  • System Operating Parameters – 2019 PCAR

    System Operating Parameters | 2019 Aurizon Network

  • Aurizon Network 2019

    System Operating Parameters / 2019 PCAR 2

    Document Control

    Disclaimer

    While all reasonable endeavours have been exercised to ensure all information used and contained in

    this document was true and correct at the time of publication, no representation or warranty, express

    or implied, is made as to the fairness, accuracy, completeness or correctness of the information,

    opinions or conclusions contained in this document.

    To the maximum extent permitted by law, Aurizon Network and its directors, employees, affiliates or

    agents do not accept and expressly exclude any liability, including, without limitation, any liability

    arising out of negligence, for any loss arising from the use of this document or any information

    contained in it.

    Document Information

    Document System Operating Parameters

    Version: 2019

    Author: Supply Chain Development Manager

    Mike Backhouse

    Signature

    __________________________________________

    Endorsed by: Manager Planning and Development

    Steve Straughan

    Signature:

    ____________________________________________

  • Aurizon Network 2019

    System Operating Parameters / 2019 PCAR 3

    Table of Contents

    1 Introduction ............................................................................................................................. 4

    2 Capacity ................................................................................................................................. 5

    3 Network Configuration ............................................................................................................ 9

    4 Maintenance Scope ............................................................................................................. 22

    5 Network Planning ................................................................................................................. 26

    6 Operator planning and logistics............................................................................................ 30

    7 Network Scheduling ............................................................................................................. 32

    8 Train Operation .................................................................................................................... 34

    9 Information ........................................................................................................................... 39

    10 Appendix 1: Sectional Run Times ........................................................................................ 46

  • Aurizon Network 2019

    System Operating Parameters / 2019 PCAR 4

    1 Introduction

    1.1 Purpose

    1.1.1 Capacity Assessments

    Capacity Assessments (CA) of the CQCN are undertaken to determine if there is sufficient Capacity to

    meet the Committed (or contracted) Capacity and any changed or additional capacity requested by an

    Access Seeker in an Access Application.

    Further to these Capacity Assessments undertaken for new or modified access Aurizon Network performs

    • Capacity Assessments on an annual basis for publication in the Capacity Assessment Report.

    • Capacity Assessments to assess changes to infrastructure or operations to support expansions in

    the CQCN.

    1.1.2 System Operating Parameters

    When a Capacity Assessment is undertaken, it is based on a definition of Capacity and the application of

    a defined methodology and input parameters. This document is the System Operating Parameters (SOP)

    and describes

    • the definition of Capacity applied,

    • the methodology,

    • the input parameters used and

    • an explanation of why these inputs have been used when undertaking the Capacity Assessment.

    1.1.3 System Capacity Assessment

    System Capacity Assessments are broader assessments of the capacity of the Supply Chain and include

    broader supply chain constraints outside of Aurizon Networks control. These may impact how Access

    Holders (and Seekers) utilise Capacity.

    Following the completion of the Capacity Assessment Aurizon Network will undertake a System Capacity

    Assessment.

  • Aurizon Network 2019

    System Operating Parameters / 2019 PCAR 5

    2 Capacity

    The purpose of this section is to

    • Provide Aurizon Networks definition of Capacity

    • Describe how the definition of Capacity is used within our simulation tools

    • Describe the pass and fail criteria of Capacity Assessments

    • Explain the exclusions outside of the capacity definition and how the System Capacity

    Assessment will incorporate those factors

    2.1 Capacity Definition

    The definition of the capacity of the network that Aurizon Network applies is

    The number of trains that can be operated in the CQCN taking into account the processes by which trains

    are scheduled and the impact that Aurizon Network has on

    (a) when those trains can be scheduled (availability)

    (b) how they operate (cycle time and Network caused losses)”

    This excludes external factors1 which Network does not control and there are no contracted

    understandings between parties including

    • Reliability and availability of rolling stock

    • Reliability and availability of mine loadout (and recharge time)

    • Reliability, availability and mode of operation of port

    2.1.1 Relationship to UT5

    Under UT5, Aurizon Network is obliged to complete an annual capacity analysis to determine the

    Capacity of the Rail Infrastructure, comprised in each of the Coal Systems it manages. As a result, it is

    the capacity of the Rail Infrastructure, not the supply chain as a whole, which is the focus of Aurizon

    Network’s Capacity Assessments.

    Aurizon Network has developed its System Operating Parameters to align with its contractual

    commitments to its access holders. This is important as each of Aurizon Network and its access holders

    are bound by those commitments, and they represent an objective baseline from which to measure Rail

    Infrastructure capacity. This approach also recognises that Aurizon Network only controls and operates

    the Rail Infrastructure and cannot dictate how other supply chain participants approach key

    considerations which impact on overall supply chain capability. These considerations include matters

    1 These factors are considered part of the System Capacity Assessment

  • Aurizon Network 2019

    System Operating Parameters / 2019 PCAR 6

    such port operating methodology, mine and port inventory levels, volume and availability of rollingstock

    and appetite to invest in infrastructure and systems.

    This approach is consistent with UT5, which requires that in conducting its capacity analysis Aurizon

    Network must include “consideration of the following factors

    (A) The terms of Access Agreements relating to Train Services operating in each Coal System; and

    (B) The interfaces between the Rail Infrastructure and other facilities forming part of, or affecting, the

    relevant Supply Chain” (clause 7A.4.2(b)(iv))

    Access Agreements include the following factors (including factors relating to supply chain interfaces) that

    are used in the generation of the System Operating Parameters. These include:

    • Number of Train Service Entitlements (TSEs) required

    • Mode of operation (even railings)

    • The time taken for trains to traverse sections of the network (Section Run Times or “SRTs”)

    • The time at interface locations (load and unload times)

    • How operators will operate on the network – described in Operating Plans

    These parameters are a joint agreement between Aurizon Network and Access Holders on how the

    Access Holder will operate on the Rail Infrastructure.

    Aurizon Network note that Access Agreements do not always reflect the current scheduling and operating

    parameters. Therefore, the parameters relating to loading, unloading and SRTs have been updated to

    reflect the scheduled parameters in the 2019 SOP and Capacity Assessment.

    2.2 Application within simulation suite

    2.2.1 Planning, Scheduling and Operating processes

    The process by which trains are planned, scheduled and operated is summarised below, this forms the

    basis of the simulation approach and structure of the SOP.

    Figure 1: Summary diagram of Planning, Scheduling and Operating processes

  • Aurizon Network 2019

    System Operating Parameters / 2019 PCAR 7

    2.2.2 Inclusion within the System Operating Parameters O

    pera

    tor

    logis

    tics

    Customer orders /

    demand planning /

    train orders

    • Network Capacity Assessments are undertaken on the presumption

    that the supply chain operates in a manner that meets demand

    6

    Netw

    ork

    Logis

    tics

    Train Scheduling

    • Dispatching of trains subject to

    o Path availability

    o Rolling stock availability

    o Loadout availability

    7

    Tra

    in

    Contr

    ol

    Train Operation

    • Trains operate through the CQCN subject to variations due to:

    o Speed Restrictions

    o Network caused DOO loss

    8

    Area Step Inc Section

    Ta

    ctical P

    lannin

    g

    Maintenance &

    renewals scope

    • Input data developed for Capacity Assessments taking into account

    demand and intervention frequency

    4

    Maintenance &

    renewals planning

    • Input data developed for Capacity Assessments based on the time

    taken to undertake different work activities

    5

    Pathing Availability

    • Pathing availability is developed using the pathing tool SLICER taking

    into account

    o Path separation

    o Planned maintenance

    o MTP traffic

    o Pathing rules

    5

    Netw

    ork

    Logis

    tics

    Opera

    tor

    pla

    nnin

    g Fleet & crew

    capability

    • Network Capacity Assessments are undertaken on the presumption

    that

    o Access Holders would contract operators to provide sufficient

    resources to meet demand

    o That operates operate in a manner consistent with their

    access agreements and operating plans

    6

  • Aurizon Network 2019

    System Operating Parameters / 2019 PCAR 8

    2.3 Exclusions and incorporation in System Capacity Assessments

    There are a range of parameters that there are no contracted understandings between Aurizon Network

    and other parties including:

    From feedback received during on SOP and BCA, Aurizon Network have identified that there is a desire

    from stakeholders to understand the Supply Chain Capability. These items are activities or actions that

    affect the Supply Chain Capability and are outside of the control (or agreed interface parameters) of

    Network. These include:

    • Mine, Port or Train availability:

    Losses associated with the (planned) time that mines / ports or rolling stock are not available for the

    movement of coal through the supply chain.

    • Mine, Port, Train or external DOO loss:

    Losses associated with failures and other events outside of the control of Network. This may include

    items such as load and unload time variation through to rolling stock failures and coal availability.

    • Supply Chain Operation:

    The mode of operation and how trains are ordered differ from the even railings basis by which

    Network capacity is derived and can lead to losses.

    • Payload variation:

    Network provides capacity in the form of Train Service Entitlements (TSEs) which are derived using

    a payload as part of the Access Request process. Actual payload can vary.

    • Force Majeure:

    Losses associated with significant events that trigger force majeure events.

    • Demand:

    The changes in demand above and below the contracted demand

    These factors (and other relevant parameters) will be considered in the System Capacity Assessment

  • Aurizon Network 2019

    System Operating Parameters / 2019 PCAR 9

    3 Network Configuration

    This section of the SOP describes the infrastructure used in Capacity Assessments. It contains information

    regarding the network:

    • Configuration

    • Speeds

    • Signalling

    • Interfaces, including:

    o Yards

    o Ports

    o Mines

    • Operational Constraints

    3.1 Infrastructure configuration

    The infrastructure configuration used in the model reflects the committed infrastructure, which is the existing

    infrastructure and modifications already committed to over the life of the capacity analysis.

    3.1.1 Planned changes

    Capacity Assessments are based on the existing infrastructure with the following changes

    • RCS implemented in the Newlands system between Collinsville and Newlands Jn (see section 3.3.1)

    • Drake connection in the Newlands system

    • Washpool connection in the Blackwater system

    • Olive Downs connection in the Goonyella system

    • Meteor Downs South connection in the Blackwater system

    • Starlee passing loop in the Blackwater system

    A summary of the CQCN is provided in Figure 2. A more detailed representation of the network through line

    diagrams is provided in the Review of Rail Infrastructure and Line Diagrams for the Central Queensland Coal

    Region1 published on the Aurizon website.

    1 http://www.aurizon.com.au/Network-site/Pages/Reports-and-QCA.aspx

  • Aurizon Network 2019

    System Operating Parameters / 2019 PCAR 10

    Figure 2: CQCN summary overview

  • Aurizon Network 2019

    System Operating Parameters / 2019 PCAR 11

    3.2 Sectional Running Times (SRTs)

    SRTs can be sourced from

    • Access Agreements

    • System Operating Parameters

    • Scheduled

    • Actual

    Historically the SOP has been based on the parameters contracted in Access Agreements. Feedback on previous

    SOPs has indicated that this is not preferred, and Aurizon Network notes that Access Agreements do not always

    reflect the current scheduling and operating parameters. Therefore, the parameters relating to loading, unloading

    and SRTs have been updated to reflect the scheduled parameters in the 2019 SOP and Capacity Assessment

    3.2.1 Start / Stop allowances

    SRTs are produced for continuous green light running (with the exception of arriving and departing mines, ports

    and yards). When scheduling services an increase in time is applied to reflect the additional time to traverse the

    section whenever a train needs to start or stop. This additional time is used in the CA whenever a train needs to

    start or stop.

    Table 1: Start and Stop allowances

    System Start Allowance

    (min)

    Stop Allowance

    (min)

    Newlands 4 2

    Goonyella 5 4

    Blackwater 2 3

    Blackwater 2 3

    Moura 2 3

  • Aurizon Network 2019

    System Operating Parameters / 2019 PCAR 12

    3.3 Signalling Description

    Aurizon Network has three signalling systems in place across the CQCN

    • Remote Control Signalling (RCS)

    • Direct Train Control (DTC)

    • DTC with Main Line Point Indicators (DTC-MLPI)

    This section of the SOP describes where each signalling system is and how it is implemented in the Capacity

    Assessment. The specific application of the signalling is sourced from the relevant AS plan.

    3.3.1 Newlands System

    The Newlands system currently operates with a mix of RCS and DTC-MLPI signalling. Full RCS installation has

    been deferred while system demand is lower than contract. As this infrastructure will be in place prior to full

    contracted capacity being reached, the assessment assumes RCS to be installed across the entire Newlands

    System. This provides a better measure of whether full contract can be delivered.

    Figure 3: Newlands system and NML train control map

  • Aurizon Network 2019

    System Operating Parameters / 2019 PCAR 13

    3.3.2 Goonyella system

    The Goonyella system has RCS throughout.

    Figure 4: Goonyella system train control map.

  • Aurizon Network 2019

    System Operating Parameters / 2019 PCAR 14

    3.3.3 Blackwater system

    The Blackwater system has RCS throughout with the exception of the Rolleston and Minerva branches which have

    DTC installed. Memooloo (on the Rolleston branch) has DTC-MLPI installed.

    Figure 5: Blackwater system train control map

  • Aurizon Network 2019

    System Operating Parameters / 2019 PCAR 15

    3.3.4 Moura system

    The Moura system is largely RCS with the exception of DTC on the Dakenba branch (to Callide) and DTC-MLPI

    west of Moura mine junction to Baralaba.

    Figure 6: Moura system train control map

  • Aurizon Network 2019

    System Operating Parameters / 2019 PCAR 16

    3.3.5 Remote Control Signalling (RCS)

    RCS is a system of safe working where rail traffic movements are regulated by signals usually controlled from a

    remote location and/or automatically by the passage of rail traffic. The RCS system operates on the principle of

    only one rail traffic movement being on a signal section at one time. Key characteristics are as follows:

    • Normal authority for rail traffic movements is by

    o two, three or four colour light signals for running movements

    o position light signals for non-running movements

    • A signal at PROCEED is the authority to go forward

    • The position of rail traffic on the track is detected by

    o track circuits, or

    o axle counters

    • Points are generally controlled by points machines

    The application of RCS in the CA is described below.

    Table 2: RCS application in CA

    Activity Description Time impact

    (mins)

    Provision of authority Network controller issues authority on UTC screen which is displayed on

    RCS to train crew

    Nominal (0)

    Movement of trains Following the provision of an authority the time taken for a train to

    commence moving

    Nominal (0)

    Movement of points Route set in UTC requires points to move from Normal to Reverse (or

    vice versa)

    Nominal (0)

    Release of section Train exits a train detection section which is released for the provision of

    authority of other trains

    Nominal (0)

    Explanatory notes

    Application of RCS in the CA incurs a total time impact of 0 minutes. The following points explain this in more

    detail:

    • Provision of authority and movement of points occur in advance of train movements and are not required

    to occur in sequence of train movements

    • Movement of trains do not incur additional time. These are captured in the start/stop times added to

    section run times

    • Release of section automatically occurs and is detected via track circuits or axle counters

  • Aurizon Network 2019

    System Operating Parameters / 2019 PCAR 17

    3.3.6 Direct Traffic Control (DTC)

    The movement of rail traffic is governed by instructions contained in DTC Authorities issued by the Network Control

    Officer to Rail Traffic Crew.

    In Direct Traffic Control (DTC) territory the route is divided into sections known as DTC blocks, which are identified

    by Block Limit Boards (see Figure 7). A DTC Authority gives rail traffic possession of the block (or multiple blocks)

    up to a nominated Block Limit Board. Ownership of the block(s) will be passed from the Network Control Officer to

    the Rail Traffic Crew when the Network Control Officer issues a DTC Authority.

    The actual time taken for trains to cross in DTC territory is dependent upon the interval between the first train

    arriving and the second train arriving. The parameters used for capacity analysis purposes represent the worst

    case arrival times. Waiting times between train arrivals are governed by model dynamics.

    Figure 7: DTC Blocks and Position of Block Limit Boards

    There are two types of passing loop configuration used in DTC territory:

    1. Directional Running

    2. Mainline points Indicators (MLPI)

    These are described below.

  • Aurizon Network 2019

    System Operating Parameters / 2019 PCAR 18

    3.3.6.1 Directional Running

    In this system the passing loop turnouts are arranged with trailable facing points (TFP) such that trains can travel

    through the passing loop without requiring any switching of the turnouts. They are normally arranged such that

    loaded trains will always be routed through the mainline and empty trains through the passing loop. This system

    has the advantage that train crews do not need to operate the turnouts, they are very simple and inexpensive to

    install. The disadvantages are the TFP’s are relatively high in maintenance and require that all trains slow to

    25km/h prior to entering the turnout. This is taken into account in the SRT’s.

    When trains are required to cross, additional time delays are applied to the trains to replicate the processes that

    are carried out to cross another train. These are defined in Table 3: Crossing Time Parameters.

    Table 3: Crossing Time Parameters Directional Running

    Train Activity Time

    1 Traverses section enters crossing loop and stops at Block Limit Board 10 mins

    1 Releases Section

    2 Traverses section and stops at BLB 5 mins

    2 Gets authority to enter station and traverse into Section

    2 Pulls forward past BLB, traverses section 5 mins

    2 Releases Section once past BLB

    1 Gets authority to pass BLB and traverse into Section 6 mins

    1 Pulls forward past BLB and traverses Section

    Explanatory notes:

    Train 1 is first to arrive.

    Train 2 is second to arrive.

  • Aurizon Network 2019

    System Operating Parameters / 2019 PCAR 19

    3.3.6.2 Main Line Points Indicators (MLPI)

    Passing loops fitted with MLPI’s have power operated turnouts and illuminated indicators to give train crews

    advanced indication of the direction the turnout is set. Train crews needing to enter the passing loop can set the

    turnout by use of a hand-held remote control.

    The advantages of this type of equipment are:

    • It removes the need for manual operation of turnouts by train crew.

    • Trains travelling through the mainline can do so at full line speed.

    Disadvantages include:

    • Higher capital cost than directional running

    • Crossing times are longer due to in built safety logic

    • Need for mains power supply

    Table 4: Crossing Time Parameters -MLPI

    Train Activity Time

    1 Traverses Section and stops at Block Limit Board

    20 mins 1 Sets points for loop road

    1 Pulls forward and stops in loop

    1 Sets points for mainline

    1 Releases Section

    2 Traverses Section and stops at BLB 10 mins

    2 Gets authority to enter station and next section

    2 Pulls forward past BLB and continues to next section

    2 Releases previous section

    1 Waits second train to clear, gains new authority 21 mins

    1 Set points to enter mainline from loop road

    1 Pulls forward past BLB and traverses into next section

    Explanatory Notes

    Application of DTC-MLPI in the CA incurs a total time of 12 minutes. However, additional time is considered for the

    Movement of points.

  • Aurizon Network 2019

    System Operating Parameters / 2019 PCAR 20

    3.4 Electrification

    Electric trains can operate throughout the CQCN with the exception of the following areas

    • Newlands and GAPE systems north of North Goonyella

    • Blackwater system west of Burngrove

    • Moura system

    • Mt Miller branch

    Figure 8: Electrification of CQCN.

  • Aurizon Network 2019

    System Operating Parameters / 2019 PCAR 21

    3.5 Yards

    Yard activities that occur on Network infrastructure by Above Rail Operators are performed in accordance with their

    operating plans. These activities as applied to the Capacity Assessment are described in the appropriate operator

    appendix.

    Non Network yards are included in the capacity model and assumed to provide sufficient capacity for the Above

    Rail operators activities and not impact Network capacity.

    3.6 Interfaces

    3.6.1 Load / Unload times

    The primary interfaces between the CQCN and the rest of the supply chain is at mines and ports and are defined

    as the time taken to load and unload trains.

    These interface parameters can be sourced from

    • Access Agreements

    • System Operating Parameters

    • Scheduled

    • Actual

    Historically the SOP has been based on the parameters contracted in Access Agreements. Feedback on previous

    SOPs has indicated that this is not preferred, and Aurizon Network notes that Access Agreements do not always

    reflect the current scheduling and operating parameters. Therefore, the parameters relating to loading, unloading

    and SRTs have been updated to reflect the scheduled parameters in the 2019 SOP and Capacity Assessment.

    3.6.2 Interface availability and reliability

    Capacity Assessments do not take into account constraints to the operation outside of the CQCN interface point.

    For instance,

    • constraints due to belt routes in ports are not included when assessing network capacity.

    • Availability of mine or port infrastructure is assumed to align with rail network capacity

  • Aurizon Network 2019

    System Operating Parameters / 2019 PCAR 22

    4 Maintenance Scope

    This section of the SOP describes how the scope for maintenance and renewal activities is generated including

    • The source of historic maintenance and renewals information

    • Scope of activities included

    • Scaling made to possessions to reflect changes in demand between historic and contracted

    4.1 Fixed activities: Maintenance, Renewals and Construction

    Aurizon Network’s aim is to best replicate a maintenance and renewal program that aligns accurately with current

    practices to provide a realistic view network availability.

    4.1.1 Source

    In order to best align modelling with current practices Aurizon Network has used the maintenance and renewal

    activities detailed in each of the monthly Master Train Plan (MTP) reports for the calendar year of 2018. Aurizon’s

    MTP Customer Report is created monthly and contains a detailed outlook of all maintenance and renewal activities

    scheduled to be undertaken for the forthcoming month.

    4.1.2 Scope

    133 individual work types are detailed in the MTP reporting. To create greater simplicity these were allocated into

    the below sub groups:

    • BCM / Ballasting

    • GIJ's

    • Level Crossing Maintenance

    • OHLE Mtce

    • Other

    • Rail Repairs

    • Re-Railing

    • Re-Sleepering

    • Re-Stressing

    • Spot Resurfacing

    • Turnout Mtce

    • Undercutting

    4.1.3 Scaling

    Work products determined by Aurizon’s Network Strategic Asset Plan (NSAP) model as tonnage dependant have

    been scaled up proportionally from the tonnes delivered in 2018 compared to that contracted on a system by

    system basis. These products are:

    • Ballast Cleaning

    • Ballasting

    • BCM

    • Grinder

    • Resurfacing

    • Spot Resurfacing

  • Aurizon Network 2019

    System Operating Parameters / 2019 PCAR 23

    • Undercutting

    As per the NSAP model, a 1% increase in tonnes delivered equates to an approximate increase of 0.49% in the

    tonnage dependant maintenance. This scaling has therefore been applied as an extension to activity durations of

    the above products to reach contract tonnes from that delivered in calendar year 2018.

    Table 5: Tonnage dependent activity increase

    System Base Tonnes Contract Tonnes

    Tonnage Increase

    Increase of tonnage dependant activity duration

    Newlands 29,491,748 50,061,600 20,569,852 34.18%

    Goonyella 119,094,507 136,324,656 17,230,149 7.09%

    Blackwater 65,008,257 79,280,483 14,272,225 10.76%

    Moura 11,957,976 16,493,724 4,535,748 18.59%

    4.1.4 Possession time

    The resulting possession times for each system are summarised below by activity and month

    Table 6: Possession hours by activity and system

    Activity Blackwater Goonyella Moura Newlands

    BCM / Ballasting 2155 1682 48 68

    GIJ's 130 90 8

    Level Crossing Maintenance 154 61 4 8

    OHLE Mtce 189 22 74

    Other 735 391 98 221

    Rail Repairs 540 332 33 33

    Re-Railing 301 330 22

    Re-Sleepering 508 173 51 4

    Re-Stressing 413 154 57 10

    Spot Resurfacing 286 90 115 11

    Turnout Mtce 636 100 65 30

    Undercutting 106 114 15

    Table 7: Possession hours by month and system

    Month Blackwater Goonyella Moura Newlands

    Jan 397 256 7 8

    Feb 483 66 17

    Mar 602 271 134 51

    Apr 381 242 48 67

    May 493 438 31 55

    Jun 609 464 59 64

    Jul 597 403 65 43

    Aug 427 291 43 37

    Sep 527 199 58 28

    Oct 703 287 77 15

    Nov 618 305 33 9

    Dec 316 317 19 9

  • Aurizon Network 2019

    System Operating Parameters / 2019 PCAR 24

    4.1.5 System Closures

    The number of system closure hours in years subsequent to 2018 are substantially less across the four systems.

    This has been as a result of a concerted effort to compress scope and maximise efficiency where possible for

    FY20.

    It is assumed that the increased scope in each system in future years (due to increased tonnes) will increase the

    closure durations to no more than the closure hours in 2018.

    The following system shuts are included in the Capacity Assessment.

    Table 8: System closure hours per system

    Month Blackwater Goonyella Moura Newlands

    Jan 12 12 10 24

    Feb 12 12 11 24

    Mar 36 24 12 24

    Apr 36 36 36 24

    May 36 16 24

    Jun 12

    Jul 24 58 24

    Aug 24 48 12 108

    Sep 48 48 60

    Oct 58 24 12 54

    Nov 48 24 12 21

    Dec 36

    The majority of tonnage dependant activities conducted in the Newlands and Moura systems take place in their

    respective system closures, they have therefore been scaled by the same ratios of the tonnage dependant

    maintenance activities (Newlands 34.18% and Moura 18.59%) to reach a contract tonnage state.

    This has resulted in an additional 41hrs and 77hrs of system closure hours in the Moura and Newlands systems

    respectively.

  • Aurizon Network 2019

    System Operating Parameters / 2019 PCAR 25

    4.2 Moving maintenance activities

    In addition to the fixed activities that require possessions for the work to be undertaken there are moving activities that are undertaken to:

    • Inspect the infrastructure

    • Transport material or work trains to / from site

    • Perform maintenance on the move (i.e. grinding)

    To establish the amount of moving activities to incorporate within the Capacity Assessment a review was performed of 2018 records. Historical maintenance train data was sourced from the Vizirail Datawarehouse for a period of 1 calendar year – 01/01/2018-31/12/2018. The 3205 train services are maintenance trains moving or working between locations and does not include on track machinery movements within maintenance possessions. A summary of the services identified through the analysis is provided in Table 9 below.

    Table 9: Maintenance moving activities service category

    Maintenance moving activities Service Category Proportion of services

    Resurfacing and Lining (MMA070/MMA500/MMA501) 40%

    Ballast Train 8%

    Turnout Grinder (MMY030) 8%

    Mainline Grinder (MMY031) 7%

    Rail Inspection Vehicle (RTI Test Car) 7%

    Ballast Clean and Drainage (RM900) 4%

    Weed Spray Truck 5%

    Rail Train 2%

    Others (Sleeper, track laying, Track Geometry, Tuition, Scissor & unidentified) 19%

  • Aurizon Network 2019

    System Operating Parameters / 2019 PCAR 26

    5 Network Planning

    This section of the System Operating Parameters refers to the activities undertaken to:

    • Plan non-coal (MaTP) traffic

    • Plan maintenance and renewals

    • Provide available capacity information for the scheduling of services

    5.1 Non Coal (MaTP Services)

    The provision of capacity for Non-Coal trains on the CQCN is a legislative requirement of the Transport

    Infrastructure Act (TIA) 1994. The TIA specifies the minimum number of train paths to be made available to Non-

    coal services. Non-coal trains are typically included in the Master Train Plan (MaTP) developed in conjunction with

    Queensland rail for services operating on the NCL.

    The MaTP contains the following types of traffic:

    • Livestock

    • Passenger:

    o Tilt Train

    o Sprit of Outback

    o Spirit of Queensland

    • Freight

    • Light Engine1

    To ensure that the Capacity Assessment is based on an adequate representation of Non-coal traffic the MaTP has

    been compared to the TIA requirements. Where it was found that the MTP had less trains operating than in the TIA

    additional trains were added to the simulated MaTP.

    5.1.1 Seasonal traffic

    Seasonal grain traffic is not included in the MaTP.

    5.2 Alignment with supply chain interfaces

    All port and mine maintenance and renewal activities are assumed to occur in alignment with network closures and

    other network activities. I.e. – there is no capacity loss assumed with these activities when undertaking Capacity

    Assessments and coal is assumed to be available at the mine.

    1 Paths to facilitate Light Engine movements are not preserved under the TIA

  • Aurizon Network 2019

    System Operating Parameters / 2019 PCAR 27

    5.3 Pathing Plan

    The AN Tactical Planning team develop pathing plans to advertise the paths that are available for Access Holders

    to operate trains on. These are based on the constraints from MaTP services, possessions and moving products.

    This approach is replicated in the Capacity Assessment as described below.

    5.3.1 Network Pathing

    A base template for train paths is developed for each system based on the achievable headway through each

    component as described in Table 10 below.

    Table 10: Model Pathing.

    Section Empty Separation Loaded Separation

    Newlands

    Abbot Point – Pring Headway separation Demand basis for port availability

    Pring – Birralee 36 minutes – fixed times Headway separation

    Goonyella

    Hay Point – Jilalan Headway separation Demand basis for port availability

    Jilalan – Coppabella 20 minutes – fixed times 20 minutes – fixed times

    Coppabella – Gregory Jct Headway separation Headway separation

    Coppabella - Wotonga Headway separation Headway separation

    Wotonga – Blair Athol Headway separation Headway separation

    Wotonga – North Goonyella Jct Headway separation Headway separation

    Blackwater

    Callemondah – Bluff1 15 minutes – fixed times 20 minutes – fixed times

    West of Bluff Headway separation Headway separation

    Moura

    Callemondah – Dumgree2 90 minutes – fixed times Headway separation

    This differs from the pathing templates used by the tactical planning team in the following respects:

    • Newlands System

    Capacity Assessments assume that RCS has been implemented through the Newlands system resulting in a

    lower path separation than currently used.

    1 Empty coal traffic travels in the Down direction 2 Empty coal traffic travels in the Down direction

  • Aurizon Network 2019

    System Operating Parameters / 2019 PCAR 28

    5.3.2 Pathing Plan

    The following flow chart describes how activities that affect availability are incorporated into the simulation.

  • Aurizon Network 2019

    System Operating Parameters / 2019 PCAR 29

    5.4 Availability

    The resulting availability (described in the number of daily empty and loaded paths available by month is provided

    in Table 11 to Table 14.

    Table 11: Average daily available paths by month in Newlands

    Newlands Paths Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun

    Empty / day 38.0 34.3 36.0 35.8 37.0 38.8 37.5 36.8 37.2 35.8 37.0 37.6

    Loaded / day 37.1 34.1 35.6 35.5 36.6 38.4 36.9 37.7 36.8 35.0 36.8 37.0

    Table 12: Average daily available paths by month in Goonyella

    Goonyella Paths Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun

    Empty / day 54.5 55.6 59.5 60.6 61.2 59.3 58.4 64.0 60.4 62.6 60.6 55.1

    Loaded / day 54.2 55.2 58.2 60.2 60.5 58.6 58.4 63.0 59.7 61.9 60.0 54.8

    Table 13: Average daily available paths by month in Blackwater

    Blackwater Paths Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

    Empty / day 58.0 55.7 52.3 46.9 48.5 60.8 58.2 46.8 50.7 58.9 58.1 59.3

    Loaded / day 43.0 41.9 39.3 34.5 35.4 46.3 41.2 32.7 36.6 42.8 42.7 43.4

    Table 14: Average daily available paths by month in Moura

    Moura Paths Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

    Empty / day 13.5 14.5 13.1 14.1 15.4 13.6 15.2 14.4 13.0 13.7 14.6 14.1

    Loaded / day 13.3 14.4 12.9 14.1 15.1 13.5 15.0 14.2 12.7 13.4 14.1 13.8

  • Aurizon Network 2019

    System Operating Parameters / 2019 PCAR 30

    6 Operator planning and logistics

    6.1 Train Operation

    6.1.1 Fleet Size

    The modelling process seeks to ensure that all demand is met, therefore the quantum of rolling stock modelled

    may differ from that operated in each system. When undertaking a Capacity Assessment Aurizon Network adjusts

    the quantum of rolling stock to meet the demand requirements. This is primarily because the fleet sizes each

    operator may have in each system may not match that required to meet the demand scenario considered in the

    Capacity Assessment

    The number of trains used for the Capacity Assessment will be published in the relevant Capacity Assessment

    report.

    6.1.2 Payloads

    Because Aurizon Network provides capacity in terms of TSEs (rather than tonnes), any increase in payload beyond

    contract assumptions, will not have any impact on network capacity, unless that increase in payload results in

    consumption of an additional path or changes the interface parameters. The Capacity Assessment is therefore

    performed to understand if the number of Train Service Entitlements (TSEs) can be achieved.

    Payloads from Schedule F of UT5 are used to convert the TSEs into mtpa for information purposes in the Capacity

    Assessment.

  • Aurizon Network 2019

    System Operating Parameters / 2019 PCAR 31

    6.2 Cycle description

    The ability of Network infrastructure to deliver Access Holder demand depends on the design of the above rail

    operation. This operation is included within the capacity assessment to enable the planned operation to be tested.

    Typically, operators generally plan and operate to the following cycle in the CQCN:

    • Train departs home depot

    • Crew change at designated point

    • Arrive mine and load train

    • Crew change at designated point

    • Arrive port and unload train

    • Return to home depot

    • Relieve crew

    • Provision train for next journey

    • Undertake any train inspections, maintenance and shunting

    Aurizon Network sources information relating to each operator’s cycle from the relevant Operating Plan

    supplemented with information from scheduled operations. This interpretation of the cycle is provided in each

    operator specific appendix which includes:

    • Cycle Description

    Description of the train cycle including crew changes, operations in yards and other activities en-route

    • Interface times:

    The times used for interface locations (load / unload)

  • Aurizon Network 2019

    System Operating Parameters / 2019 PCAR 32

    7 Network Scheduling

    This section of the SOP describes how Coal train services that operate within the CQCN are scheduled within the

    Capacity Assessment. This includes:

    • The demand

    • How rolling stock is assigned to meet demand

    7.1 Demand

    The CQSCM is a discrete event simulation model used to generate schedules using business rules based on the demand entered. This demand, entered as TSEs is

    • Converted into a number of train orders required

    • Scaled by the number of days in the month.

    Demand used in the Capacity Assessment is provided in the relevant Capacity Assessment report.

    7.2 Dispatching

    During the simulation the train orders are injected into the CQSCM Dispatcher. The dispatcher is a queue based management system that registers the orders and allocates them to available trains. The dispatcher prioritises orders to maximise order fulfilment equally across all demand

    Within the CQSCM’s Dispatcher, several sub-processes are executed to determine if a train accepts the order and

    commences its service. To enable a successful allocation of an order to a train to form an active service, all sub-

    processes must successfully complete.

    These are:

    • Availability of Network Paths

    This process controls the Network Path allocated to a train. When a Network Path is available, the Dispatcher

    reserves the Network Path for the train and continues to evaluate the other sub-processes. In the event a

    network path is not available, train orders are not processed and are queued.

    • Train Configuration applicability

    This process checks to ensure the train configuration is suitable for the available order. In some cases, there

    are restrictions on the train configurations such as Electric trains operating to non-electrified origins.

    • Train Loadout management

    This process predicts the trains arrival time at the mine to ensure the loadout is available to accept the train.

    The availability of the loadout is evaluated to minimise train delays at the loadout.

    • Route availability

    This process evaluates the availability of the track network to ensure the train can reach its origin mine. In the

    event an outage on the network is encountered, the Dispatcher will prevent the service from being created and

    seek to find a suitable time that aligns track network and mine availability.

    • Empty direction

    Prior to dispatching a train service from the origin, the model looks forward in time. This determines if the

    train service is able to traverse the track to the destination load out without being blocked by a closure or

    track possession. If the model detects that one of these two events will block the train from reaching its

    destination, the train service will not dispatch.

  • Aurizon Network 2019

    System Operating Parameters / 2019 PCAR 33

    The model continuously re-evaluates to dispatch a train service. This method will see that trains depart

    their respective service origin to arrive at the section under closure or possession at a point in time when

    the track becomes available.

    The look ahead function in the model utilises reference train SRTs and considers scheduled dwells such

    as crew changes. Variation to SRTs and contracted dwells is not considered in this method. Based on

    this approach the model may dispatch a train service in the empty direction that will be blocked by a

    closure or possession, dependant on the variation levels entered.

    Network paths are also considered and managed in the Dispatcher for the mainline corridor.

    • Loaded direction

    Train services departing the mine assess the availability of the track up to the next point of capacity (i.e.

    signal or passing loop). Using this method in the model, train services will proceed along their route to

    the identified separation location where trains dwell for network paths.

    Once a train arrives at the separation point, a network path is allocated to a train. Trains will dwell at the

    separation location until the network path time is reached and will then continue the journey to the

    destination port.

    During the trains journey, the train continues to assess the track sections being traversed to ensure the

    network is available. In the event congestions or an outage is reached, trains will proceed once the

    following sections and/or queued trains have cleared.

    The dispatcher seeks to fulfil demand equally across all contracts by prioritising those that have achieved the

    smallest proportion of their demand during the simulation period.

  • Aurizon Network 2019

    System Operating Parameters / 2019 PCAR 34

    8 Train Operation

    This section of the System Operating Parameters describe how the Capacity Assessment replicates the operation

    of trains across the CQCN through:

    • Network Control

    • Speed of trains (speed restrictions)

    • Day of Operations loss

    • Force Majeure

    8.1 Network Control

    The management of a trains journey in the CQSCM is handled through a Track Control process. The purpose of

    this process is to continuously monitor the situation of trains on the track network and determine the next possible

    moves similar to that of a Network Controller operating trains, including.

    • Manage conflicts at a nodal level to pass trains at crossing locations

    • Manage the route set ahead to avoid deadlocks

    • Manage the routing of trains around maintenance being undertaken on the track network

    • Manage the trains entire journey to ensure its cycle is completed

    • Manage activities in yards and allocation of roads in a yard

    • Manage safe-working and headway constraints of the track network

    8.2 Temporary Speed Restrictions (TSRs)

    To replicate the impact of TSRs on the rail network, historical data for the CQCN for 1/1/18 to 31/12/18 was

    analysed. This information was used to generate a set of representative speed restrictions through the following

    process:

    • Collate historical speed restrictions

    Records of the location, duration and speed limit imposed across the CQCN were collated for a 12 month

    period

    • Determine time impact

    The impact of the TSR was determined by calculating the additional time taken to traverse the speed

    restriction length (including decelerating and accelerating) compared to the time taken to cover the section

    without speed restrictions applied.

  • Aurizon Network 2019

    System Operating Parameters / 2019 PCAR 35

    Figure 9: Assumed impact to train speed used to calculate TSR impact to SRT

    • Inclusion in the Capacity Assessment

    A table was generated that identified for each TSR the:

    • Location

    • Track

    • Start Date / End Date

    • Time impact

    Table 15 to Table 18 illustrates the typical speed restrictions (total minutes) applied on each branch of the CQCN

    systems in the Capacity Assessment. The impact of these speed restrictions is dependent on the amount of traffic

    operating over each speed restriction.

  • Aurizon Network 2019

    System Operating Parameters / 2019 PCAR 36

    Table 15: Typical speed restrictions applied (total minutes) in the Newlands system

    Corridor Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

    GY Wotonga > NML Jn - - 0.2 1.2 - - - 0.1 6.4 6.4 6.4 2.3

    NL Birralee > NML Jn 1.1 4.0 5.9 4.6 2.9 4.8 4.8 4.1 3.2 1.6 2.5 2.0

    NL McNaughton Branch 0.4 - - - - - 0.1 - - - - -

    NL Ports 2.1 1.2 3.2 4.0 1.9 0.9 0.9 1.0 3.1 3.0 2.3 -

    NL Pring > Birralee 1.1 0.6 4.0 3.4 1.0 0.4 0.3 3.4 1.3 10.3 13.2 10.6

    NL Total 4.7 5.8 13.3 13.1 5.8 6.0 6.0 8.6 14.0 21.3 24.3 15.0

    Table 16: Typical speed restrictions applied (total minutes) in the Goonyella system

    Corridor Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

    GY Blair Athol Branch 1.3 1.5 0.7 1.3 2.9 1.7 2.7 1.5 1.8 2.2 2.0 1.9

    GY Coppabella > Saraji 7.2 7.1 6.6 11.5 12.2 9.2 11.9 4.9 7.5 7.2 6.9 6.9

    GY Coppabella > Wotonga 9.9 11.1 12.2 10.8 3.6 1.5 0.6 - 4.4 9.3 12.4 21.0

    GY Hail Creek Branch - 4.6 9.3 3.3 - - - - - 0.3 3.0 0.5

    GY Jilalan > Coppabella 13.6 17.7 15.7 17.5 18.7 17.0 17.1 23.0 28.2 25.2 16.3 16.6

    GY North Goonyella Branch - - - - - - 0.5 - - - - -

    GY Ports 0.2 - 1.0 8.1 7.4 9.2 9.5 1.2 0.4 - 1.8 5.6

    GY Riverside Branch - - - - - - - - - - 4.7 6.2

    GY Saraji > Bundoora 6.0 4.8 5.5 1.5 2.6 12.4 12.4 12.4 11.9 8.6 12.4 7.4

    GY Waitara Branch - - 0.6 0.1 - - - - 0.1 0.8 - -

    GY Wotonga > NML Jn 5.1 5.3 3.8 6.5 7.4 8.8 0.6 1.1 3.1 1.6 2.5 0.9

    GY Total 43.3 52.1 55.5 60.7 54.8 59.7 55.3 44.1 57.4 55.2 62.0 67.0

  • Aurizon Network 2019

    System Operating Parameters / 2019 PCAR 37

    Table 17: Typical speed restrictions applied (total minutes) in the Blackwater system

    Corridor Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

    BW Bluff > Burngrove 23.3 23.7 22.0 20.2 17.5 3.9 3.3 4.1 3.4 3.8 12.4 9.4

    BW Boonal Branch - - - - - - 1.3 8.6 3.6 1.6 0.2 1.2

    BW Bundoora > Burngrove 1.0 5.3 6.9 5.8 5.2 10.3 14.8 14.2 8.8 1.8 1.8 5.4

    BW Callemondah > Bluff 87.9 94.4 107.4 100.4 87.2 100.8 89.4 69.6 89.0 93.6 104.9 70.5

    BW Curragh Branch 0.2 5.7 6.0 6.0 0.7 0.1 15.8 24.1 - - - -

    BW EEQ Branch 1.0 0.5 - - - - - - 0.2 - - -

    BW Ensham Branch - - - - - - - - - - 1.4 3.3

    BW Gordonstone Branch 0.1 - - - - - 1.0 0.0 - - 0.6 0.4

    BW Gregory Branch 0.3 0.5 - - - 1.1 0.6 0.9 4.8 4.8 7.5 2.6

    BW Kinrola Branch - - - - - - 3.5 4.9 3.0 - - -

    BW Koorilgah Branch - - 5.5 10.5 10.5 10.5 10.5 0.6 - 1.1 0.5 -

    BW Minerva Branch 41.7 37.1 38.0 38.0 38.0 36.7 36.2 36.2 36.3 42.6 36.8 27.6

    BW Ports - 1.3 - - 1.7 3.9 7.9 4.3 10.8 10.3 4.9 6.8

    BW Rangal > Burngrove - - 0.6 - 4.8 2.4 - - - - 0.5 0.9

    BW Rangal > Rolleston - 3.7 5.8 3.5 6.8 3.6 3.4 9.4 6.8 7.7 3.7 2.5

    BW Bundoora > Burngrove 3.8 3.8 3.8 3.8 3.8 3.0 0.3 1.5 2.3 5.9 2.1 2.9

    BW total 159.4 175.8 196.1 188.2 176.2 176.2 188.0 178.2 168.8 173.2 177.3 133.5

    Table 18: Typical speed restrictions applied (total minutes) in the Moura system

    Corridor Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

    MA Baralaba Branch - - - 1.6 7.3 7.3 7.3 7.3 7.3 7.3 6.1 11.9

    MA Callide Branch 10.7 13.7 13.5 10.3 17.5 16.1 5.6 5.6 5.6 8.5 14.1 7.9

    MA Mainline 37.6 43.1 33.0 22.1 20.2 14.0 10.4 14.1 21.6 21.6 16.4 10.8

    MA Ports 4.1 7.5 7.0 3.1 - 3.7 4.5 4.3 4.3 4.3 4.3 4.3

    MA total 52.4 64.2 53.4 37.2 45.0 41.2 27.8 31.2 38.7 41.7 40.8 34.8

  • Aurizon Network 2019

    System Operating Parameters / 2019 PCAR 38

    8.3 Network caused Day of Operations Losses

    Day of operations losses result from a number of varying influences, which include (but are not limited to):

    • Adverse weather conditions (excludes those declared as Force Majeure)

    • Infrastructure faults and failures

    • Incidents at interfaces (e.g. level crossing incidents, trespassing)

    These can manifest in the DOO as delays and failures. To represent this, the operating logic in the dynamic model

    randomly applies cancellations to 10% of empty train services scheduled to depart the origin.

    8.4 Force Majeure

    Force Majeure Events are not included in the Capacity Assessment, which is in accordance with all Access

    Agreements whereby obligations are suspended during a Force Majeure Event.

  • Aurizon Network 2019

    System Operating Parameters / 2019 PCAR 39

    9 Information

    9.1 Train Service Entitlements

    Aurizon Network provides capacity in the form of TSEs i.e. the provision of the ability for an Access Holder to

    operate a specified number and type of train services between a mine and a port. Aurizon Network determines the

    number of TSEs that are required to be contracted based on throughput and payload assumptions provided by the

    Access Seeker in the COP. Two TSEs are required for cyclic traffic, one for the empty leg and one for the loaded

    leg.

    The derivation of TSEs from a tonnage is described below:

    Table 19: Train Service Entitlements calculation Table.

    Value Source / Calculation

    million tonnes per annum (MTPA) Access Holder / Seeker

    Train payload (tonnes) Access Holder / Seeker

    Annual TSEs = 2 * (MTPA / Payload)

    Monthly1 TSEs = Annual TSE / 12

    The agreed TSEs are included in the Access Agreement.

    1 Rounding of fractional part of TSE calculation based on method described in section 0

  • Aurizon Network 2019

    System Operating Parameters / 2019 PCAR 40

    9.2 Measurement of capacity

    9.2.1 Monthly scaling

    To ensure there is sufficient network capacity to service existing and future contracts TSEs are tested in the

    dynamic Capacity Model based on a 30 day month with adjustments made for non 30 day months. Once scaled for

    the non-30-day months adjustments are made as per the following:

    • if the remainder of TSEs are less than or equal to 0.29, then round down

    • if the remainder of TSEs are greater than 0.29, then round up

    9.2.2 Pass / Fail criteria

    Capacity Assessments are assessed on a monthly basis to determine if the demand can be met for each month.

    • Each mine / port combination must achieve all TSEs in each month of the simulation

    • Capacity is limited at the worse performing month.

    Available Capacity is determined as the over achievement of demand through the simulation. This Available

    Capacity is illustrative only as does not take account of the specific demand which may be required. Specific

    scenarios can be initiated by Access Seekers through the Access Request process.

    Capacity

  • Aurizon Network 2019

    System Operating Parameters / 2019 PCAR 41

    9.3 Definitions and Abbreviations

    Definition Meaning

    Above Rail Delay A delay to a Train Service from its scheduled Train Path in the DTP, where that delay can

    be attributed directly to an Access Holder (including, if applicable, its Nominated

    Railway Operator) in operating its Train Services, but excludes:

    (a) cancellations;

    (b) delays resulting from compliance with a Passenger Priority Obligation; and

    (c) delays resulting from a Force Majeure Event.

    Absolute Capacity The maximum number of Train Paths (calculated on a Monthly and annual basis) that can

    be provided:

    (a) in each Coal System; and

    (b) for the mainline and each branch line of each Coal System,

    using the following assumptions:

    (c) the Rail Infrastructure is not affected by maintenance, renewal or Expansion

    activities;

    (d) there are no speed restrictions affecting the Rail Infrastructure;

    (e) there are sufficient origins and destinations, and sufficient infrastructure at those

    origins and destinations, to enable all Train Paths to be utilised;

    (f) there are no delays or failures occurring in the relevant Supply Chain;

    (g) there is sufficient rollingstock and other above rail assets to enable all Train Paths to

    be utilised; and

    (h) the minimum headway of the relevant Coal System.

    Access Holder Unless expressed to the contrary, a person that has been granted Access Rights to

    operate Train Services on all or part of the Rail Infrastructure.

    Access Seeker Subject to clause 4.9(a) and unless expressed to the contrary, the entity that provides

    Aurizon Network with a properly completed Access Application, but does not include

    a request to enter into a Train Operations Deed.

    Available Capacity Capacity, excluding all Committed Capacity.

    Below Rail Delay A delay to a Train Service from its scheduled Train Path in the DTP, where that delay can

    be attributed directly to Aurizon Network, but excludes:

    (a) cancellations;

    (b) delays resulting from compliance with a Passenger Priority Obligation; and

    (c) delays resulting from a Force Majeure Event.

    Below Rail Transit Time For a Train Service travelling between its origin and destination, the sum of:

    (a) the relevant nominated section running times (in the direction of travel) as specified in

    the Train Service Entitlement;

    (b) identified Below Rail Delays for that Train Service;

    (c) the time taken in crossing other Trains to the extent that such time is not contributed

    to by Above Rail causes or Force Majeure Events or otherwise included in paragraph

    (a) of this definition; and

    (d) delays due to Operational Constraints directly caused by the activities of Aurizon

    Network in maintaining the Rail Infrastructure, provided such delays are not

    contributed to by Above Rail causes or Force Majeure Events or otherwise included

    in paragraphs (b) and (c) of this definition.

    Below Rail Transit Time

    Percentage

    For a type of Train Service specified in a Train Service Entitlement, the proportion

    (expressed as a percentage) calculated by dividing the Below Rail Transit Time by the

  • Aurizon Network 2019

    System Operating Parameters / 2019 PCAR 42

    Definition Meaning

    maximum sectional running times (as set out in the relevant Access Agreement) for all

    relevant sections (as set out in the relevant Access Agreement).

    BRTT Below Rail Transit Time

    Capacity The aggregate of Existing Capacity and Planned Capacity.

    Capacity Analysis A simulation modelling assessment of the Available Capacity of the Rail Infrastructure,

    based on the Network Management Principles, System Operating Parameters,

    System Rules, Train Operator’s Operating Plans and any requested Access Seeker’s

    Access Rights, to determine, as the context requires:

    (a) Available Capacity;

    (b) whether there is sufficient Capacity to accommodate Committed Capacity;

    (c) whether there is sufficient Available Capacity to accommodate the requested Access

    Rights not yet considered to be Committed Capacity;

    (d) if there is insufficient Capacity to accommodate Committed Capacity, the Expansions

    required to provide the Shortfall Capacity to accommodate Committed Capacity (and

    an indicative estimate of the cost of such works and timing for completion);

    (e) if there is insufficient Available Capacity to accommodate requested Access Rights

    not yet considered to be Committed Capacity, whether Expansions are required to

    provide the additional Capacity to accommodate the requested Access Rights (and

    an indicative estimate of the cost of such works and timing for completion); and

    (f) the operational impacts of the requested Access Rights including the impact of the

    requested Access Rights on the, Network Management Principles, System Operating

    Parameters, System Rules and Train Operator’s Operating Plans,

    and which:

    (g) provides a sufficient basis to enable Aurizon Network to finalise the relevant Train

    Service Entitlement, initial timetable, applicable Access Charges and associated

    funding arrangements (subject to other variations identified in the negotiation

    process); and

    (h) for information purposes only:

    (i) includes the Monthly available tonnes based on Nominal Train Payloads

    outlined in Schedule F; and

    (ii) identifies the assumed split of traffic to different destinations serviced by the

    relevant Coal System.

    Committed Capacity That portion of the Capacity that is required:

    (i) to meet Train Service Entitlements;

    (j) to satisfy Aurizon Network’s obligations under clause 7.3(d) in respect of a Renewing

    Access Seeker;

    (k) to comply with any Passenger Priority Obligation or Preserved Train Path Obligation;

    (l) to provide Access Rights where Aurizon Network has, in relation to those Access

    Rights, contractually committed to construct an Expansion; and

    (m) to provide Access Rights where Aurizon Network has, in relation to those Access

    Rights, contractually committed to construct a Customer Specific Branch Line.

    CQSCM Central Queensland Supply Chain Model

    Customer A person in respect of which an Access Holder or an Access Seeker is or is intending to

    use Access Rights to provide Train Services for that person (in that Access Seeker’s or

    Access Holder’s capacity as a Railway Operator).

    Cyclic Traffic A traffic, the Train Service Entitlements in respect of which are defined in terms of a

    number of Train Services within a particular period of time, for example, a year,

    Month, week or day. Coal traffic is an example of such traffic.

    DTC Direct Traffic Control

  • Aurizon Network 2019

    System Operating Parameters / 2019 PCAR 43

    Definition Meaning

    Dwell Where a Train stops for a short period on Rail Infrastructure at locations specified by

    Aurizon Network as required for crew changes, meal breaks and maintenance, examination

    and provisioning of that Train.

    Existing Capacity Absolute Capacity, net of:

    (a) Aurizon Network’s reasonable requirements for the exclusive or partial utilisation of

    the Rail Infrastructure for the purposes of performing activities associated with the

    maintenance and repair of the Rail Infrastructure, including the operation of work

    Trains; and

    (b) Aurizon Network’s allowances for “day of operations” losses, speed restrictions and

    other operational losses or restrictions applicable to the Rail Infrastructure as set out

    in the System Operating Parameters.

    Infrastructure Service

    Providers Those parties who provide maintenance, construction and other related services in respect

    of the Rail Infrastructure.

    Loading Time The time between a Train Service arriving at a Nominated Loading Facility and that same

    Train departing the Nominated Loading Facility, and for the purpose of clarity, this time

    runs from when a Train Service arrives at the entry signal to the Nominated Loading Facility

    until it has completed loading, presented at the exit signal, is ready to depart the Nominated

    Loading Facility and has advised the relevant Network Controller accordingly.

    Maintenance Work Any work involving maintenance or repairs to, or renewal, replacement and associated

    alterations or removal of, the whole or any part of the Rail Infrastructure (other than

    Infrastructure Enhancements) and includes any inspections or investigations of the Rail

    Infrastructure.

    Major Periodic Maintenance Activities that renovate the Rail Infrastructure to retain it in a functional condition completed

    on Track sections at intervals of more than one year, and includes activities such as

    re-railing, rail grinding, resurfacing, re-signalling, communications upgrades, renovating

    structures, ballast cleaning and re-sleepering.

    MaTP Master Train Plan containing the planned time of scheduled traffic

    Operational Constraint Any restriction on the use of any part of the Rail Infrastructure that impacts adversely on

    Train Services, including speed restrictions, load restrictions, Possessions or signalling or

    overhead restrictions

    PACE Possession Aligner and Capacity Evaluator

    Planned Capacity The additional Train Paths (calculated on a Monthly and annual basis) that is expected to

    result from an Expansion that Aurizon Network is contractually committed to

    construct, taking into account:

    (a) Aurizon Network’s reasonable requirements for the exclusive or partial utilisation of

    the Rail Infrastructure resulting from that Expansion for the purposes of performing

    activities associated with the maintenance and repair of the Rail Infrastructure

    resulting from that Expansion, including the operation of work Trains; and

    (b) Aurizon Network’s allowances for “day of operations” losses, speed restrictions and

    other operational losses or restrictions applicable to the Rail Infrastructure resulting

    from that Expansion as set out in the System Operating Parameters.

    Railway Operator The meaning given to that term in the TIA and, for clarity, includes an Access Holder’s

    nominated Train Operator.

    Railway Operator (TIA

    definition)

    (a) means a person who operates rolling stock on a railway; but

    (b) does not include the Authority.

    RCS Remote Control Signalling

    Supply Chain Group (a) A group that has been established as a supply chain coordination group for the

    purpose of coordinating some or all aspects of the planning or operation of a Supply

    Chain; or

  • Aurizon Network 2019

    System Operating Parameters / 2019 PCAR 44

    Definition Meaning

    (b) a group which has the support of sufficient participants in the Supply Chain to

    effectively perform that coordination purpose,

    but in each case the group includes consideration of the service taken to be declared

    under section 250(1)(a) of the Act.

    TIA Transport Infrastructure Act 1994 (QLD)

    Train Operator A person nominated by an Access Seeker or an Access Holder to operate Train Services

    for that Access Seeker or Access Holder under the terms of a Train Operations Deed.

    Unloading Time The time between a Train Service arriving at a Nominated Unloading Facility and that same

    Train departing the Nominated Unloading Facility, and for the purpose of clarity, this time

    runs from when a Train Service arrives at the entry signal to the Nominated Unloading

    Facility until it has completed unloading, presented at the exit signal, is ready to depart the

    Nominated Unloading Facility and has advised the relevant Network Controller accordingly.

  • Aurizon Network 2019

    System Operating Parameters / 2019 PCAR 45

    Appendices

  • Aurizon Network 2019

    System Operating Parameters / 2019 PCAR 46

    10 Appendix 1: Sectional Run Times

    Table 20: Newlands and GAPE SRTs

    Location from Location to Empty Loaded

    Newlands trunk

    Abbot Point Kaili 13 17

    Kaili Durroburra 8 10

    Durroburra Pring 11 3

    Pring Buckley 5 6

    Buckley Armuna 13 15

    Armuna Aberdeen 12 10

    Aberdeen Binbee 12 9

    Binbee Briaba 14 15

    Briaba Almoola 16 31

    Almoola Collinsville 6 6

    Collinsville McNaughton Junction 4 4

    McNaughton Junction Sonoma Junction 7 6

    Sonoma Junction Birralee 10 10

    Birralee Cockool 15 16

    Cockool Havilah 15 18

    Havilah Newlands Junction 13 13

    Northern missing link

    Newlands Junction Leichardt Range 8 7

    Leichhardt Range Byerwen Junction 11 12

    Byerwen Junction Suttor Creek 11 11

    Suttor Creek Eaglefield Creek 21 24

    Eaglefield Creek North Goonyella Junction 8 8

    North Goonyella branch

    North Goonyella Junction Riverside 15 14

    Riverside Goonyella 6 7

    Goonyella Moranbah North Junction 5 4

    Moranbah North Junction Wotonga 16 15

    Blair Athol branch

    Wotonga Moranbah 19 15

    Moranbah Caval Ridge Junction 3 5

    Caval Ridge Junction Villafranca 13 17

    Villafranca Mount McLaren 18 22

    Mount McLaren Blackridge 21 23

    Blackridge Blair Athol Junction 15 21

  • Aurizon Network 2019

    System Operating Parameters / 2019 PCAR 47

    Location from Location to Empty Loaded

    Wotonga to Coppabella

    Wotonga Isaac Plains Junction 3 2

    Isaac Plains Junction Mallawa 3 3

    Mallawa Carborough Downs Junction 8 12

    Carborough Downs Junction Broadlea 5 5

    Broadlea Coppabella 13 19

    South Goonyella branch

    Coppabella Moorvale Junction 5 16

    Moorvale Junction Ingsdon 2 4

    Ingsdon Millennium Junction 5 8

    Millennium Junction Red Mountain 7 7

    Red Mountain Winchester 9 9

    Winchester Peak Downs 13 12

    Peak Downs Harrow 13 15

    Harrow Saraji 6 8

    Saraji Lake Vermont Junction 16 18

    Lake Vermont Junction Dysart 4 3

    Dysart Stephens 7 7

    Stephens Norwich Park 9 11

    Norwich Park Middlemount Junction 12 17

    Mine spurs

    Blair Athol Junction Blair Athol 3 2

    Byerwen Junction Byerwen 10 10

    Caval Ridge Junction Caval Ridge 15 12

    Lake Vermont Junction Lake Vermont 11 7

    McNaughton Junction McNaughton 8 6

    Middlemount Junction Middlemount 21 11

    Newlands Junction Newlands 8 9

    Riverside Riverside Balloon 4 1

    Sonoma Junction Sonoma 9 1

  • Aurizon Network 2019

    System Operating Parameters / 2019 PCAR 48

    Table 21: Goonyella SRTs

    Location from Location to Empty Loaded

    Goonyella Trunk

    Dalrymple Bay Dalrymple Bay Staging 3 3

    Dalrymple Bay Staging Dalrymple Crossover Points 4 6

    Hay Point Hay Point Entry 4 8

    Hay Point Entry Dalrymple Crossover Points 9 4

    Dalrymple Crossover Points Praguelands 7 6

    Praguelands Jilalan 6 1

    Jilalan Yukan 7 10

    Yukan Black Mountain 13 19

    Black Mountain Hatfield 12 12

    Hatfield Bolingbroke 12 12

    Bolingbroke Balook 13 14

    Balook Wandoo 7 14

    Wandoo Waitara 11 14

    Waitara Braeside 10 6

    Braeside Mindi 9 14

    Mindi South Walker Junction 7 7

    South Walker Junction Tootoolah 6 6

    Tootoolah Macarthur Junction 4 4

    Macarthur Junction Coppabella 9 5

    Coppabella Broadlea 11 19

    Broadlea Carborough Downs Junction 2 5

    Carborough Downs Junction Mallawa 9 9

    Mallawa Isaac Plains Junction 2 4

    Isaac Plains Junction Wotonga 2 3

    South Goonyella branch

    Coppabella Moorvale Junction 6 13

    Moorvale Junction Ingsdon 2 2

    Ingsdon Millennium Junction 5 7

    Millennium Junction Red Mountain 6 6

    Red Mountain Olive Downs Junction 6 5

    Olive Downs Junction Winchester 3 3

    Winchester Peak Downs 13 11

    Peak Downs Harrow 13 14

    Harrow Saraji 6 13

    Saraji Lake Vermont Junction 15 22

    Lake Vermont Junction Dysart 4 3

    Dysart Stephens 7 7

    Stephens Norwich Park 9 11

    Norwich Park Middlemount Junction 12 17

    Middlemount Junction Bundoora 2 3

    Bundoora German Creek 4 6

  • Aurizon Network 2019

    System Operating Parameters / 2019 PCAR 49

    Location from Location to Empty Loaded

    German Creek Oaky Creek 15 20

    Oaky Creek Lilyvale 13 12

    Lilyvale Gregory Junction 1 2

    Blair Athol branch

    Wotonga Moranbah 16 16

    Moranbah Caval Ridge Junction 4 3

    Caval Ridge Junction Villafranca 12 16

    Villafranca Mount Mclaren 17 21

    Mount Mclaren Blackridge 21 22

    Blackridge Blair Athol Junction 16 19

    North Goonyella branch

    Wotonga Moranbah North Junction 16 17

    Moranbah North Junction Goonyella 4 3

    Goonyella Riverside 4 4

    Riverside North Goonyella Junction 12 15

    Mine spurs

    South Walker Junction Bidgerley Junction 5 1

    Bidgerley Junction South Walker (Bidgerley Balloon) 6 2

    Bidgerley Junction Hail Creek 38 30

    Blair Athol Junction Blair Athol 2 3

    Carborough Downs Junction Carborough Downs 9 1

    Caval Ridge Junction Caval Ridge 13 11

    Goonyella Goonyella Balloon 2 1

    Isaac Plains Junction Isaac Plains 5 2

    Macarthur Junction Macarthur (Coppabella Mine) 5 1

    Mallawa Burton 3 1

    Middlemount Junction Middlemount 19 9

    Millennium Junction Millennium 2 2

    Moorvale Junction Moorvale 6 1

    Moranbah North Junction Moranbah North 3 4

    North Goonyella Junction North Goonyella 3 3

    Peak Downs Peak Downs Balloon 5 2

    Riverside Riverside Balloon 4 1

    Saraji Saraji Balloon 1 2

  • Aurizon Network 2019

    System Operating Parameters / 2019 PCAR 50

    Table 22: Blackwater SRTs

    Location from Location to Empty Loaded

    North Coast Line

    Callemondah Mount Miller 12 14

    Mount Miller Wiggins Island Junction 2 2

    Wiggins Island Junction Yarwun 1 2

    Yarwun Aldoga 6 7

    Aldoga Mount Larcom 9 12

    Mount Larcom Ambrose 4 4

    Ambrose Epala 5 7

    Epala Raglan 9 8

    Raglan Marmor 11 10

    Marmor Bajool 8 9

    Bajool Archer 9 10

    Archer Midgee 7 8

    Midgee Rocklands 8 9

    Blackwater trunk

    Rocklands Gracemere 7 8

    Gracemere Kabra 11 15

    Kabra Warren 6 6

    Warren Wycarbah 11 10

    Wycarbah Westwood 9 10

    Westwood Windah 10 19

    Windah Grantleigh 10 12

    Grantleigh Tunnel 8 9

    Tunnel Edungalba 10 19

    Edungalba Aroona 11 10

    Aroona Duaringa 7 10

    Duaringa Wallaroo 13 15

    Wallaroo Tryphinia 11 10

    Tryphinia Dingo 12 14

    Dingo Umolo 7 8

    Umolo Parnabal 3 4

    Parnabal Walton 8 4

    Walton Bluff 11 13

    Bluff Boonal Balloon Points 9 12

    Boonal Balloon Points Blackwater 12 13

    Blackwater Sagittarius 3 6

    Sagittarius Rangal 5 5

    Rangal Burngrove 7 8

  • Aurizon Network 2019

    System Operating Parameters / 2019 PCAR 51

    Location from Location to Empty Loaded

    South Goonyella (Gregory) branch

    Burngrove Washpool Junction 7 8

    Washpool Junction Crew 1 1

    Crew Mackenzie 12 14

    Mackenzie Fairhill 11 12

    Fairhill Yan Yan 12 13

    Yan Yan Gregory Junction 9 10

    Gregory Junction Lilyvale 2 2

    Lilyvale Oaky Creek Junction 13 15

    Oaky Creek Junction German Creek Junction 16 16

    German Creek Junction Bundoora 2 4

    Bundoora Middlemount Junction 2 2

    Middlemount Junction Norwich Park 14 14

    Norwich Park Stephens 10 12

    Stephens Dysart 8 7

    Dysart Lake Vermont Junction 3 5

    Rolleston branch

    Rangal Tikardi 7 6

    Tikardi Boorgoon Junction 5 6

    Boorgoon Junction Kinrola Junction 6 8

    Kinrola Junction Kenmare 23 22

    Kenmare Memooloo 27 34

    Memooloo Starlee 31 30

    Starlee Meteor Downs Junction 17 18

    Meteor Downs Junction Rolleston 8 8

    Minerva branch

    Burngrove Tolmies 3 2

    Tolmies Comet 23 35

    Comet Yamala 20 24

    Yamala Nogoa 18 21

    Nogoa Minerva Balloon 92 98

    Domestic and export terminals

    Golding Gladstone Powerhouse Junction 8 5

    Gladstone Powerhouse Junction Callemondah 10 7

    Gladstone Powerhouse Callemondah 11 2

    Wiggins Island Wiggins Island Staging 8 6

    Wiggins Island Staging Wiggins Island Junction 6 7

    Comalco Balloon Junction Fisherman's Landing 6 9

    Stanwell Powerhouse Warren 5 3

  • Aurizon Network 2019

    System Operating Parameters / 2019 PCAR 52

    Location from Location to Empty Loaded

    Mine spurs

    Boonal Balloon Points Boonal Balloon 3 1

    German Creek German Creek Balloon 5 4

    Kinrola Junction Kinrola 6 4

    Lake Vermont Junction Lake Vermont 12 19

    Mackenzie Ensham 12 10

    Oaky Creek Junction Oaky Creek 6 6

    Sagittarius Curragh 13 11

    Yan Yan Gordonstone Balloon 13 12

  • Aurizon Network 2019

    System Operating Parameters / 2019 PCAR 53

    Table 23: Moura SRTs

    Location From Location To Empty Loaded

    Moura trunk

    Callemondah Byellee 8 11

    Byellee Stowe 15 13

    Stowe Graham 5 9

    Graham Stirrat 10 9

    Stirrat Clarke 20 24

    Clarke Fry 10 11

    Fry Mount Rainbow 21 24

    Mount Rainbow Dumgree 19 29

    Dumgree Boundary Hill Junction 13 17

    Boundary Hill Junction Annandale 3 1

    Annandale Earlsfield 7 14

    Earlsfield Belldeen 23 23

    Belldeen Moura Mine Junction 21 39

    Callide branch

    Earlsfield Koonkool 7 5

    Koonkool Dakenba 26 20

    Dakenba Callide Coalfields 17 21

    Mine spurs

    Boundary Hill Junction Boundary Hill 7 4

    Moura Mine Junction Moura Mine 2 2

    Moura Mine Junction Baralaba Balloon Loop 31 31

    Gladstone surrounds

    Gladstone QAL SDG South Gladstone 5 7

    Parana Callemondah 11 10

    South Gladstone Parana 7 10