Ryobi Kiso (S) Pte Ltd SWP-15
Safe Work Practices (SWP) for Using of Mancage
Procedures check for minimum requirements (Please tick):
Permit-to-Work Procedure in place where applicable
Logout Tag out Sstem where applicable
PP! requirements
!mergenc "esponse Plan(!"P)
#############################################################
When working with mancage operation the following procedures must strictl adhered to$
Lifting Supervisor to inspect all lifting gear prior to slinging on to the hooks at four (4) corners of man-
cage.
Briefing by Safety supervisor to all personnel involved on the sequence of activity.
Every personnel engaged to work on the man-cage shall be provided with a full-body safety
harness with double lanyard and shock absorber and safety helmet.
Ensure that the ground stability & uniformly level(1% of level grade) for the lifting machine
sitting is firm
Crane outriggers, if required, shall be fully extended.
Lifting machine operator shall be checked hoist drum/slewing brake & locking device before
lifting up man-cage.
Lifting and lowering speed shall not exceed 0.5m/s
Crane must be operated with caution such that when slewing at slow speed.
Free falling is prohibited.
The man-cage shall be shall be hoisted a few centimeters above ground and inspected to
ensure that it is secure and properly balanced before personnel are allowed on the platform.
Lifting up man-cage.
Personnel working on the man-cage shall keep every part of their bodies inside the platform
during raising, lowering and positioning.
Load and boom hoist drum brakes, slewing brakes and locking devices shall be engaged when
the man-cage is in a stationary working position.
Lifting operations are not to be carried out during adverse weather or person working
underneath the man-cage
Mobile crane or crawler crane to minimize lifting eccentricity and coordinate movement of
rigger and maintain signaler visual path with crane operator.
Position man-cage over the designated position and lowered it slowly after the operation.
If the man-cage is not landed, it shall be secured to a structure or held stationary before the
workers exit or enter the platform.
Lifting super%isor to ensure all L& ' L such man cage shackles wire rope are certified b *!
e%er + months and in good working condition
To adhere to Safe Working Load of man cage,
To displa signage of SWL %alid L& certificate and one personnel in the cage per an hoist on the
mancage
Page 1 of 1
Prepared : &r .aiman "e%iewed : &r /g 0hoon 1uat
.esignation: WS12 .esignation: Senior Pro3ect &anager
.ate: 45 .ec 6747 .ate: 45 .ec 6747