 Ryobi Kiso (S) Pte Ltd SWP-15 Saf e Work Practi ces (SWP) for Using of Mancage Procedures check for minimum requirements (Please tick): Permit-to-Work Procedure in place where applicable Logout Tag out Sstem where applicable PP! requirements !mergenc "esponse Plan(!"P)  ###################################################### ####### When working with manca ge operation the following procedures must str ictl adhered to$ Lifting Supervisor to inspect all lifting gear prior to slinging on to the hooks at four (4) corners of man- cage. Briefing by Safety supervisor to all personnel involved on the sequence of activity. Every personnel engaged to work on the man-cage shall be provided with a full-body safety harness with double lanyard and shock absorber and safety helmet. Ensure that the ground stability & uniformly level(1% of level grade) for the lifting machine sitting is firm Crane outriggers, if required, shall be fully extended. Lifting machine operator shall be checked hoist drum/slewing brake & locking device before lifting up man-cage. Lifting and lowering speed shall not exceed 0.5m/s Crane must be operated with caution such that when slewing at slow speed. Free falling is prohibited. The man-cage shall be shall be hoisted a few centimeters above ground and inspected to ensure that it is secure and properly balanced before personnel are allowed on the platform. Lifting up man-cage. Personnel working on the man-cage shall keep every part of their bodies inside the platform during raising, lowering and positioning. Load and boom hoist drum brakes, slewing brakes and locking devices shall be engaged when the man-cage is in a stationary working position. Lifting operations are not to be carried out during adverse weather or person working underneath the man-cage Mobile crane or crawler crane to minimize lifting eccentricity and coordinate movement of rigger and maintain signaler visual path with crane operator. Position man-cage over the designated position and lowered it slowly after the operation. If the man-cage is not landed, it shall be secured to a structure or held stationary before the workers exit or enter the platform. Lifting super%isor to ensure all L& ' L such man cage shackles wire rope a re certified b *! e%er + months and in good working condition To adhere to Safe Working Load of man cage, To displa signage of SWL %alid L& certificate and one personnel in the cage per an hoist on the mancage  Page 1 of 1 Prepared : &r .aiman "e%iewed : &r /g 0hoon 1uat .esignation: WS12 .esignation: Senior Pro3ect &anager .ate: 45 .ec 6747 .ate: 45 .ec 6747

Upload: hassan-abdullah

Post on 04-Jun-2018

230 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: SWP-15 Using of Mancage Daiman

 

 

Ryobi Kiso (S) Pte Ltd SWP-15

Safe Work Practices (SWP) for Using of Mancage

Procedures check for minimum requirements (Please tick):

Permit-to-Work Procedure in place where applicable

Logout Tag out Sstem where applicable

PP! requirements

!mergenc "esponse Plan(!"P)

 ############################################################# 

When working with mancage operation the following procedures must strictl adhered to$

Lifting Supervisor to inspect all lifting gear prior to slinging on to the hooks at four (4) corners of man-

cage.

Briefing by Safety supervisor to all personnel involved on the sequence of activity.

Every personnel engaged to work on the man-cage shall be provided with a full-body safety

harness with double lanyard and shock absorber and safety helmet.

Ensure that the ground stability & uniformly level(1% of level grade) for the lifting machine

sitting is firm

Crane outriggers, if required, shall be fully extended.

Lifting machine operator shall be checked hoist drum/slewing brake & locking device before

lifting up man-cage.

Lifting and lowering speed shall not exceed 0.5m/s

Crane must be operated with caution such that when slewing at slow speed.

Free falling is prohibited.

The man-cage shall be shall be hoisted a few centimeters above ground and inspected to

ensure that it is secure and properly balanced before personnel are allowed on the platform.

Lifting up man-cage.

Personnel working on the man-cage shall keep every part of their bodies inside the platform

during raising, lowering and positioning.

Load and boom hoist drum brakes, slewing brakes and locking devices shall be engaged when

the man-cage is in a stationary working position.

Lifting operations are not to be carried out during adverse weather or person working

underneath the man-cage

Mobile crane or crawler crane to minimize lifting eccentricity and coordinate movement of

rigger and maintain signaler visual path with crane operator.

Position man-cage over the designated position and lowered it slowly after the operation.

If the man-cage is not landed, it shall be secured to a structure or held stationary before the

workers exit or enter the platform.

Lifting super%isor to ensure all L& ' L such man cage shackles wire rope are certified b *!

e%er + months and in good working condition

To adhere to Safe Working Load of man cage,

To displa signage of SWL %alid L& certificate and one personnel in the cage per an hoist on the

mancage

 

Page 1 of 1

 

Prepared : &r .aiman "e%iewed : &r /g 0hoon 1uat

.esignation: WS12 .esignation: Senior Pro3ect &anager 

.ate: 45 .ec 6747 .ate: 45 .ec 6747