SURVEYING HISTORY

• Surveying dates back 5000 years

China

India

Babylon

Egypt

Page 2: SURVEYING HISTORY

Egyptians

–Pyramids

–Roads

–Property and the Nile River

–Taxation

Page 3: SURVEYING HISTORY

Ancient Techniques

• Ropes and Knots

• Water Levels

• Plumb Levels

Page 4: SURVEYING HISTORY

Ancient Level

Page 5: SURVEYING HISTORY

Greeks

• 250 BC Archimedes wrote the Sand Reckoner– Established the circumference of the Earth at 300,000

Stadia

– 1 Stadia = 1/10 of a mile

– 30,000 miles

– Actual circumference = 24,900 miles

Page 6: SURVEYING HISTORY

Eratosthenes

Page 7: SURVEYING HISTORY

SUN

A LEXA ND R IA

EA R TH

7 .2 °

9 0 °

THE WELL A T SCY ENE

ER ATO STHENES' CA LC ULA TIO N

Page 8: SURVEYING HISTORY

7 .2 °

Page 9: SURVEYING HISTORY

SUN

A LEXA ND R IA

EA R TH

7 .2 °

9 0 °

THE WELL A T SCY ENE

5 0 0 MILES

7 .2 °=

X MILES

3 6 0 °

ER ATO STHENES' CA LC ULA TIO N

X = 2 5 ,0 0 0 MILES

Page 10: SURVEYING HISTORY

Greeks and Romans

• Surveyed for:– Aqueducts

– Roadways

– Military Camps

– Buildings

– Taxation

Page 11: SURVEYING HISTORY

Fall of the Roman Empire

• The Dark Ages

• The Age of Enlightenment

• Navigation

• Up until the late 1700’s navigators struggled with the problem of longitude

Page 12: SURVEYING HISTORY
Page 13: SURVEYING HISTORY

Latitude

• Where you are north or south is relatively easy to calculate using a Sextant

Page 14: SURVEYING HISTORY

Longitude

• But how do you calculate where you are East and West?

• Time is the key

• It takes 24 hours for the Earth to spin 360°

• 1 hours = 1/24 of a spin

• Or 360/24 = 15°

Page 15: SURVEYING HISTORY

Longitude

• At the Equator 15° = 1000 miles

• 1° = 68 miles

• Problem: No reliable clocks existed that could be used at sea.

Page 16: SURVEYING HISTORY

Longitude

• King George III of England offered a reward to anyone who could solve the problem of longitude.

• The reward was $15,000,000 to invent a clock that would loose no more than 3 seconds in 24 hours.

• The clock had to find longitude within 1/2°

Page 17: SURVEYING HISTORY

Longitude

• 1Hr = 15°

• 1minute = .25°

• 2 minutes = .5°

• At the Equator that would be 34 miles

Page 18: SURVEYING HISTORY

Longitude

• Many famous scientists tried to tackle the problem– Sir Isaac Newton– Galileo– Edmond Haley

• John Harrison – a British clockmaker– Invented the Chronometer

Page 19: SURVEYING HISTORY
Page 20: SURVEYING HISTORY

Colonial States Survey

• Colonial States Survey

• Public Land Survey System

Page 21: SURVEYING HISTORY

What is Surveying?

• Locating Points on Land

• How do we locate points?– From Land– From Air– From Space

Page 22: SURVEYING HISTORY

Types of Surveys

Plane Surveying

• Topographic Survey – Horizontal plane measurements over the surface of the earth, but including indication of changes in elevation.

Page 23: SURVEYING HISTORY
Page 24: SURVEYING HISTORY

Types of Surveys

• Property Survey – Sometimes called boundary or Cadastral survey. These are the most common and oldest type of plane surveying– Locating property lines– Usually required by law

• Route Survey – Surveys along highways, railroads, pipelines and power lines

Page 25: SURVEYING HISTORY

Types of Surveys

• Hydrographic Survey are similar to Topographic but used for rivers, lake and other bodies of water.

• Construction Survey – – Used for the purpose of planning a construction

project.– Location and layout of buildings– Controlling the dimensions of a structure as it is being

built– As Built Survey Cover dimensional changes that

occurs during the construction project.

Page 26: SURVEYING HISTORY

BREAK TIME

Page 27: SURVEYING HISTORY

READING LEGAL DESCRIPTIONS

• Public Land Survey System (PLSS)

Page 28: SURVEYING HISTORY

Public Land Surveying System

Page 29: SURVEYING HISTORY
Page 30: SURVEYING HISTORY
Page 31: SURVEYING HISTORY
Page 32: SURVEYING HISTORY
Page 33: SURVEYING HISTORY
Page 34: SURVEYING HISTORY
Page 35: SURVEYING HISTORY

LET’S WRITE A LEGAL DESCRIPTION

NE ¼, NW ¼, Section 21, T2S,R2W P.M. Willamette

Page 36: SURVEYING HISTORY
Page 37: SURVEYING HISTORY
Page 38: SURVEYING HISTORY
Page 39: SURVEYING HISTORY
Page 40: SURVEYING HISTORY

North American Datum (NAD)

Page 41: SURVEYING HISTORY

National Geodetic Surveys

• Continuously Operating Reference Stations (CORS)

Page 42: SURVEYING HISTORY
Page 43: SURVEYING HISTORY

CORS BTON

• BTON