swissfel diagnostics review, 2013-03-04 screen monitor rasmus ischebeck

15
SwissFEL Diagnostics Review, 2013-03-04 Screen Monitor Rasmus Ischebeck

Upload: naiya

Post on 20-Jan-2016

51 views

Category:

Documents


0 download

DESCRIPTION

SwissFEL Diagnostics Review, 2013-03-04 Screen Monitor Rasmus Ischebeck. Task: Measurement of Transverse Profiles. Technical Requirements Operational Requirements * With the possible exception of the last monitor before the beam dump. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: SwissFEL Diagnostics Review, 2013-03-04 Screen Monitor Rasmus Ischebeck

SwissFEL Diagnostics Review, 2013-03-04

Screen MonitorRasmus Ischebeck

Page 2: SwissFEL Diagnostics Review, 2013-03-04 Screen Monitor Rasmus Ischebeck

Rasmus Ischebeck, SwissFEL Diagnostics Review: Screen MonitorRasmus Ischebeck, SwissFEL Diagnostics Review: Screen Monitor

Task: Measurement of Transverse Profiles

> Technical Requirements

> Operational Requirements

* With the possible exception of the last monitor before the beam dump

22

Beam Size 5 … 500 µm rms

Bunch Charge 10 pC … 200 pC

Field of View 4 mm (h) × 15 mm (v)

Observation Measurement

Acquisition Rate 10 Hz 100 Hz

Synchronized Data Acquisition No Yes

Use for Feedbacks No*

Page 3: SwissFEL Diagnostics Review, 2013-03-04 Screen Monitor Rasmus Ischebeck

> 23 Screen Monitors:

Rasmus Ischebeck, SwissFEL Diagnostics Review: Screen MonitorRasmus Ischebeck, SwissFEL Diagnostics Review: Screen Monitor

Distribution in SwissFEL

33

Section Number

SIN 14

S10/20/30 3

SAR 5

SAT (Phase I)

1

Type Number

Observation

10

Measurement

13

Page 4: SwissFEL Diagnostics Review, 2013-03-04 Screen Monitor Rasmus Ischebeck

Rasmus Ischebeck, SwissFEL Diagnostics Review: Screen MonitorRasmus Ischebeck, SwissFEL Diagnostics Review: Screen Monitor

Measurement Principle

> Combination of two monitors:

> Scintillating crystal

> Optical transition radiation

> Wire scanners: See Gian Luca’s presentation

44

Page 5: SwissFEL Diagnostics Review, 2013-03-04 Screen Monitor Rasmus Ischebeck

Rasmus Ischebeck, SwissFEL Diagnostics Review: Screen MonitorRasmus Ischebeck, SwissFEL Diagnostics Review: Screen Monitor

Design Considerations

> Scheimpflug imaging principle

> Snell’s law of refraction

55

Observation of the Scheimpflug imaging principleallows to image the entire screen without depth-of-field issues.To avoid astigmatism, the lens is not tilted, butthe detector is tilted. For a 1:1 imaging, we tiltthe CMOS sensor by 15º.

The YAG / LuAG scintillators are observed at suchan angle that Snell’s law of refraction is observed.As a consequence, we can image beams that aresmaller than the thickness of the scintillator.

Page 6: SwissFEL Diagnostics Review, 2013-03-04 Screen Monitor Rasmus Ischebeck

Rasmus Ischebeck, SwissFEL Diagnostics Review: Screen MonitorRasmus Ischebeck, SwissFEL Diagnostics Review: Screen Monitor

Implementation

66

to camera

(coherent)OTR

Page 7: SwissFEL Diagnostics Review, 2013-03-04 Screen Monitor Rasmus Ischebeck

Rasmus Ischebeck, SwissFEL Diagnostics Review: Screen MonitorRasmus Ischebeck, SwissFEL Diagnostics Review: Screen Monitor

Implementation: Prototype installed in SITF

77

Page 8: SwissFEL Diagnostics Review, 2013-03-04 Screen Monitor Rasmus Ischebeck

Rasmus Ischebeck, SwissFEL Diagnostics Review: Screen MonitorRasmus Ischebeck, SwissFEL Diagnostics Review: Screen Monitor

Measurements with the Prototype

88

The smallest beam in this measurement is 50 µm rms.Beams of 10 µm rms have been measured.

> Emittance Measurement

Page 9: SwissFEL Diagnostics Review, 2013-03-04 Screen Monitor Rasmus Ischebeck

Rasmus Ischebeck, SwissFEL Diagnostics Review: Screen MonitorRasmus Ischebeck, SwissFEL Diagnostics Review: Screen Monitor

Measurements with the Prototype

> Slice emittance measurement of a 10 pC beam

99Eduard Prat, Marta

Divall

Page 10: SwissFEL Diagnostics Review, 2013-03-04 Screen Monitor Rasmus Ischebeck

Rasmus Ischebeck, SwissFEL Diagnostics Review: Screen MonitorRasmus Ischebeck, SwissFEL Diagnostics Review: Screen Monitor

Measurements with the Prototype

> Slice emittance measurement of a 1.3 pC beam

1010Eduard Prat, Marta Divall

Page 11: SwissFEL Diagnostics Review, 2013-03-04 Screen Monitor Rasmus Ischebeck

Rasmus Ischebeck, SwissFEL Diagnostics Review: Screen MonitorRasmus Ischebeck, SwissFEL Diagnostics Review: Screen Monitor

Status / Time Plan

> Fabrication by external company planned

> Presently starting industrialization study

1111

Requirements Defined 01/ 2012 √

Decision on Measurement Principle 01 / 2012 √

Prototyping 2012 √

Prototype Tested 12 / 2012 √

Design for Series Production 2013

Ready for Fabrication Q4 / 2013

Fabrication 2014

System Acceptance Test Q3 / 2014

Ready for Installation Q1 / 2015

Page 12: SwissFEL Diagnostics Review, 2013-03-04 Screen Monitor Rasmus Ischebeck

Rasmus Ischebeck, SwissFEL Diagnostics Review: Screen MonitorRasmus Ischebeck, SwissFEL Diagnostics Review: Screen Monitor

Time Plan

1212

Page 13: SwissFEL Diagnostics Review, 2013-03-04 Screen Monitor Rasmus Ischebeck

Rasmus Ischebeck, SwissFEL Diagnostics Review: Screen MonitorRasmus Ischebeck, SwissFEL Diagnostics Review: Screen Monitor

Resources

1313⊠

Page 14: SwissFEL Diagnostics Review, 2013-03-04 Screen Monitor Rasmus Ischebeck

Rasmus Ischebeck, SwissFEL Diagnostics Review: Screen MonitorRasmus Ischebeck, SwissFEL Diagnostics Review: Screen Monitor

Open Issues / Questions to the Committee

> Please evaluate the presented solution with respect to

> Suitability of the chosen concepts

> Appropriateness of the design for the given specifications

> Feasibility of the technical designs

> Assess whether the presented time plans and resource planning is appropriate

> Time plan

> Material resources

> Personnel planning

1414

Page 15: SwissFEL Diagnostics Review, 2013-03-04 Screen Monitor Rasmus Ischebeck

Rasmus Ischebeck, SwissFEL Diagnostics Review: Screen MonitorRasmus Ischebeck, SwissFEL Diagnostics Review: Screen Monitor

Budget for Prototype

1515⊠