Point of Discussion• Finding• Learning
![Page 3: Suzuki Industrial Visit - Gurgaon India](https://reader035.vdocuments.us/reader035/viewer/2022081508/555ecb53d8b42a74708b5733/html5/thumbnails/3.jpg)
3
Important Findings• Decentralization• Outsourced Transportation• Outsourced Bike Parts Manufacturing ( Ex – ABM and
Omax Bikes Ltd.)• Yong Workers (Mostly Men)• Recreation Zone• Separate Smoking Zone• Safety Concern• Environment Friendly Plant
![Page 4: Suzuki Industrial Visit - Gurgaon India](https://reader035.vdocuments.us/reader035/viewer/2022081508/555ecb53d8b42a74708b5733/html5/thumbnails/4.jpg)
4
Important Learnings• Plant Manger’s Role and Responsibility• Production Management System• Focus and Participation on R&D • Sustainability Approach• Wastes Management
![Page 5: Suzuki Industrial Visit - Gurgaon India](https://reader035.vdocuments.us/reader035/viewer/2022081508/555ecb53d8b42a74708b5733/html5/thumbnails/5.jpg)
5
Important Learnings
• Plant Manger’s Role and Responsibility
• Rejection Rate• Labor Cost Per Hour• Supply Chain Management of Raw and Processed Goods
![Page 6: Suzuki Industrial Visit - Gurgaon India](https://reader035.vdocuments.us/reader035/viewer/2022081508/555ecb53d8b42a74708b5733/html5/thumbnails/6.jpg)
6
Important Learnings.. Contd..Rejection Rate
RR = (Rejectedpieces / ProcessedPieces)x100
![Page 7: Suzuki Industrial Visit - Gurgaon India](https://reader035.vdocuments.us/reader035/viewer/2022081508/555ecb53d8b42a74708b5733/html5/thumbnails/7.jpg)
7
Labor Cost Per Hour (total annual labor costs + taxes + benefits + paid time off) / (total annual hours worked – breaks and training time). This is your direct labor cost per hour.
Important Learning.. Contd..
![Page 8: Suzuki Industrial Visit - Gurgaon India](https://reader035.vdocuments.us/reader035/viewer/2022081508/555ecb53d8b42a74708b5733/html5/thumbnails/8.jpg)
8
Supply Chain Management
Upstreamsuppliers
Upstreamsuppliers SuppliersSuppliers Your
CompanyYour
CompanyDistribution
channelsDistribution
channels CustomersCustomers
Integrated Supply chain
Information flow sharing
Important Learning.. Contd..
![Page 9: Suzuki Industrial Visit - Gurgaon India](https://reader035.vdocuments.us/reader035/viewer/2022081508/555ecb53d8b42a74708b5733/html5/thumbnails/9.jpg)
9
Production Management System
Important Learning.. Contd..
![Page 10: Suzuki Industrial Visit - Gurgaon India](https://reader035.vdocuments.us/reader035/viewer/2022081508/555ecb53d8b42a74708b5733/html5/thumbnails/10.jpg)
10
Production Management System
5s“A place for everything necessary and everything necessary in its place, clean and ready for use”
Important Learning.. Contd..
![Page 11: Suzuki Industrial Visit - Gurgaon India](https://reader035.vdocuments.us/reader035/viewer/2022081508/555ecb53d8b42a74708b5733/html5/thumbnails/11.jpg)
11
Production Management System
3G“In case of an abnormality, all the concerned members should actually go to the place where the problem has occurred, see the actual thing & take realistic action to solve the problem”
Important Learning.. Contd..
![Page 12: Suzuki Industrial Visit - Gurgaon India](https://reader035.vdocuments.us/reader035/viewer/2022081508/555ecb53d8b42a74708b5733/html5/thumbnails/12.jpg)
12
Production Management System
3k 3K concept is “What has been decided must be followed exactly as per the standard”
These concepts are displayed prominently at work place across the company
Important Learning.. Contd..
![Page 13: Suzuki Industrial Visit - Gurgaon India](https://reader035.vdocuments.us/reader035/viewer/2022081508/555ecb53d8b42a74708b5733/html5/thumbnails/13.jpg)
13
Focus and Participation on R&D
•Open R&D Department•Reward for Best Ideas
Important Learning.. Contd..
![Page 14: Suzuki Industrial Visit - Gurgaon India](https://reader035.vdocuments.us/reader035/viewer/2022081508/555ecb53d8b42a74708b5733/html5/thumbnails/14.jpg)
14
Sustainability Approach
•CO2 emission reduction•Energy Conservation•Water Conservation•Solid Waste Management•Fuel Efficiency
Important Learning.. Contd..
![Page 15: Suzuki Industrial Visit - Gurgaon India](https://reader035.vdocuments.us/reader035/viewer/2022081508/555ecb53d8b42a74708b5733/html5/thumbnails/15.jpg)
15
Motion – inefficient people movementWaiting – people utilizationInventory – stuff laying around (often a symptom of another waste)Defects/Correction – Time spent fixing defects, including defect that get thrown away and the time make the product correctlyUnderutilized People – not dedicated to Value-Added 100%, untapped human creativity
Wastes Management
![Page 16: Suzuki Industrial Visit - Gurgaon India](https://reader035.vdocuments.us/reader035/viewer/2022081508/555ecb53d8b42a74708b5733/html5/thumbnails/16.jpg)
16
• Systematic approach to Productivity and Quality Improvement
• Operators play a significant role in Business Excellence
Conclusion