t a n 0 e 1 m e d c g a l n p sheet index e r t cover ... r o j e c t l o c a t io n m a p a.02...

14
THE DNR INSPECTOR. REINFORCED CONCRETE PIPES AND INCIDENTAL WORK AS REQUIRED BY PAVEMENT AND THE INSTALLATION OF DOUBLE 30" EQUIVALENT ARCH EXISTING 12" METAL PIPES, PCC LOW WATER CROSSING, EXISTING HMA THE CULVERT REPLACEMENT PROJECT INCLUDES THE REMOVAL OF FOUR ALL 17 G.02 G.01 E.01 D.03 D.02 D.01 C.02 C.01 B.04 B.03 B.02 B.01 A.02 A.01 SURVEY CONTROL SURVEY CONTROL DEMOLITION SHEET PROFILE SHEET PROFILE SHEET PLAN SHEET GENERAL NOTES QUANTITIES & NOTES GENERAL DETAILS GENERAL DETAILS GENERAL DETAILS GENERAL DETAILS PROJECT LOCATION MAPS COVER SHEET LACEY-KEOSAUQUA STATE PARK L AC E Y - K E O S AUQ UA S T ATE P AR K CULVERT REPLACEMENT CUL VE RTRE P L ACE M E NTF O R: 16-06-89-01 PROJECT # 16-06-89-01 VAN BUREN COUNTY VAN B URE N CO UNT Y, O W A August 2016 PROJECT DESCRIPTION AUTHORIZATION TO BID DATE ENGINEERING BUREAU CHIEF DATE AUTHORIZATION - PARKS | WILDLIFE | FISHERIES | LAW ENFORCEMENT | FORESTRY PROJECT NUMBER: DATE: NO. DATE BY REVISION DRAWN BY: CHK’D BY: SHEET No: NAT U R ALR E S OU RC E S I O W A DE P AR T M E NTO F 502 E . 9 T H S T ., DE SM O NE S , A 50319 - 0034 E NG NEE RNG S E RVI CE S- W ALL ACEB UL NG DIRECTORY COMPANY ADDRESS CITY,STATE,ZIP TELEPHONE FAX EMAIL CONTACT COMPANY ADDRESS CITY,STATE,ZIP TELEPHONE FAX EMAIL CONTACT PROJECT MANAGER CONSTRUCTION INSPECTOR CONS ULT ANT : I hereby certify that this engineering document was prepared by me or under my direct personal supervision and that I am a duly licensed Professional Engineer under the laws of the Date My license renewal date is December 31, 20 Pages or sheets covered by this seal: IOWA DEPARTMENT OF NATURAL RESOURCES FOR CONSTRUCTION DOCUMENTS State of Iowa. 10: 11: 45 AM 9/2/2016 mal dr i c N:\Cons er vati on Recr eati on\Land and Wat er s \Engi neer i ng\PROJECTS\ACTI VE\VAN BUREN\#16- 06- 89- 01, Lacey - Keos auqua, Cul ver t Repl acement\02 Des i gn\16- 06- 89- 01 Lacey - Keo Cul ver t Repl acement _ SHEET INDEX C OVE R S HEET DES MOINES, IA 50319 502 EAST 9TH STREET IOWA DEPARTMENT OF NATURAL RESOURCES A.01 [email protected] 515-725-8468 MANDI ALDRICH PETERS [email protected] 515-985-9196 MICHAEL DUFOE DES MOINES, IA 50319 502 EAST 9TH STREET IOWA DEPARTMENT OF NATURAL RESOURCES 14439 A W O I G R E E N I N E L O A N I S S E F O R P D E S N E C I L PETERS ALDRICH MANDI LU Mandi Lu Aldrich Peters, Iowa Reg. No. 14439

Upload: vanhanh

Post on 26-Apr-2018

213 views

Category:

Documents


1 download

TRANSCRIPT

THE DNR INSPECTOR.

REINFORCED CONCRETE PIPES AND INCIDENTAL WORK AS REQUIRED BY

PAVEMENT AND THE INSTALLATION OF DOUBLE 30" EQUIVALENT ARCH

EXISTING 12" METAL PIPES, PCC LOW WATER CROSSING, EXISTING HMA

THE CULVERT REPLACEMENT PROJECT INCLUDES THE REMOVAL OF FOUR

ALL

17

G.02

G.01

E.01

D.03

D.02

D.01

C.02

C.01

B.04

B.03

B.02

B.01

A.02

A.01

SURVEY CONTROL

SURVEY CONTROL

DEMOLITION SHEET

PROFILE SHEET

PROFILE SHEET

PLAN SHEET

GENERAL NOTES

QUANTITIES & NOTES

GENERAL DETAILS

GENERAL DETAILS

GENERAL DETAILS

GENERAL DETAILS

PROJECT LOCATION MAPS

COVER SHEET

LACEY-KEOSAUQUA STATE PARK

LA

CE

Y-K

EO

SA

UQ

UA S

TA

TE P

AR

K

CULVERT REPLACEMENT

CU

LV

ER

T R

EP

LA

CE

ME

NT F

OR:

16-06-89-01

PROJECT # 16-06-89-01

VAN BUREN COUNTY

VA

N B

UR

EN C

OU

NTY, IO

WA

August 2016

PROJECT DESCRIPTION AUTHORIZATION TO BID

DATEENGINEERING BUREAU CHIEF

DATEAUTHORIZATION - PARKS | WILDLIFE | FISHERIES | LAW ENFORCEMENT | FORESTRYPROJECT NUMBER:

DATE:

NO.DATE

BYREVISION

DRAWN BY:

CHK’D BY:

SHEET No:

NA

TU

RA

L R

ES

OU

RC

ES

IOW

A D

EP

ART

ME

NT O

F

502 E. 9TH S

T., D

ES M

OIN

ES, IA 5

0319-0

034

EN

GIN

EERIN

G S

ER

VIC

ES - W

ALLA

CE B

UILIN

G

DIRECTORY

COMPANY

ADDRESS

CITY,STATE,ZIP

TELEPHONE

FAX

EMAIL

CONTACT

COMPANY

ADDRESS

CITY,STATE,ZIP

TELEPHONE

FAX

EMAIL

CONTACT

PROJECT MANAGER CONSTRUCTION INSPECTOR

CO

NS

ULTA

NT:

I hereby certify that this engineering document was prepared

by me or under my direct personal supervision and that I am

a duly licensed Professional Engineer under the laws of the

Date

My license renewal date is December 31, 20

Pages or sheets covered by this seal:

IOWA DEPARTMENT OF NATURAL RESOURCES

FORCONSTRUCTION DOCUMENTS

State of Iowa.

10:11:45

AM

9/2/2016

maldric

N:\

Conservation

Recreation\

Land and

Waters\

Engineering\

PR

OJ

EC

TS\

AC

TI

VE\

VA

N

BU

RE

N\#

16-06-89-01,

Lacey-

Keosauqua,

Culvert

Replace

ment\02

Design\16-06-89-01

Lacey-

Keo

Culvert

Replace

ment_

A01.dgn

SHEET INDEX

CO

VER S

HEET

DES MOINES, IA 50319

502 EAST 9TH STREET

IOWA DEPARTMENT OF NATURAL RESOURCES

[email protected]

515-725-8468

MANDI ALDRICH PETERS

[email protected]

515-985-9196

MICHAEL DUFOE

DES MOINES, IA 50319

502 EAST 9TH STREET

IOWA DEPARTMENT OF NATURAL RESOURCES

14439

AWOI

GR

EE

NIN

E

LO

ANISSEFORP

DE

SN

ECI

L

PETERS

ALDRICH

MANDI LU

Mandi Lu Aldrich Peters, Iowa Reg. No. 14439

PR

OJEC

T L

OC

ATIO

N M

AP

A.02

VICINITY MAP LOCATION MAP

1

1

2

22

280TH ST

LA

UR

EL R

D

280TH ST

295TH ST

FIR A

VE

287TH ST

240TH ST

GR

AY A

VE

275TH ST LA

RK A

VE

230TH ST

AM

BER A

VE

250TH ST

210TH ST

KIN

G A

VE

195TH ST

205TH ST

IRIS TRL

DEER A

VE

195TH ST

200TH RD

CLO

VER R

D

210TH ST

NO

VA A

VE

285TH RD

GR

AY A

VE

295TH ST

HIC

KO

RY

AV

E

290TH RD

300TH RD

LA

RK A

VE

302ND ST

305TH ST

280TH ST

DA

VIS-V

AN B

UR

EN

AV

E

290TH ST

DEER A

VE

FIR A

VE

300TH ST300TH ST

RTE J40

NO

VA A

VE

245TH ST

RTE W

20

RTE J40

235TH ST

HE

ATH

ER A

VE

245TH ST

247TH ST

252ND ST

250TH ST

LA

RK A

VE

265TH ST

JERSE

Y A

VE

IOW

A O

AK G

RO

VE A

VE

260TH ST

GO

LD A

VE

HE

ATH

ER A

VE

RTE J40220TH ST

AM

BER A

VE

AC

OR

N R

D

RTE V

56

RTE V

56

CE

DA

R A

VE

DEER A

VE

DO

VE A

VE

230TH ST

235TH ST

RTE V

64

240TH ST

245TH ST

252ND ST

RTE V

64

ELK A

VE

DEER A

VE

CE

DA

R A

VE

CH

ESTN

UT A

VE

AM

BER A

VE

HA

WK D

R

MA

PLE A

VE

IVO

RY R

D

185TH ST

185TH RD

197TH RD

EA

GLE D

R

RTE J40

JERSE

Y A

VE

IVY TRL

205TH STHE

ATH

ER R

D

HE

ATH

ER R

D RTE J40

215TH ST

CH

ESTN

UT A

VE

185TH RD

185TH RD

185TH ST

197TH RD

FIR A

VE

RTE V

64

205TH RD

205TH R

D

AC

OR

N A

VE

RTE J40

195TH ST

CLO

VER R

D

IVY TR

L

202ND RD

CO R

D V

56

CO R

D V

56

ST

210TH

GO

LD A

VE

FA

LC

ON A

VE

EM

ER

ALD A

VE

ME

AD

OW A

VE

220TH ST

222ND ST

JE

WEL A

VE

245TH S

T

270TH ST

KE

YSTO

NE A

VE

EM

ER

ALD A

VE

EM

ER

ALD A

VE

MAPLE A

VE190TH ST

ME

AD

OW A

VE

MA

PLE A

VE

EV

ER

GR

EE

N A

VE

JA

SMIN

E R

D

LA

CE

Y T

RL

265TH R

D

RTE V

56

255TH ST

190TH ST

212TH ST

IVO

RY A

VE

245TH ST

KIN

G S

T

AM

BER A

VE

275TH ST

RD

GA

RD

EN

BU

RE

N A

VE

DA

VIS-V

AN

AVE

GOLD

AV

E

HIC

KO

RY

GR

OV

E A

VE

IOW

A O

AK

CLARK CO.

DA

VIS C

O.

SCOTLAND CO.

SCOTLAND CO.

KEOSAUQUA

CANTRIL

MILTON

Fox

River

Little

Fox

River

Fox

River

Chequest

Creek

LAKE

SUGEMA

MAPCO

R-10W

R-11W

T-67

NT-68

NT-69

N

PITTSBURG

LEBANON

PARK

STATE

KEOSAUQUA

LACY-

WILDLIFE AREA

LAKE SEGUMA

FOREST

SHIMEK

V A N B U R E N

C H E Q U E S T

J A C K S O N

D E S M O I N E S

25

15

2829

24

32

19 20

27

28

34

9

23456

15

12

12

127

8

18

262728

29

23

27

2930

31

5 4 36

36

26 2530

31 32

33

29

2119 20

1416

27

30

26

3536

32

1318

30

171813141516

17

910 11

2122

28

343335

3025

21 22 23 24 19

20

29

1713

6

31

56

7 8

12

1110

98

7

16

14

1

127

17181314

111098

17 1618

7

1314

1110

15161718

7 8

1815

17

20

292526

19242322

2120

19242322

14151617

18

323135

34333231363534333231

6 5 4 32

16 5

4

3

21

13 18

30

17

2

S T A T E O F M I S S O U R I

V64

V64J40

J40

V56

J40

J40

W20

J56 J56

W20

AIRPORT

MUNICIPAL

KEOSAUQUA

36

POP.

1006

POP.

443

POP.

222

POP.

STERLINGMOUNT

LA

CE

Y-K

EO

SA

UQ

UA S

TA

TE P

AR

K

CU

LV

ER

T R

EP

LA

CE

ME

NT F

OR:

16-06-89-01

VA

N B

UR

EN C

OU

NTY, IO

WA

August 2016

PROJECT NUMBER:

DATE:

NO.DATE

BYREVISION

DRAWN BY:

CHK’D BY:

NA

TU

RA

L R

ES

OU

RC

ES

IOW

A D

EP

ART

ME

NT O

F

502 E. 9TH S

T., D

ES M

OIN

ES, IA 5

0319-0

034

EN

GIN

EERIN

G S

ER

VIC

ES - W

ALLA

CE B

UILIN

G

CO

NS

ULTA

NT:

SHEET No:

10:11:47

AM

9/2/2016

maldric

N:\

Conservation

Recreation\

Land and

Waters\

Engineering\

PR

OJ

EC

TS\

AC

TI

VE\

VA

N

BU

RE

N\#

16-06-89-01,

Lacey-

Keosauqua,

Culvert

Replace

ment\02

Design\16-06-89-01

Lacey-

Keo

Culvert

Replace

ment_

A02.dgn

PROJECT LOCATION

B.01

GE

NER

AL D

ETAIL

S

2’

Pavement w/ IDOT C4 Mix

7" Non-Reinforced Concrete

2’

12" Prepared Subgrade

Typical Roadway Pavement

20’

6" Special Backfill

A B

Station

10+11.53

+2.65% +0.35%

A B

+2.15% -0.15%

+2.00% -0.65%

+2.00% -1.15%

+2.00% -1.65%

+2.00% -2.00%

13+58.16

+2.00% -2.00%

+3.15%* +0.85%*

+2.55%* -2.45%*

Pavement Slope Changes

10+20

10+30

10+40

10+50

10+60

10+70

13+50

*NOTE: Match existing slope

LA

CE

Y-K

EO

SA

UQ

UA S

TA

TE P

AR

K

CU

LV

ER

T R

EP

LA

CE

ME

NT F

OR:

16-06-89-01

VA

N B

UR

EN C

OU

NTY, IO

WA

August 2016

PROJECT NUMBER:

DATE:

NO.DATE

BYREVISION

DRAWN BY:

CHK’D BY:

NA

TU

RA

L R

ES

OU

RC

ES

IOW

A D

EP

ART

ME

NT O

F

502 E. 9TH S

T., D

ES M

OIN

ES, IA 5

0319-0

034

EN

GIN

EERIN

G S

ER

VIC

ES - W

ALLA

CE B

UILIN

G

CO

NS

ULTA

NT:

SHEET No:

10:11:50

AM

9/2/2016

maldric

N:\

Conservation

Recreation\

Land and

Waters\

Engineering\

PR

OJ

EC

TS\

AC

TI

VE\

VA

N

BU

RE

N\#

16-06-89-01,

Lacey-

Keosauqua,

Culvert

Replace

ment\02

Design\16-06-89-01

Lacey-

Keo

Culvert

Replace

ment_

B01.dgn

B.02

GE

NER

AL D

ETAIL

S

ROCK CHECK DAM

DITCH PROFILE

SECTION A-A

A

L

6" min.

Engineering Fabric

Excavation Trench

Original Ground Line

11.5

1.5

1

6" min.

A

FabricEngineering

to remain in the excavation trench.

flush with and/or below final ditch grade will be allowed

ditch grade. Rock, silt, and engineering fabric that is

required to remove all rock and material above original

Payment is full compensation for all labor and equipment

the contract unit price for each Rock Check Dam removed.

Basis of Payment for Removal of Rock Check Dam will be at

be by count.

Method of Measurement for Removal of Rock Check Dam will

needed during the project.

when capacity reaches 50%, and for any repair that is

full compensation for clean out and disposal of material

at the contract unit price for each occurrence. Payment is

Basis of Payment for Maintenance of Rock Check Dam will be

will be by count.

Method of Measurement for Maintenance of Rock Check Dam

paid for separately.

prior to placing revetment are incidental and will not be

required to cut trench and engineering fabric installed

construct the Rock Check Dam as shown. Class 10 excavation

for all materials, labor, and equipment required to

unit price per linear foot. Payment is full compensation

Basis of Payment for Rock Check Dam will be the contract

feet to the nearest 0.1 feet.

Method of Measurement for Rock Check Dam will be in linear

Use Class A Revetment to construct Rock Check Dam.

6" min.

2’ min.

Rock

Rock Rock

Rock

LA

CE

Y-K

EO

SA

UQ

UA S

TA

TE P

AR

K

CU

LV

ER

T R

EP

LA

CE

ME

NT F

OR:

16-06-89-01

VA

N B

UR

EN C

OU

NTY, IO

WA

August 2016

PROJECT NUMBER:

DATE:

NO.DATE

BYREVISION

DRAWN BY:

CHK’D BY:

NA

TU

RA

L R

ES

OU

RC

ES

IOW

A D

EP

ART

ME

NT O

F

502 E. 9TH S

T., D

ES M

OIN

ES, IA 5

0319-0

034

EN

GIN

EERIN

G S

ER

VIC

ES - W

ALLA

CE B

UILIN

G

CO

NS

ULTA

NT:

SHEET No:

10:11:52

AM

9/2/2016

maldric

N:\

Conservation

Recreation\

Land and

Waters\

Engineering\

PR

OJ

EC

TS\

AC

TI

VE\

VA

N

BU

RE

N\#

16-06-89-01,

Lacey-

Keosauqua,

Culvert

Replace

ment\02

Design\16-06-89-01

Lacey-

Keo

Culvert

Replace

ment_

B02.dgn

B.03

GE

NER

AL D

ETAIL

S

6"

1’-8" W

W WD D

42"

36"

30"

24"

18"

15"

12"

4f2

4f1

4f2

4f1

4f2

4f1

4f2

4f1

4f2

4f1

4f2

4f1

4f2

4f1

Mark

4

4

4

4

4

4

4

4

4

4

4

4

4

4

Size

5

3

5

3

4

3

3

3

3

3

2

3

2

3

Count

4f2

4f1

4f2

4f1

4f2

4f1

4f2

4f1

4f2

4f1

4f2

4f1

4f2

4f1

Mark

4

4

4

4

4

4

4

4

4

4

4

4

4

4

Size

3’-8"

10’-9"

3’-8"

10’-3"

3’-8"

9’-8"

3’-8"

8’-7"

3’-8"

8’-7"

3’-8"

8’-1"

3’-8"

7’-6"

Length

8

3

7

3

7

3

6

3

6

3

6

3

6

3

Count

84"

78"

72"

66"

60"

54"

48"

11’-1"

10’-7"

10’-0"

8’-11"

8’-11"

8’-5"

7’-10"

TYPICAL SECTION ELEVATION

RCP Apron Section

D

48"48"

Section

RCP Apron

4f1

4f2

#4 Bars @ 18" o.c.

21

REINFORCING BAR LIST

RCP APRON SECTION FOOTING

3’-8"

6’-11"

3’-8"

6’-4"

3’-8"

5’-3"

3’-8"

4’-2"

3’-8"

3’-1"

3’-8"

2’-6 "

3’-8"

2’-0"

Length

7’-3"

6’-8"

5’-7"

4’-6"

3’-5"

2’-10 "

2’-4"

LA

CE

Y-K

EO

SA

UQ

UA S

TA

TE P

AR

K

CU

LV

ER

T R

EP

LA

CE

ME

NT F

OR:

16-06-89-01

VA

N B

UR

EN C

OU

NTY, IO

WA

August 2016

PROJECT NUMBER:

DATE:

NO.DATE

BYREVISION

DRAWN BY:

CHK’D BY:

NA

TU

RA

L R

ES

OU

RC

ES

IOW

A D

EP

ART

ME

NT O

F

502 E. 9TH S

T., D

ES M

OIN

ES, IA 5

0319-0

034

EN

GIN

EERIN

G S

ER

VIC

ES - W

ALLA

CE B

UILIN

G

CO

NS

ULTA

NT:

SHEET No:

10:11:53

AM

9/2/2016

maldric

N:\

Conservation

Recreation\

Land and

Waters\

Engineering\

PR

OJ

EC

TS\

AC

TI

VE\

VA

N

BU

RE

N\#

16-06-89-01,

Lacey-

Keosauqua,

Culvert

Replace

ment\02

Design\16-06-89-01

Lacey-

Keo

Culvert

Replace

ment_

B03.dgn

B.04

GE

NER

AL D

ETAIL

S

TYPICAL SECTION

ELEVATION

2’

MI

N.

3’ TYP. 3’ TYP.

Section

RCP Apron

Section

RCP Apron

Class "E" Revetment

2’

MI

N.

5’ MIN.

FS

Footing

6"

Section

RCP Apron

Fabric

Engineering

Fabric

Engineering

Fabric

Engineering

6"

6"

Class "E" Revetment

Footing Footing

2’

MI

N.

LA

CE

Y-K

EO

SA

UQ

UA S

TA

TE P

AR

K

CU

LV

ER

T R

EP

LA

CE

ME

NT F

OR:

16-06-89-01

VA

N B

UR

EN C

OU

NTY, IO

WA

August 2016

PROJECT NUMBER:

DATE:

NO.DATE

BYREVISION

DRAWN BY:

CHK’D BY:

NA

TU

RA

L R

ES

OU

RC

ES

IOW

A D

EP

ART

ME

NT O

F

502 E. 9TH S

T., D

ES M

OIN

ES, IA 5

0319-0

034

EN

GIN

EERIN

G S

ER

VIC

ES - W

ALLA

CE B

UILIN

G

CO

NS

ULTA

NT:

SHEET No:

10:11:53

AM

9/2/2016

maldric

N:\

Conservation

Recreation\

Land and

Waters\

Engineering\

PR

OJ

EC

TS\

AC

TI

VE\

VA

N

BU

RE

N\#

16-06-89-01,

Lacey-

Keosauqua,

Culvert

Replace

ment\02

Design\16-06-89-01

Lacey-

Keo

Culvert

Replace

ment_

B04.dgn

CONSTRUCTION NOTES:

PROTECTION DETAILSEMBANKMENT

B, 3 OF THE STANDARD SPECIFICATIONS.

REQUIREMENTS IN ACCORDANCE WITH ARTICLE 4196.01,

THE ENGINEERING FABRIC SHALL MEET THE MATERIAL

SPECIFICATIONS.

ACCORDING TO ARTICLE 2507.03 OF THE STANDARD

CLASS E REVETMENT SHOULD BE USED AND PLACED

QU

AN

TITIE

S & N

OTES

C.01

ESTIMATED PROJECT QUANTITIES

ITEM NO. ITEM UNIT TOTAL

LA

CE

Y-K

EO

SA

UQ

UA S

TA

TE P

AR

K

CU

LV

ER

T R

EP

LA

CE

ME

NT F

OR:

16-06-89-01

VA

N B

UR

EN C

OU

NTY, IO

WA

August 2016

ESTIMATE REFERENCE INFORMATION

DESCRIPTIONITEM

NO.

PROJECT NUMBER:

DATE:

NO.DATE

BYREVISION

DRAWN BY:

CHK’D BY:

NA

TU

RA

L R

ES

OU

RC

ES

IOW

A D

EP

ART

ME

NT O

F

502 E. 9TH S

T., D

ES M

OIN

ES, IA 5

0319-0

034

EN

GIN

EERIN

G S

ER

VIC

ES - W

ALLA

CE B

UILIN

G

CO

NS

ULTA

NT:

SHEET No:

10:11:55

AM

9/2/2016

maldric

N:\

Conservation

Recreation\

Land and

Waters\

Engineering\

PR

OJ

EC

TS\

AC

TI

VE\

VA

N

BU

RE

N\#

16-06-89-01,

Lacey-

Keosauqua,

Culvert

Replace

ment\02

Design\16-06-89-01

Lacey-

Keo

Culvert

Replace

ment_

C01.dgn

(8th & 9th in 2016).

NOTE: Construction is not allowed to begin prior to the Scenic Drive Festival the second full weekend of October

LS

LS

LS

LF

ACRE

LS

TON

LF

CY

CY

CY

CY

CY

EACH

LF

EACH

EACH

EACH

EACH

LF

TON

SY

STA

SY

LF

SY

LF

LS

LS

site is stabilized.

remain in place and be maintained during construction. DNR Park staff will remove once the

A. Filter sock shall be installed to prevent sediment from exiting the project site and shall

EROSION CONTROL25

A. DOT Standard Road Plan DR-101

FLOODED BACKFILL20

A. DOT Standard Road Plan DR-101

FLOWABLE MORTAR19

be allowed.

A. A suitable borrow site shall be obtained by the contractor. No payment for overhaul will

EMBANKMENT-IN-PLACE18

EXCAVATION, CLASS 2017

EXCAVATION, CLASS 10, ROADWAY AND BORROW16

A. The parking area at the park will be 6" Class "A" Crushed Stone..

CLASS "A" CRUSHED STONE9

provided it meets the gradation requirements.

B. The contractor may crush ACC from the pavement removal and use as recycled material

A. Existing ACC from pavement removal shall be used on the project as a special backfill.

SPECIAL BACKFILL8

A. No payment for overhaul will be allowed for earth shoulder material.

SHOULDER CONSTRUCTION, EARTH7

A. Joints shall be sawcut at standard spacing, 12’ maximum.

PAVING, P.C. CONCRETE, 7"6

A. The contractor shall cut the existing pavement as indicated in the plan sheets.

SAW CUTTING EXISTING ASPHALT PAVEMENT5

C. Overhaul shall be considered incidental.

B. Disposal is the responsibility of the contractor.

A. The contractor shall remove the existing pavement as indicated in the plan sheets.

REMOVAL OF EXISTING PAVEMENT4

C. Overhaul shall be considered incidental.

B. Disposal is the responsibility of the contractor.

A. The contractor shall remove the existing pipes as indicated in the plan sheets.

REMOVAL OF EXISTING PIPE3

C. Overhaul shall be considered incidental.

B. Disposal is the responsibility of the contractor.

A. The contractor shall remove the existing structure as indicated in the plan sheets.

REMOVAL OF EXISTING STRUCTURE2

B. Disposal is the responsibility of the contractor.

DNR Inspector.

A. Includes the removal and disposal of trees as shown in the plans and as directed by the

CLEARING AND GRUBBING1

1

1

1

895

0.11

1

40

24

93.6

18.4

248.5

10.0

31.7

2

22

1

6

2

4

112

11

867

7

788.1

40

709.5

22

1

1

28

27

26

25

24

23

22

21

20

19

18

17

16

15

14

13

12

11

10

9

8

7

6

5

4

3

2

1

MOBILIZATION

CONSTRUCTION STAKING

TRAFFIC CONTROL

EROSION CONTROL

SEEDING, FERTILIZING AND MULCHING

FINISH GRADING

REVETMENT, CLASS E

ROCK CHECK DAM

FLOODED BACKFILL

FLOWABLE MORTAR

EMBANKMENT-IN-PLACE

EXCAVATION, CLASS 20

EXCAVATION, CLASS 10, ROADWAY AND BORROW

APRON, LOW CLEARANCE CONCRETE, EQUIV. DIAM. 18 IN.

CULVERT, LOW CLEARANCE CONCRETE ENTRANCE PIPE, EQUIV. DIAM. 18 IN.

PIPE FOOTING

APRON GUARD, DR-213

APRON, LOW CLEARANCE CONCRETE, EQUIV. DIAM. 30 IN.

CULVERT, LOW CLEARANCE CONCRETE ROADWAY PIPE, EQUIV. DIAM. 30 IN.

CLASS "A" CRUSHED STONE

SPECIAL BACKFILL

SHOULDER CONSTRUCTION, EARTH

PAVING, P.C. CONCRETE, 7"

SAW CUTTING EXISTING ASPHALT PAVEMENT

REMOVAL OF PAVEMENT

REMOVAL OF EXISTING PIPE

REMOVAL OF EXISTING STRUCTURE

CLEARING AND GRUBBING

C.02

GE

NER

AL N

OTES

LA

CE

Y-K

EO

SA

UQ

UA S

TA

TE P

AR

K

CU

LV

ER

T R

EP

LA

CE

ME

NT F

OR:

16-06-89-01

VA

N B

UR

EN C

OU

NTY, IO

WA

August 2016

GENERAL NOTES

PROJECT NUMBER:

DATE:

NO.DATE

BYREVISION

DRAWN BY:

CHK’D BY:

NA

TU

RA

L R

ES

OU

RC

ES

IOW

A D

EP

ART

ME

NT O

F

502 E. 9TH S

T., D

ES M

OIN

ES, IA 5

0319-0

034

EN

GIN

EERIN

G S

ER

VIC

ES - W

ALLA

CE B

UILIN

G

CO

NS

ULTA

NT:

SHEET No:

10:11:56

AM

9/2/2016

maldric

N:\

Conservation

Recreation\

Land and

Waters\

Engineering\

PR

OJ

EC

TS\

AC

TI

VE\

VA

N

BU

RE

N\#

16-06-89-01,

Lacey-

Keosauqua,

Culvert

Replace

ment\02

Design\16-06-89-01

Lacey-

Keo

Culvert

Replace

ment_

C02.dgn

be subject to the approval of the DNR Engineer.

equipment or use these areas for storage of materials. Storage, parking and service areas will

construction limits. The contractor will not be permitted to park or service vehicles and

N. The contractor shall not disturb desirable grass areas and desirable trees outside the

or delay caused by such work.

No claims for additional compensation will be allowed to the contractor for any interference

responsibility to determine their existence and exact location and to avoid damage thereto.

others, the existence of which is presently not known or shown. It is the contractor’s

therefore their locations must be considered approximate only. It is possible there may be

facilities, structures and utilities have been plotted from available surveys and records and

afforded access to these facilities for necessary modification of services. Underground

Engineer of those utilities prior to the beginning of any construction. The contractor shall be

construction area, it shall be the responsibility of the contractor to notify the DNR

M. Where utilities and fixtures are shown as existing on the plans or encountered within the

Backfill to the top of all rock or paved surfaces.L.

The contractor shall seed, fertilize and mulch all disturbed areas. Use Class "C" seed mixture.K.

Topsoil shall be spread to a minimum thickness of 6 inches on all disturbed unpaved areas. J.

to finish grade.

The contractor shall shape graded area to maintain surface drainage. All elevations shown are I.

silt fence, rock ditch checks, silt basins or silt dikes.

to install and maintain erosion control features of the project. This may involve seeding,

The contractor is expected to have materials, equipment, and labor available on a daily basis H.

considered incidental to other bid items in the project.

any such operations shall be restored to an applicable condition. This operation shall be

the right of way or project limits (including borrow areas and operation sites) disturbed by

practical - preferably the day created and not later than the following day. Any portion of

directed by the Engineer to prevent future settlement. The voids shall be filled as soon as

fence posts, utility poles or piers, shall be filled and consolidated to finish grade as

All holes resulting from operations of the contractor, including removal of guardrail posts, G.

right-of-way, unless specifically stated in the plans or approved by the DNR Engineer.

allowed for material hauled to these sites. No material shall be placed within the

incorporated into the work involved on this project. No payment for overhaul will be

excess material (excavated material or broken concrete) which is not desirable to be

F. It shall be the contractor’s responsibility to provide waste areas or disposal sites for

ordinances.

All work shall conform to and be preformed in accordance with all applicable codes and E.

owner.

their negligence, or that of a subcontractor, and said repairs shall be approved by the

D. The contractor shall be responsible for any damage to existing facilities resulting from

proceeding with the work.

shall notify the DNR Engineer of any discrepancies, omissions, and/or conflicts prior to

C. The contractor shall verify, at the site, all dimensions and conditions shown on the plans and

to the plans, specification, special provisions and contract.

visit the project site shall not relieve the contractor from performing the work in accordance

themselves with the actual job conditions prior to bidding and the start of work. Failure to

The contractor shall visit the site and inspect the project area and thoroughly familiarize B.

District Inspector: Mike Dufoe (515) 985-9196a.

The contractor shall notify the following two weeks prior to demolition and/ or construction:A.

PROJECT NUMBER:

DATE:

NO.DATE

BYREVISION

DRAWN BY:

CHK’D BY:

NA

TU

RA

L R

ES

OU

RC

ES

IOW

A D

EP

ART

ME

NT O

F

502 E. 9TH S

T., D

ES M

OIN

ES, IA 5

0319-0

034

EN

GIN

EERIN

G S

ER

VIC

ES - W

ALLA

CE B

UILIN

G

CO

NS

ULTA

NT:

SHEET No:

10:12:05

AM

9/2/2016

maldric

N:\

Conservation

Recreation\

Land and

Waters\

Engineering\

PR

OJ

EC

TS\

AC

TI

VE\

VA

N

BU

RE

N\#

16-06-89-01,

Lacey-

Keosauqua,

Culvert

Replace

ment\02

Design\16-06-89-01

Lacey-

Keo

Culvert

Replace

ment_

D01.dgn

LA

CE

Y-K

EO

SA

UQ

UA S

TA

TE P

AR

K

CU

LV

ER

T R

EP

LA

CE

ME

NT F

OR:

16-06-89-01

VA

N B

UR

EN C

OU

NTY, IO

WA

August 2016

250’ Filter Sock

250’ Filter Sock

150’ Filter Sock

FL=575.64

125’ Filter Sock

120’ Filter Sock

Rock Check Dam

FL=575.91

30° Lt Ahead

56’-30" Equivalent Arch RCP

Sta. 11+39.72

Sta. 11+30.82 &

Riprap

Riprap50’

Mini

mum

28.8’

27.2’

Footing and Guards

RCP Aprons with

30" Equivalent Arch

to Drain

Ditches

Grade All *

Footings

RCP Aprons with

30" Equivalent Arch

FL=579.50

RCP Aprons with Footing

40’- 18" Equivalent Arch

Sta. 10+20.01, 20.9’ RT

FL=578.30

RCP Aprons with Footing

40’- 18" Equivalent Arch

Sta. 10+60, 19.9’ RT

10

+00

11

+00

12+00

13+00

14+00

11

+20.16

PC

12+60.26

PT

0+00

1+00

575.70

12"CMP

+575.73

12"CMP

+575.81

12"CMP

+575.86

12"

CM

P

+

575.87

12"C

MP

+575.97

12"C

MP

+576.00

576.04

576.04

"C

MP

+

576.04

576.05

576.05

12"C

MP

+

+

18"CMP FLOW 578.30

+

18"CMP FLOW 579.01

PLA

N S

HEET

D.01

O

FEET

3O

PR

OFIL

E S

HEET

D.02

PROJECT NUMBER:

DATE:

NO.DATE

BYREVISION

DRAWN BY:

CHK’D BY:

NA

TU

RA

L R

ES

OU

RC

ES

IOW

A D

EP

ART

ME

NT O

F

502 E. 9TH S

T., D

ES M

OIN

ES, IA 5

0319-0

034

EN

GIN

EERIN

G S

ER

VIC

ES - W

ALLA

CE B

UILIN

G

CO

NS

ULTA

NT:

SHEET No:

10:12:06

AM

9/2/2016

maldric

N:\

Conservation

Recreation\

Land and

Waters\

Engineering\

PR

OJ

EC

TS\

AC

TI

VE\

VA

N

BU

RE

N\#

16-06-89-01,

Lacey-

Keosauqua,

Culvert

Replace

ment\02

Design\16-06-89-01

Lacey-

Keo

Culvert

Replace

ment_

D02.dgn

LA

CE

Y-K

EO

SA

UQ

UA S

TA

TE P

AR

K

CU

LV

ER

T R

EP

LA

CE

ME

NT F

OR:

16-06-89-01

VA

N B

UR

EN C

OU

NTY, IO

WA

August 2016-

PVI 10

+11.53

Elev 581.79

PV

C 10

+11.71

Elev 581.78

PVI 10

+55.21

Elev 580.17

PV

T 10

+98.71

Elev 580.06

PV

C 12

+95.02

Elev 579.57

PVI 13

+20.02

Elev 579.51

PV

T 13

+45.02

Elev 579.33

PVI 13

+58.16

Elev 579.24

-3.70%

-0.25%-0.71%

L 87.00’

e 0.38’

K 25.19

R 3.97

L 50.00’

e -0.03’

K 108.76

R -0.92

580

570

590

570

580

590

10+00 11+00 12+00 13+00 14+0014+00

10+46.05 - Prop. Type C Ent. Rt.

580

580.54

10’ Rt

580.61

18’ Rt

0.89%

18" Equivalent Arch RCP

30" Equivalent Arch RCP

56’ - Double

D.03

PR

OFIL

E S

HEET

FL=575.64FL=575.91

Road Elv = 579.97

30° Lt Ahead

@ 0.48%

30" Equivalent Arch RCP

56’ - Double

PROJECT NUMBER:

DATE:

NO.DATE

BYREVISION

DRAWN BY:

CHK’D BY:

NA

TU

RA

L R

ES

OU

RC

ES

IOW

A D

EP

ART

ME

NT O

F

502 E. 9TH S

T., D

ES M

OIN

ES, IA 5

0319-0

034

EN

GIN

EERIN

G S

ER

VIC

ES - W

ALLA

CE B

UILIN

G

CO

NS

ULTA

NT:

SHEET No:

10:12:08

AM

9/2/2016

maldric

N:\

Conservation

Recreation\

Land and

Waters\

Engineering\

PR

OJ

EC

TS\

AC

TI

VE\

VA

N

BU

RE

N\#

16-06-89-01,

Lacey-

Keosauqua,

Culvert

Replace

ment\02

Design\16-06-89-01

Lacey-

Keo

Culvert

Replace

ment_

D03.dgn

LA

CE

Y-K

EO

SA

UQ

UA S

TA

TE P

AR

K

CU

LV

ER

T R

EP

LA

CE

ME

NT F

OR:

16-06-89-01

VA

N B

UR

EN C

OU

NTY, IO

WA

August 2016

-

580

570 570

580

0+00 1+00 2+00

28.8’ 27.2’

PROJECT NUMBER:

DATE:

NO.DATE

BYREVISION

DRAWN BY:

CHK’D BY:

NA

TU

RA

L R

ES

OU

RC

ES

IOW

A D

EP

ART

ME

NT O

F

502 E. 9TH S

T., D

ES M

OIN

ES, IA 5

0319-0

034

EN

GIN

EERIN

G S

ER

VIC

ES - W

ALLA

CE B

UILIN

G

CO

NS

ULTA

NT:

SHEET No:

10:12:10

AM

9/2/2016

maldric

N:\

Conservation

Recreation\

Land and

Waters\

Engineering\

PR

OJ

EC

TS\

AC

TI

VE\

VA

N

BU

RE

N\#

16-06-89-01,

Lacey-

Keosauqua,

Culvert

Replace

ment\02

Design\16-06-89-01

Lacey-

Keo

Culvert

Replace

ment_

E01.dgn

LA

CE

Y-K

EO

SA

UQ

UA S

TA

TE P

AR

K

CU

LV

ER

T R

EP

LA

CE

ME

NT F

OR:

16-06-89-01

VA

N B

UR

EN C

OU

NTY, IO

WA

August 2016

HMA Pavement

Existing

Remove

HMA Pavement

Existing

Remove

Crossing Structure

PCC Low Water

Remove Existing

Corrugated Metal Pipe

Remove Existing

Install Rock Check Dam

Tree Removal to

575.70

12"

CM

P

+575.73

12"

CM

P

+575.81

12"

CM

P

+575.86

12"CMP

+

575.87

12"C

MP

+575.97

12"C

MP

+576.00

576.04

576.04

"C

MP

+

576.04

576.05

576.05

12"C

MP

+

+

18"

CM

P

FL

OW 578.30

+

18"

CM

P

FL

OW 579.01

E.01

DE

MO

LITIO

N S

HEET

O

FEET

5O

PROJECT NUMBER:

DATE:

NO.DATE

BYREVISION

DRAWN BY:

CHK’D BY:

NA

TU

RA

L R

ES

OU

RC

ES

IOW

A D

EP

ART

ME

NT O

F

502 E. 9TH S

T., D

ES M

OIN

ES, IA 5

0319-0

034

EN

GIN

EERIN

G S

ER

VIC

ES - W

ALLA

CE B

UILIN

G

CO

NS

ULTA

NT:

SHEET No:

10:12:12

AM

9/2/2016

maldric

N:\

Conservation

Recreation\

Land and

Waters\

Engineering\

PR

OJ

EC

TS\

AC

TI

VE\

VA

N

BU

RE

N\#

16-06-89-01,

Lacey-

Keosauqua,

Culvert

Replace

ment\02

Design\16-06-89-01

Lacey-

Keo

Culvert

Replace

ment_

G01.dgn

LA

CE

Y-K

EO

SA

UQ

UA S

TA

TE P

AR

K

CU

LV

ER

T R

EP

LA

CE

ME

NT F

OR:

16-06-89-01

VA

N B

UR

EN C

OU

NTY, IO

WA

August 2016

575.70

12"

CM

P

+575.73

12"

CM

P

+575.81

12"

CM

P

+575.86

12"CMP

+

575.87

12"C

MP

+575.97

12"C

MP

+576.00

576.04

576.04

"C

MP

+

576.04

576.05

576.05

12"C

MP

+

+

18"

CM

P

FL

OW 578.30

+

18"

CM

P

FL

OW 579.01

264530.8290

2064895.3340

579.175Elev:

E:

N:1735

PK NAIL ASPHALT

CP 1735

PK NAIL ASPHALT

CP 1734

264324.2420

2064795.9660

580.982Elev:

E:

N:1734

G.01

SU

RV

EY C

ON

TR

OL

Description Elev EastingPoint Northing

PK NAIL 1 5/32 EDGE ASPHALT EDGE OF PULL OVER AREA1735 264530.829 2064895.33 579.175

PK NAIL 1 5/32 EDGE ASPHALT 264324.242 2064796.66 580.9821734

O

FEET

5O

PROJECT NUMBER:

DATE:

NO.DATE

BYREVISION

DRAWN BY:

CHK’D BY:

NA

TU

RA

L R

ES

OU

RC

ES

IOW

A D

EP

ART

ME

NT O

F

502 E. 9TH S

T., D

ES M

OIN

ES, IA 5

0319-0

034

EN

GIN

EERIN

G S

ER

VIC

ES - W

ALLA

CE B

UILIN

G

CO

NS

ULTA

NT:

SHEET No:

10:12:13

AM

9/2/2016

maldric

N:\

Conservation

Recreation\

Land and

Waters\

Engineering\

PR

OJ

EC

TS\

AC

TI

VE\

VA

N

BU

RE

N\#

16-06-89-01,

Lacey-

Keosauqua,

Culvert

Replace

ment\02

Design\16-06-89-01

Lacey-

Keo

Culvert

Replace

ment_

G02.dgn

LA

CE

Y-K

EO

SA

UQ

UA S

TA

TE P

AR

K

CU

LV

ER

T R

EP

LA

CE

ME

NT F

OR:

16-06-89-01

VA

N B

UR

EN C

OU

NTY, IO

WA

August 2016

G.02

SU

RV

EY C

ON

TR

OL

Tangent Length: 139.78

Tangent Direction: N 49°59’10" E

POE ( ) 14+00.04 264617.45 2064983.54

PT ( ) 12+60.26 264527.57 2064876.48

Element: Linear

Tangent Direction: N 49°59’10" E

Radial Direction: S 40°00’50" E

Chord Direction: N 31°44’36" E

Radial Direction: S 76°29’59" E

Tangent Direction: N 13°30’01" E

External: 11.64

Middle Ordinate: 11.06

Chord: 137.74

Tangent: 72.51

Length: 140.10

Degree of Curvature(Arc): 26°02’37"

Delta: 36°29’09" Right

Superelevation: 6.000%

Design Speed(mph): 30.00

Radius: 220.00

PT ( ) 12+60.26 264527.57 2064876.48

CC ( ) 264359.08 2065017.93

PI ( ) 11+92.68 264480.95 2064820.94

PC ( ) 11+20.16 264410.44 2064804.01

Element: Circular

Tangent Length: 120.16

Tangent Direction: N 13°30’01" E

PC ( ) 11+20.16 264410.44 2064804.01

POB ( ) 10+00.00 264293.59 2064775.96

Element: Linear

STATION NORTHING EASTING

Roadway

Tangent Length: 39.39

Tangent Direction: N 45°46’45" W

POE ( ) 1+66.55 264480.86 2064754.13

PI ( ) 1+27.16 264453.38 2064782.36

Element: Linear

Tangent Length: 78.83

Tangent Direction: N 42°08’52" W

PI ( ) 1+27.16 264453.38 2064782.36

PI ( ) 0+48.32 264394.93 2064835.26

Element: Linear

Tangent Length: 48.32

Tangent Direction: N 26°49’56" W

PI ( ) 0+48.32 264394.93 2064835.26

POB ( ) 0+00.00 264351.81 2064857.07

Element: Linear

STATION NORTHING EASTING

Channel