T-1 Infiltration Tools, v3.01 Presented to Caltrans and RWQCB Staff May 10, 2013 Prepared by Caltrans and Office of Water Programs 1 Presented by Sean Penders (Caltrans) Eric Berntsen (SWRCB) Brian Currier (CSUS-OWP)

Upload: jamil

Post on 24-Feb-2016

71 views

Category:

Documents


1 download

DESCRIPTION

T-1 Infiltration Tools, v3.01. Presented by Sean Penders (Caltrans) Eric Berntsen (SWRCB) Brian Currier (CSUS-OWP). Presented to Caltrans and RWQCB Staff May 10, 2013 Prepared by Caltrans and Office of Water Programs. Overview. Background - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: T-1 Infiltration Tools, v3.01

T-1 Infiltration Tools, v3.01

Presented to Caltrans and RWQCB StaffMay 10, 2013

Prepared by Caltrans and Office of Water Programs 1

Presented by Sean Penders (Caltrans)Eric Berntsen (SWRCB)

Brian Currier (CSUS-OWP)

Page 2: T-1 Infiltration Tools, v3.01

Overview

Background Prioritizing soil-based BMPs in the

Caltrans BMP Selection Process Conceptual infiltration model review Example: strip/swale and detention

basin treatment train Q&A

2

Page 3: T-1 Infiltration Tools, v3.01

Background

Sustainable BMP goals from EPA, FHWA, SWRCB, RWQCB, & Caltrans

District Design needs Performance-based ranking for target

design constituents using statewide studies confirmed that infiltration was a key variable for load reduction

3

Page 4: T-1 Infiltration Tools, v3.01

Consistency with Water Board Goals

Board resolution on sustainability Caltrans MS4 NPDES permit Based on the CGP Post Construction “Soil

Quality” credit in the CGP Water Balance Calculator

Phase I & II MS4

4

Background

http://www.waterboards.ca.gov/board_decisions/adopted_orders/resolutions/2008/rs2008_0030.pdf

Page 5: T-1 Infiltration Tools, v3.01

Caltrans Conditions and Applicability

Not for flood Analysis• Analyzing small storm sizes• Only for water quality BMP sizing

Tailored to Caltrans• Compacted fill• Motorist safety• Useful statewide

5

Background

Page 6: T-1 Infiltration Tools, v3.01

Caltrans Design Process: Project Planning and Design Guidance

(PPDG)

1-acre net new impervious post-construction BMP threshold Hwy

5000 sf non-hwy PPDG, T-1 Checklist: Treatment BMP

Selection• Performance-based ranking of BMPs• Requires infiltration calculation

6

Background

Page 7: T-1 Infiltration Tools, v3.01

T-1 Checklist Process

7

> 90 % strip/swales infiltration

no

no> 90%

treatment train infiltration

yes

Identify special-cases Add special BMPs

Add strips/swales

Add basinyes

Potential BMPs

Add Tier 1 BMPs

Estimate infiltrationRanking Algorithm

 

Select pollutant

 

Two-tiered

list

no

 

Need Infiltration

Prioritizing Soil-based BMPsPrioritizing soil-

based BMPs

MEP BMP Selection

Page 8: T-1 Infiltration Tools, v3.01

T-1 Selection: Performance-Based Ranking Across Caltrans Studies

Performance-Based Ranking of Treatment BMPs. CTSW-RT-10-239.01. February 26, 2010 8

0%

20%

40%

60%

80%

100%

0% 20% 40% 60% 80% 100%

% L

oad

Redu

ction

% Infiltration

Dissolved Zn

EDB

EDBL

Delaware

Austin

Austin Earthen

MCTT

Wet Basin

Swales

Retrofit As/Ad > 0.2

Retrofit As/Ad < 0.1

RVTS As/Ad > 0.2

RVTS 0.1≤As/Ad≤0.2

RVTS As/Ad < 0.1

Prioritizing Soil-based BMPs

Page 9: T-1 Infiltration Tools, v3.01

Performance-Based Ranking Across Caltrans Studies

9

Prioritizing Soil-based BMPs

Performance-Based Ranking of Treatment BMPs. CTSW-RT-10-239.01. February 26, 2010

Page 10: T-1 Infiltration Tools, v3.01

Conceptual Infiltration Model Review

No surface storage• Strips• Swales• Natural and amended conditions• Infiltration Trenches

With surface storage• Detention Basins• Infiltration Basins

10

Page 11: T-1 Infiltration Tools, v3.01

No Surface Storage:Strips and Swales Infiltration Tool

(SSIT)

11

Native Soil

Amended Soil

Native Soil

Conceptual Model

Page 12: T-1 Infiltration Tools, v3.01

With Surface Storage:Basin Infiltration Tool (BIT)

12

Conceptual Model

Page 13: T-1 Infiltration Tools, v3.01

Example Project: New Highway

10 acres of new impervious surface Limited area for a strip/swale and

detention basin Type B soil ½ acre of pervious shoulder

13

Page 14: T-1 Infiltration Tools, v3.01

Strip/swale and Detention

14

Example

Page 15: T-1 Infiltration Tools, v3.01

15

Page 16: T-1 Infiltration Tools, v3.01

Native Soil, Rate-Based Estimate

16

Page 17: T-1 Infiltration Tools, v3.01

Amendment Input

17

Example

Page 18: T-1 Infiltration Tools, v3.01

18

Example

Page 19: T-1 Infiltration Tools, v3.01

Adjust Soil Amendment

Use 9 inches instead of 4 to meet surface loading design requirements

19

Example

Page 20: T-1 Infiltration Tools, v3.01

SSIT Results Page

20

Substantial benefits from amendment

Example

Page 21: T-1 Infiltration Tools, v3.01

Adding a Downstream Basin

21

Example

Page 22: T-1 Infiltration Tools, v3.01

Basin Size Reduced Based on Maximum Upstream Losses

22

Example

Page 23: T-1 Infiltration Tools, v3.01

Basin Inputs Enter available area (100 ft x 50 ft) Verify soil infiltration rate

23

Example

Page 24: T-1 Infiltration Tools, v3.01

BIT Results

56% total treatment train infiltration! 42% upstream infiltration + 58% basin

treatment = 100% treatment!24

Example

Page 25: T-1 Infiltration Tools, v3.01

Consistency with Water Board Standards and Goals

Consistent with State Water Board resolution on sustainability (Resolution No. 2008-0030)

Caltrans MS4 NPDES permit Based on the “Soil Quality” credit in the

CGP Water Balance Calculator

25

Page 26: T-1 Infiltration Tools, v3.01

Links Basin Sizer

http://svctenvims.dot.ca.gov/wqpt/basinsizer.aspx

WQPT

http://svctenvims.dot.ca.gov/wqpt/wqpt.aspx

Infiltration Tool

http://www.dot.ca.gov/hq/oppd/stormwtr/t1.htm

PPDG

http://www.dot.ca.gov/hq/oppd/stormwtr/ppdg.htm

SWRCB

http://www.waterboards.ca.gov/board_decisions/adopted_orders/resolutions/2008/rs2008_0030.pdf

Caltrans NPDES MS4 permit

http://www.swrcb.ca.gov/water_issues/programs/stormwater/caltrans.shtml26

Page 27: T-1 Infiltration Tools, v3.01

Questions and Comments