suvarana karnataka growth corridor
TRANSCRIPT
-
7/30/2019 Suvarana Karnataka Growth Corridor
1/12
SAHYOGA Public-Private Partnership Initiative
Suvarna Karnataka Growth Corridor
for
Inclusive Growth & Prosperity
-
7/30/2019 Suvarana Karnataka Growth Corridor
2/12
Public-Private Partnerships
Successful Public-PrivatePartnerships (PPPs) leverage
private sector strengths &
resources to improve the quality,efficiency and delivery, while
maintaining an appropriate level of
public sector control.
-
7/30/2019 Suvarana Karnataka Growth Corridor
3/12
Bangalore The Magnet ofGrowth Karnataka has achieved high rate of industrial growth inpast decade
However this growth has been uneven and has created
geographical disparities
Bangalore has become the industrial hub & growthengine while other cities remain underdeveloped
This has resulted in unmanageable growth of Bangalore
with severe infrastructure bottlenecks
This is unsustainable and industries are being forced to
look at other states with better infrastructure facilities
-
7/30/2019 Suvarana Karnataka Growth Corridor
4/12
Tier II Cities Underdeveloped
Governments effort to decongest Bangalore and attract
investment in tier-II cities have not been successful
Primary reason behind this is poor connectivity &lack of
social infrastructure in tier-II cities
This has also created large scale migration of skilled andunskilled laborfrom hinterland to Bangalore
While Bangalore continues to prosper & grow, Karnataka
is still by & large agricultural economy
Now it has become a serious social & political issue and
needs urgent attention
-
7/30/2019 Suvarana Karnataka Growth Corridor
5/12
All Inclusive Growth ofKarnataka ? Industrial Growth has centered around South Karnatakacities of Bangalore, Mysore and Mangalore
North Karnataka is primarily dependent on agricultural
with majority of land being rain fed with little irrigation
It is extremely dry region and failure of monsoon resultsin severe hardship to its farmers resulting in suicides
Government needs to find ways to attract industry to
other parts of Karnataka, specially NORTH KARNATAKA
This NORTH-SOUTH divide has to be bridged for an
equitable and inclusive growth of Karnataka
-
7/30/2019 Suvarana Karnataka Growth Corridor
6/12
What is the Solution ?
A North-South Suvarna Karnataka Growth CorridorA North-South Suvarna Karnataka Growth Corridor
8 Lane Access Controlled Highway Connecting
Bidar to Bangalore
via Gulbarga, Bijapur, Hospet & Chitradurga
with branches/loops connecting
Hubli, Belgaum, Mysore, Hassan, Shimoga & Raichur
& Port Connectivity toKarwar & Mangalore
Create Infrastructure (China!) & They Will ComeCreate Infrastructure (China!) & They Will Come
-
7/30/2019 Suvarana Karnataka Growth Corridor
7/12
North-South CorridorBLR-Chitradurga-Hubli-Belgaum (NH-4)Chitradurga-Hospet-Bijapur(NH-13)
Bijapur-Jevargi-Gulbarga-Bidar(SH)
East-West Corridors
BLR-Hassan-MLR (NH-48)Bellary-Hospet-Hubli-Karwar(NH-63)
Branch/Loop CorridorsMysore-Hassan-Shimoga (SH)
Hospet-Raichur(SH)Chitradurga-Shimoga-Mangalore (NH-13)
ProposedSKGCs
-
7/30/2019 Suvarana Karnataka Growth Corridor
8/12
-
7/30/2019 Suvarana Karnataka Growth Corridor
9/12
Suggested Locations for IEs/SEZs
BLR-Chitradurga-Hubli-Belgaum (NH-4)
Sira (Tumkur), Hiriyur (Chitradurga), Anagodu (Davangere), Shiggaon (Haveri),Kittur (Belgaum)
Chitradurga-Hospet-Bijapur (NH-13)
Kudligi (Bellary), Kushtagi (Koppal), Hungund (Bagalkot), Mangoli (Bijapur)
Bijapur-Jevargi-Gulbarga-Bidar-HYD (SH)Sindgi (Bijapur), Jevargi (Gulbarga), Homnabad (Bidar) Make Homnabad (Bidar) a Satellite to HYD as Hosur is to BLR (via existing NH-9)
Bellary-Hospet-Hubli-Karwar(NH-63)Hospet, Koppal, Gadag, Yellapur (Uttar Kannad)
-
7/30/2019 Suvarana Karnataka Growth Corridor
10/12
Economic Benefits
Bridging of North-South Divide
Bidar To Bangalore economic growth corridor will transform the hinterland ofKarnataka and will make it a leading industrial state of the nation.
It will create evenly distributed economic and industrial clusters leading to equitable
growth and prosperity of the state
Region Specific IEs/SEZsIndustrial Estates and SEZs could develop along the regional competence and
resource availability say mining related SEZs in Bellary and Food Processing SEZ
in Bijapur
Investment/Employment PotentialTotal of 16 IEs/SEZs will bring around 1,60,000 Crore of investment at theleast and will provided employment for at least 16 Lakh people on a
conservative estimate
-
7/30/2019 Suvarana Karnataka Growth Corridor
11/12
Next Steps
In-principle acceptance ofSuvarna Karnataka Growth Corridor Concept
A cabinet decision to implement SKGC over next 5 years. Suitable funding
provision in the current budget
GoK should work with NHAI to make NH-13 a 4 lane toll-way - Chitradurga-
Hospet-Bijapur section 389 Km - on cost share basis. Cost 2000 Cr
SH stretches Bijapur-Jevargi-Gulbarga-Bidar- 277 Km, should be taken-up
immediately by GoK for conversion to 4 lane toll road Cost Rs. 1500Cr
GoK should call for EoI from private parties to set-up IEs/SEZs along NH-4
which is part of NHAIs GQ and already a 4 lane toll road at following locations
Sira (Tumkur), Hiriyur (Chitradurga), Anagodu (Davangere), Shiggaon (Haveri),
Kittur (Belgaum)
-
7/30/2019 Suvarana Karnataka Growth Corridor
12/12
Thank You