supervision of works
TRANSCRIPT
-
8/12/2019 Supervision of Works
1/2
Supervision of Works
Minor Works Contract & Tendered Contract
In Civil Works Contract, managed by P&D Section, the CWA is represented as
follows
!ngineer Chief !ngineer"esident !ngineer Principal !ngineerAssistant "# !ngineer !$ec%tive !ngineer
echnical 'fficers and Assistant Inspectors work in close collaboration with the!! and are involved on a f%ll time basis on s%pervision works#
S%pervision for pipelaying works starts at the time the contractor mobili(es onsite#
he following stages are involved in pipelaying works
Setting o%t
)ormation level
*edding
Pipelaying
*ackfilling
+ydrostatic test
Connection works
++ Connections "einstatement works
Prior approval for each stage of works sho%ld be obtained by the Contractorbefore he can proceed to the ne$t stages#
Works are approved by !!, ' and AI depending on the nat%re of the works,the site conditions etc, b%t it sho%ld be noted that no site is left %nattendedand all approval of works at the different phases as o%tlined above arerecorded# In case the Contractor does not comply with drawings andspecifications, written instr%ctions are iss%ed to the Contractor#
As a general g%ideline, an !! is entr%sted to or - minor works or with ./minor works and one tendered contract at a time depending on the availabilityof '0s and AI0s, with each contract comprising of an average of 1 to 2 sites#
he overall management of these contracts is administered by !$ec%tive!ngineers and Principal !ngineers# he Chief !ngineer follows the progress ofworks and gives advice, recommendations and approval as and when necessary#
-
8/12/2019 Supervision of Works
2/2
echnical officers and !! are involved mainly on technical iss%es on sites#echnical iss%es means whether the contractor is complying with CWAspecifications and/or specifications imposed by other A%thorities s%ch asDistrict Co%ncils, 3%nicipalities and "oad Development A%thority etc# and
whether the proper methodology is being followed by the Contractor#
Prior to +anding 'ver of the work to the 'ps Section, as4made drawings areprepared and a copy of which is handed over to the 'ps Section d%ring +anding'ver e$ercise# It sho%ld be noted that tho%gh the works are handed over tothe 'ps section, any defects arising from poor workmanship are remedied bythe contractor following instr%ctions by the !! d%ring the 3aintenance Period#
As a general r%le, the following may be adopted as a g%ideline for propers%pervision at different levels
5.6 Assistant Inspectors 4 Daily on all sites where there is activity
56 echnical 'fficers 4 'n sites where their presence isre7%ired
5-6 !$ec%tive !ngineer 4 5i6 At least once/week on each andevery site where there is activity
5ii6 'n sites where their presence isspecifically re7%ired
586 Principal !ngineer 4 At least once every fortnight on each
and every site where there is activity
516 Chief !ngineer 4 Small ContractsAs and when the need arisesContracts 9 1: 3'nce a week