Supporting facility & process flow
Physical environment where
Customer & provider co-productionChap. 5
![Page 2: Supporting facility & process flow Physical environment where Customer & provider co-production Chap. 5](https://reader030.vdocuments.us/reader030/viewer/2022032517/56649c9c5503460f9495a711/html5/thumbnails/2.jpg)
Supporting Facility & Process Flows
Creating the Right Environment
Chapter 5
![Page 3: Supporting facility & process flow Physical environment where Customer & provider co-production Chap. 5](https://reader030.vdocuments.us/reader030/viewer/2022032517/56649c9c5503460f9495a711/html5/thumbnails/3.jpg)
![Page 4: Supporting facility & process flow Physical environment where Customer & provider co-production Chap. 5](https://reader030.vdocuments.us/reader030/viewer/2022032517/56649c9c5503460f9495a711/html5/thumbnails/4.jpg)
• Home Depot– Aisles are narrow– Ceiling high merchandise– Lighting is industrial– Check out line is long
• Lowe’s– Copy its rival first– Wide aisles– Bright lighting– Merchandise display
encourage browsing
Physical Environment shapes customer’s behaviors & perceptions
![Page 5: Supporting facility & process flow Physical environment where Customer & provider co-production Chap. 5](https://reader030.vdocuments.us/reader030/viewer/2022032517/56649c9c5503460f9495a711/html5/thumbnails/5.jpg)
Environmental Orientation Considerations
• Spatial cues are needed to orient visitors.
• Orientation aids and signage such as “You Are Here” maps reduce anxiety. – Color-coded subway
routes
5-5
![Page 6: Supporting facility & process flow Physical environment where Customer & provider co-production Chap. 5](https://reader030.vdocuments.us/reader030/viewer/2022032517/56649c9c5503460f9495a711/html5/thumbnails/6.jpg)
![Page 7: Supporting facility & process flow Physical environment where Customer & provider co-production Chap. 5](https://reader030.vdocuments.us/reader030/viewer/2022032517/56649c9c5503460f9495a711/html5/thumbnails/7.jpg)
Environmental Orientation Considerations
• Formula facilities draw on previous experience.
• Entrance atrium allows visitors to gain a quick orientation and observe others for behavioral cues.
5-7
![Page 8: Supporting facility & process flow Physical environment where Customer & provider co-production Chap. 5](https://reader030.vdocuments.us/reader030/viewer/2022032517/56649c9c5503460f9495a711/html5/thumbnails/8.jpg)
Servicescapes
Designing Physical Surroundings to Affect Employee and Customer Behavior• Ambient Conditions: background characteristics such as
noise level, music, lighting, temperature, and scent• 百貨公司、美食街、夜市、名品店
• Spatial Layout and Functionality: reception area, circulation paths of employees and customers, and focal points
• 大賣場、醫院、主題樂園、學校• Signs, Symbols, and Artifacts: selection, orientation,
location, and size of objects
5-8
![Page 9: Supporting facility & process flow Physical environment where Customer & provider co-production Chap. 5](https://reader030.vdocuments.us/reader030/viewer/2022032517/56649c9c5503460f9495a711/html5/thumbnails/9.jpg)
Typology of Servicescapes
Who Performs in Servicescape
Physical Complexity of the Servicescape Elaborate Lean
Self-service (customer only)
Golf course Water slide park
Post office kiosk E-commerce
Interpersonal (both)
Luxury hotel Airline terminal
Budget hotel Bus station
Remote service (employee only)
Research lab L.L. Bean
Telemarketing Online tech support
5-9
![Page 10: Supporting facility & process flow Physical environment where Customer & provider co-production Chap. 5](https://reader030.vdocuments.us/reader030/viewer/2022032517/56649c9c5503460f9495a711/html5/thumbnails/10.jpg)
![Page 11: Supporting facility & process flow Physical environment where Customer & provider co-production Chap. 5](https://reader030.vdocuments.us/reader030/viewer/2022032517/56649c9c5503460f9495a711/html5/thumbnails/11.jpg)
• Behavior in servicescapes– A building communicates a message to both its
customers and employees
![Page 12: Supporting facility & process flow Physical environment where Customer & provider co-production Chap. 5](https://reader030.vdocuments.us/reader030/viewer/2022032517/56649c9c5503460f9495a711/html5/thumbnails/12.jpg)
– Invoke social interaction between and among customers and employees• Approach or avoidance behavior
![Page 13: Supporting facility & process flow Physical environment where Customer & provider co-production Chap. 5](https://reader030.vdocuments.us/reader030/viewer/2022032517/56649c9c5503460f9495a711/html5/thumbnails/13.jpg)
Servicescape Elements
5-13
![Page 14: Supporting facility & process flow Physical environment where Customer & provider co-production Chap. 5](https://reader030.vdocuments.us/reader030/viewer/2022032517/56649c9c5503460f9495a711/html5/thumbnails/14.jpg)
– Ambient conditions• Temperature, lighting, noise, music, and scent
– All of human’s five senses
• Music tempo– Pace of shopping, length of stay, amount of money spent
• Convenience store play “elevator music”– Drive away teenager
» Loitering teen discourage paying customers from entering
• Cookie shop– Open doors to emit fragrance of freshly baked
![Page 15: Supporting facility & process flow Physical environment where Customer & provider co-production Chap. 5](https://reader030.vdocuments.us/reader030/viewer/2022032517/56649c9c5503460f9495a711/html5/thumbnails/15.jpg)
– Spatial layout and functionality• Arrangement of furniture & equipment
– Visual and functional landscape for service delivery
• Fast food restaurant– Menu are posted over the cash register– Self serve drink between counter and table– Waste containers locate near exits
![Page 16: Supporting facility & process flow Physical environment where Customer & provider co-production Chap. 5](https://reader030.vdocuments.us/reader030/viewer/2022032517/56649c9c5503460f9495a711/html5/thumbnails/16.jpg)
– Signs, symbols, and artifacts• Explicit and implicit signals
– Explicit
– Implicit» Floor covering» Doctors office
![Page 17: Supporting facility & process flow Physical environment where Customer & provider co-production Chap. 5](https://reader030.vdocuments.us/reader030/viewer/2022032517/56649c9c5503460f9495a711/html5/thumbnails/17.jpg)
– Servicescape• Visual metaphor for organizational offers
– Home Depot» Orange colors, bare floors, industrial lighting, generally
cluttered look» Masculine image of construction industry
– Lowes» Soft blue, attractively displayed merchandise» Female friendly image for the home improvement
![Page 18: Supporting facility & process flow Physical environment where Customer & provider co-production Chap. 5](https://reader030.vdocuments.us/reader030/viewer/2022032517/56649c9c5503460f9495a711/html5/thumbnails/18.jpg)
• Facilitate customer orientation– Way finding techniques
» Color coded subway lines» Logical flow planning» Audible assistance» Google maps for store location» Website navigations
• Encourage social interaction– Waiting areas
» with round tables for social interaction» with rows of chairs
![Page 19: Supporting facility & process flow Physical environment where Customer & provider co-production Chap. 5](https://reader030.vdocuments.us/reader030/viewer/2022032517/56649c9c5503460f9495a711/html5/thumbnails/19.jpg)
• Focus employee’s behavior
![Page 20: Supporting facility & process flow Physical environment where Customer & provider co-production Chap. 5](https://reader030.vdocuments.us/reader030/viewer/2022032517/56649c9c5503460f9495a711/html5/thumbnails/20.jpg)
• Facility design– Directly impact service operations• Hospital
– Group operating rooms together» Enable surgeons to communicate easily
– Provide ample pleasant place to walk» Encourage early ambulation to promote faster recovery
– Community dinning rooms» Allow patient to get together» Require walking
![Page 21: Supporting facility & process flow Physical environment where Customer & provider co-production Chap. 5](https://reader030.vdocuments.us/reader030/viewer/2022032517/56649c9c5503460f9495a711/html5/thumbnails/21.jpg)
– Good design and layout enhance service• Adequate lighting• Fire exits• Proper location of dangerous equipment• Privacy & security
![Page 22: Supporting facility & process flow Physical environment where Customer & provider co-production Chap. 5](https://reader030.vdocuments.us/reader030/viewer/2022032517/56649c9c5503460f9495a711/html5/thumbnails/22.jpg)
– Factors influence facility design• Nature and objectives of service organization• Land availability and space requirement• Flexibility• Security• Aesthetic• Community and environment
![Page 23: Supporting facility & process flow Physical environment where Customer & provider co-production Chap. 5](https://reader030.vdocuments.us/reader030/viewer/2022032517/56649c9c5503460f9495a711/html5/thumbnails/23.jpg)
– Factors influence facility design• Nature and objectives of service organization
– Most important parameter– Bank
» Spacious and comfortable waiting area» Vaults
– Physicians» Privacy for patient» Modern and advance looks
– Engender immediate recognition of service» 學校外觀、教堂、廟宇
![Page 24: Supporting facility & process flow Physical environment where Customer & provider co-production Chap. 5](https://reader030.vdocuments.us/reader030/viewer/2022032517/56649c9c5503460f9495a711/html5/thumbnails/24.jpg)
– Factors influence facility design• Land availability and space requirement
– Costs, zoning requirement, actual area– Urban area
» Lot is relatively small» Building expand upward
– Suburban & rural» Lands are larger and more affordable» Zoning laws on land usage & exterior appearance
– Off-street parking– Future expansion
![Page 25: Supporting facility & process flow Physical environment where Customer & provider co-production Chap. 5](https://reader030.vdocuments.us/reader030/viewer/2022032517/56649c9c5503460f9495a711/html5/thumbnails/25.jpg)
– Factors influence facility design• Flexibility
– Adapt to change in quantity and nature of demand– Design for the future
» Expansion for present service» Accommodate new and different service
• Walk-in, drive-thru» Significant financial saving in the long run
– Airport» Failure to anticipate growth» Security check
![Page 26: Supporting facility & process flow Physical environment where Customer & provider co-production Chap. 5](https://reader030.vdocuments.us/reader030/viewer/2022032517/56649c9c5503460f9495a711/html5/thumbnails/26.jpg)
– Factors influence facility design• Security
– Airport security after 911» More sophisticate carry-on scanners» Wipes to detect explosive residue» Profiling (Info technology)
– Surveillance camera for buildings» To discourage would-be robbers» To identify violator
– Jails, level 4 labs– Department stores: tags on mechandises
![Page 27: Supporting facility & process flow Physical environment where Customer & provider co-production Chap. 5](https://reader030.vdocuments.us/reader030/viewer/2022032517/56649c9c5503460f9495a711/html5/thumbnails/27.jpg)
– Factors influence facility design• Aesthetic
– Sense of elegance and attention to customer’s needs» Upscale department store» Floor carpet» Complimentary lighting» Well-groomed salesperson» Roomy fitting rooms
– Sense of bargain» Outlet stores
– Both offer attractive, quality services
![Page 28: Supporting facility & process flow Physical environment where Customer & provider co-production Chap. 5](https://reader030.vdocuments.us/reader030/viewer/2022032517/56649c9c5503460f9495a711/html5/thumbnails/28.jpg)
– Factors influence facility design• Community and environment
– Traffic congestion due to new stores– Noise and odor of new restaurant– New detention facility
– Zoning
![Page 29: Supporting facility & process flow Physical environment where Customer & provider co-production Chap. 5](https://reader030.vdocuments.us/reader030/viewer/2022032517/56649c9c5503460f9495a711/html5/thumbnails/29.jpg)
Process analysis:
Types of Services ProcessesProcess
TypeService
ExampleCharacteristic Management
Challenge
Project Consulting One-of-a-kind engagement
Staffing and scheduling
Job Shop Hospital Many specialized departments
Balancing utilization and scheduling patients
Batch Airline Group of customers treated simultaneously
Pricing of perishable asset (seat inventory)
Flow Cafeteria Fixed sequence of operations
Adjust staffing to demand fluctuations
Continuous Electric Utility
Uninterrupted delivery Maintenance and capacity planning
5-29
![Page 30: Supporting facility & process flow Physical environment where Customer & provider co-production Chap. 5](https://reader030.vdocuments.us/reader030/viewer/2022032517/56649c9c5503460f9495a711/html5/thumbnails/30.jpg)
Process analysis
• Flowcharting– Identify bottleneck operation– Determine system capacity– Making improvement
![Page 31: Supporting facility & process flow Physical environment where Customer & provider co-production Chap. 5](https://reader030.vdocuments.us/reader030/viewer/2022032517/56649c9c5503460f9495a711/html5/thumbnails/31.jpg)
Swim Lane Flowchart of Graduate School Admissions
5-31
![Page 32: Supporting facility & process flow Physical environment where Customer & provider co-production Chap. 5](https://reader030.vdocuments.us/reader030/viewer/2022032517/56649c9c5503460f9495a711/html5/thumbnails/32.jpg)
![Page 33: Supporting facility & process flow Physical environment where Customer & provider co-production Chap. 5](https://reader030.vdocuments.us/reader030/viewer/2022032517/56649c9c5503460f9495a711/html5/thumbnails/33.jpg)
• In Class exercise– Do your own service flowchart
![Page 34: Supporting facility & process flow Physical environment where Customer & provider co-production Chap. 5](https://reader030.vdocuments.us/reader030/viewer/2022032517/56649c9c5503460f9495a711/html5/thumbnails/34.jpg)
Gantt Chart for Mortgage Service
5-34
Visual presentation of activity-based schedule
![Page 35: Supporting facility & process flow Physical environment where Customer & provider co-production Chap. 5](https://reader030.vdocuments.us/reader030/viewer/2022032517/56649c9c5503460f9495a711/html5/thumbnails/35.jpg)
Process Analysis Terminology• Cycle Time is the average time between completions
of successive units.• Bottleneck is the factor that limits production usually
the slowest operation.• Capacity is a measure of output per unit time when
fully busy.• Capacity Utilization is a measure of how much output
is actually achieved.• Throughput Time is the time to complete a process
from time of arrival to time of exit.
5-35
![Page 36: Supporting facility & process flow Physical environment where Customer & provider co-production Chap. 5](https://reader030.vdocuments.us/reader030/viewer/2022032517/56649c9c5503460f9495a711/html5/thumbnails/36.jpg)
Process Analysis Terminology (cont.)
• Rush Order Flow Time is the time to go through the system without any queue time.
• Direct Labor Content is the actual amount of work time consumed.
• Total Direct Labor Content is the sum of all the operations times.
• Direct Labor Utilization is a measure of the percentage of time that workers are actually contributing value to the service.
5-36
![Page 37: Supporting facility & process flow Physical environment where Customer & provider co-production Chap. 5](https://reader030.vdocuments.us/reader030/viewer/2022032517/56649c9c5503460f9495a711/html5/thumbnails/37.jpg)
Facility Layout
• Layout– Location arrangement of the service delivery
system– Functional layout• 人力資源部門、會計部門• Indirect labor (maintenance, management)
– Flow process layout• Product
– Job shop layout• Project
![Page 38: Supporting facility & process flow Physical environment where Customer & provider co-production Chap. 5](https://reader030.vdocuments.us/reader030/viewer/2022032517/56649c9c5503460f9495a711/html5/thumbnails/38.jpg)
• Flow process layout and work allocation problem– Service with predefined activities that all
customers must experience• Cafeteria• Driver license application
– A well-balanced line will have all jobs be of nearly equal duration to avoid bottleneck
![Page 39: Supporting facility & process flow Physical environment where Customer & provider co-production Chap. 5](https://reader030.vdocuments.us/reader030/viewer/2022032517/56649c9c5503460f9495a711/html5/thumbnails/39.jpg)
• Example 5.2– 6 activities process
![Page 40: Supporting facility & process flow Physical environment where Customer & provider co-production Chap. 5](https://reader030.vdocuments.us/reader030/viewer/2022032517/56649c9c5503460f9495a711/html5/thumbnails/40.jpg)
• Design #1– Bottleneck activity #3– Requires 6 operators– Capacity: 60 application per hour
![Page 41: Supporting facility & process flow Physical environment where Customer & provider co-production Chap. 5](https://reader030.vdocuments.us/reader030/viewer/2022032517/56649c9c5503460f9495a711/html5/thumbnails/41.jpg)
• Design #2– Bottlenecks: on 3 activities– Requires 7 person– Capacity: 120 applications per hour
![Page 42: Supporting facility & process flow Physical environment where Customer & provider co-production Chap. 5](https://reader030.vdocuments.us/reader030/viewer/2022032517/56649c9c5503460f9495a711/html5/thumbnails/42.jpg)
• Design #3– Operator trained to do
all activities 1 – 5– Line is most balanced
![Page 43: Supporting facility & process flow Physical environment where Customer & provider co-production Chap. 5](https://reader030.vdocuments.us/reader030/viewer/2022032517/56649c9c5503460f9495a711/html5/thumbnails/43.jpg)
• Job shop process layout– No particular fixed sequence• Inter-departmental flow matrix• Cost matrix
– Traveling distance,
– Minimize total cost• CRAFT, computerized Relative Allocation of Facilities
Technique
![Page 44: Supporting facility & process flow Physical environment where Customer & provider co-production Chap. 5](https://reader030.vdocuments.us/reader030/viewer/2022032517/56649c9c5503460f9495a711/html5/thumbnails/44.jpg)
Job Shop Layout:
Ocean World Theme Park
5-44
![Page 45: Supporting facility & process flow Physical environment where Customer & provider co-production Chap. 5](https://reader030.vdocuments.us/reader030/viewer/2022032517/56649c9c5503460f9495a711/html5/thumbnails/45.jpg)
• Mini case– Case 5.3 Esquire Department store• 找一個當地百貨公司,某個樓層,畫個簡圖,給些建議
– Case 5.4 Central Market• 找一個市場或夜市,畫個簡圖,給些建議