau-Kaura Namoda-Sabon Birni road, Sokoto state.

• Kano state border-KafinKaniya-Jahun road, Jigawa state.

• Kano-Kwana Huguma road, Kano state

• Supervision of Routine maintenance of Kano state border Funtua-Funtua-Yankara-Sokoto state boundary road Kastina state (World Bank Assisted).

Responsibilities: • Review of Contractor’s insurance, securities and safety plans • Ensure works are as per laid down specification • Ensure adequacy and timeliness of plant, equipment, machinery and manpower deployed by the Contractor to

execute the work • Ensure maintenance of safety standards during construction works • Supervision, scrutiny and approval of the final setting out by the Contractor • Site supervision • Maintain working drawings/construction records • Recording measurement of works • Verification of sub-station works • Preparation of recording documentation • Regular inspections and ensuring quality of workmanship • Progress monitoring • Final inspection of works • Compilation and verification of final drawings • Verification of Contractor’s statements statement at completion.

1996 to 1997 Pentagon Engineering Consultants Project Engineer

• Design and Supervision of Rehabilitation of Ibadan-Akanran Ogun state boundary road (Oyo state Multi-state road project II.

Responsibilities:

Corporate Profile Sanol Engineering Consultants Ltd.

* Consulting Engineers * Development Consultants * Project Managers

91

• Review of Contractor’s insurance, securities and safety plans • Ensure works are as per laid down specification • Maintain working drawings/construction records • Recording measurement of works • Verification of sub-station works • Preparation of recording documentation • Regular inspections and ensuring quality of workmanship • Progress monitoring • Final inspection of works • Compilation and verification of final drawings • Verification of Contractor’s statements statement at completion.

1990 to 2000 Kilam Associates Ltd. Principal Resident Engineer • Supervision of Rehabilitation of Tewure-Gambari-Iwofin-Iresaadu-Owode road (Oyo state Multi state road

project II)

• Design and Supervision of Rehabilitation of Ibadan – Akaran Ogun State Boundary road (Oyo state Multi-state road project II

• Gusau – Kaura Namoda-Sabon Birni road, Sokoto state.

• Kano state border – KafinKaniya – Jahun road, Jigawa state.

• Kano Kwana huguma road, Kano state.

• Supervisor of Routine maintenance of Kano state border Funtua – Yankara – Sokoto state boundary road, Kastina state (Word Bank Assisted)

Responsibilities: • Review of Contractor’s insurance, securities and safety plans • Ensure works are as per laid down specification • Ensure adequacy and timeliness of plant, equipment, machinery and manpower deployed by the Contractor to

execute the work • Ensure maintenance of safety standards during construction works • Supervision, scrutiny and approval of the final setting out by the Contractor • Site supervision • Maintain working drawings/construction records • Recording measurement of works • Verification of sub-station works • Preparation of recording documentation • Regular inspections and ensuring quality of workmanship • Progress monitoring • Final inspection of works • Compilation and verification of final drawings • Verification of Contractor’s statements statement at completion.

1987 to 1988 Anambra State University of Technology, Enugu Technical Officer

• Construction Supervision of the University ceremonial ground

Responsibilities: • Site supervision • Maintain working drawings/construction records • Recording measurement of works • Verification of sub-station works • Preparation of recording documentation

Publications: § N/A

Corporate Profile Sanol Engineering Consultants Ltd.

* Consulting Engineers * Development Consultants * Project Managers

92

Languages Speaking Reading Writing English Excellent Excellent Excellent Yoruba Excellent Excellent Excellent

Corporate Profile Sanol Engineering Consultants Ltd.

* Consulting Engineers * Development Consultants * Project Managers

93

Name of Firm : Sanol Engineering Consultants Ltd.

Name of Staff Member : Eke, Ogbonna Chimaeze

Position : Principal Engineer

Date of Birth : 17th June, 1976

Nationality : Nigerian

Yearsof Experience : 13 Years

Membership of Professional Societies • Member, Nigerian Society of Engineers (M.N.S.E.) • Member, Council for the Regulation of Engineering in Nigeria (COREN).

Detailed Tasks Assigned: • Supervision of works; All concreting works to be done in his or the field engineers presence only • Keep proper record of all Contractor’s activities and work progress • Ensure that the respective contractors are properly administered • Assist the team leader with the review of the Contractor’s work programme and scheme for the deployment of

plant, equipment and machinery • Strictly monitor the progress of work for timely completion of the project • Supervision, scrutiny of the contractor • Assisting the Team leader with updating drawings, setting up quantity and quality control procedures and

review of contractors’ method of construction • Monitoring contractors’ operations including adherence to safety and environment requirements • Assisting the team leader with the preparation of variation orders • Maintaining a record set of working drawings • Maintaining construction records • Assisting the ER for recording measurement of completed works • Assisting the team leader with the evaluation of contractors’ claims • Quality control of works; verification of Bus-Bar stringing, , inspection of works, acceptance and rejection of

the completed works • Verification of Contractors’ monthly estimates of the completed works and assisting the team leader in the

preparation of Interim Certificates • Progress monitoring • Conducting and keeping records of minutes of the monthly site meetings • Preparing monthly progress reports • Final inspection of works • Verification of contractors statements at completion • Compilation and verification of drawings and • Preparation of contract completion reports.

Key Qualifications Engineer Eke, Ogbonna Chimaeze holds a Degree in Civil Engineering with 13 years of experience. This entire experience has been in the Design of residential buildings, Supervision of the construction of buildings, Design of reinforced concrete bridges and Preparation of BOQ/BEME.

He has had extensive experience of engineering project managements.

He is of sound health and mind

Education: • B.Eng. (Civil Engineering) (2000)

Corporate Profile Sanol Engineering Consultants Ltd.

* Consulting Engineers * Development Consultants * Project Managers

94

Employment Record:

1999 Till Date Sanol Engineering Consultants Ltd. Principal Engineer

(Highways/Structures) (A) Highways

• Engineering Design for the Construction of Bridge at Onuebonyi – Ishinwo Ukawu – Onicha L.G.A. Ebonyi State. (FMW – 2014) – N58.90m

• Technical Proposal for the engineering design of Yebu-Kuje Road (FMW – 2014) – N28.90m • Engineering Design for the Rehabilitation of Abayi-Ogbuligba-Umuojima-Ogbu Road with spur at Umuagba

(FMW – 2014) – N25.40m • Consultancy Services for the Engineering Design of the Siluko-Iguobazuwa-Okada-Ogbese Road in Edo State.

(FMW – 2013) – N52.8mConsultancy Services for Detailed Engineering Design Safeguards Studies and Preparation of Bidding Documents for Prioritized 222.83KM. Rural Roads in Osun State of Nigeria. (FPMU – 2012) – N42.7m & $187.3

• Consultancy Services for the Engineering Design of the Siluko-Iguobazuwa-Okada-Ogbese Road in Edo State. (FMW – 2013) – N52.8m Consultancy Services for Detailed Engineering Design Safeguards Studies and Preparation of Bidding Documents for Prioritized 222.83KM. Rural Roads in Osun State of Nigeria. (FPMU – 2012) – N42.7m & $187.3

• Consultancy Services for Detailed Engineering Design Safeguards Studies and Preparation of Bidding Documents for Prioritized 222.83KM. Rural Roads in Osun State of Nigeria. (FPMU – 2012) – N42.7m & $187.3

• The Consultancy Services For The Survey & Design of Machina to Kanamma Route in Yobe State (YSMW – 2010) – N210.5m.

• Consultancy Services For The Engineering Design Of The 62km Ashige – Alawagana – Gidan Buba – Fadama Bauna – Arikya – Wamba Road in Nasarawa State, (NSMW&T – 2010) – N50m.

• Consultancy Engineering Supervision for the Rehabilitation ofOba-Nnewi Road (Section 1) In Anambra State, (FMWH&UD – 2010) – N40.15m.

• Consultancy Services For The Engineering Design Of Enugu-Nara-Isu-Onicha-Okposi-Amasiri-Oso-Owuta-Ohafia Junction in Abia State, (FMW – 2010) – N39.35m.

• Independent Project Monitoring Consultancy Services to Edo State Government. (ESG – 2010). • Consultancy Services on the Engineering Design of Gombe-Wuyo (Borno State Border) Road in Gombe State,

(FMWH&UD – 2010) – N22.22m. • Consultancy Services for Rapid Study and Preparation of Bidding Documents for Output and Performance

Based Road Contract – OPRC for Abuja to Keffi Road. (FERMA – 2009) – N7.1m • Consultancy Services on the Engineering Design of Lafia-Doma-Rutu-Bassa-Rafin Gabas-Nasarawa-Orozo

Road in Nasarawa State. (NSMW&T – 2009) – N70m • Consultancy Services on the Engineering Design of the Dualisation of Lafia – AkurbaRoad in Nasarawa State.

(NSMW&T – 2009) – N10m

(B) Bridges • Design of 7 No. Multispan bridges along the 62km Ashige – Alawagana – Gidan Buba – Fadama Bauna –

Arikya – Wamba Road in Nasarawa State, (NSMW&T – 2010) – N50m. • Design of 8 No. Multispan bridges along Lafia-Doma-Rutu-Bassa-Rafin Gabas-Nasarawa-Orozo Road in

Nasarawa State. (NSMW&T – 2009) – N70m

(C) Structures

• Structural Integrity Assessment of Proposed Skye Bank Plc., Karu Branch, Abuja • Structural Integrity Assessment of Skye Bank Plc., Jalingo Branch • Structural Integrity Assessment of Skye Bank Plc., Life Camp Branch, Abuja • Engineering Design and Supervision of Retaining Wall and River Channelization at the Collapsed Fence of

Skye Bank Plc., Karu Branch, AbujaConsultancy Services for Design of a Modern Befitting, Functional and

Corporate Profile Sanol Engineering Consultants Ltd.

* Consulting Engineers * Development Consultants * Project Managers

95

Cost Effective State Office Complex to Accommodate About 150 Staff Strength in Ondo State. (Min. of Niger Delta Affairs – 2009) – N63m

(D) Gis & Mapping • Revision and Upgrading of Highways Maintenance Manual. (FMWH&UD – 2010) – N9.5m

Responsibilities:

• Review of Contractor’s insurance, securities and safety plans • Ensure works are as per laid down specification • Ensure adequacy and timeliness of plant, equipment, machinery and manpower deployed by the Contractor to

execute the work • Ensure maintenance of safety standards during construction works • Supervision, scrutiny and approval of the final setting out by the Contractor • Site supervision • Maintain working drawings/construction records • Recording measurement of works • Verification of sub-station works • Preparation of recording documentation • Regular inspections and ensuring quality of workmanship • Progress monitoring • Final inspection of works • Compilation and verification of final drawings • Verification of Contractor’s statements statement at completion.

2009 Cypress Konsult Ltd. Project Manager

• Supervision of Outer Ring Road in Imo State. This comprises of the following roads: • Mbieri T-junction-Orji-Uratta-Egbu-Naze Road (19.125km); • Iho-Ogwa-Amauzari-Amaigbo Road and Bridge (17.3km); • Ukwuorji-Nwaorieubi-Atta Junction-Afor Ogbe-Afor Oru Road (43km) • Ahiara junction-Okpala junction 924km) • Dredging of Nwaorie River 97.2km) and Construction of Approach Roads and Bridges.

Responsibilities: • Review of Contractor’s insurance, securities and safety plans • Ensure works are as per laid down specification • Ensure adequacy and timeliness of plant, equipment, machinery and manpower deployed by the Contractor to

execute the work • Ensure maintenance of safety standards during construction works • Supervision, scrutiny and approval of the final setting out by the Contractor • Site supervision • Maintain working drawings/construction records • Recording measurement of works • Verification of sub-station works • Preparation of recording documentation • Regular inspections and ensuring quality of workmanship • Progress monitoring • Final inspection of works • Compilation and verification of final drawings • Verification of Contractor’s statements statement at completion.

2006 to 2009 Timwork Engineering Ltd Principal Resident Engineer

• Design of residential buildings

Corporate Profile Sanol Engineering Consultants Ltd.

* Consulting Engineers * Development Consultants * Project Managers

96

• Supervision of the construction of buildings • Roads condition survey • Design of reinforced concrete bridges • Supervision of the construction of a 400 miters reinforced concrete bridge and its approach roads • Preparation of BOQ/BEME • Engineering design of Katabu-Pambegui-Saminaka Road in Kaduna State • Preparation of monthly progress reports. • Design and supervision of female hostel in University of Abuja permanent site • Design and supervision of laboratory and workshop buildings in Federal University of Technology Minna. • Reconfiguration and supervision of Shehu Shagari Presidential Complex, Abuja. • Design and supervision of WAEC Office Complex, Sokoto. • Design of Nnamdi Azikiwe • University Teaching Hospital Building Nnewi

Responsibilities: • Review of Contractor’s insurance, securities and safety plans • Ensure works are as per laid down specification • Ensure adequacy and timeliness of plant, equipment, machinery and manpower deployed by the Contractor to

execute the work • Ensure maintenance of safety standards during construction works • Supervision, scrutiny and approval of the final setting out by the Contractor • Site supervision • Maintain working drawings/construction records • Recording measurement of works • Verification of sub-station works • Preparation of recording documentation • Regular inspections and ensuring quality of workmanship • Progress monitoring • Final inspection of works • Compilation and verification of final drawings • Verification of Contractor’s statements statement at completion.

2004 to 2006 Ladiom Associates Senior Engineer

• Supervision of the construction of a 4000 unit housing estate with roads, water, and waste water infrastructures

• Structural design of shopping mall; design of a 2 story residential building

Responsibilities: • Review of Contractor’s insurance, securities and safety plans • Ensure works are as per laid down specification • Ensure adequacy and timeliness of plant, equipment, machinery and manpower deployed by the Contractor to

execute the work • Ensure maintenance of safety standards during construction works • Supervision, scrutiny and approval of the final setting out by the Contractor • Site supervision • Maintain working drawings/construction records • Recording measurement of works • Verification of sub-station works • Preparation of recording documentation • Regular inspections and ensuring quality of workmanship • Progress monitoring • Final inspection of works • Compilation and verification of final drawings • Verification of Contractor’s statements statement at completion.

Corporate Profile Sanol Engineering Consultants Ltd.

* Consulting Engineers * Development Consultants * Project Managers

97

2002 to 2004 Ette Aro & Partners Resident Engineer

• Design and supervision of a 3-story building with helped for Globacom at Adeola Odeku Street, Victoria Island

• Supervision of a 10-story residential building at Glover Road, Ikoyi for Cadwell properties Ltd. • Development of the Niger Delta Regional Master Plan of Imo State for NDDC.

Responsibilities: • Review of Contractor’s insurance, securities and safety plans • Ensure works are as per laid down specification • Ensure adequacy and timeliness of plant, equipment, machinery and manpower deployed by the Contractor to

execute the work • Ensure maintenance of safety standards during construction works • Supervision, scrutiny and approval of the final setting out by the Contractor • Site supervision • Maintain working drawings/construction records • Recording measurement of works • Verification of sub-station works • Preparation of recording documentation • Regular inspections and ensuring quality of workmanship • Progress monitoring • Final inspection of works • Compilation and verification of final drawings • Verification of Contractor’s statements statement at completion.

2001 to 2002 Nigerian Petroleum Development Company Ltd Site Engineer

• Renovation of banking hall • Renovation of Ologbo flow state campsite • Preparation of BOQ/BEME • Supervision of the construction of covered walkways in the office premises.

Responsibilities: • Review of Contractor’s insurance, securities and safety plans • Ensure works are as per laid down specification • Maintain working drawings/construction records • Recording measurement of works • Verification of sub-station works • Preparation of recording documentation • Regular inspections and ensuring quality of workmanship • Progress monitoring • Final inspection of works • Compilation and verification of final drawings • Verification of Contractor’s statements statement at completion.

Publications: § N/A

Languages Speaking Reading Writing English Excellent Excellent Excellent Igbo Excellent Excellent Excellent Yoruba Excellent Excellent Excellent

Corporate Profile Sanol Engineering Consultants Ltd.

* Consulting Engineers * Development Consultants * Project Managers

98

Name of Firm : Sanol Engineering Consultants Ltd.

Name of Staff Member : Alhassan E. Christian

Position : Surveyor

Date of Birth : 24th May 1972

Nationality : Nigerian

Yearsof Experience : 17 Years

Membership of Professional Societies • Member, Nigerian Institution of Surveyors • Registered, Surveyors Council of Nigeria

Detailed Tasks Assigned: • Establishment of site offices • Assist the employer in the interpretation of provision in the Contract documents and technical specifications • Scrutinize the provision of purchase order so as to ensure quality of materials and scheme for the deployment

of Engineer for inspection of materials of laboratory testing for the approval of the ER • Modify and issue detailed drawings to the Client • Regular supervision of works • Evolve and implement quantity and quality control procedures • Prepares quarterly project budgets and estimates • Conducts monthly progress meetings • Completes monthly progress reports • Strictly ,monitors the progress of work for timely completion of the work project • Completion inspections • Verify and certify contractor’s statements at completion • Time schedule and management of team’s resources • Advising the Employer in all matters related to the progress of works, with particular reference to delays,

possible reasons and mitigating measures

Key Qualifications Alhassan E. Christian holds a Post Graduate Degree in Civil Engineering with 17 years of experience. This entire experience has been in Engineering Surveying, Building Construction Supervision, Route Survey (Longitudinal/Cross Sectional Surveys), Topographical Survey and Cadastral Survey among others.Route, Topographical and Cadastral Survey of Road and Building Projects

He has had extensive experience of engineering project managements.

He is of sound health and mind

Education:

• P.GD. Land Surveying (2010)

• HND Land Surveying (2001)

• ND Land Surveying (1997)

Employment Record:

2006 Till Date Sanol Engineering Consultants Ltd. Surveyor

(A) Highways

• Engineering Design for the Construction of Bridge at Onuebonyi – Ishinwo Ukawu – Onicha L.G.A. Ebonyi State. (FMW – 2014) – N58.90m

• Technical Proposal for the engineering design of Yebu-Kuje Road (FMW – 2014) – N28.90m

Corporate Profile Sanol Engineering Consultants Ltd.

* Consulting Engineers * Development Consultants * Project Managers

99

• Engineering Design for the Rehabilitation of Abayi-Ogbuligba-Umuojima-Ogbu Road with spur at Umuagba (FMW – 2014) – N25.40m

• Consultancy Services for the Engineering Design of the Siluko-Iguobazuwa-Okada-Ogbese Road in Edo State. (FMW – 2013) – N52.8mConsultancy Services for Detailed Engineering Design Safeguards Studies and Preparation of Bidding Documents for Prioritized 222.83KM. Rural Roads in Osun State of Nigeria. (FPMU – 2012) – N42.7m & $187.3

• Consultancy Services for the Engineering Design of the Siluko-Iguobazuwa-Okada-Ogbese Road in Edo State. (FMW – 2013) – N52.8m Consultancy Services for Detailed Engineering Design Safeguards Studies and Preparation of Bidding Documents for Prioritized 222.83KM. Rural Roads in Osun State of Nigeria. (FPMU – 2012) – N42.7m & $187.3

• Consultancy Services for Detailed Engineering Design Safeguards Studies and Preparation of Bidding Documents for Prioritized 222.83KM. Rural Roads in Osun State of Nigeria. (FPMU – 2012) – N42.7m & $187.3

• The Consultancy Services For The Survey & Design of Machina to Kanamma Route in Yobe State (YSMW – 2010) – N210.5m.

• Consultancy Services For The Engineering Design Of The 62km Ashige – Alawagana – Gidan Buba – Fadama Bauna – Arikya – Wamba Road in Nasarawa State, (NSMW&T – 2010) – N50m.

• Consultancy Engineering Supervision for the Rehabilitation ofOba-Nnewi Road (Section 1) In Anambra State, (FMWH&UD – 2010) – N40.15m.

• Consultancy Services For The Engineering Design Of Enugu-Nara-Isu-Onicha-Okposi-Amasiri-Oso-Owuta-Ohafia Junction in Abia State, (FMW – 2010) – N39.35m.

• Independent Project Monitoring Consultancy Services to Edo State Government. (ESG – 2010). • Consultancy Services on the Engineering Design of Gombe-Wuyo (Borno State Border) Road in Gombe State,

(FMWH&UD – 2010) – N22.22m. • Consultancy Services for Rapid Study and Preparation of Bidding Documents for Output and Performance

Based Road Contract – OPRC for Abuja to Keffi Road. (FERMA – 2009) – N7.1m • Consultancy Services on the Engineering Design of Lafia-Doma-Rutu-Bassa-Rafin Gabas-Nasarawa-Orozo

Road in Nasarawa State. (NSMW&T – 2009) – N70m • Consultancy Services on the Engineering Design of the Dualisation of Lafia – AkurbaRoad in Nasarawa State.

(NSMW&T – 2009) – N10m • Engineering Design and Construction Supervision of Taraku-Aondona-Naka-Agagbe-Abiam-Agatu Road in

Benue State. (BSMWH&T – 2008) – N59.6m • Consultancy Services and Construction Supervision of all Federal Roads in Nasarawa State. (FERMA – 2008)

– N5.4m • Engineering Design of Nasarawa-Toto-Abaji Road in Nasarawa State. (FMW – 2006) – N49.79m. • Construction Supervision of Nasarawa-Toto-Abaji Road in Nasarawa State. (FMW – 2006) – N75m. • Engineering Design of Uba-Askira-Mbalala Road in Borno State. (FMW – 2006) – N28m • Engineering Design of Akungba–Ikare–Omuo Road with 2 No. Bridges in Ondo State. (FMW – 2006) –

N22m • Engineering Design for the Limited Rehabilitation of Ado-Ekiti-Aramoko-Ijaro-Afon Alaaye Road in Ekiti State.

(FMW – 2007) – N16m. • Route Condition Survey and Road Safety Audit for Selected (9 Border) Roads towards the implementation of

the international vehicle transit charge. (FERMA – 2006) – N6m • Design and Construction Supervision of the Limited Rehabilitation of Onitsha End–Onitsha–Enugu Road in

Anambra State. (FMW – 2006) – N4m

(B) Bridges • Design of 7 No. Multispan bridges along the 62km Ashige – Alawagana – Gidan Buba – Fadama Bauna –

Arikya – Wamba Road in Nasarawa State, (NSMW&T – 2010) – N50m. • Design of 8 No. Multispan bridges along Lafia-Doma-Rutu-Bassa-Rafin Gabas-Nasarawa-Orozo Road in

Nasarawa State. (NSMW&T – 2009) – N70m

Corporate Profile Sanol Engineering Consultants Ltd.

* Consulting Engineers * Development Consultants * Project Managers

100

• Design of 8 No. Multispan bridges along Lafia-Doma-Rutu-Bassa-Rafin Gabas-Nasarawa-Orozo Road in Nasarawa State. (NSMW&T – 2009) – N70m

• Design of 4-15m long Bridge at Ch.80+300 along Nasarawa -Toto-Abaji Road in Nasarawa State. (FMW – 2006)

• Design of 2 No. Bridges along Akungba–Ikare–Omuo-Ekiti Road in Ondo State. (FMW – 2006)

(C) Structures

• Structural Integrity Assessment of Proposed Skye Bank Plc., Karu Branch, Abuja • Structural Integrity Assessment of Skye Bank Plc., Jalingo Branch • Structural Integrity Assessment of Skye Bank Plc., Life Camp Branch, Abuja • Engineering Design and Supervision of Retaining Wall and River Channelization at the Collapsed Fence of

Skye Bank Plc., Karu Branch, AbujaConsultancy Services for Design of a Modern Befitting, Functional and Cost Effective State Office Complex to Accommodate About 150 Staff Strength in Ondo State. (Min. of Niger Delta Affairs – 2009) – N63m

(D) Gis & Mapping • Revision and Upgrading of Highways Maintenance Manual. (FMWH&UD – 2010) – N9.5m • Retainership contract for GIS mapping & IT Consultancy services (FERMA – 2008), (N8m). • Retainership contract for GIS mapping & IT Consultancy services (FERMA – 2007), (N5.2m). • Production of Federal Road Maps of Nigeria showing FERMA 4–year intervention programme. (2008 –

2011), (N3m). • Study for the Development of Traffic Park. (FERMA – 2008), (N7.6m). • Development of Federal Road Map of Nigeria showing Bond Funding and Printing of Federal Road Map of

Nigeria depicting FERMA’s operations. (FERMA – 2008), (N5m). • Development of Federal Road Map of Nigeria showing Earth Roads, Performance Based Maintenance

Management Roads and Projects Schedule for Systematic Pavement Strengthening and Enhancement in 2008 Fiscal Year. (FERMA – 2008), (N2m).

• Development of Federal Road Map of Nigeria showing Observation and Service Camps Locations. (FERMA – 2008), (N1m).

• Building a Due Diligence Micro Site for FERMA (2008 – N2.9m)

Responsibilities: • Review of Contractor’s insurance, securities and safety plans • Ensure works are as per laid down specification • Ensure adequacy and timeliness of plant, equipment, machinery and manpower deployed by the Contractor to

execute the work • Ensure maintenance of safety standards during construction works • Supervision, scrutiny and approval of the final setting out by the Contractor • Site supervision • Maintain working drawings/construction records • Recording measurement of works • Verification of sub-station works • Preparation of recording documentation • Regular inspections and ensuring quality of workmanship • Progress monitoring • Final inspection of works • Compilation and verification of final drawings • Verification of Contractor’s statements statement at completion.

2000 to 2005 Other Firms Site Surveyor

• Perimeter, Topographical Survey and detailing of Jalingo airport. • Perimeter, Topographical Survey, detailing and setting out of Yola Modern market, Yola, Adamawa State.

Corporate Profile Sanol Engineering Consultants Ltd.

* Consulting Engineers * Development Consultants * Project Managers

101

• Perimeter and Topographical Survey of North-East International market, Gombe. • Topographical Survey of Academic Core Area of Federal Polytechnic Bauchi, Bauchi State. • Perimeter/Topographical Survey of Faculty of arts, science and student center of University of Abuja. • Perimeter/Topographical Survey of a residential Kuje master plan, Abuja. • Route Survey (Longitudinal/Cross Sectional) of Jibiya-Kaura-Namoda-Gusau Road – 161km. • Route Survey (Longitudinal/Cross Sectional) of Aba-Ikot Ekpene-Uyo Road – 68km for dualization. • As built Survey and detailing of the Bell University Ota, Ogun State. • Survey to determine the volume of llimestone deposit in Shagamu, Ogun State. (WAPCO). • Route Survey of Hadija-Garin Gabas-Brinuwa-Digimsa-Maigeteri-Babura Route (226km) • Survey of residential layout in Gosa.

Responsibilities: • Review of Contractor’s insurance, securities and safety plans • Ensure works are as per laid down specification • Ensure adequacy and timeliness of plant, equipment, machinery and manpower deployed by the Contractor to

execute the work • Ensure maintenance of safety standards during construction works • Supervision, scrutiny and approval of the final setting out by the Contractor • Site supervision • Maintain working drawings/construction records • Recording measurement of works • Verification of sub-station works • Preparation of recording documentation • Regular inspections and ensuring quality of workmanship • Progress monitoring • Final inspection of works • Compilation and verification of final drawings • Verification of Contractor’s statements statement at completion.

Publications: § N/A

Languages Speaking Reading Writing English Excellent Excellent Excellent Yausa Excellent Excellent Excellent Yoruba Good Good Good

Corporate Profile Sanol Engineering Consultants Ltd.

* Consulting Engineers * Development Consultants * Project Managers

102

Name of Firm : Sanol Engineering Consultants Ltd.

Name of Staff Member : Engr. Ajayi A. Oluwole

Position : Chief Engineer (Mech.)

Date of Birth : 12thApril. 1968

Nationality : Nigerian

Yearsof Experience : 21 Years

Membership of Professional Societies • Member, Nigerian Society of Engineers (M.N.S.E.) • Member, Council for the Regulation of Engineering in Nigeria (COREN).

Detailed Tasks Assigned: • Establishment of site offices • Assist the employer in the interpretation of provision in the Contract documents and technical specifications • Scrutinize the provision of purchase order so as to ensure quality of materials and scheme for the deployment

of Engineer for inspection of materials of laboratory testing for the approval of the ER • Modify and issue detailed drawings to the Client • Regular supervision of works • Evolve and implement quantity and quality control procedures • Prepares quarterly project budgets and estimates • Conducts monthly progress meetings • Completes monthly progress reports • Strictly ,monitors the progress of work for timely completion of the work project • Completion inspections • Verify and certify contractor’s statements at completion • Time schedule and management of team’s resources • Advising the Employer in all matters related to the progress of works, with particular reference to delays,

possible reasons and mitigating measures

Key Qualifications Engineer Ajayi A. Oluwoleholds a Masters Degree in Mechanical Engineering with 21 years of experience. This entire experience has been in Procurement, installation and managing of the daily running of the asphalt plant and other company equipment and contract procurement.

He has had extensive experience inproject Operationmanagements.

He is of sound health and mind

Education: • B.Eng. (Mech. Engineering) (1994) • M.Sc. (Mech. Engineering) (1998)

Employment Record:

2006 Till Date Sanol Engineering Consultants Ltd. General Manager (Plant &

Operation) (A) Highways

• Engineering Design for the Construction of Bridge at Onuebonyi – Ishinwo Ukawu – Onicha L.G.A. Ebonyi State. (FMW – 2014) – N58.90m

• Technical Proposal for the engineering design of Yebu-Kuje Road (FMW – 2014) – N28.90m • Engineering Design for the Rehabilitation of Abayi-Ogbuligba-Umuojima-Ogbu Road with spur at Umuagba

(FMW – 2014) – N25.40m • Consultancy Services for the Engineering Design of the Siluko-Iguobazuwa-Okada-Ogbese Road in Edo State.

(FMW – 2013) – N52.8mConsultancy Services for Detailed Engineering Design Safeguards Studies and

Corporate Profile Sanol Engineering Consultants Ltd.

* Consulting Engineers * Development Consultants * Project Managers

103

Preparation of Bidding Documents for Prioritized 222.83KM. Rural Roads in Osun State of Nigeria. (FPMU – 2012) – N42.7m & $187.3

• Consultancy Services for the Engineering Design of the Siluko-Iguobazuwa-Okada-Ogbese Road in Edo State. (FMW – 2013) – N52.8m Consultancy Services for Detailed Engineering Design Safeguards Studies and Preparation of Bidding Documents for Prioritized 222.83KM. Rural Roads in Osun State of Nigeria. (FPMU – 2012) – N42.7m & $187.3

• Consultancy Services for Detailed Engineering Design Safeguards Studies and Preparation of Bidding Documents for Prioritized 222.83KM. Rural Roads in Osun State of Nigeria. (FPMU – 2012) – N42.7m & $187.3

• The Consultancy Services For The Survey & Design of Machina to Kanamma Route in Yobe State (YSMW – 2010) – N210.5m.

• Consultancy Services For The Engineering Design Of The 62km Ashige – Alawagana – Gidan Buba – Fadama Bauna – Arikya – Wamba Road in Nasarawa State, (NSMW&T – 2010) – N50m.

• Consultancy Engineering Supervision for the Rehabilitation ofOba-Nnewi Road (Section 1) In Anambra State, (FMWH&UD – 2010) – N40.15m.

• Consultancy Services For The Engineering Design Of Enugu-Nara-Isu-Onicha-Okposi-Amasiri-Oso-Owuta-Ohafia Junction in Abia State, (FMW – 2010) – N39.35m.

• Independent Project Monitoring Consultancy Services to Edo State Government. (ESG – 2010). • Consultancy Services on the Engineering Design of Gombe-Wuyo (Borno State Border) Road in Gombe State,

(FMWH&UD – 2010) – N22.22m. • Consultancy Services for Rapid Study and Preparation of Bidding Documents for Output and Performance

Based Road Contract – OPRC for Abuja to Keffi Road. (FERMA – 2009) – N7.1m • Consultancy Services on the Engineering Design of Lafia-Doma-Rutu-Bassa-Rafin Gabas-Nasarawa-Orozo

Road in Nasarawa State. (NSMW&T – 2009) – N70m • Consultancy Services on the Engineering Design of the Dualisation of Lafia – AkurbaRoad in Nasarawa State.

(NSMW&T – 2009) – N10m • Engineering Design and Construction Supervision of Taraku-Aondona-Naka-Agagbe-Abiam-Agatu Road in

Benue State. (BSMWH&T – 2008) – N59.6m • Consultancy Services and Construction Supervision of all Federal Roads in Nasarawa State. (FERMA – 2008)

– N5.4m • Engineering Design of Nasarawa-Toto-Abaji Road in Nasarawa State. (FMW – 2006) – N49.79m. • Construction Supervision of Nasarawa-Toto-Abaji Road in Nasarawa State. (FMW – 2006) – N75m. • Engineering Design of Uba-Askira-Mbalala Road in Borno State. (FMW – 2006) – N28m • Engineering Design of Akungba–Ikare–Omuo Road with 2 No. Bridges in Ondo State. (FMW – 2006) –

N22m • Engineering Design for the Limited Rehabilitation of Ado-Ekiti-Aramoko-Ijaro-Afon Alaaye Road in Ekiti State.

(FMW – 2007) – N16m. • Route Condition Survey and Road Safety Audit for Selected (9 Border) Roads towards the implementation of

the international vehicle transit charge. (FERMA – 2006) – N6m • Design and Construction Supervision of the Limited Rehabilitation of Onitsha End–Onitsha–Enugu Road in

Anambra State. (FMW – 2006) – N4m

(B) Bridges • Design of 7 No. Multispan bridges along the 62km Ashige – Alawagana – Gidan Buba – Fadama Bauna –

Arikya – Wamba Road in Nasarawa State, (NSMW&T – 2010) – N50m. • Design of 8 No. Multispan bridges along Lafia-Doma-Rutu-Bassa-Rafin Gabas-Nasarawa-Orozo Road in

Nasarawa State. (NSMW&T – 2009) – N70m • Design of 8 No. Multispan bridges along Lafia-Doma-Rutu-Bassa-Rafin Gabas-Nasarawa-Orozo Road in

Nasarawa State. (NSMW&T – 2009) – N70m • Design of 4-15m long Bridge at Ch.80+300 along Nasarawa -Toto-Abaji Road in Nasarawa State. (FMW –

2006)

Corporate Profile Sanol Engineering Consultants Ltd.

* Consulting Engineers * Development Consultants * Project Managers

104

• Design of 2 No. Bridges along Akungba–Ikare–Omuo-Ekiti Road in Ondo State. (FMW – 2006)

(C) Structures

• Structural Integrity Assessment of Proposed Skye Bank Plc., Karu Branch, Abuja • Structural Integrity Assessment of Skye Bank Plc., Jalingo Branch • Structural Integrity Assessment of Skye Bank Plc., Life Camp Branch, Abuja • Engineering Design and Supervision of Retaining Wall and River Channelization at the Collapsed Fence of

Skye Bank Plc., Karu Branch, AbujaConsultancy Services for Design of a Modern Befitting, Functional and Cost Effective State Office Complex to Accommodate About 150 Staff Strength in Ondo State. (Min. of Niger Delta Affairs – 2009) – N63m

(D) Gis & Mapping • Revision and Upgrading of Highways Maintenance Manual. (FMWH&UD – 2010) – N9.5m • Retainership contract for GIS mapping & IT Consultancy services (FERMA – 2008), (N8m). • Retainership contract for GIS mapping & IT Consultancy services (FERMA – 2007), (N5.2m). • Production of Federal Road Maps of Nigeria showing FERMA 4–year intervention programme. (2008 –

2011), (N3m). • Study for the Development of Traffic Park. (FERMA – 2008), (N7.6m). • Development of Federal Road Map of Nigeria showing Bond Funding and Printing of Federal Road Map of

Nigeria depicting FERMA’s operations. (FERMA – 2008), (N5m). • Development of Federal Road Map of Nigeria showing Earth Roads, Performance Based Maintenance

Management Roads and Projects Schedule for Systematic Pavement Strengthening and Enhancement in 2008 Fiscal Year. (FERMA – 2008), (N2m).

• Development of Federal Road Map of Nigeria showing Observation and Service Camps Locations. (FERMA – 2008), (N1m).

• Building a Due Diligence Micro Site for FERMA (2008 – N2.9m)

Responsibilities: • Responsible for all mechannical works related to platforms. • Conceptualization of site management, • Material inspection & testing at manufacturer's works, • Preparation of project monitoring scheme, • Preparation of guidelines for execution of supply and installation supervision, • Preparation of guidelines for workers' safety measures for adherence to by the contractor, • Site supervision to countercheck project quality, • Ensuring construction under stipulated and necessary environmental, safety & health norms (EHS), • Appointment of Subcontractor relating the piece of work, • Liaison with statutory authorities for approvals and sanctions, • Erection and commissioning of all electrical equipments and system including Power Transformers, 33/11 kV

Substation, HT & LT Switchgears, System earthing.100 Amperes 11 kV & 33 kV pole mounted air load break switch, 11 kV & 33 kV Cut-out.

2003 to 2007 Min. Of Environment & Solid Minerals., Edo State

Special Assistant To The Honourable Comm. For Environment & Solid Minerals

Responsibilities: • Reports to the Hon. Commissioner on daily activities of the Ministry. • Supervises environmental projects and enforcement of environmental laws • Leases between the Ministry and House Committee on Environment (House of Assembly) on policy

formulation • Approves proposal on behalf of the Hon. Commissioner • Industrial Inspection, Erosion Control and Environmental Consultancy.

Corporate Profile Sanol Engineering Consultants Ltd.

* Consulting Engineers * Development Consultants * Project Managers

105

• Maintenance and installation of Chiller, Air-conditions, Air compressors, ventilation, thermo pac, generator, boiler, heat exchangers, vacuum system and pumps (vacuum pumps and water pumps).

2002 to 2003 Udofe Metal Ind. Limited Contract Staff Responsibilities:

• Installation and repair of hydraulic presses, mould setting, metal fabrication, machine design and reservoir management

• Transport management (Heavy duty Trucks and Buses.

1999 to 2001 Okebho Farm Ind. Ltd., Edo State Senior Engineer Responsibilities:

• Processing of crude palm oil into refine bleached and deodorized palm olein, vegetable fats and palm fatty acid distilled.

• Maintenance and installation of Chiller, Air-conditions, Air compressors, ventilation, thermo Pac, generator, boiler, heat exchangers, vacuum system and pumps (vacuum pumps and water pumps).

• Installation of PABS KX-T61610 Panasonic Electronic Modula Switching System • Installation and maintenance of borehole pumps and water distribution system.

1998 Wacom Nig. Ltd., Edo State Site Engineer Responsibilities:

• Timestudy against due date, project management (water treatment plants). • Pumps installation and water distribution. • Construction of water treatment plant (PTF) project work at Camp 1, Ojo Military Cantonment, Lagos

Publications: § N/A

Languages Speaking Reading Writing English Excellent Excellent Excellent Igbo Excellent Excellent Excellent Yoruba Excellent Excellent Excellent

Corporate Profile Sanol Engineering Consultants Ltd.

* Consulting Engineers * Development Consultants * Project Managers

106

Name of Firm : Sanol Engineering Consultants Ltd.

Name of Staff Member : Efosa Okeaya-Inneh

Position : Design Engineer

Date of Birth : 26th April, 1982

Nationality : Nigerian

Yearsof Experience : 7 Years

Membership of Professional Societies • Student Member, Nigerian Society of Engineers • Student Member, Council for the Regulation of Engineering in Nigeria.

Detailed Tasks Assigned: • Road Design • Traffic Studies • Geometric Design • Highway Planning • Modify and issue detailed drawings to the Client • Strictly ,monitors the progress of work for timely completion of the work project • Completion inspections • Time schedule and management of team’s resources

Key Qualifications Efosa Okeaya-Inneh, holds a Degree in Civil Engineering with 7 years of experience. His experience has been in the design,production of drawings and construction supervision of several highway projects in Nigeria and the designs of residential buildings and road projects. He has had extensive experience of engineering designs and CAD drawings. He is of sound health and mind

Education:

• Ambrose Ali University, Ekpoma. B.Eng. (Civil Engineering). (2006)

Employment Record: 1999 Till Date Sanol Engineering Consultants Ltd. AutoCad Operator

(A) Highways

Detailer and Autocad specialist in the following projects: • Engineering Design for the Construction of Bridge at Onuebonyi – Ishinwo Ukawu – Onicha L.G.A. Ebonyi

State. (FMW – 2014) – N58.90m • Technical Proposal for the engineering design of Yebu-Kuje Road (FMW – 2014) – N28.90m • Engineering Design for the Rehabilitation of Abayi-Ogbuligba-Umuojima-Ogbu Road with spur at Umuagba

(FMW – 2014) – N25.40m • Consultancy Services for the Engineering Design of the Siluko-Iguobazuwa-Okada-Ogbese Road in Edo State.

(FMW – 2013) – N52.8mConsultancy Services for Detailed Engineering Design Safeguards Studies and Preparation of Bidding Documents for Prioritized 222.83KM. Rural Roads in Osun State of Nigeria. (FPMU – 2012) – N42.7m & $187.3

• Consultancy Services for the Engineering Design of the Siluko-Iguobazuwa-Okada-Ogbese Road in Edo State. (FMW – 2013) – N52.8m Consultancy Services for Detailed Engineering Design Safeguards Studies and

Corporate Profile Sanol Engineering Consultants Ltd.

* Consulting Engineers * Development Consultants * Project Managers

107

Preparation of Bidding Documents for Prioritized 222.83KM. Rural Roads in Osun State of Nigeria. (FPMU – 2012) – N42.7m & $187.3

• Consultancy Services for Detailed Engineering Design Safeguards Studies and Preparation of Bidding Documents for Prioritized 222.83KM. Rural Roads in Osun State of Nigeria. (FPMU – 2012) – N42.7m & $187.3

• The Consultancy Services For The Survey & Design of Machina to Kanamma Route in Yobe State (YSMW – 2010) – N210.5m.

• Consultancy Services For The Engineering Design Of The 62km Ashige – Alawagana – Gidan Buba – Fadama Bauna – Arikya – Wamba Road in Nasarawa State, (NSMW&T – 2010) – N50m.

• Consultancy Engineering Supervision for the Rehabilitation ofOba-Nnewi Road (Section 1) In Anambra State, (FMWH&UD – 2010) – N40.15m.

• Consultancy Services For The Engineering Design Of Enugu-Nara-Isu-Onicha-Okposi-Amasiri-Oso-Owuta-Ohafia Junction in Abia State, (FMW – 2010) – N39.35m.

• Independent Project Monitoring Consultancy Services to Edo State Government. (ESG – 2010). • Consultancy Services on the Engineering Design of Gombe-Wuyo (Borno State Border) Road in Gombe

State, (FMWH&UD – 2010) – N22.22m. • Consultancy Services for Rapid Study and Preparation of Bidding Documents for Output and Performance

Based Road Contract – OPRC for Abuja to Keffi Road. (FERMA – 2009) – N7.1m • Consultancy Services on the Engineering Design of Lafia-Doma-Rutu-Bassa-Rafin Gabas-Nasarawa-Orozo

Road in Nasarawa State. (NSMW&T – 2009) – N70m • Consultancy Services on the Engineering Design of the Dualisation of Lafia – AkurbaRoad in Nasarawa

State. (NSMW&T – 2009) – N10m • Engineering Design and Construction Supervision of Taraku-Aondona-Naka-Agagbe-Abiam-Agatu Road in

Benue State. (BSMWH&T – 2008) – N59.6m • Consultancy Services and Construction Supervision of all Federal Roads in Nasarawa State. (FERMA – 2008)

– N5.4m

(B) Bridges • Design of 7 No. Multispan bridges along the 62km Ashige – Alawagana – Gidan Buba – Fadama Bauna –

Arikya – Wamba Road in Nasarawa State, (NSMW&T – 2010) – N50m. • Design of 8 No. Multispan bridges along Lafia-Doma-Rutu-Bassa-Rafin Gabas-Nasarawa-Orozo Road in

Nasarawa State. (NSMW&T – 2009) – N70m

• Design of 4-15m long Bridge at Ch.80+300 along Nasarawa -Toto-Abaji Road in Nasarawa State. (FMW – 2006)

(C) Structures

• Structural Integrity Assessment of Proposed Skye Bank Plc., Karu Branch, Abuja • Structural Integrity Assessment of Skye Bank Plc., Jalingo Branch • Structural Integrity Assessment of Skye Bank Plc., Life Camp Branch, Abuja • Engineering Design and Supervision of Retaining Wall and River Channelization at the Collapsed Fence of

Skye Bank Plc., Karu Branch, AbujaConsultancy Services for Design of a Modern Befitting, Functional and Cost Effective State Office Complex to Accommodate About 150 Staff Strength in Ondo State. (Min. of Niger Delta Affairs – 2009) – N63m

(D) Gis & Mapping • Revision and Upgrading of Highways Maintenance Manual. (FMWH&UD – 2010) – N9.5m • Retainership contract for GIS mapping & IT Consultancy services (FERMA – 2008), (N8m). • Retainership contract for GIS mapping & IT Consultancy services (FERMA – 2007), (N5.2m). • Production of Federal Road Maps of Nigeria showing FERMA 4–year intervention programme. (2008 –

2011), (N3m).

Corporate Profile Sanol Engineering Consultants Ltd.

* Consulting Engineers * Development Consultants * Project Managers

108

• Study for the Development of Traffic Park. (FERMA – 2008), (N7.6m). • Development of Federal Road Map of Nigeria showing Bond Funding and Printing of Federal Road Map of

Nigeria depicting FERMA’s operations. (FERMA – 2008), (N5m). • Development of Federal Road Map of Nigeria showing Earth Roads, Performance Based Maintenance

Management Roads and Projects Schedule for Systematic Pavement Strengthening and Enhancement in 2008 Fiscal Year. (FERMA – 2008), (N2m).

• Development of Federal Road Map of Nigeria showing Observation and Service Camps Locations. (FERMA – 2008), (N1m).

• Building a Due Diligence Micro Site for FERMA (2008 – N2.9m)

Responsibilities: • Preliminary Design, • Geometric Design, • Pavement Design • Geometric Design • Pavement Evaluation, • Topographical Survey, • Hydrological Study of Water, • Road and Bridge Design and • Construction Supervision of the Project

1990 to 1995 Newtec Dev. Company Engineers, Surveyors And Architects Design Engineer

• Design/Supervision of Consultancy jobs to NDDC.

Responsibilities: • Review of Contractor’s insurance, securities and safety plans • Ensure works are as per laid down specification • Ensure adequacy and timeliness of plant, equipment, machinery and manpower deployed by the Contractor to

execute the work • Ensure maintenance of safety standards during construction works • Supervision, scrutiny and approval of the final setting out by the Contractor • Site supervision • Maintain working drawings/construction records • Recording measurement of works • Verification of sub-station works • Preparation of recording documentation • Regular inspections and ensuring quality of workmanship • Progress monitoring • Final inspection of works • Compilation and verification of final drawings

Publications: § N/A

Languages Speaking Reading Writing English Excellent Excellent Excellent Yoruba Excellent Excellent Excellent

Corporate Profile Sanol Engineering Consultants Ltd.

Corporate Profile Sanol Engineering Consultants Ltd.

* Consulting Engineers * Development Consultants * Project Managers

110

Proposed Position : Leader Technical Advisor

Name of Firm : Sanol Engineering Consultants Ltd.

Name of Staff : Bankole, Ilesanmi O.

Date of Birth : 1st Nov. 1969

Nationality : Nigerian

Education: • Ph.D. (Structural Engineering) University of Ibadan. (2007) • M.Sc. (Civil Engineering) University of Ibadan. (2000) • B.Sc. (Civil Engineering) (First Class Hons.) Former Ondo State University, Ado Ekiti (1994) • National Diploma (Land Surveying) – Federal Polytechnic Ado- Ekiti (1998)

Membership of Professional Associations: • Member, Nigerian Society of Engineers (M.N.S.E.) • Member, Council for the Regulation of Engineering in Nigeria (COREN). • Member, Nigerian Institution of Structural Engineer (M.N.I Struct. E.) • Member, American Society of Civil Engineers (ASCE)

Other Trainings: • Steel and Concrete bridges design to BS 5400: Organized by Thomas Telford Training, London. (a

subsidiary of Institution of Civil Engineering, London)-Sept 2002. • International Federation of Consulting Engineers (FIDIC) Annual Conference, Singapore (Sept. 2007) • International Federation of Consulting Engineers (FIDIC) Annual Conference, Canada (Sept. 2009) • International Federation of Consulting Engineers (FIDIC) Annual Conference, London (Sept. 2009) • American Society of Civil Engineers Structures Congress, Austin Texas (May 2009) • Oxford Advance management and leadership certificate, Said Business School, Oxford, UK (June 2010). • Construction law summer school, Cambridge, UK (Sept. 2011).

Publications: § Use of Laterite Brick for low cost housing- (B. Eng Thesis, 1994) § Comparative analysis of Wingwall Cantilever Abutment Bridge and Bank-Seat Abutment Bridge. (M. Sc

Thesis, 1999) § Modeling the Structural Behaviour of Non-Prismatic Slab Bridges. (P.hd. Thesis, 2007)

Countries of Work Experience : Nigeria

Languages: Languages Speaking Reading Writing English Excellent Excellent Excellent Yoruba Excellent Excellent Excellent Key Qualifications Engineer (Dr.) Bankole Ilesanmi O. holds a Doctorate Degree in Civil Engineering with 17 years of experience. His experience is in the area of Highways, Structures, Bridges, Traffic and Transportation Engineering, software development, computer aided designs and drawings. He is also vast in pre-feasibility, feasibility study, planning and project management and supervision of many projects He equally developed a Computer program on road and culvert designs.

Corporate Profile Sanol Engineering Consultants Ltd.

* Consulting Engineers * Development Consultants * Project Managers

111

He has had extensive experience of engineering design and construction supervision of major Nigerian Roads and Bridges.

Detailed Tasks Assigned: • Overall responsible for monitoring of all the activities of his staff. • Responsible for quality assurance of all inspected materials and shall maintain close communication with

Employer/Client • He will be the Authorized Representative of the Firm and shall interact with its Clients on behalf of the Firm. • General project management, coordination of construction activities and project implementation • Topographical Survey, Pavement Evaluation, Hydrological Study of Water, Road and Bridge Design and

Construction Supervision of the Project • Feasibility Study, Traffic Study, Pavement Evaluation, Preliminary Design, Geometric Design, Pavement

Design, Condition Survey of Road Facilities and Safety Audit of Road. • Responsible for overall planning and progress of the assignment. Also responsible for checking of traffic

report, all designs, cost estimates prepared by other team members, laisoning with client and discussing various options / alternative alignments.

• Regular interaction with Environmentalist as well as Social expert. • Responsible for finalization of cost estimates of the project and accordingly suggesting procuring methods and

implementation type. • Fixation of design standards, design of alignment, service roads, design of intersection and interchanges,

design of toll plaza. • Responsible for alternative alignment study, fixation of design standards,

S/No. Tasks Assigned in

the Present Project

Relevant Previous Experiences

Project Details (Title, Funded by Location, Year)

Client (Govt. Dept.

Etc.)

Duration of Tasks

Tasks Actually Performed Remarks

Please refer to this information in Employment Record

Employment Record:

June 1999 Till Date Sanol Engineering Consultants Ltd. Principal Partner/

Highway Engineer

Responsible for Business Development, Project Coordination for all on-going Design as well Construction Supervision Projects, Finalization of Detailed Project Reports, Bid-Documents, Monthly Progress Reports, Corporate Management Plans, Budget etc. and handling following projects Planning, design, production of drawings and documents and supervision of the following projects:

(A) Highways

• Transaction Advisory Services for Lagos – Iseyin – Keshi – Kaiama Road in Lagos, Oyo and Kwara States, –

In JV with Voyants Solutions PVT. Ltd. (PPP – 2011) – N65.8m • Transaction Advisory Services for Kaiama – Bahama – Kaoje – Gwambu – Fokku - Sokoto Road in Kwara,

Niger, Kebbi and Sokoto States. – In JV with Voyants Solutions PVT. Ltd. (PPP – 2011) N60.1m • The Consultancy Services For the Survey & Design of Machina to Kanamma Route in Yobe State (YSMW –

2010) – N210.5m. • Consultancy Services For The Engineering Design Of The 62km Ashige – Alawagana – Gidan Buba – Fadama

Bauna – Arikya – Wamba Road in Nasarawa State, (NSMW&T – 2010) – N50m. • Consultancy Engineering Supervision for the Rehabilitation ofOba-Nnewi Road (Section 1) In Anambra

State, (FMWH&UD – 2010) – N40.15m.

Corporate Profile Sanol Engineering Consultants Ltd.

* Consulting Engineers * Development Consultants * Project Managers

112

• Consultancy Services For The Engineering Design Of Enugu-Nara-Isu-Onicha-Okposi-Amasiri-Oso-Owuta-Ohafia Junction in Abia State, (FMW – 2010) – N39.35m.

• Independent Project Monitoring Consultancy Services to Edo State Government. (ESG – 2010). • Consultancy Services on the Engineering Design of Gombe-Wuyo (Borno State Border) Road in Gombe

State, (FMWH&UD – 2010) – N22.22m. • Consultancy Services for Rapid Study and Preparation of Bidding Documents for Output and Performance

Based Road Contract – OPRC for Abuja to Keffi Road. (FERMA – 2009) – N7.1m • Consultancy Services on the Engineering Design of Lafia-Doma-Rutu-Bassa-Rafin Gabas-Nasarawa-Orozo

Road in Nasarawa State. (NSMW&T – 2009) – N70m • Consultancy Services on the Engineering Design of the Dualisation of Lafia – AkurbaRoad in Nasarawa

State. (NSMW&T – 2009) – N10m • Engineering Design and Construction Supervision of Taraku-Aondona-Naka-Agagbe-Abiam-Agatu Road in

Benue State. (BSMWH&T – 2008) – N59.6m • Consultancy Services and Construction Supervision of all Federal Roads in Nasarawa State. (FERMA – 2008)

– N5.4m • Engineering Design of Nasarawa-Toto-Abaji Road in Nasarawa State. (FMW – 2006) – N49.79m. • Construction Supervision of Nasarawa-Toto-Abaji Road in Nasarawa State. (FMW – 2006) – N75m. • Engineering Design of Uba-Askira-Mbalala Road in Borno State. (FMW – 2006) – N28m • Engineering Design of Akungba–Ikare–Omuo Road with 2 No. Bridges in Ondo State. (FMW – 2006) –

N22m • Engineering Design for the Limited Rehabilitation of Ado-Ekiti-Aramoko-Ijaro-Afon Alaaye Road in Ekiti State.

(FMW – 2007) – N16m. • Route Condition Survey and Road Safety Audit for Selected (9 Border) Roads towards the implementation of

the international vehicle transit charge. (FERMA – 2006) – N6m • Design and Construction Supervision of the Limited Rehabilitation of Onitsha End–Onitsha–Enugu Road in

Anambra State. (FMW – 2006) – N4m • Engineering Design and Construction Supervision of Road Network at Industrial Development Centre

Oshogbo for the Federal Ministry of Industries. (2005) – N4m • Engineering Design and Construction Supervision of Estate Road Network for Cambial Limited at Kuje

Housing Estate, Abuja. (2004) • Engineering Design for the Rehabilitation of Udi-Ozalla-Ubani Road in Enugu State. (FMW – 2008) –

N12.3m. (In Collaboration withClem-George Nig. Ltd.) • Engineering Design for the Rehabilitation of Jega-Sokoto Road in Kebbi/Sokoto States. (FMW – 2008) –

N30.4m. (In Collaboration withPark Associates Inc.) • Engineering Design of Aba-Azumini-Ohanbele-Ugwunagbo-Ihie Expressway in Abia State. (FMW – 2005) –

N49m. (In Collaboration withClem-George Nig. Ltd.) • Engineering design of Gumel-Maigatari Road in Jigawa State. (FMW – 2005) – N21m. (In Collaboration

withCLS Ltd.) • Design of Ila-Ashi-Oyan-Konta Road in Osun State for Osun State Government (1999). (In Collaboration

withProfen Consultancy Inc.) • Design of Ila-Ajaba-Imesi-Ile junction Road in Osun State for Osun State Government. (In Collaboration

withProfen Consultancy Inc.) • Design, production of drawings and contract documents for Langtang-Lalin-Tunkus-Shendam road in Plateau

state. Construction supervision of Langtang-Lalin-Tunkus-Shendam road in Plateau state. (FMW). (In Collaboration withPentagon Engineering Consultants Ltd.)

(B) Bridges • Design of 7 No. Multispan bridges along the 62km Ashige – Alawagana – Gidan Buba – Fadama Bauna –

Arikya – Wamba Road in Nasarawa State, (NSMW&T – 2010) – N50m.

Corporate Profile Sanol Engineering Consultants Ltd.

* Consulting Engineers * Development Consultants * Project Managers

113

• Design of 8 No. Multispan bridges along Lafia-Doma-Rutu-Bassa-Rafin Gabas-Nasarawa-Orozo Road in Nasarawa State. (NSMW&T – 2009) – N70m

• Design of 4-15m long Bridge at Ch.80+300 along Nasarawa -Toto-Abaji Road in Nasarawa State. (FMW – 2006)

• Design of 2 No. Bridges along Akungba–Ikare–Omuo-Ekiti Road in Ondo State. (FMW – 2006) • Design of 800m long Post-Tension Prestressed Concrete Box Girder Bridge over River Niger at Nupeko along

Bida-Sacci-Nupeko Road in Niger/Kogi State. (FMW – 2002). (In Collaboration withPentagon Engineering Consultants Ltd.)

• Design of 100m long Bridge over River Mabolo along Ankpa Onyegade Road in Ankpa, Kogi State. (FMW). (In Collaboration withPentagon Engineering Consultants Ltd.)

• Design of 5 No. bridges along Langtang-Lalin-Tunkins-Shedam Road in Plateau State. (FMW – 2001). (In Collaboration withPentagon Engineering Consultants Ltd.)

(C) Structures

• Consultancy Services for Design of a Modern Befitting, Functional and Cost Effective State Office Complex to Accommodate About 150 Staff Strength in Ondo State. (Min. of Niger Delta Affairs – 2009) – N63m

• Design of 4-storey Administrative building for Ladoke Akintola University of Technology, Ogbomoso, (LAUTECH – 2004).

• Design of 4-Bedroom duplex for Kambal Ltd in Abuja • Design of many residential buildings. • Design of 4-storey office complex for Idea Consult, Ibadan • Design of 5000 capacity Church building for Christ Life Church Apata,Ibadan • Design and construction supervision of steel hoist for Procter and Gambles Nig. Ltd Ibadan. (In Collaboration

withPentagon Engineering Consultants Ltd.) • Design and Construction supervision of Abeni House – An ultramodern Office/Hall Complex at Oluyole

Estate, Ibadan. (In Collaboration withPentagon Engineering Consultants Ltd.) • Design and construction supervision of Ondo State University Christian Union Chapel, Ado-Ekiti.

(D) Gis & Mapping • Revision and Upgrading of Highways Maintenance Manual. (FMWH&UD – 2010) – N9.5m • Retainership contract for GIS mapping & IT Consultancy services (FERMA – 2008), (N8m). • Retainership contract for GIS mapping & IT Consultancy services (FERMA – 2007), (N5.2m). • Production of Federal Road Maps of Nigeria showing FERMA 4–year intervention programme. (2008 –

2011), (N3m). • Study for the Development of Traffic Park. (FERMA – 2008), (N7.6m). • Development of Federal Road Map of Nigeria showing Bond Funding and Printing of Federal Road Map of

Nigeria depicting FERMA’s operations. (FERMA – 2008), (N5m). • Development of Federal Road Map of Nigeria showing Earth Roads, Performance Based Maintenance

Management Roads and Projects Schedule for Systematic Pavement Strengthening and Enhancement in 2008 Fiscal Year. (FERMA – 2008), (N2m).

• Development of Federal Road Map of Nigeria showing Observation and Service Camps Locations. (FERMA – 2008), (N1m).

• Building a Due Diligence Micro Site for FERMA (2008 – N2.9m)

Responsibilities: • General project management, coordination of construction activities and project implementation. • Preparation, design, cost estimate and evaluation of tender documents (technical Specifications BEME

and Bill of Quantities) • Consultancy Servicesfor Engineering Design, Survey& Construction Supervision. • Road Inventory, Road Condition Survey, Traffic Studies and Safety Audits.

Corporate Profile Sanol Engineering Consultants Ltd.

* Consulting Engineers * Development Consultants * Project Managers

114

1995 Till 1999 Pentagon Engineering Consultants Principal Highway Engineer

• Engineering Consultants. In charge of all design and detailing using CAD software • Design, production of computer Aided drawings of many residential and industrial building. • Partook in the design, drawings, production of Tender and contract document for Ibadan-Akaran-Ogun state

Boundary Road Project. • Partook in the Design, drawings and production of tender and contract document on Labo-Olomi-Olurinde-

Olojuoro road with spur to Kudeti-idi Arere, in Oyo state. • Design, production of AutoCAD drawings on Bida-Sacci-Nupeko-patigi road with bridge over river Niger at

Nupeko (54km). • Design of 10 Nos. Bridge of various spans along Bida Sacci-Nupeko-Panti road. • Design of 800m long prestressed concrete Box-girder bridge over River Niger at Nupeko. • Construction supervision of the Rehabilitation of 5.4km long Wema Bank Apata – Oluyole Estate road in

Ibadan. • Construction supervision of Ibadan-Akanran-Ogun State Boundary road project. • Develop a computer program on reinforced concrete box culvert design. • Develop a computer program on vertical and horizontal alignment of road design. • Design, production of drawing of 2-12m long bridge over river Kudeti, Idi-Arere in Ibadan. • Construction supervision of many building projects. • Detailed engineering design of Bida-Sacci-Nupeko-Panti road with 5 bridges (45km) in Niger/Kwara state

(Federal Government of Nigeria Financed). • Detailed engineering design of 800m long bridge over River Niger at Nupeko (Client Federal Government of

Nigeria). • Detailed Engineering design of Guyuk-Chikila-Lafia road: 50km in Adamawa state (Client: Federal

Government of Nigeria). • Detailed Engineering design of Tank Farm incorporating a jetty for Obat Nig. Ltd. • Detailed Engineering design of Langtang-Tunkun-Lailain-Shandam road with spur to Federal government

Girls College, Langtang in Plateau state 45km (Client Federal Government of Nigeria). • Study and detailed engineering design of 100m long bridge over Ankpa in Kogi state. (Client: Federal

Government of Nigeria). • New Eye Clinic/Kitchen and Canteen, Randle Health Center, Surulere, Lagos. Abeni House – an ultra modern

Office Complex for pentagon Engineering Consultant. • Construction of Hostel block at School of Hygiene, Eleyele Ibadan. • Supervision and project management of much maintenance. • Construction project at Procter and gamble Nig. Ltd, Ibadan. • Computer proficiency in AutoCAD Rel. 2002, Drafix-CAD, Word Perfect, Microsoft word, Microsoft

Publishers, Corel Draw, Microsoft Excel. Responsibilities:

• Project appraisal/processing and monitoring • Coordinate the design process and liaising with client. • Consultancy Services for Engineering Design, Survey& Construction Supervision. • Feasibility Study, Traffic Study, Pavement Evaluation, Preliminary Design, Geometric Design, Pavement

Design, Condition Survey of Road Facilities and Safety Audit of Road.

Corporate Profile Sanol Engineering Consultants Ltd.

* Consulting Engineers * Development Consultants * Project Managers

115

Detailed Tasks Assigned: LEADER TECHNICAL ADVISOR

(1) Project Coordination (2) Personnel Allocation (3) Task Distribution (4) Liaising with client (5) Pavement Evaluation (6) IRI Tests (7) Road Inventories (8) Road Condition Survey (9) Field Tests on Pavement (10) Drawings Preparation (11) Feasibility Studies (12) Document Preparation (13) Report Writing (14) Project Timeline

Compliance Ensured

Work Undertaken that Best Illustrates Capability to Handle the Tasks Assigned: (1) Name of Assignment or Project:Transaction Advisory Services for Lagos –

Iseyin – Keshi – Kaiama Road in Lagos, Oyo and Kwara States, – In JV with Voyants Solutions PVT. Ltd. (PPP – 2011) – N65.8m. Year: 2011 Location: Nigeria Client: Fed. Min. of Works Main Project Features: This Project Involves Transaction Advisory Services on Topographical Survey, Pavement Evaluation, Hydrological Study of Water, Road and Bridge Design and Traffic study. Positions Held: Team Leader/Highway Engineer Activities Performed: Transaction Advisory Services

(2) Name of Assignment or Project:Transaction Advisory Services for Kaiama – Bahama – Kaoje – Gwambu – Fokku - Sokoto Road in Kwara, Niger, Kebbi and Sokoto States. – In JV with Voyants Solutions PVT. Ltd. (PPP – 2011) – N60.1m. Year: 2011 Location: Nigeria Client: Fed. Min. of Works Main Project Features: This Project Involves Transaction Advisory Services on Topographical Survey, Pavement Evaluation, Hydrological Study of Water, Road and Bridge Design and Traffic study. Positions Held: Team Leader/Highway Engineer Activities Performed: Transaction Advisory Services

(3) Name of Assignment or Project:Engineering Design for the Rehabilitation of Omu Aran – Isanlu Road in Kwara State, (PPP – 2011) – N23.9m. Year: 2011 Location: Kwara State Client: Fed. Min. of Works Main Project Features: This Project Involves the Topographical Survey, Pavement Evaluation, Hydrological Study of Water, Road and Bridge Design and Construction Supervision of the Project Positions Held: Team Leader/Highway Engineer Activities Performed: Engineering Design

(4) Name of Assignment or Project:Consultancy Services for the Survey & Design of Machina to Kanamma Route in Yobe State, (YSMW – 2010) – N210.5m. Year: 2010 Location: Yobe State Client: Yobe State Min. of Works Main Project Features: This Project Involves the Topographical Survey, Pavement Evaluation, Hydrological Study of Water, Road and Bridge Design and Construction Supervision of the Project Positions Held: Team Leader/Highway Engineer Activities Performed: Survey &Engineering Design

(5) Name of Assignment or Project:Consultancy Services for The Engineering Design Of Enugu-Nara-Isu-Onicha-Okposi-Amasiri-Oso-Owuta-Ohafia Junction in Abia State, (FMW – 2010) – N39.35m. Year: 2010 Location: Abia State

Corporate Profile Sanol Engineering Consultants Ltd.

* Consulting Engineers * Development Consultants * Project Managers

116

Client: Fed. Min. of Works Main Project Features: This Project Involves the Topographical Survey, Pavement Evaluation, Hydrological Study of Water, Road and Bridge Design and Construction Supervision of the Project Positions Held: Team Leader/Highway Engineer Activities Performed: Engineering Design & Construction Supervision

(6) Name of Assignment or Project: Consultancy Services For The Engineering Design Of The 62km Ashige – Alawagana – Gidan Buba – Fadama Bauna – Arikya – Wamba Road in Nasarawa State, (NSMW&T – 2010) – N50m. Year: 2010 Location: Nasarawa State Client: Nasarawa State Min. of Works & Transport Main Project Features: This Project Involves the Topographical Survey, Pavement Evaluation, Hydrological Study of Water, Road and Bridge Design and Construction Supervision of the Project Positions Held: Team Leader/Highway Engineer Activities Performed: Engineering Design & Construction Supervision

(7) Name of Assignment or Project:Consultancy Engineering Supervision for the Rehabilitation ofOba-Nnewi Road (Section 1) in Anambra State, (FMW – 2010) – N40.15m. Year: 2010 Location: Anambra State Client: Federal Min. of Works Main Project Features: This Project Involves the Topographical Survey, Pavement Evaluation, Hydrological Study of Water, Road and Bridge Design and Construction Supervision of the Project Positions Held: Team Leader/Highway Engineer Activities Performed: Engineering Design & Construction Supervision

(8) Name of Assignment or Project: Engineering Design and Construction Supervision of Nasarawa-Toto-Abaji Road. Year: 2005 Location: Nasarawa State Client: Fed. Min. of Works Main Project Features: This Project Involves general project management, coordination of construction activities and project implementation. Positions Held: Project Manager Activities Performed: Engineering Design & Construction Supervision.

(9) Name of Assignment or Project: Survey and Engineering Design of Taraku-Aondona-Naka-Agagbe-Abiam-Agatu Road. Year: 2008 Location: Benue State Client: Benue State Ministry of Works, Transport & Housing Main Project Features: This Project Involves Feasibility Study, Traffic Study, Pavement Evaluation, Preliminary Design, Geometric Design, Pavement Design, Condition Survey of Road Facilities and Safety Audit of Road Positions Held: Project Director Activities Performed: Coordinate the design process and liaising with client

(10) Name of Assignment or Project: Condition Survey and Traffic Study for 10 No. Selected Roads under the FERMA Concession Programme. Year: 2008 Location: All over the Country Client: FERMA Main Project Features: This Project Involves Road Inventory, Road Condition Survey, Traffic Studies and Safety Audits. Positions Held: Project Director/Co-ordinator Activities Performed: Coordinate thecondition survey of the eight (8No.) roads and traffic studies including the road safety audit of the road.

Corporate Profile Sanol Engineering Consultants Ltd.

* Consulting Engineers * Development Consultants * Project Managers

117

Certification:

I, the undersigned, certify that (i) I was not a former employee of the Client immediately before the submission of this proposal, and (iii) to the best of my knowledge and belief, this biodata correctly describes myself, my qualifications, and my experience. I understand that any willful mis-statement described herein may lead to my disqualification or dismissal, if engaged. I have been employed by Sanol Engineering Consultants Ltd. continuously for the last twelve (12) months as regular full time staff. Indicate “Yes” or “No” in the boxes below: YES NO

__________________________ __________________________ Signature Date

Full Name of Authorized Representative: ENGR. (DR.)BANKOLE, ILESANMI OLORUNFEMI

x

Corporate Profile Sanol Engineering Consultants Ltd.

* Consulting Engineers * Development Consultants * Project Managers

118

Proposed Position : Environmental & Social Impact Specialist

Name of Firm : Sanol Engineering Consultants Ltd.

Name of Staff : ITUA, Eugene OtaigbeM.Sc, MNES, AIIRSM, Lead Fellow

Date of Birth : July 12, 1965

Nationality : Nigerian

Corporate Profile Sanol Engineering Consultants Ltd.

* Consulting Engineers * Development Consultants * Project Managers

119

1. MEMBERSHIP IN PROFESSIONAL SOCIETIES • Convener/Coordinator (Nigeria Region), International Institute for Risk & Safety Management (IIRSM) UK • Vice Chairman,Nigeria Environmental Society, Lagos Chapter • Secretary, Waste Management Society of Nigeria, Lagos (www.wamason.org) • Member, Environmental Management Strategic Action Drafting Committee for Cross River State(2008) • Coordinator (Lagos) for the 1st International Conference on Environmental- Climate Change – Consequences and

Global Concerns organised by Institute of Petroleun Studies (UNIPort), NREP (USA), Nigerian Environmental Society, at Denis Hotel Abuja, May 10-13, 2008.

• Member, LAWMA Technical Committee on Medical Waste Management • Course Coordinator for a one-Week Course on pollution Control and Environmental Management • organised by IPS/NES and POCEMA at Airport Hotel, Lagos, October .2007 • Acting President,/Convener,Association of Resettlement and Rehabilitation Experts of Nigeria(ARREN) • Regional Coordinator/Convener, African Platform for the Promotion of Profitable Environmental Management in the

Private Sector of Developing Countries, c/o GTZ-P3U, Bonn, Germany • Chairman, Technical/Project Committee, Nigerian Environmental Society (NES), LagosState Chapter. • External Examiner to School of Environmental Health, NAMCS, Ojo Cantonment, Lagos. • Project Officer/Coordinator “Lagos Train” of the Nigerian Environmental Society – National Maritime Authority

National project on Public awareness and enlightenment on the protection of the Marine and Coastal Environment – Volunteer Community Enlightenment programme, June 18 – 20, 2004

• Coordinated Market Cleaning Campaign in Lagos for Nigerian Environmental Society (NES), LagosState Chapter. Volunteer Community Enlightenment programme (2003)

• Former Chairman, Workshop, Seminars and Conferences Committee, Nigerian Environmental Society (NES), LagosState Chapter.

• Member, Technical Committee, NES, LagosState Chapter (2001-2002) • Coordinator/Converner, EoCM Nigeria Network • Secretary for the Planning/Inaugural Committee of Nigerian Environmental Society, Lagos Chapter • Corp Liaison Officer (CLO), NYSC, Damaturu. 1992-1993 • Cadet, Federal Road Safety Club, (Life)

2. EDUCATION :

INSTITUTION

DATE

DEGREE OBTAINED

CONCENTRATION/ SPECIALIZATION

University of Agriculture, Abeokuta, Ogun State, Nigeria

2007 - date

Ph.D (Candid)

Environmental Sustainability - Ecological Management

LagosStateUniversity, Ojo, Lagos, Nigeria

1998-1999

M.Sc. (Hons)

Environmental Resources Management

Nigerian Institute of Journalism, Ogba, LagosState

1997

Postgraduate Diploma

Marketing

University of Jos, Jos, Plateau State, Nigeria.

1988-1992

B.Sc (Hons)

Geography &Planning

HolyTrinityGrammar School, Sabongidda –Ora, EdoState.

1979-1984

O’ Level Certificate

-

UghodinPrimary School, Iruekpen, Ekpoma, EdoState.

1973-1979

FirstSchool Leaving Certificate

-

3. OTHER TRAINING:

COURSE TITLE & FOCUS

DATE

INSTITUTION/ ORGANISER

VENUE ROLE

Corporate Profile Sanol Engineering Consultants Ltd.

* Consulting Engineers * Development Consultants * Project Managers

120

Leaders for a New Climate: Systems Thinking and the C‐ROADS Simulation Workshop by Climate Interactive and Seed Systems

October 19 - 21, 2010 Climate Interactive (http://www.climateinteractive.org/).

MITSloanSchool of Management Cambridge, Massachusetts, USA

Participant

EIA Improvement Process Workshop

Aug. 16-17, 2010 Federal Ministry of Environment

ChelseaHotel, Abuja Participant/Working Group Chairman

Media/press climate Impacts Awareness Seminar

Sept 14-15, 2010

Cares & British Council Ghana

British Council, AccraGhana Observer Participant

Environmental Management Workshop

Sept 6, 2010 Centre for Management Development

CMD Training Complex, Lagos

Resource Person

Development of Indicators and Benchmarks for a Peer Review Mechanism for States (A two-Day Workshop)

Aug 6-7, 2010 DFID + Nigeria Governors’ Forum + State Partnership for accountability Responsiveness and Capability (SPARC)

Shehu Musa Yar Adua Centre, Abuja, Nigeria

Environmental Specialist/ Consultant for Environmental Indicators Development

1stNigeria’s Ecofair (Ecofair 2010) – Raising Eco Standards – Issues and Challenges

July 20-21, 2010 Nigeria Ecological Fund Office

Sheraton, Abuja, Nigeria Participant

One - day Meeting on the proposed National Climate Change Trust Fund Architecture

June 30, 2010 Special Climate Change Unit of FMENV and UNDP

UN House, Abuja, Nigeria Participant

IFC Policy and Performance Standards Review

June 18, 2010 International Finance Corporation (IFC)

Golden Tulip, Accra, Ghana Participant

48 Hour HAZWOPER” Supervisory 29 CFR 1910.120(e), OSHA, EPA, DOT, CERCLA, RCRA Review

June 14-18, 2010 Multiple Dev. Services & Work Safe Communicators, Inc,

Lagos, Nigeria Facilitator

One-day seminar to Mark the World Environment Day

June 3, 2010 NAHCO AVIANCE (Nigerian Aviation Handling Co. Ltd)

NAHCO Training Centre, MMIA, Lagos

Guest Speaker

Improving Health, Environment and Socio-Economic Status of People Associated With Saw Dust Occupation in Lagos

May 24, 2010 SRADev Nigeria HMMC Conf Centre, , Yaba, Lagos

Facilitator

Regional Workshop on Pesticide Storage and Stock Management Capacity Building/Training for Storekeepers, Farmers, Trade Unions, etc to support the Nigeria-ASP Prevention Component”

Began May 13, 2010 SRADev Nigeria Ongoing across Nigeria Regional Zones

Facilitator

A Mandatory One-Day Workshop for LASEPA Accredited Environmental Consultants

March 23, 2010 LagosState Environmental Protection Agency

LASEPA Conference Hall Resource Person

one day Stocktaking Meeting on the Second National Communication on Climate Change to UNFCCC

March 11, 2010

Special Climate Change Unit of FMENV and UNDP

UN House, Abuja, Nigeria Participant

Corporate Profile Sanol Engineering Consultants Ltd.

* Consulting Engineers * Development Consultants * Project Managers

121

Mobile Safeguard Clinic for Safeguard (Environmental and Social) Specialists of World Bank

March 7-10 Africa Safeguards Enhancement Network (ASPEN) + World Bank

Asaa Pyramid Hotel, Kaduna, Nigeria

Participant

48 Hour HAZWOPER” Supervisory 29 CFR 1910.120(e), OSHA, EPA, DOT, CERCLA, RCRA Review

Jan 18, 2010 Work Safe Communicators, Inc, Instructor Arthur ‘Cat’ Brandon

Baytown, Texas77522, USA Participant

The African Diaspora Marketplace (ADM) Final Event

Jan 12-13, 2010 Financed jointly by USAID, Western Union, Western Union Foundation, EcoBank, and the Academy for Educational Development (ADM)

ADM, Washington, DC20008, USA

Participant & Finalist

Leadership and Climate Change - Impacts, Innovation and Interdependence

Nov 8-11, 2009 Lead International BeijingChina Participant

Lead Fellows Training Programme in Leadership for Sustainable Development- 14th Cohort

Nov 8-11, 2009 Lead International BeijingChina Participant as Associate Fellow

Stakeholder Consultation on Nigeria’s Private-Public Partnership Program for Infrastructure Development

Sept 17 & 18, 2009 Infrastructure Concession Regulatory Commission & World Bank

Ocean-view Coral Continental , Lagos

Participant & Paper presenter

One-day community based awareness-raising workshops on Harmful Effects of the Re-use of Chemical /Pesticides Empty Containers

8th and 9th September 2009 in Ogun and LagosStates

(SRADev Nigeria) & Friends of the Environment (FOTE) supported by Global GreenGrant Fund, USA.

Ajido Community, Lagos State & Mowe/Owode/Ofada Community, OgunState

Resource Person

Consultants’ Support to World Bank Projects Supervision - CapacityBuilding and General Overview of World Bank Safeguard Policies.

July 23, 2009 World Bank World Bank Country Office, Abuja.

Participant

African CSOs and Experts Meeting on DDT

6-8 April 2009 IPEN & PAN Africa Mbezi Garden Hotel, Dar es Salaam, Tanzania,

Participant

Advanced Management Programme on Entrepreneurial Skills & Business Management Strategy

March 18-19, 2009

Sam Ohuabunwa Foundation for Economic Empowerment

Nigerian Institute of International Affairs, V/I, Lagos

Participant

UNESCO –IHE-UN/DOALOS-UNEP/GPA Train-Sea-Coast training on Improving Wastewater Management in Coastal Cities in Nigeria

December 15 – 19, 2008.

Rivers State University of Science and Technology & Environmental Protection Agency of Ghana with the Lagos State Government and the Lagos State Environmental Protection Agency

LASEPA Conference Hall, Alausa, Lagos,

Participant

27th International Safety Professionals Development Conference on Safety Leadership & Culture – A Tool for National Growth

December 2 – 4, 2008.

Nigerian Institute of Safety Professionals (NISP)

Sheraton Hotel & Towers, Abuja,

Paper Presenter & Participant

Slips, Trips & Falls at HSE Biennial International Conference

November 3-5, 2008, Department of Petroleum Resources (DPR)

Nicon Luxury Hotel, Abuja, Author & Participant

Corporate Profile Sanol Engineering Consultants Ltd.

* Consulting Engineers * Development Consultants * Project Managers

122

on the Oil and Gas Industry in Nigeria 1st International Conference & Exhibition on Environmental Management titled Waste Management and Climate Change – Consequences and Global Concerns

May 10-13, 2008. NREP (USA)/ Institute of Petroleum Studies (UniPort)/ Nigerian Environmental Society

Denis Hotel Abuja, Paper presenter and Rapporteur

Dam-related Hazard Warning System

April 8 – 9, 2008 Earth Watch Services Lagos, Nigeria, Participant

Pollution Control and Environmental Management

October 10-13, 2007 IPS/NES and POCEMA, an affiliate Body and Registered Solution Provider on Behalf of NREP (USA)

Airport Hotel, Ikeja, Lagos Participant

1st, 2nd& 3RD Lagos Summits on Medical Waste Management

2006, 2007 & 2008. LAWMA Univeristy of Lagos Teaching Hospital

Lead Rapporteur

One-Day Interactive Session/Workshop on Medical Waste Management

October 4, 2007. Lagos Ministry of Health and Waste Management Authority

Adeyemi Bero Hall, Alausa Secretariat, Lagos

Participant

1st International Conference on Environmental Research, Technology and Policy

July 16 – 18, 2007 Western Onatario University/CIDA/Ministry of LG, Rural & Environment, Accra

La Palm Royal Hotel, Accra, Ghana

Participant

Training/Workshop on Sanitary Landfill Facilities Management as part of the 1st International Conference on Environmental Research, Technology and Policy

July 16 – 18, 2007 Western Onatario University/CIDA/Ministry of LG, Rural & Environment, Accra

La Palm Royal Hotel, Accra, Ghana

Participant

‘National Workshop on the Africa Stockpiles (ASP) and Chemical Conventions for Journalists in Nigeria’

August 13-14, 2007. Nigerian Environmental Scoiety and WorldWide Fund for Nature (WWF)

Lagos Airport Hotel, Ikeja, Lagos

Rapporteur

Medical Waste Management

March 15, 2007 LAWMA & John Snow International

LAWMATraining School, Lagos

Participant

A Workshop on Making Injection Safe and Healthcare Waste Management

2006 MMIS/John Snow International

Sheraton, Abuja Participant

One-Day House of Lords Luncheon with Sir Frank Davies, Hon FIIRSM, Chairman, British Safety Council Speaking on “Health and Safety Retrospect and Prospect”

26th September, 2006. International Institutes of Risk and Safety Management

House of Lord, UK Participant

One-Day workshop on Envronmental and Safety Leadership Expectations Workshop

April 28, 2007 ChevronTexaco Miedan Hotel, VGC, Lekki, Lagos.

Participant

One-week International Training on ‘Alternative Fuels: Energy Security, Techno-economic and Environmental Issues’

April 23-30, 2006 Integrated Research and Action for Development (IRADe) sponsored by Ministry of Non-Conventional Energy Sources, Government of India

New Delhi, India Participant

World Bank/GGFR Second & Third Stakeholders’ CapacityBuilding Workshop on Carbon

9th February and May 4, 2006,

ICF Consulting (London) and Triple E Associates

Sheraton Hotel, Lagos, Nigeria

Participant/ PIN presenter

Corporate Profile Sanol Engineering Consultants Ltd.

* Consulting Engineers * Development Consultants * Project Managers

123

Credit Development for Flare Reduction Projects in Nigeria(“CDM Incentives for Flare Out Projects in Nigeria”) First Stakeholders’ CapacityBuilding Workshop on Carbon Credit Development for Flare Reduction Projects in Nigeria(“CDM Incentives for Flare Out Projects in Nigeria”).

12 October 2005. World Bank/GGFR/ICF Consulting (London) and Triple E Associates

Hilton, Abuja, Nigeria, Participant

UNIDO Sponsored “Ecologically Sustainable Industrial Development (ESID) - Restoration of the Lagos Lagoon Project Stakeholders’ Seminar”

October 4, 2005. UNIDO UNIDO Project Office, Ikoyi, Lagos, Nigeria.

Participant

Five - Day Training Workshop on the Design and Preparation of Resettlement Action Plans (RAPs). The Workshop included the Process in the design of RAP, etc.

September 19 –23, 2005

Lagos Metropolitan Transport Authority (LAMATA) in collaboration with The World Bank

Lagos, Nigeria Participant

Three Day Training-of-Trainers on Environment-Oriented Cost Management

March 14- 16, 2005 German Agency for Technical Cooperation (GTZ) in collaboration with P3U

Bonn, Germany Participant

Two Day Training-of-Trainers on Organisational Development and Consultancy in “Profitable Environmental Management Context

March 17-18, 2005 German Agency for Technical Cooperation (GTZ) in collaboration with P3U

Bonn, Germany Participant

One-Day Course on Public Consultation and Stakeholder Involvement in Project Management

November 13, 2004. Earth Watch Services Excellence Hotel, Ogba, Lagos, Nigeria,

Participant

Two-day International Sustainable Development Research Conference

24-25th March, 2003 ERP Environment University of Nottingham, UK.

Participant

A 6–Month Training Programme onEnvironment–Oriented Cost Management (EoCM)

June–December, 2002

(LCCI + P3U +GTZ) with -Support from European Union Based Assistance Scheme

Lagos, Nigeria Trainer /Consultant

Two-Day Workshop on Resettlement Planning and Implementation.

April 8, 2004 Earth Watch Services Lagos, Nigeria Participant

Eight–Month Training Programme on Environment–Oriented Cost Management (EoCM)

September 2000 and May 2001

P3U +GTZ + LCCI LCCI, Lagos, Nigeria Participant

3-Day Practitioners Course On Impact Assessment Training,

(2002) AMEC, Calgary, CanadaFor Shell

Presidential Hotel, Port Harcourt, Nigeria

Participant

2-Day Environmental ManagementCapacityBuilding Workshop

July 5 -9, 2004.

Chevron- Texaco Peninsula Hotel, Lekki, Lagos, Nigeria

Participant

One-Day workshop on Safety Leadership Expectations Workshop

April 28, 2004 Chevron Texaco Ocean View

Restaurant,

Victoria

Participant

Corporate Profile Sanol Engineering Consultants Ltd.

* Consulting Engineers * Development Consultants * Project Managers

124

Island,

Lagos.

National Workshop on CapacityBuilding For FMENV Accredited Environmental Consultants in Nigeria.

July 20-21, 2004 Federal Ministry of Environment (FMENV) &University of Lagos Linkage Centre for Environmental Human Resources Development

University of Lagos. Participant

One-Day workshop on Project Monitoring and Evaluation. An In house programme

August 22, 2003 Bodley Company Ltd, Lagos. Participant

Trainee land surveyor

with John Aigbe

&Associate, a

Licensed Surveyor’s

firm. Trained in

Cadastral Surveying,

leveling, etc.

Between 1986 and 1988.

John Aigbe &Associate, Participant

4. LANGUAGES & DEGREE OF Language Speaking Reading Writing

PROFICIENCY e.g. English Fluent Excellent English. Fluent in reading, writing & speaking Excellent

5. COUNTRIES OF WORK EXPERIENCE: NIGERIA.

6. EMPLOYMENT RECORD ORGANIZATION ADDRESS JOB TITLE DATE Employer 1. Sanol Engineering Consultants Ltd.

Nigeria Country Office, Wuse II, Abuja, Nigeria

EIA Specialist

March2011 to date, (Contract)

Primary Responsibilities:

Ø Participated in Soil and Material Analysis Design, Ø Evolve and implement quantity and quality control procedures Ø Quality control of works; Ø verification of Bus-Bar stringing, , Ø inspection of works, acceptance and rejection of the completed works Ø Ensure works are as per laid down specification Ø Ensure adequacy and timeliness of plant, equipment, machinery and manpower deployed by the Contractor

to execute the work Ø Ensure maintenance of safety standards during construction works Ø Supervision, scrutiny and approval of the final setting out.

Employer 2.World Bank

Nigeria Country Office, Asokoro, Abuja, Nigeria

Safeguard Consultant

Oct 2009 to date, (On & Off short-term Contract)

Corporate Profile Sanol Engineering Consultants Ltd.

* Consulting Engineers * Development Consultants * Project Managers

125

Primary Responsibilities:

Ø Participate in Mission Supervision of World Bank Sponsored Projects Ø Ascertain that Safeguard (Environmental & Social) Management of sponsored projects are in line with

Bank’s Safeguard Policies Ø Participate in meetings with stakeholders alongside Task Team Leaders Ø Assist in the preparation of the end of Supervision Reports – aide memoir

Employer 3. Medilag Consult, College of Medicine of the University of Lagos

Idi-Arab, Lagos. Email: [email protected]

Assistant Lecturer 2006 to Date

Primary Responsibilities:

§ Lectures Environmental Management in Post Graduate Diploma Programme on Health, Safety and Environmental Management.

§ Develop Lecture Notes, etc. Employer 4. Multiple Development Services Limited

18, Olorunlogbon Street, AnthonyVillage, Lagos

Coordinating Consultant

2001 to Date

Primary Responsibilities:

§ Coordinates the Company’s Programmes/activities § Develop Environmental Programmes § Coordinates Training & Manpower Development Programmes § Spearheads the application of Environment-oriented Cost Management § Field studies and Report writing, such as IA, EAR, etc. § Liase with regulatory bodies § HSE Policy development § Source clients/Public Relations

Employer 5. GTZ-Pilot Programme for the Promotion of Environmental Management in the Private Sector of Developing Countries (P3U) in collaboration with LCCI.

Commerce House, Idowu Taylor Street, Victoria Island, Lagos. Tel: 01-2701009

Trainer/Senior Consultant on Environment-oriented Cost Management (EoCM)

Sept., 1999 to Date

Duties:

§ Train Consultants and Company Innovation Team members on communication and social skills as well as steps of the EoCM methods

§ Assist the company in the execution of its defined tasks and in finding solutions to arising problems upon requests

§ Facilitate and coordinates contacts between the company and the foreign EoCM consultants. § Prepare EoCM trained Innovation Teams for presentations to their top managements and § Prepare reports on assignments for top Management (client) and BSU/P3U/GTZ. § Being continuously trained in skills necessary for the sustainability of EoCM in Nigeria and other African

Countries. Follow up progress of work in companies (clients’) by regular visits, as defined in the work plan Employer 6. Bodley Company Ltd.

4, Oteomi Street, Papa Ajao, Mushin, Lagos. Tel. 01-4524721

Consultant, Environmental Studies

1994 to 2001

Duties:

§ Participation in field trips for environmental studies § Writing of reports, e.g. Environmental Impact Assessment, Environmental Audit Report, § Development of training proposal on environment § Assist in training programmes coordination § Trainer/resource person

Employer 7. Nationwide Computer Systems Ltd.

30, Adelabu Street, Masha, Surulere, Lagos.

Marketing Executive 1993 – 1994

Employer 8. Department of Lands & Survey, Governor’s Office

Damaturu, YobeState. Corper (NYSC) 1992 – 1993

Employer 9. Nigerian Airports Ikeja, Lagos. Industrial Training 1990 & 1991

Corporate Profile Sanol Engineering Consultants Ltd.

* Consulting Engineers * Development Consultants * Project Managers

126

Authority

11 WORK UNDERTAKEN THAT [give an outline of experience and training most BEST ILLUSTRATES YOUR pertinent to tasks on this assignment, with degree CAPABILITY TO HANDLE of responsibility held. Use about half of a page THIS ASSIGNMENT A4].

A. General Industry 1. Transaction Advisory Services for Lagos – Iseyin – Keshi – Kaiama Road in Lagos, Oyo and Kwara States, – In JV

with Voyants Solutions PVT. Ltd. (PPP – 2011) 2. Transaction Advisory Services for Kaiama – Bahama – Kaoje – Gwambu – Fokku - Sokoto Road in Kwara, Niger,

Kebbi and Sokoto States. – In JV with Voyants Solutions PVT. Ltd. (PPP – 2011) 3. Environmental Impact Assessment Consultant ofPrimary Health Care Clinics in Bauchi and Cross Rivers States for

AGRITEAM CANADA, Canadian Executing Agency (CEA) for the Canada – Nigeria Health Technology Project (CNHTP) supported by the Canadian International Development Agency (CIDA).- Team Leader

4. Environmental Impact Assessment of proposed Metal Smelting Plant, Ogijo, OgunState. Team Leader. 5. Environmental Management Plan for proposed Skye Bank Hotel, CBD, Alausa Lagos, Nigeria 6. Environmental Impact Assessment of MuritalaInternationalAirport (MMIA) Ultra Model Carpark, Ikeja, Lagos,

Nigeria for TERMINAL ZERO DEVELOPMENT LIMITED (Terminal Zero) 7. Environmental Impact Assessment of a proposed 200MW Independent Power Plant for FARM Electric Nig. Ltd

(Obasanjo Farm), Ota, OgunState (2006) 8. Environmental Auditing of GSM Base Stations for Etisalat in Nigeria 9. Impact Mitigation Monitoring of Base stations for Zain in Southwestern Nigeria 10. Environmental Audit of Cadbury Premises at Agidingbi, Ikeja, Lagos for Cadbury Nigeria Plc 11. Environmental Assessment of Conexco Ltd Facility at Oregun, Ikeja, Lagos 12. Environmental Audit of Metal Furniture Ltd Facility at Ikeja, Lagos 13. Environmental Impact Assessment of a Proposed Oil Storage Facility at CalabarPort for Specialty Oil Ltd. 12. Environmental Evaluation of Jet A1 (Oil) Storage Facilities of Shell Nigeria Oil Ltd, Shell Airfield, Port

HarcourtNigeria (2007) 13. Environmental Impact Assessment of proposed Incinerator Plant at Escravos, for ChevronTexaco Nig. Ltd (2006) 14. Environmental Impact Assessment of proposed Medical Waste Incinerator Plant in Lagos for ChevronTexaco Nig.

Ltd 15 Environmental Impact Assessment of proposed Medical Waste Incinerator Plant in Warri for ChevronTexaco

Nig. Ltd. 16. Environmental Impact Studies of Pennington and Middleton Producing Fields, for TOPCON. (1999). 17. Environmental Evaluation Report and Seabed Survey, Sampling and Analysis of TOPCON’s Okubie Field 18. Environmental Impact Assessment of the OML-53 Exploratory Drilling Project for Chevron Nig. Ltd.(1996) 19. Environmental Evaluation of Oil Storage Warehouse at Isolo, Lagos for Shell Nigeria Oil Products Ltd, Marina,

Lagos. TRAINNING 1. Environmental Assessment Procedures in Nigeria at A Mandatory One-Day Workshop for LASEPA Accredited

Environmental Consultants organized by Lagos State Environmental Protection Agency (LASEPA) March 23, 2010 2. Environmental Management System for Officials of Lagos State Ministry of Environment, Lagos State

Environmental Protection Agency & Lagos State Waste Management Authority, organized by Lagos State Ministry of Establishments and Training & Multiple Development Services, July 14-16, 2009, Alausa, Lagos

3. Solid Waste Management and the Challenge of Social Responsibility to the Environment at Effective Solid Waste Management for Lagos State Waste Management Authority Officials organized by Lagos State Metropolitan & Development/The Tall & Wide Company Ltd, August 4 – 5, 2009, Airport Hotel, Lagos.

4. Capacity & AwarenessBuilding for Solid Waste Management in LagosState for Lagos State Waste Management Authority Officials organized by Lagos State Metropolitan & Development/The Tall & Wide Company Ltd, August 4 – 5, 2009, Airport Hotel, Lagos.

5. 1st – 4th Environmental Management Capacity -Building Programme For The Nigerian Mining Sector for Officials of the Environmental Compliance Monitoring Department of Ministry of Mines and Steel, Ministry of Environment and National Enforcement and Regulatory Agency – NESREA organised by Ministry of Mines and Steel Sustainable Management of Mineral Resources Project/World Bank, Abuja & Enugu Nigeria, February 16-20, April and July 2009

CERTIFICATION

Corporate Profile Sanol Engineering Consultants Ltd.

I, the undersigned, certify that (i) I was not a former employee of the Client immediately before the submission of this proposal, and (iii) to the best of my knowledge and belief, this biodata correctly describes myself, my qualifications, and my experience. I understand that any willful mis-statement described herein may lead to my disqualification or dismissal, if engaged. I have been employed by Sanol Engineering Consultants Ltd. continuously for the last twelve (12) months as regular part time staff. Indicate “Yes” or “No” in the boxes below: YES NO Signature Date of Signing

Proposed Position : Traffic and Transport Planner

Day / Month / Year

x

Corporate Profile Sanol Engineering Consultants Ltd.

* Consulting Engineers * Development Consultants * Project Managers

128

Name of Firm : Sanol Engineering Consultants Ltd.

Name of Staff : Alexander Adedayo Adeeko

Date of Birth : 14 June 1971

Nationality : Nigerian and British

Education • Masters in Business Administration (with Merit) – The University of Birmingham, UK, 2007 • BSc (Hons) Civil Engineering – London South Bank University, UK, 1998 • Higher National Certificate in Civil Engineering – London South Bank University, UK, 1994 • Ordinary National Diploma in Civil Engineering – Yaba College of Technology, Nigeria, 1990

Member ship of Professional Associations • Member Chartered Institution of Highways & Transportation, UK • Member Institute of Transportation Engineers, USA

Other Training • Certificate of Competence in Road Safety Engineering – Royal Society for the Prevention of Accidents,

UK • PRINCE2® Registered Practitioner (Project Management), UK • Masterclass in Masterplanning & Community Regeneration, UK • Business Case Appraisal for Major Transport Infrastructure Projects – Aston University, UK • Parking & Demand Management – Aston University, UK • Construction & Design Management, UK • Certificate of Competence in Traffic Signal Timing – University of Maryland, USA • Certificate of Competence in Fundamentals of ITS & Traffic Management – University of Maryland,

USA • Using the National ITS Architecture for Deployment – National Highway Institute, USA • Various business development, management and leadership training courses, UK

Countries of Work Experience • United Kingdom • United States of America • Nigeria

Languages • English: Good speaking, reading and writing • Yoruba: Good speaking, fair reading and writing • Hausa, French and Spanish – Basic speaking (beginners)

Employment Record 2012 - To date Employer: Sanol Engineering Consultants Ltd. Position held: Traffic and Transport Planner 2010 - To 2012 Employer: TTi Consulting Ltd, UK/Africa

Corporate Profile Sanol Engineering Consultants Ltd.

* Consulting Engineers * Development Consultants * Project Managers

129

Position held: Director/Managing Consultant (Owner) 2007 - 2010 Employer: Parsons Brinckerhoff Ltd, West Midlands, UK Position held: Associate/Business Group Team Leader 2005 - 2007 Employer: JMP Consultants Ltd, West Midlands, UK Position held: Principal Transport Planner/Consultant 2004 - 2005 Employer: Princeton Baptist Church of Penns Neck, New Jersey, USA Position held: Chair Board of Trustees 1999 - 2004 Employer: Orth-Rodgers & Associates, Inc. Pennsylvania/New Jersey, USA Position held: Traffic Engineer/Transportation Analyst 1999 - 1999 Employer: Denis Wilson Partnership, Surrey, UK Position held: Transportation Engineer 1998 - 1999 Employer: CFH Construction, London, UK Position held: Engineer’s Assistant 1994 - 1996 Employer: Department of Social Security, London, UK Position held: Administrative Officer

Detailed Task Assigned

Responsible for the following tasks: • Transport data collection and analysis, • Multi-modal transport corridor studies, • Feasibility studies, • Traffic modeling, • Congestion management plans, • Road safety engineering/audits, • Site planning for major development schemes, • Environmental impact assessments, • Transport assessments for new development schemes, • Corporate travel audits, • Area-wide travel plans, • Traffic incident management plans, • Intelligent transport systems planning, • Procurement & deployment, • Local and regional transport strategies, master plans & community/urban regeneration • Business case appraisal for transport projects.

Corporate Profile Sanol Engineering Consultants Ltd.

* Consulting Engineers * Development Consultants * Project Managers

130

• Responsible for developing a performance evaluation framework for the company’s ‘Influential Travel Behaviour Programme’.

• Supervise weekly resource scheduling • Monitored compliance of health and safety regulations on construction sites • Provides development planning services and strategic advice on transportation infrastructure

requirements. • Providing strategic transport advisory services • Regular interaction with Environmentalist as well as Social expert. • Maintain oversight on operational and financial matters including recurrent and capital

expenditures

Work Undertaken that Best Illustrates Capability to Handle the Tasks Assigned Project experience covers transport data collection and analysis, multi-modal transport corridor studies, feasibility studies, traffic modeling, congestion management plans, road safety engineering/audits, site planning for major development schemes, environmental impact assessments, transport assessments for new development schemes, corporate travel audits, area-wide travel plans, airport surface access strategies, traffic incident management plans, intelligent transport systems planning, procurement & deployment, local and regional transport strategies, master plans & community/urban regeneration and business case appraisal for transport projects.

Name of Project: Spatial Planning Framework Contract, West Midlands and South

East Year: Highways Agency Location: England, United Kingdom Client: 2005-2010 Main Project Features: Development Control and Development Planning Advisory Services Positions Held: Project Manager Activities Performed: Project manager with primary responsibility for managing and

facilitating the delivery of major development schemes within the West Midlands (2005-2007) and South East (2008-2010) regions of England, ensuring that such developments are sustainable, with minimal detrimental impacts on the highway network and environment. Advised the Highways Agency on Regional Spatial Strategies and Local Development Frameworks, and conducted technical reviews on supporting documentation for planning applications: transport assessments, travel plans, road safety audits, flood risk assessments, etc. Negotiated and facilitated planning approvals and funding mechanisms for transport mitigation works on several local and regional regeneration schemes. Advised the Highways Agency’s ‘Network Strategy’ team and other key stakeholders, on cost-effective options for optimizing network performance, improving journey time reliability, reducing road traffic accidents and minimizing adverse environmental impacts on the strategic road network.

Name of Project: Managed Motorway Feasibility Studies, M5 Motorway Junctions 2-4A and 4A-6, West Midlands

Corporate Profile Sanol Engineering Consultants Ltd.

* Consulting Engineers * Development Consultants * Project Managers

131

Year: 2008 Location: West Midlands Region, United Kingdom Client: Highways Agency/Department for Transport Main Project Features: The Managed Motorway Feasibility Studies were undertaken on

behalf of the Highways Agency and Department for Transport to establish the practicality of applying the principles of ‘Active Traffic Management’ (Intelligent Transportations Systems) on the M42 motorway pilot scheme, to other parts of England’s strategic road network. The feasibility studiestook into account physical and environmental constraints along two separate sections of the M5 motorway within the West Midlands conurbation, in terms of positioning of roadside infrastructure that is needed for effective deployment of ‘Active Traffic Management’ strategies (including ‘Dynamic Hard Shoulder running’), as well as amendments required to existing alignments.

Positions Held: Project Advisor-Quality Assurance Activities Performed: Coordinated quality assurance procedures for the various work

packages, tasks and outputs; including traffic assessments, highway and structural engineering assessments, drainage analysis, geological surveys, maintenance and repair strategies, evaluation of technology options, operational and environmental assessments, preparation of order of magnitude cost estimates and outline cost-benefit analysis. Provided input and technical oversight on the traffic and economic assessments, accident analysis and road safety reviews. Reviewed the Appraisal Summary Tables and co-authored the final reports.

Name of Project: Research into the Effectiveness of Voluntary Area Travel Plans Year: 2007-2008 Location: England, United Kingdom Client: Highways Agency Main Project Features: Research commissioned by the Highways Agency to assess the

performance and effectiveness of voluntary travel planning initiatives across England: part of the Highways Agency’s ‘Influencing Travel BehaviourProgramme’.

Positions Held: Project Manager Activities Performed: Provided technical advisory including recommendations on how to

select viable pilot site, secure long term stakeholder buy-in and ensure value-for-money on the Highways Agency’s travel demand management strategies, including ‘smarter travel choices’ investments.

Name of Project: Influencing Travel Behaviour Programme, South East Year: 2007-2009

Corporate Profile Sanol Engineering Consultants Ltd.

* Consulting Engineers * Development Consultants * Project Managers

132

Location: South East Region, United Kingdom Client: Highways Agency Main Project Features: The ‘Influencing Travel Behaviour Programme’ provided an

overarching framework for implementing travel demand management strategies and encourage ‘smarter travel choices’ (through collaborative institutional efforts with private and public sector stakeholders). The prime goal of this programme was to reduce traffic congestion, improve safety on the strategic road network as well as protect the environment.

Positions Held: Project Manager Activities Performed: Responsible for developing and implementing ‘Voluntary Travel

Plan’ projects at large employment sites/business parks across the South East of England. Provided technical oversight on all deliverables, managed project risks and was the key point of contact for liaisons with the client and stakeholders. Assisted resident business organisations in preparing Outline Business Cases for corporate travel plans.

Name of Project: Guidance on Transport Assessment Year: 2005-2007 Location: England, United Kingdom Client: Department for Transport/Highways Agency and the Department

for Communities & Local Government Main Project Features: This publication provides guidance for local authorities and

property developers on the process of preparing transport assessments for new development schemes.

Positions Held: Assistant Project Manager Activities Performed: Member of project team tasked with producing the document,

project managed the research efforts, coordinated stakeholder engagement activities and co-authored the document

Name of Project: Regional Network Reports for the West Midlands Year: 2005 and 2006 Location: West Midlands, United Kingdom Client: Highways Agency Main Project Features: Project Manager Positions Held: The ‘Regional Network Report’ (formerly ‘Regional Investment

Strategy’) provided a long term assessment of the performance of England’s strategic road network against a range of indicators for safety and congestion. This yearly publication assessed how the attainment of development aspirations of regional and local planning bodies (as expressed in planning, transport and economic development strategies) would impact on the performance of the strategic road network, both in the short and long term.

Activities Performed: Led multidisciplinary team of consultants, provided technical oversight on project deliverables and was responsible for quality assurance and financial performance of the project.

Corporate Profile Sanol Engineering Consultants Ltd.

* Consulting Engineers * Development Consultants * Project Managers

133

Name of Project: Burntwood Town Centre Redevelopment – Phase 1 Year: 2005-2007 Location: West Midlands, United Kingdom Client: London and Cambridge Properties Main Project Features: £20million regeneration scheme which incorporated multiple retail

units with associated parking, highway and public transport improvements, landscaping and environmental remediation.

Positions Held: Project Manager-Transportation Planning/Traffic Engineering Activities Performed: Led multidisciplinary teams of transportation planners, highway

design engineers and environmental consultants. Worked within the client’s wider project team and provided transport planning and engineering advice from initial scheme conception to granting of full planning permission by the local planning authority. Primarily responsible for preparing and securing the necessary technical approval for the Transport Assessment and Framework Travel Plan. Negotiated the S106/S278 agreements with the local authorities (highway and planning) and secured the Section 247 stopping up order (Town and Country Planning Act 1990), which was needed to enable the development achieve optimum retail footprint. Member of the client-appointed panel that was tasked with selecting the main contractor for constructing the scheme.

Name of Project: PA Route 41 Corridor Improvements Year: 2003-2004 Location: Pennsylvania, United States of America Client: Pennsylvania Department of Transportation Main Project Features: Feasibility Study on various improvement options for route

optimisation and traffic calming along a 12-mile stretch of PA Route 41.

Positions Held: Traffic Engineer Activities Performed: Data collection and analysis, travel demand forecasting, junction

capacity assessments and corridor analysis (traffic modelling), accident analysis and road safety review, review of conceptual plans and preliminary designs, client/stakeholder liaisons and preparation of technical reports.

Name of Project: Corridor Study for NJ Route 36 Year: 2003-2004 Location: New Jersey, United States of America Client: New Jersey Department of Transportation Main Project Features: Route Signal Optimisation Positions Held: Traffic Engineer Activities Performed: Data collection and analysis, travel demand forecasting, junction

capacity assessments and corridor analysis (traffic modelling), accident analysis and road safety engineering, client/stakeholder liaisons and preparation of technical reports.

Name of Project: PENNDOT 2-0 Regional ITS Architecture Development

Corporate Profile Sanol Engineering Consultants Ltd.

* Consulting Engineers * Development Consultants * Project Managers

134

Programme Year: 2001-2004 Location: Pennsylvania, United States of America Client: Pennsylvania Department of Transportation/Federal Highways

Administration Main Project Features: The ‘Regional ITS Architecture Development Programme’ was

commissioned by the Pennsylvania Department of Transportation’s Engineering District 2-0 in conjunction with the Federal Highways Administration in the USA. The programme aimed to address major regional transportation issues through the development of a framework that mapped key transport challenges and identified needs to proven cost-effective ITS technologies and management strategies (as defined within the US National ITS Architecture). The programme also identified partnership opportunities to address institutional challenges across a vast study area (over 7,000 square miles) that included nine counties within Pennsylvania

Positions Held: Assistant Project Manager Activities Performed: Coordinated stakeholder outreach activities (surveys, meetings,

seminars and workshops) and managed the delivery of several project outputs, including project newsletters, project website, monthly progress updates and technical reports. Collated and analysed transportation systems data and developed the draft ‘Turbo ITS architecture database’ using the Turbo Architecture software.

Name of Project: Center County Dynamic Incident Management System Year: 2001-2003 Location: Pennsylvania, United States of America Client: Pennsylvania Department of Transportation Main Project Features: The project reviewed existing traffic incident management

practices, communications infrastructure, ITS deployments and major institutional challenges affecting traffic incident management operations within Center County, Pennsylvania, identified operational and infrastructure deficiencies and recommended action plans to address these gaps.

Positions Held: Assistant Project Manager Activities Performed: Managed data collection and analysis, coordinated stakeholder

consultations and co-authored the final report. The final report included recommendations on deploying cost-effective ITS subsystems, interagency incident management response plans and a dynamic incident management GIS database.

Name of Project: Interstate 99 Corridor Incident Management Plan Year: 2001-2003

Corporate Profile Sanol Engineering Consultants Ltd.

* Consulting Engineers * Development Consultants * Project Managers

135

Location: Pennsylvania, United States of America Client: Pennsylvania Department of Transportation Main Project Features: Project was commissioned to establish an integrated corridor-wide

strategy for managing traffic incidents. Positions Held: Traffic Engineer Activities Performed: Managed data collection and analysis, identified stakeholders and

agency roles in incident management operations and coordinated stakeholder consultations and various research efforts. Established user needs and other system requirements through surveys, meetings and workshops.Provided technical input for the development of the ‘Highway Advisory Radio Operations Manual’ and draft ‘Incident Management Plan-Phase 1’.

Other Notable Relevant Projects (2000-Present)

• Stage 3 Road Safety Audit for new Roundabout on A48, Lydney, Gloucester, UK • Mobility Audit on Section 278 Works, Gloucester, UK • Combined Stage F & 1 Road Safety Audit, Teddington Hands, Gloucestershire, UK • Development Control Advisory for BAA Colnbrook Logistics Centre, Heathrow Airport, UK • Development Control Advisory for Slough Intermodal Freight Exchange, Slough-UK • Transport Assessment and Traffic Engineering Services for Daventry Waste Transfer Station, Daventry-

UK • Development Control Advisory for Crossrail’s Northfleet Tunnelling Logistics Facility, Northfleet-UK • Workplace Travel Plan for Project Site Office (M1 Junctions 10 to 13 Improvement Scheme),

Bedfordshire-UK • Highways Agency’s Research on Traffic Impacts of Large Residential Developments-UK • Development Control Advisory for Birmingham International Airport’s Runway Extension,

Birmingham-UK • Development Control Advisory for Coventry Airport’s New Terminal Building, Coventry-UK • Development Control Advisory for East Midlands Airport Expansion, Nottingham-UK • Strategic Appraisal for Longbridge Regeneration Scheme/Area Action Plan, Birmingham/Bromsgrove-

UK • Public Inquiry Advisory for M42 Motorway Service Area Inquiry, Solihull-UK • Traffic Engineering Services for Western Expansion Area Mixed-Use development, Milton Keynes-UK • Development Control Advisory for Walsall Office Corridor/Gigaport development, Walsall-UK • Development Control Advisory for Walsall Waterfront Mixed-Use development, Walsall-UK • Development Control Advisory, Lichfield Park Mixed-Use development Phase 2, Lichfield-UK • Development Control Advisory for Walsall College/TESCO retail development, Walsall-UK • West Midlands Regional Spatial Strategy (RSS11), West Midlands-UK • Transport Assessment & Travel Plan for Primary Care Centre, Cleethorpes-UK • Transport Assessment for Woolley Hall office/residential developments, Littlewick Green-Maidenhead-

UK • Corridor Study for CR537, Monmouth County, New Jersey-USA • Corridor Study for CR520, Monmouth County, New Jersey-USA • Traffic Impact Study for Whitebrooke Mixed-Use Development, Great Valley, Pennsylvania-USA

Corporate Profile Sanol Engineering Consultants Ltd.

* Consulting Engineers * Development Consultants * Project Managers

136

• Traffic Impact Study for Park Towne Place – Residential Redevelopment, Philadelphia, Pennsylvania-USA

• Road Safety Audit for Ninth Street, Ocean City, New Jersey-USA • Road Safety Audit for Fulling Mill Road (CR654), Lower/Middle Townships, Cape May County New

Jersey-USA • Circulation & Parking Study for Philadelphia Museum of Art, Philadelphia, Pennsylvania-USA • Corridor Study for I-287 Raritan River, Middlesex & Somerset Counties, New Jersey-USA

1. Certification I, the undersigned, certify that (i) I was not a former employee of the Client immediately before the submission of this proposal, and (iii) to the best of my knowledge and belief, this biodata correctly describes myself, my qualifications, and my experience. I understand that any willful mis-statement described herein may lead to my disqualification or dismissal, if engaged. I have been employed by Sanol Engineering Consultants Ltd. continuously for the last twelve (12) months as regular part time staff. Indicate “Yes” or “No” in the boxes below: YES NO

__________________________ __________________________ Signature Date

Full Name of Authorized Representative: ENGR. (DR.)BANKOLE, ILESANMI OLORUNFEMI