Page 1: Sunum Başlık Konusu · Energy Potential of Region MONTHS Global Radiation (kWh/m2-day) Sunshine Duration ( Hour ) Turkey Konya Karaman Karapınar Turkey Konya Karaman Karapınar
Page 2: Sunum Başlık Konusu · Energy Potential of Region MONTHS Global Radiation (kWh/m2-day) Sunshine Duration ( Hour ) Turkey Konya Karaman Karapınar Turkey Konya Karaman Karapınar

Agenda

1• Energy Potential of Our Region

2• Energy Investments in our Region

3• Problems with Energy Legislation

4

• Industry Competition Analysis of Konya

Page 3: Sunum Başlık Konusu · Energy Potential of Region MONTHS Global Radiation (kWh/m2-day) Sunshine Duration ( Hour ) Turkey Konya Karaman Karapınar Turkey Konya Karaman Karapınar

Our Energy Politics

Our Mission

Evaluating theEnergy Potential

of Region

Solar Plants

Thermic Plant

Building up an energy industrial

at the region

Solar PowerIndustry

Wind PowerIndustry

Nuclear PowerIndustry

Page 4: Sunum Başlık Konusu · Energy Potential of Region MONTHS Global Radiation (kWh/m2-day) Sunshine Duration ( Hour ) Turkey Konya Karaman Karapınar Turkey Konya Karaman Karapınar

Energy Potential of Region

HighRenewable

EnergyPotential

Ready InvestmentLands and

Infrastructure

EnergyIncentives

StrongIndustry

HighestCapacity

Permission

Page 5: Sunum Başlık Konusu · Energy Potential of Region MONTHS Global Radiation (kWh/m2-day) Sunshine Duration ( Hour ) Turkey Konya Karaman Karapınar Turkey Konya Karaman Karapınar

Energy Potential of Region

Konya %5,53, Karapınar %6,82, Karaman %8,92

are more efficiency than Turkey’s avarage

January February March April May June July August September October November December Average

Global Radiation (kWh/m2-day) Turkey 1,79 2,5 3,87 4,93 6,14 6,57 6,5 5,81 4,81 3,46 2,14 1,59 4,18

Global Radiation (kWh/m2-day) Konya 1,98 2,56 4,23 5,2 6,3 6,78 6,81 6,05 5,12 3,73 2,35 1,77 4,41

Global Radiation (kWh/m2-day) Karaman 2,16 2,69 4,38 5,35 6,45 6,98 6,91 6,15 5,22 3,86 2,52 1,91 4,55

Global Radiation (kWh/m2-day) Karapınar 2,06 2,59 4,33 5,25 6,31 6,85 6,8 6,07 5,2 3,8 2,46 1,81 4,46

0

1

2

3

4

5

6

7

8

kWH

/m2-

day

Global Radiation (kWh/m2-day)

Page 6: Sunum Başlık Konusu · Energy Potential of Region MONTHS Global Radiation (kWh/m2-day) Sunshine Duration ( Hour ) Turkey Konya Karaman Karapınar Turkey Konya Karaman Karapınar

Energy Potential of Region

Konya %5,66, Karapınar %8,12, Karaman %9,88

are more efficiency than Turkey’s avarage

January February March April May June July AugustSeptembe

rOctober November December Average

Sunshine Duration ( Hour ) Turkey 4,11 5,22 6,27 7,46 9,1 10,81 11,31 10,7 9,23 6,87 5,15 3,75 7,50

Sunshine Duration ( Hour ) Konya 4,19 5,51 6,68 8,03 9,46 11,28 11,97 11,35 9,79 7,35 5,53 3,93 7,92

Sunshine Duration ( Hour ) Karaman 4,46 5,85 7,14 8,44 9,84 11,51 12,02 11,47 10,11 7,77 5,95 4,31 8,24

Sunshine Duration ( Hour ) Karapınar 4,18 5,65 6,91 8,25 9,58 11,53 12,22 11,6 10,05 7,6 5,74 3,98 8,11

0

2

4

6

8

10

12

14

Saat

Sunshine Duration ( Hour )

Page 7: Sunum Başlık Konusu · Energy Potential of Region MONTHS Global Radiation (kWh/m2-day) Sunshine Duration ( Hour ) Turkey Konya Karaman Karapınar Turkey Konya Karaman Karapınar

Energy Potential of RegionMONTHS

Global Radiation (kWh/m2-day) Sunshine Duration ( Hour )

Turkey Konya Karaman Karapınar Turkey Konya Karaman Karapınar

January 1,79 1,98 2,16 2,06 4,11 4,19 4,46 4,18February 2,5 2,56 2,69 2,59 5,22 5,51 5,85 5,65

March 3,87 4,23 4,38 4,33 6,27 6,68 7,14 6,91April 4,93 5,2 5,35 5,25 7,46 8,03 8,44 8,25May 6,14 6,3 6,45 6,31 9,1 9,46 9,84 9,58June 6,57 6,78 6,98 6,85 10,81 11,28 11,51 11,53July 6,5 6,81 6,91 6,8 11,31 11,97 12,02 12,22

August 5,81 6,05 6,15 6,07 10,7 11,35 11,47 11,6September 4,81 5,12 5,22 5,2 9,23 9,79 10,11 10,05

October 3,46 3,73 3,86 3,8 6,87 7,35 7,77 7,6November 2,14 2,35 2,52 2,46 5,15 5,53 5,95 5,74December 1,59 1,77 1,91 1,81 3,75 3,93 4,31 3,98

Average 4,18 4,41 4,55 4,46 2.741,07 2.896,01 3.011,41 2.963,47

Konya %5,66, Karapınar %8,12,Karaman %9,88

are more

efficiency than

Turkey’s

avarage

2.741,07

2.896,01

3.011,412.963,47

2.600,00

2.700,00

2.800,00

2.900,00

3.000,00

3.100,00

Turkey Konya Karaman Karapınar

Annual Average Sunshine Duration ( Hour )

AnnualAverageSunshineDuration( Hour )

Page 8: Sunum Başlık Konusu · Energy Potential of Region MONTHS Global Radiation (kWh/m2-day) Sunshine Duration ( Hour ) Turkey Konya Karaman Karapınar Turkey Konya Karaman Karapınar

Energy Potential of Region

Page 9: Sunum Başlık Konusu · Energy Potential of Region MONTHS Global Radiation (kWh/m2-day) Sunshine Duration ( Hour ) Turkey Konya Karaman Karapınar Turkey Konya Karaman Karapınar

Energy Potential of Region

Values are taken from PVGIS site. http://re.jrc.ec.europa.eu/pvgis/apps4/pvest.php

0,00

50,00

100,00

150,00

200,00

250,00

0,00

5.000,00

10.000,00

15.000,00

20.000,00

25.000,00

30.000,00

35.000,00

40.000,00

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

(kW

h/m

2)

kWh

Avarage Montly Electricity Production

Paris Konya Paris Konya

Konya is

%49,61 more efficiency than Paris’s avarage for Avarage Montly Electricity Production

Konya is

%51,45 more efficiency than Paris’s avarage for Avarage Montly Irradiation persquare meter

Paris Case

Page 10: Sunum Başlık Konusu · Energy Potential of Region MONTHS Global Radiation (kWh/m2-day) Sunshine Duration ( Hour ) Turkey Konya Karaman Karapınar Turkey Konya Karaman Karapınar

Energy Potential of Region

Konya is

%49,61 more efficiency than Paris’sYearly Elecricity Production

Values are taken from PVGIS site. http://re.jrc.ec.europa.eu/pvgis/apps4/pvest.php

Tariffs taken from CRE site. http://www.cre.fr/documents/deliberations/communication/coefficients-s11-et-v11

The Power Plant inKonya is

%97,07more efficiency than Paris’sAnnual Revenue

0,00 EUR

5.000,00 EUR

10.000,00 EUR

15.000,00 EUR

20.000,00 EUR

25.000,00 EUR

30.000,00 EUR

35.000,00 EUR

0,00

50.000,00

100.000,00

150.000,00

200.000,00

250.000,00

300.000,00

350.000,00

Paris Konya

Euro

kWh

Annual Elecricity Production and Revenue

Yearly Electricity Production (kWh) Annual Revenue (Euro)

Paris

Month

Average daily electricity

productionEd

(kWh)

Average monthly electricity

productionEm

(kWh)

Average daily sum of global irradiation per square meter

Hd

(kWh/m2)

Average sum of global irradiation per square meter

Hm

(kWh/m2)

Yearly average

580,08 17.666,67 3,77 114,96

Total for year

212.000,00 1.379,50

Annual Revenue

15.603,20 EUR 0,0736 Euro / kWh

Konya

Month

Average daily electricity

productionEd

(kWh)

Average monthly

electricity production

Em

(kWh)

Average daily sum of global

irradiation per square meter

Hd

(kWh/m2)

Average sum of global

irradiation per square meter

Hm

(kWh/m2)

Yearly average

867,92 26.416,67 5,71 173,92

Total for year

317.000,00 2.087,00

Annual Revenue

30.749,00 EUR 0,097 Euro / kWh

Paris Case

Page 11: Sunum Başlık Konusu · Energy Potential of Region MONTHS Global Radiation (kWh/m2-day) Sunshine Duration ( Hour ) Turkey Konya Karaman Karapınar Turkey Konya Karaman Karapınar

Energy Potential of Region

Values are taken from PVGIS site. http://re.jrc.ec.europa.eu/pvgis/apps4/pvest.php

Konya is

%81,15 more efficiency than Berlin’s avarage for Avarage Montly Electricity Production

Konya is

%82,45 more efficiency than Berlin’s avarage for Avarage Montly Irradiation persquare meter

Berlin Case

0,00

50,00

100,00

150,00

200,00

250,00

0,00

5.000,00

10.000,00

15.000,00

20.000,00

25.000,00

30.000,00

35.000,00

40.000,00

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

(kW

h/m

2)

kWh

Avarage Montly Electricity Production

Berlin Konya Berlin Konya

Page 12: Sunum Başlık Konusu · Energy Potential of Region MONTHS Global Radiation (kWh/m2-day) Sunshine Duration ( Hour ) Turkey Konya Karaman Karapınar Turkey Konya Karaman Karapınar

Energy Potential of Region

Konya is

%81,15 more efficiency thanBerlin’s Yearly ElecricityProduction

Values are taken from PVGIS site. http://re.jrc.ec.europa.eu/pvgis/apps4/pvest.php

Tariffs taken from Bundesnetzagentur site. http://www.bundesnetzagentur.de/cln_1432/DE/Sachgebiete/ElektrizitaetundGas/Unternehmen_Institutionen/ErneuerbareEnergien/Photovoltaik/DatenMeldgn

_EEG-VergSaetze/DatenMeldgn_EEG-VergSaetze_node.html;jsessionid=5579EEAD06F7DC40B17FF710F2BE5806#doc405794bodyText4

The Power Plant inKonya is

%69,61more efficiency thanBerlin’s Annual Revenue

Berlin

Month

Average daily electricity

productionEd

(kWh)

Average monthly electricity

productionEm

(kWh)

Average daily sum of global irradiation per square meter

Hd

(kWh/m2)

Average sum of global irradiation per square meter

Hm

(kWh/m2)

Yearly average

478,50 14.582,50 3,13 95,36

Total for year

174.990,00 1.144,30

Annual Revenue

18.128,96 EUR0,1153 Euro / kWh (Av. 0,1036 E)

Monthly %1,48 Decline

Konya

Month

Average daily electricity

productionEd

(kWh)

Average monthly

electricity production

Em

(kWh)

Average daily sum of global

irradiation per square meter

Hd

(kWh/m2)

Average sum of global

irradiation per square meter

Hm

(kWh/m2)

Yearly average

867,92 26.416,67 5,71 173,92

Total for year

317.000,00 2.087,00

Annual Revenue

30.749,00 EUR 0,097 Euro / kWh

Berlin Case

0,00 EUR

5.000,00 EUR

10.000,00 EUR

15.000,00 EUR

20.000,00 EUR

25.000,00 EUR

30.000,00 EUR

35.000,00 EUR

0,00

50.000,00

100.000,00

150.000,00

200.000,00

250.000,00

300.000,00

350.000,00

Berlin Konya

Euro

kWh

Annual Elecricity Production and Revenue

Yearly Electricity Production (kWh) Annual Revenue (Euro)

Page 13: Sunum Başlık Konusu · Energy Potential of Region MONTHS Global Radiation (kWh/m2-day) Sunshine Duration ( Hour ) Turkey Konya Karaman Karapınar Turkey Konya Karaman Karapınar

Energy Potential of Region

Values are taken from PVGIS site. http://re.jrc.ec.europa.eu/pvgis/apps4/pvest.php

Konya is

%10,05 more efficiency than Malaga’s avarage for Avarage Montly Electricity Production

Konya is

%6,72more efficiency than Malaga’s avarage for Avarage Montly Irradiation per squaremeter

Malaga Case

0,00

50,00

100,00

150,00

200,00

250,00

0,00

5.000,00

10.000,00

15.000,00

20.000,00

25.000,00

30.000,00

35.000,00

40.000,00

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

(kW

h/m

2)

kWh

Avarage Montly Electricity Production

Malaga Konya Malaga Konya

Page 14: Sunum Başlık Konusu · Energy Potential of Region MONTHS Global Radiation (kWh/m2-day) Sunshine Duration ( Hour ) Turkey Konya Karaman Karapınar Turkey Konya Karaman Karapınar

Energy Potential of Region

Konya is

%10,05 more efficiency thanMalaga’s Yearly ElecricityProduction

Values are taken from PVGIS site. http://re.jrc.ec.europa.eu/pvgis/apps4/pvest.php

Tariffs taken from El Ministro de Industria, Turismo y Comerciohttp://www.boe.es/boe/dias/2010/11/23/pdfs/BOE-A-2010-17976.pdf

The Power Plant inKonya is

%20,91less efficiency thanMalaga’s Annual Revenue

Malaga

Month

Average daily electricity

productionEd

(kWh)

Average monthly electricity

productionEm

(kWh)

Average daily sum of global irradiation per square meter

Hd

(kWh/m2)

Average sum of global irradiation per square meter

Hm

(kWh/m2)

Yearly average

788,17 24.000,00 5,35 162,92

Total for year

288.000,00 1.955,00

Annual Revenue

38.880,00 EUR 0,135 Euro / kWh

Konya

Month

Average daily electricity

productionEd

(kWh)

Average monthly

electricity production

Em

(kWh)

Average daily sum of global

irradiation per square meter

Hd

(kWh/m2)

Average sum of global

irradiation per square meter

Hm

(kWh/m2)

Yearly average

867,92 26.416,67 5,71 173,92

Total for year

317.000,00 2.087,00

Annual Revenue

30.749,00 EUR 0,097 Euro / kWh

Malaga Case

0,00 EUR

5.000,00 EUR

10.000,00 EUR

15.000,00 EUR

20.000,00 EUR

25.000,00 EUR

30.000,00 EUR

35.000,00 EUR

40.000,00 EUR

45.000,00 EUR

0,00

40.000,00

80.000,00

120.000,00

160.000,00

200.000,00

240.000,00

280.000,00

320.000,00

Malaga Konya

Euro

kWh

Annual Elecricity Production and Revenue

Yearly Electricity Production (kWh) Annual Revenue (Euro)

Page 15: Sunum Başlık Konusu · Energy Potential of Region MONTHS Global Radiation (kWh/m2-day) Sunshine Duration ( Hour ) Turkey Konya Karaman Karapınar Turkey Konya Karaman Karapınar

Energy Potential of RegionKonya, %8,39

Regarding average

montly energy

production Konya’s

actual value is more

efficient than

calculated.

Month

PVGISAverage monthly

electricity productionEm

(kWh)

MEDAS Power PlantEelectricity production

Em

(kWh)

Efficiency of Generated to

Calculated

Annual Revenue of MEDAS Power Plant

Jan 17.400,00 16.660,00 -4,25 1.616,02 EUR

Feb 19.700,00 20.800,00 5,58 2.017,60 EUR

Mar 26.400,00 27.450,00 3,98 2.662,65 EUR

Apr 27.500,00 30.790,00 11,96 2.986,63 EUR

May 30.400,00 36.570,00 20,30 3.547,29 EUR

Jun 30.800,00 37.900,00 23,05 3.676,30 EUR

Jul 32.900,00 40.630,00 23,50 3.941,11 EUR

Aug 33.700,00 40.190,00 19,26 3.898,43 EUR

Sep 31.600,00 34.850,00 10,28 3.380,45 EUR

Oct 27.600,00 31.740,00 15,00 3.078,78 EUR

Nov 22.400,00 20.150,00 -10,04 1.954,55 EUR

Dec 16.600,00 13.620,00 -17,95 1.321,14 EUR

Total 317.000,00 351.350,00 8,39 34.080,95 EUR

10.000,00 EUR

15.000,00 EUR

20.000,00 EUR

25.000,00 EUR

30.000,00 EUR

35.000,00 EUR

40.000,00 EUR

0,00

50.000,00

100.000,00

150.000,00

200.000,00

250.000,00

300.000,00

350.000,00

Malaga(Calculated)

Konya(Calculated)

Berlin(Calculated)

Paris(Calculated)

Konya(Produced)

Euro

kWh

Annual Elecricity Production and Revenue

Yearly Electricity Production (kWh) Annual Revenue (Euro)

Page 16: Sunum Başlık Konusu · Energy Potential of Region MONTHS Global Radiation (kWh/m2-day) Sunshine Duration ( Hour ) Turkey Konya Karaman Karapınar Turkey Konya Karaman Karapınar

Energy Potential of RegionTurkey has %6,65Avarage Annual

Electricity

compsumption

growth

4,45 4,07 3,74 3,58 4,23 4,47 4,53 4,46 4,13 3,91 4,51

49,04 49,30 49,17 47,82 47,55 47,57 46,22 44,92 46,11 47,28 47,35

10,56 11,52 12,92 14,24 14,16 14,92 14,76 15,95 16,12 16,40 16,33

22,88 22,54 22,80 23,75 24,09 23,51 24,44 24,95 24,07 23,79 23,28

2,67 2,54 2,60 2,49 2,45 2,65 2,92 2,33 2,53 2,05 2,3310,40 10,03 8,77 8,13 7,53 6,88 7,12 7,40 7,04 6,58 6,20

0,00

10,00

20,00

30,00

40,00

50,00

60,00

70,00

80,00

90,00

100,00

2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012

Electricity Compsumption of Turkey

State Offices Consumption (MWh) Industrial Consumption ( MWh) Commercial Comsuption (MWh)

Residental Comsupmtion (MWh) Agricultural irrigation (MWh) Loss or Leak or Other Compsumptions

0

50.000.000

100.000.000

150.000.000

200.000.000

250.000.000

2000 2002 2004 2006 2008 2010 2012 2014

Total Electricity Cunsumption(MWh)

Page 17: Sunum Başlık Konusu · Energy Potential of Region MONTHS Global Radiation (kWh/m2-day) Sunshine Duration ( Hour ) Turkey Konya Karaman Karapınar Turkey Konya Karaman Karapınar

Energy Potential of RegionKonya has %13,09Avarage Annual

Electricity

compsumption

growth

1,68 1,10 2,11 2,15 2,37 3,81 4,51 5,67 5,05 2,86 3,37

31,96

55,50 55,5151,06

55,06 54,0547,80 43,45

49,7545,10

39,51

10,06

6,75 6,547,47

7,62 8,318,77

10,39

10,1015,73

13,80

26,30

17,14 16,8119,06

15,90 15,8517,40 20,61

18,19 21,42

18,30

15,64

11,19 11,95 13,45 11,5913,89 16,87 15,52 13,24

3,88

11,85

14,378,32 7,09 6,80 7,46 4,09 4,64 4,35 3,67

11,02 13,17

0,00

10,00

20,00

30,00

40,00

50,00

60,00

70,00

80,00

90,00

100,00

2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012

Electricity Compsumption of Konya

State Offices Consumption (MWh) Industrial Consumption ( MWh) Commercial Comsuption (MWh)

Residental Comsupmtion (MWh) Agricultural irrigation (MWh) Loss or Leak or Other Compsumptions

0

2.000.000

4.000.000

6.000.000

2000 2002 2004 2006 2008 2010 2012 2014

Total Electricity Cunsumption(MWh)

Page 18: Sunum Başlık Konusu · Energy Potential of Region MONTHS Global Radiation (kWh/m2-day) Sunshine Duration ( Hour ) Turkey Konya Karaman Karapınar Turkey Konya Karaman Karapınar

Energy Potential of RegionKaraman has %9,40Avarage Annual

Electricity

compsumption

growth

3,41 3,39 5,74 2,99 3,79 5,87 5,43 5,38 2,06 2,41 2,68

29,77 30,6031,39

30,78 29,31

33,99 33,08 34,7632,63

38,07 37,63

5,577,71

6,33 9,75 8,02

6,66 6,97 7,1511,38

12,55 9,61

22,4321,76 20,53 19,80

19,16

18,46 18,7519,87 20,09

19,0919,05

25,9213,09

29,4225,88

25,28

28,74 30,84 27,1823,81 12,18 18,20

12,90

23,44

6,5810,79

14,446,28 4,93 5,65

10,0215,70 12,83

0,00

10,00

20,00

30,00

40,00

50,00

60,00

70,00

80,00

90,00

100,00

2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012

Electricity Compsumption of Karaman

State Offices Consumption (MWh) Industrial Consumption ( MWh) Commercial Comsuption (MWh)

Residental Comsupmtion (MWh) Agricultural irrigation (MWh) Loss or Leak or Other Compsumptions

0

200000

400000

600000

2000 2002 2004 2006 2008 2010 2012 2014

Total Electricity Cunsumption(MWh)

Page 19: Sunum Başlık Konusu · Energy Potential of Region MONTHS Global Radiation (kWh/m2-day) Sunshine Duration ( Hour ) Turkey Konya Karaman Karapınar Turkey Konya Karaman Karapınar

Energy Potential of Region

Konya has a 2,77% annual average in Turkey's electricity consumption

0,00

0,50

1,00

1,50

2,00

2,50

3,00

3,50

2000 2002 2004 2006 2008 2010 2012 2014

%

Ratio of Electricity Cunsumption to Turkey

Konya Karaman TR52

Karaman has a 0,27% annual average in Turkey's electricity consumption

Page 20: Sunum Başlık Konusu · Energy Potential of Region MONTHS Global Radiation (kWh/m2-day) Sunshine Duration ( Hour ) Turkey Konya Karaman Karapınar Turkey Konya Karaman Karapınar

Energy Investments in Region

Total Application Approved Application Evaluating Application

Türkiye (Others) 1251 750 219

Karaman 65 12 53

Konya 394 114 280

23,0413,01

50,723,80

1,37

9,60

73,16

85,62

39,67

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

%

Applications of Unlicensed Energy

Page 21: Sunum Başlık Konusu · Energy Potential of Region MONTHS Global Radiation (kWh/m2-day) Sunshine Duration ( Hour ) Turkey Konya Karaman Karapınar Turkey Konya Karaman Karapınar

Energy Investments in Region

Number of ApprovedApplication

Number ofApplication for

Project

Number of ApprovedProject

Number ofApplication for

TemporaryAcceptance

Number of ApprovedTemporaryAcceptance

Türkiye (Others) 449 179 100 41 21

Karaman 11 6 0 0 0

Konya 107 22 7 2 1

18,8710,63 6,54 4,65 4,65

1,94

2,90

79,1986,47

93,46 95,35 95,45

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

%

Applications of Unlicensed Solar Energy

Page 22: Sunum Başlık Konusu · Energy Potential of Region MONTHS Global Radiation (kWh/m2-day) Sunshine Duration ( Hour ) Turkey Konya Karaman Karapınar Turkey Konya Karaman Karapınar

Energy Investments in Region

72,78

27,72

0

50

100

150

200

250

300

350

400

450

Total Applications

Konya Unlicensed Solar Applications

Number ofApprovedApplication

Number ofEvaluatingApplications

20,56

6,54

72,90

0

20

40

60

80

100

120

Approved Applications

Konya Unlicensed Solar Applications

Number ofNonpractisingApplications

Number ofApproved Project

Number ofApplication forProject

28,57

14,29

57,14

0

1

2

3

4

5

6

7

Total Aproved Projects

Konya Unlicensed Solar Applications

Number ofUnappliedProjects

Number ofApprovedTemporaryAcceptance

Number ofApplication forTemporaryAcceptance

Page 23: Sunum Başlık Konusu · Energy Potential of Region MONTHS Global Radiation (kWh/m2-day) Sunshine Duration ( Hour ) Turkey Konya Karaman Karapınar Turkey Konya Karaman Karapınar

Energy Investments in Region

Konya Karaman TR-52 Turkey

Number 120 78 198 496

Percentage 24,19 15,73 39,92 100,00

0,00

20,00

40,00

60,00

80,00

100,00

120,00

0

100

200

300

400

500

600

%

Nu

mb

er

Total Applications for Licensed Solar Energy

For the number of Licensed Applications Konya-Karaman is % 39,92

Page 24: Sunum Başlık Konusu · Energy Potential of Region MONTHS Global Radiation (kWh/m2-day) Sunshine Duration ( Hour ) Turkey Konya Karaman Karapınar Turkey Konya Karaman Karapınar

Energy Investments in Region

For the number of Unlicensed Applications Konya-Karaman is % 20,81

Konya Karaman TR-52 Turkey

Number 107 11 118 567

Percentage 18,87 1,94 20,81 100

0,00

20,00

40,00

60,00

80,00

100,00

0

100

200

300

400

500

600

%Nu

mb

er

Total Applications for Unlicensed Solar Energy

Page 25: Sunum Başlık Konusu · Energy Potential of Region MONTHS Global Radiation (kWh/m2-day) Sunshine Duration ( Hour ) Turkey Konya Karaman Karapınar Turkey Konya Karaman Karapınar

Energy Investments in Region

For the installed capacity of Licensed Applications Konya-Karaman is % 33,34;

For the Allowed Licensed Capacity Konya-Karaman is % 21,66; ( 130 MW / 600 MW )

Konya Karaman TR-52 Turkey

Installed Capacity 1850 1117 2967 8900

Percentage 20,79 12,55 33,34 100,00

0,00

20,00

40,00

60,00

80,00

100,00

0

1500

3000

4500

6000

7500

9000

%

MW

Total Applications for Licensed Solar Energy

Page 26: Sunum Başlık Konusu · Energy Potential of Region MONTHS Global Radiation (kWh/m2-day) Sunshine Duration ( Hour ) Turkey Konya Karaman Karapınar Turkey Konya Karaman Karapınar

Energy Investments in Region

For the installed capacity of Approved Unlicensed Applications Konya-Karaman is % 23,07

Konya Karaman TR-52 Turkey

Installed Capacity 42,18 4,80 46,98 203,60

Percentage 20,72 2,36 23,07 100

0,00

20,00

40,00

60,00

80,00

100,00

0,00

50,00

100,00

150,00

200,00

250,00

%

MW

Approved Applications for Unlicensed Solar Energy

Page 27: Sunum Başlık Konusu · Energy Potential of Region MONTHS Global Radiation (kWh/m2-day) Sunshine Duration ( Hour ) Turkey Konya Karaman Karapınar Turkey Konya Karaman Karapınar

Energy Investments in Region

2013 (From April) 2014 ( From March )

Online Instaled Capacity 0 700

Evaluating Installed Capacity 38.748 302.385

Approved Installed Capacity 0 46.278

Number of Approved Applications 0 116

Number of Evaluating Applications 100 332

Number of Online Applications 0 2

0

50

100

150

200

250

300

350

0

50.000

100.000

150.000

200.000

250.000

300.000

350.000

400.000

Nu

mb

er o

f P

lan

ts

kW

TR52 Region Unlicensed Solar Applications by Years

Approved Installed Capacity Evaluating Installed Capacity Online Instaled Capacity

Number of Approved Applications Number of Evaluating Applications Number of Online Applications

Page 28: Sunum Başlık Konusu · Energy Potential of Region MONTHS Global Radiation (kWh/m2-day) Sunshine Duration ( Hour ) Turkey Konya Karaman Karapınar Turkey Konya Karaman Karapınar

Energy Investments in Region

0

20

40

60

80

100

120

140

160

180

0,00

20.000,00

40.000,00

60.000,00

80.000,00

100.000,00

120.000,00

140.000,00

160.000,00

Nu

mb

er

kW

Power Stations

The Unlicensed Solar Applications by Power Stations

Total Installed Capacity Total Numbers

Page 29: Sunum Başlık Konusu · Energy Potential of Region MONTHS Global Radiation (kWh/m2-day) Sunshine Duration ( Hour ) Turkey Konya Karaman Karapınar Turkey Konya Karaman Karapınar

Energy Investments in RegionNUMBER POWER STATION CITY

NOMINAL POWER(MVA)

Unlicensed Application

Installed Capacity (kW) *

Unlicensed Application Number

*

Maximum Demand for 2013 Year (MW)

*

1 AKŞEHİR KONYA 25+25 6.500 10 20,548

2 ALAKOVA(GEÇİCİ) KONYA 25 7,88

3 ALİBEYHÜYÜĞÜ KONYA 50,(10+10) 9.997 13 4,196

4 ALTINEKİN KONYA 100+16 8.500 10 4,412

5 BEYŞEHİR KONYA 50+16 700 2 27,1

6 CİHANBEYLİ KONYA 25+25 9.500 10 14,284

7 ÇUMRA KONYA 50+50 4.000 6 18,656

8 DARAN(GEÇİCİ) KARAMAN 50

9 EREĞLİ KONYA OTO TR(150), POWER TR(50+25) 3.500 7 35,412

10 ERMENEK(GEÇİCİ) KARAMAN 125 500 1 7,964

11 GÜNEYSINIR KONYA 100,(10+10) 44.250 52 7,7

12 ILGIN KONYA 50 1.060 3 16,792

13 KARAMAN KARAMAN 50+50 8.590 11 37,092

14 KARAMAN OSB. KARAMAN 25+50 22.290 29 39,052

15 KARAPINAR KONYA 50+50 18.924 45 16,464

16 KEPEZKAYA-HAVZA KARAMAN 25 5.000 5 1,64

17 KIZÖREN KONYA 100+50 9.508 11 6,368

18 KOLUKISA(GEÇİCİ) KONYA 50 6.000 6 2,8

19 KONYA-1 KONYA 100+100+25 2.004 4 154,904

20 KONYA-2 KONYA 100+100 7.959 12 141,652

21 KONYA-3 KONYA 100+100 297 1 72,26

22 KONYA-4 KONYAOTO TR(2*250+250+150),

GÜÇ TR (100+50)6.560 15 38,592

23 KULU KONYA 50 6.500 7 9,98

24 LADİK KONYA 25+25 13.850 18 15,112

25 SEYDİŞEHİR KONYAOTO TR(180+180), POWER

TR(25+25)2.000 4 20,164

26 YUNAK KONYA 50+25 13.200 14 5,776

27 EVALUATED CONNECTION POINT 142.733 162

28 TOTAL 353.922 458 727

Page 30: Sunum Başlık Konusu · Energy Potential of Region MONTHS Global Radiation (kWh/m2-day) Sunshine Duration ( Hour ) Turkey Konya Karaman Karapınar Turkey Konya Karaman Karapınar

The Electrification and

Energy Generation Map of

TR52 Region

Energy Investments in Region

Page 31: Sunum Başlık Konusu · Energy Potential of Region MONTHS Global Radiation (kWh/m2-day) Sunshine Duration ( Hour ) Turkey Konya Karaman Karapınar Turkey Konya Karaman Karapınar

Karapınar EnergyIndustry Zone

• Total Area 59.710.000 m² ( 5971 ha)

• 3.500 MW Installed Power Capacity ( 1 MW = 1,7 ha)

• 200 MW Energy Infrastructure ( Karapınar TM )

Characteristics20 lt /sec using of process water,Number 1 Zone has a distance to Karapınar – Konya Road 1,5 Km, Number 3 Zone is 18,5 Km,Responsibility to waste-water plant,Both of two area have %1 gradient value,Both of two area are on 5. seismic zone

Energy Investments in Region

Page 32: Sunum Başlık Konusu · Energy Potential of Region MONTHS Global Radiation (kWh/m2-day) Sunshine Duration ( Hour ) Turkey Konya Karaman Karapınar Turkey Konya Karaman Karapınar

Karapınar EnergyIndustry Zone

• Total Area 59.710.000 m² ( 5971 ha)

• 3.500 MW Installed Power Capacity ( 1 MW = 1,7 ha)

• 200 MW Energy Infrastructure ( Karapınar TM )

- There are 55 firms which have constracted measurement station for 60 licensed solarpower plant application.- 45 company / person has applied for unlicensed solar power plants.- Totally 90 firm has applied for 880 MW licensed or unlicensed solar power capacityat KARAPINAR Energy Industry Zone

Energy Investments in Region

Page 33: Sunum Başlık Konusu · Energy Potential of Region MONTHS Global Radiation (kWh/m2-day) Sunshine Duration ( Hour ) Turkey Konya Karaman Karapınar Turkey Konya Karaman Karapınar

Karapınar EnergyIndustry Zone

Investment Criteria Parameter Karapınar

Location of Area Annual Total Sunshine Duration 2.964 hour / year

Annual Solar Radiation 2.100 kWh/m2year

ClimateCharecteristics

Low atmospheric density Open (02 okta)

Distance to Riverbeds There is not river

Low air polution Very low

Low wind potential 5,5 meter/sec/year

Arid climate Semi arid, Cold

Low Humidity %21

Distance to Sea 265 km/Akdeniz

Low air temperature 11,83 C°

Spatial Features of the site

Inclined terrain 1,5 °

Land without the risk of earthquakes

5. Degree

Land has not been protected by law

Yes

Non forest land Yes

Non agriculture land Yes

Non pasture land Yes

Railway, highway land not exceeding

Yes

Not close to the airport land 110 km

Energy Investments in Region

Page 34: Sunum Başlık Konusu · Energy Potential of Region MONTHS Global Radiation (kWh/m2-day) Sunshine Duration ( Hour ) Turkey Konya Karaman Karapınar Turkey Konya Karaman Karapınar

Karapınar EnergyIndustry Zone

Investment Criteria Parameter Karapınar

Spatial Features of the site

Military exercises in the field, away from the land

Enough distance

Away from the urban area of land Enough distance

Away from the main roads and the coastal strip of land

Yes

Land is not lookup field for miningor oil

Yes

Distance to Altitudes Yes

The land away from the direction of bird migration

Enough Distance

Others Obstacle to investment license There is no obstacle to invesmentlicense

Transformers and TransmissionConstraints

100 MVA Transformer and200 MW Transmission Capacity

Incentives Customs Duty Exemption,VAT Exemption, Land Allocation, Social Security Premium Support(Employee’s Share) ,Tax Reduction

Tax Incentives ın Industrial Zones Working

Qualified Human Resources 52 person/m2,

Energy Investments in Region

Page 35: Sunum Başlık Konusu · Energy Potential of Region MONTHS Global Radiation (kWh/m2-day) Sunshine Duration ( Hour ) Turkey Konya Karaman Karapınar Turkey Konya Karaman Karapınar

Council of ministersdecision

Removingattribute of

pasture

Transfer of land to the Ministry

of Industry

GeologicalStudies

ParcelizationStudies

InfrastructureStudies

Transfer of Land to

Investors

Karapınar EnergyIndustry Zone

Energy Investments in Region

Page 36: Sunum Başlık Konusu · Energy Potential of Region MONTHS Global Radiation (kWh/m2-day) Sunshine Duration ( Hour ) Turkey Konya Karaman Karapınar Turkey Konya Karaman Karapınar

Briefly Energy Law in Turkey

Law

Secondary

Regulation

EMRA Board Decisions

Announcementsof EnergyMinistry

Renewable Energy Law, Law no 5346

Energy Market Law, Law no 4628

Regulation for Solar Power Plants (19.06.2011/27969)

Competition for Grid Connection Rights Regulation

(29.05.2012/28307)

Pre-licence Measurement Regulation (22.02.2012/28212)

Support Mechanism (YEKDEM) Regulation

(21.07.2011/28001)

Regulation for Local Equipment Bonus (19.06.2012/27969)

Unlicenced Generation Regulation (21.07.2011/28001)

Licence Regulation (4.8.2002/24836)

Announcement on Grid connection

capacities

Announcement on licence applications

acceptance dates

Page 37: Sunum Başlık Konusu · Energy Potential of Region MONTHS Global Radiation (kWh/m2-day) Sunshine Duration ( Hour ) Turkey Konya Karaman Karapınar Turkey Konya Karaman Karapınar

Briefly Energy Law in TurkeyRenewable Energy Production

For Commercial

Sell to YEKDEM-EPIAS-Own Costumer

Unlicensed

< 1 MW

Sell to YEKDEM

Solar PP

0,133 USD/kWh

Wind PP

0,073 USD/kWh

Biogas PP

0,133 USD/kWh

Hydroelectric PP

0,073 USD/kWh

Jeotermal PP

0,105 USD/kWh

Licensed

> 1 MW

Sell to YEKDEM-EPIAS-Own Costumer

Solar PP

0,133 USD/kWh

Wind PP

0,073 USD/kWh

Biogas PP

0,133 USD/kWh

Hydroelectric PP

0,073 USD/kWh

Jeotermal PP

0,105 USD/kWh

For Own Using

Unlicensed

No Limit

For Own Using

Solar PP

Wind PP

Biogas PP

Co-generation or

Tri-generation PP

Page 38: Sunum Başlık Konusu · Energy Potential of Region MONTHS Global Radiation (kWh/m2-day) Sunshine Duration ( Hour ) Turkey Konya Karaman Karapınar Turkey Konya Karaman Karapınar

21,67

12,83

9,67

5,834,504,33

4,33

4,17

3,67

3,50

3,33

3,00

3,00

2,67

1,83

1,83 1,50

1,501,50

1,50

1,33

1,17

0,83

0,50

The Ratios of License Capacity

Konya, KaramanVan, AğrıAntalya 1,2MersinK.Maraş, AdıyamanBurdurNiğde, Nevşehir, AksarayKayseriMalatya, AdıyamanHakkariMuğla, AydınIsparta, AfyonDenizliBitlisBingöl, TunceliŞırnakAdana, OsmaniyeMuşSiirt, Batman, MardinSivasElazığŞanlıurfa, DiyarbakırErzurumErzincan

100.000

MW

•Electrical Energy Markets and Supply Security Strategy Paper target installed capacity of 100,000 MW by the year 2023,

30.000

MW

•The document in question at least 30% of total installed capacity in 2023, renewable energy,

•Target of 20,000 MW of installed wind power in 2023, the installed capacity target of 600 MW of geothermal,

4.700

MW

•Solar and geothermal energy target for 2023, a total of 9,400 MW,

•When Solar and Geothermal sharing is made of 50% for 2023, the solar power target is 4,700 MW

When based on the percentage of capacity, it is supposed to be given license to

888 MW according to 2023 energy

projection in our region

Briefly Energy Law in Turkey

Page 39: Sunum Başlık Konusu · Energy Potential of Region MONTHS Global Radiation (kWh/m2-day) Sunshine Duration ( Hour ) Turkey Konya Karaman Karapınar Turkey Konya Karaman Karapınar

Briefly Energy Law in Turkey

Locally Produced ComponentBonus

(USDcent/kWh)Bonus

(EUROcent/kWh)

Solar PVThe Base Tariff 13,3 9,67

PV Panel Integration and Production of Structural solar mechanics

0,8 0,58

PV Modules 1,3 0,95

PV Module Cells 3,5 2,55

Invertor 0,6 0,44

Metarial that focuses radiation on the PV Module 0,5 0,36

TOTAL Bonus 6,7 4,87

TOTAL Tariff 20 14,54

Concentrated SolarThe Base Tariff 13,3 9,67

Radiation collector tube 2,4 1,75

Reflective surface 0,6 0,44

Sun tracking system 0,6 0,44

Mechanical components of heat 1,3 0,95

Mechanical components of the steam generation system 2,4 1,75

Stirling engine 1,3 0,95

Panel integration and production of structural solar mechanics 0,6 0,44

TOTAL Bonus 9,2 6,69

TOTAL Tariff 22,5 16,36

Page 40: Sunum Başlık Konusu · Energy Potential of Region MONTHS Global Radiation (kWh/m2-day) Sunshine Duration ( Hour ) Turkey Konya Karaman Karapınar Turkey Konya Karaman Karapınar

Briefly Energy Law in Turkey

Before Application Phase The absence of differences between the procedure of 1 KW and 1MW

On Application Phase

The Approvals of Distribution Companies are not on time

Alternative Connection Points Are not Showing

There is not a standart application procedure between Distribution Companies

Differences in practice between Distribution Companies

On Project Phase

GES compliance letter

Modification of Construction Plan

Static Project Approval

Some Problems for Invesments

Page 41: Sunum Başlık Konusu · Energy Potential of Region MONTHS Global Radiation (kWh/m2-day) Sunshine Duration ( Hour ) Turkey Konya Karaman Karapınar Turkey Konya Karaman Karapınar

Solar Industry

Total Import 80.676.918 $ Import Average Growth %49,84

Total Export 19.731.232 $ Export Average Growth %76,99

2009 2010 2011 2012 2013 2014

Import Value ($) 7.136.612 10.794.090 13.633.989 12.051.407 30.428.232 6.632.588

Export Value ($) 1.160.439 5.444.858 8.477.984 2.334.409 1.842.029 471.513

Trade Balance ($) -5.976.173 -5.349.232 -5.156.005 -9.716.998 -28.586.203 -6.161.075

Import Annual Growth (%) 51,25 26,31 -11,61 152,49 30,78

-20,00

0,00

20,00

40,00

60,00

80,00

100,00

120,00

140,00

160,00

180,00

-$30.000.000

-$25.000.000

-$20.000.000

-$15.000.000

-$10.000.000

-$5.000.000

$0

$5.000.000

$10.000.000

$15.000.000

$20.000.000

$25.000.000

$30.000.000

PV Panel and Components Trade of Turkey

Page 42: Sunum Başlık Konusu · Energy Potential of Region MONTHS Global Radiation (kWh/m2-day) Sunshine Duration ( Hour ) Turkey Konya Karaman Karapınar Turkey Konya Karaman Karapınar

Solar Industry37,00

23,61

15,23 14,86

4,89 4,41

0,00

5,00

10,00

15,00

20,00

25,00

30,00

35,00

40,00

China Germany USA Others India Spain

Top 5 Exporter Countries to Turkey, 2009

24,57 24,19

15,86 15,71

11,068,60

0,00

5,00

10,00

15,00

20,00

25,00

30,00

China Greece Taiwan Germany Others USA

Top 5 Exporter Countries to Turkey, 2010

31,9828,57

21,87

8,745,83

3,01

0,00

5,00

10,00

15,00

20,00

25,00

30,00

35,00

China Taiwan Germany Others USA India

Top 5 Exporter Countries to Turkey, 2011

53,65

17,3410,14 9,82

4,62 4,43

0,00

10,00

20,00

30,00

40,00

50,00

60,00

China Germany Taiwan Others USA Japan

Top 5 Exporter Countries to Turkey,2012

62,85

16,418,16 5,42 4,10 3,06

0,00

10,00

20,00

30,00

40,00

50,00

60,00

70,00

China Germany Others Taiwan SouthKorea

Italy

Top 5 Exporter Countries to Turkey,2013

68,96

15,076,62 5,84 3,33 0,18

0,00

20,00

40,00

60,00

80,00

China Singapore Malaysia Germany Others Italy

Top 5 Exporter Countries to Turkey,2014

Page 43: Sunum Başlık Konusu · Energy Potential of Region MONTHS Global Radiation (kWh/m2-day) Sunshine Duration ( Hour ) Turkey Konya Karaman Karapınar Turkey Konya Karaman Karapınar

Solar Industry

YearsNumber of

PanelCapacity (KW)

Price for 250 W($)

Price per Watt ($)

Price per Watt (Euro)

2009 10.746 2.687 664 2,66 1,92

2010 10.942 2.736 986 3,95 2,85

2011 23.523 5.881 580 2,32 1,68

2012 54.744 13.686 220 0,88 0,64

2013 139.729 34.932 218 0,87 0,63

2014 27.953 6.988 237 0,95 0,69

TOTAL 267.637 66.909 301 1,21 0,87

For China Price per Watt 0,62 EuroFor Germany Price per Watt 0,84 Euro

Page 44: Sunum Başlık Konusu · Energy Potential of Region MONTHS Global Radiation (kWh/m2-day) Sunshine Duration ( Hour ) Turkey Konya Karaman Karapınar Turkey Konya Karaman Karapınar

Industry Competation AnalysisCriteria

Number of Workplaces

Employment Endorsement Salary+Charge Investments

Main Sectors TR TR52 TR TR52 TR TR52 TR TR52 TR TR52

Agriculture, Forestry, Fishing 0,01 0,09 0,02 0,03 0,01 0,12 0,02 0,04 0,03 0,00

Mining 0,14 0,14 1,09 0,99 0,82 0,57 2,06 1,15 1,83 1,53

Manufacturing 13,08 14,26 27,11 29,15 27,34 27,71 34,93 38,85 35,14 43,32

Electricity, Gas, Steam 0,03 0,01 0,65 0,33 4,63 2,56 2,20 2,28 5,20 2,30

Water, Sewer 0,12 0,30 0,72 1,26 0,46 0,59 1,48 3,33 1,46 5,23

Construction 4,49 2,81 7,16 4,40 6,03 2,74 5,62 4,23 5,46 5,28

Trade And Repair 42,87 49,25 29,23 38,14 46,13 56,29 19,89 25,83 15,86 20,55

Transport, Storage And Communication 15,86 15,39 9,71 8,80 5,84 5,94 9,10 7,20 15,38 15,30

Hotels, Restaurants, Etc. 8,17 5,89 6,53 3,75 1,64 0,70 4,11 1,98 2,82 0,55

Information And Communication 1,06 1,15 1,51 0,90 2,14 0,43 4,41 2,70 11,68 0,93

Real Estate, Renting And Business

Activities 0,78 0,43 0,41 0,19 0,20 0,22 0,31 0,08 0,34 0,00

Professional, Scientific, Technical

Operations 5,04 3,63 3,72 2,55 1,98 0,53 3,87 1,66 1,35 0,65

Administrative And Support Services 0,97 0,50 5,90 3,67 1,40 0,60 5,83 5,00 1,11 0,32

Education 0,44 0,47 1,77 2,04 0,37 0,26 2,53 2,49 0,90 1,12

Health And Social Services 1,27 0,61 1,99 1,59 0,65 0,52 2,79 2,91 1,19 2,78

Culture, Arts, Sports, Entertainment 0,57 0,27 0,36 0,12 0,16 0,01 0,36 0,02 0,15 0,01

Other Services 5,11 4,79 2,11 2,10 0,19 0,20 0,48 0,24 0,10 0,06

Other / Unallocated 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,06

Total 100,00 100,00 100,00 100,00 100,00 100,00 100,00 100,00 100,00 100,00

Distribution of the main industry in our region, 2009

Page 45: Sunum Başlık Konusu · Energy Potential of Region MONTHS Global Radiation (kWh/m2-day) Sunshine Duration ( Hour ) Turkey Konya Karaman Karapınar Turkey Konya Karaman Karapınar

Industry Competation AnalysisCriteria

Number of Workplaces

Employment Endorsement Salary+Charge Investments

Sectors TR TR52 TR TR52 TR TR52 TR TR52 TR TR52

10-Food 12,96 11,27 13,03 30,26 15,10 53,94 12,60 44,26 10,36 30,20

11-Drink 0,18 0,06 0,46 0,30 1,08 0,41 0,80 0,88 1,11 0,00

13-Textile 5,82 4,65 10,98 1,65 7,68 0,99 8,48 0,81 6,38 1,47

14-Wearing Apparel 16,05 7,64 14,70 5,30 6,64 1,75 8,93 3,55 3,45 0,94

15-Leather And Products 2,33 5,41 1,69 2,24 0,85 0,69 0,95 0,83 0,46 0,12

16-Wood, Wood Products 8,14 6,93 2,63 2,57 1,41 0,56 1,08 1,17 1,21 0,82

17-Paper And Paper Products 0,72 0,33 1,55 1,31 2,00 2,19 1,94 1,55 1,75 1,83

18-Printed Publication 3,97 1,87 2,08 0,93 1,09 0,29 1,49 0,49 0,66 0,35

20-Chemical Products 1,19 1,12 2,21 1,66 5,37 1,97 4,16 1,60 3,62 0,00

21-Basic Pharmaceutical 0,12 0,10 1,14 0,49 2,03 0,40 4,09 2,19 0,99 0,36

22-Rubber & Plastic 5,81 11,11 5,61 7,91 5,01 6,07 5,34 5,48 4,99 19,29

23-Mineral Products 4,14 4,23 6,07 3,86 5,67 4,60 6,56 4,18 8,14 5,51

24-Base Metal 0,76 1,78 3,67 5,18 10,07 5,84 6,40 5,94 31,12 8,67

25-Metal Furniture 14,86 18,64 8,79 9,05 5,14 4,25 6,53 5,20 4,24 5,41

27-Electrical Equipment 2,31 0,77 3,96 0,73 5,99 0,56 6,01 0,52 3,27 0,82

28-Machinery And Equipment 3,98 5,84 5,15 10,14 3,63 7,73 4,96 10,03 3,84 10,95

29-Manufacture Of Motor

Vehicles, Etc. 1,41 7,10 4,84 11,10 8,37 5,96 7,95 8,57 5,42 10,37

30-Other Transport

Equipment 0,35 0,05 1,42 0,04 1,39 0,02 2,37 0,02 1,84 0,00

31-Furniture 10,53 8,36 5,16 3,96 1,99 1,23 2,61 2,02 1,09 1,53

32-Other Manufacturing 2,41 1,22 1,79 0,97 2,11 0,38 1,24 0,59 0,60 0,00

33-Installation, Repair 1,71 1,49 1,28 0,28 0,54 0,04 1,43 0,05 0,63 0,00

Other / Unallocated 0,27 0,04 1,80 0,08 6,85 0,11 4,07 0,06 4,83 1,33

Manufacturing Industry 100,00 100,00 100,00 100,00 100,00 100,00 100,00 100,00 100,00 100,00

Distribution of Manufacturing Industry in our region,2009

Page 46: Sunum Başlık Konusu · Energy Potential of Region MONTHS Global Radiation (kWh/m2-day) Sunshine Duration ( Hour ) Turkey Konya Karaman Karapınar Turkey Konya Karaman Karapınar

Industry Competation Analysis

Period 2003 2009

Main Sectors / Regions TR TR52 TR TR52

Mining 0,8 0,3 1,5 0,6

Manufacturing 41,7 65,5 35,7 47,9

Electricity 13,6 4,7 8,3 12,8

Construction 3,3 1,3 7,2 3,7

Trade And Repair 10,8 14,7 16,0 18,6

Hotels, Restaurants, Etc. 4,3 1,9 3,2 0,6

Transport, Storage And Communication 15,4 5,6 21,2 9,4

Real Estate, Renting And Business Activities 4,0 1,1 3,6 3,7

Education 3,0 0,5 1,0 0,6

Other / Unallocated 3,1 4,3 2,2 2,0

Total 100,0 100,0 100,0 100,0

Sectoral Distribution of Investments

Page 47: Sunum Başlık Konusu · Energy Potential of Region MONTHS Global Radiation (kWh/m2-day) Sunshine Duration ( Hour ) Turkey Konya Karaman Karapınar Turkey Konya Karaman Karapınar

Industry Competation AnalysisTR52 Relative Shares Index,2009 – ( For Turkey 100 )

NACE SectorsNumber of

WorkplaceEmployment Endorsement Salary+Charge Investments

10-Food 87 232,3 357,2 351,3 291,6

11-Drink 31,2 65,9 37,7 108,9 0

13-Textile 80 15 13 9,6 23,1

14-Wearing Apparel 47,6 36,1 26,4 39,7 27,4

15-Leather and Products 232,2 132,2 81,7 87,3 25,8

16-Wood, wood products 85 97,4 39,9 108,3 68,3

17-Paper and Paper Products 46 84,1 109,3 79,7 104,6

18-Printed Publication 47,1 44,9 26,8 33 53,2

20-Chemical Products 94 75 36,7 38,4 0

21-Basic Pharmaceutical 87,2 42,7 19,6 53,7 36,2

22-Rubber & Plastic 191,3 140,8 121,2 102,8 386,8

23-Mineral Products 102,1 63,6 81,2 63,7 67,7

24-Base Metal 234,8 141,3 58 92,8 27,9

25-Metal Furniture 125,5 103 82,9 79,6 127,7

27-Electrical Equipment 33,3 18,4 9,4 8,7 25,1

28-Machinery and Equipment 146,9 196,9 213,2 202,1 285,4

29-Manufacture of motor vehicles, etc. 503,8 229,2 71,2 107,7 191,3

30-Other Transport Equipment 13,3 2,7 1,4 1 0,2

31-Furniture 79,4 76,7 61,7 77,4 140,5

32-Other Manufacturing 50,7 54,1 17,8 48 0

33-Installation, Repair 87 22,3 6,8 3,1 0,7

Page 48: Sunum Başlık Konusu · Energy Potential of Region MONTHS Global Radiation (kWh/m2-day) Sunshine Duration ( Hour ) Turkey Konya Karaman Karapınar Turkey Konya Karaman Karapınar

Industry Competation Analysis

Number of

Workplace

Low Technology Sectors 62,46 54,12 41,88 37,32 27,99

Low-Middle Technology Sectors 25,03 23,44 24,79 34,24 40,76

Middle-High Technology Sectors 12,38 21,71 31,91 26,97 30,49

High Technology Sectors 0,12 0,7 1,4 1,32 0,72

Number of

Workplace

Low Technology Sectors 44,7 47,2 55,9 57,2 43,3

Low-Middle Technology Sectors 34,8 26,8 20,5 22,7 39,9

Middle-High Technology Sectors 20,5 25,7 23,3 19,5 16,6

High Technology Sectors 0 0 0 0 0

Turkey Salary&Charge Investments

TR52 Salary&Charge Investments

Employment Endorsement

Employment Endorsement

Levels and Distribution of Technology in Manufacturing Industry (%)

Page 49: Sunum Başlık Konusu · Energy Potential of Region MONTHS Global Radiation (kWh/m2-day) Sunshine Duration ( Hour ) Turkey Konya Karaman Karapınar Turkey Konya Karaman Karapınar

Industry Competation AnalysisTR52 Region Foreign Trade Breakdown by Sectors, 2012

Thousand USD Export Export Share (%) Import Import Share (%) X-M

Agriculture (Agriculture, Livestock, Fisheries and Forestry) 91.646,00 5,90 230.841,00 18,10 -139,20

Mining, Quarrying 9.024,00 0,60 2.858,00 0,20 6,17

Manufacturing Industry 1.450.168,00 93,30 995.804,00 78,00 454,36

Other (Junk, Entertainment, Sports activities) 3.777,00 0,20 47.600,00 3,70 -43,82

TR52 Konya-Karaman 1.554.615 100 1.277.103 100 277.512

0,0

0,5

1,0

1,5

2,0

2,5

3,0

3,5

TR3

3

TR4

1

Ko

nya

TR5

2

TR

TR8

3

TRA

1

TRA

2

TRC

2

TR2

1

TR2

2

TR3

2

TR8

2

TRC

1

Kar

aman

Technology Scores of Exports by Regions, 2012

0,0

0,5

1,0

1,5

2,0

2,5

3,0

3,5

TR3

3

TR8

2

TR4

2

TR7

1

TR1

0

Ko

nya

TR5

2

TR8

3

TR6

1

TR9

0

TR7

2

TRC

3

TR2

2

TRB

2

TRA

2

Technology Scores of Imports by Regions, 2012

Page 50: Sunum Başlık Konusu · Energy Potential of Region MONTHS Global Radiation (kWh/m2-day) Sunshine Duration ( Hour ) Turkey Konya Karaman Karapınar Turkey Konya Karaman Karapınar

Industry Competation Analysis

0,0

2,0

4,0

6,0

15

-Gıd

a ve

İçec

ek

29

-Mak

ine

ve

Teçh

izat

1-T

arım

ve

Hay

van

cılık

34

-Mo

torl

u K

ara

Taşı

28

-Me

tal E

şya

2-O

rman

cılık

25

-Pla

stik

&K

auçu

k

26

-Min

era

l Ürü

nle

r

24

-Kim

yasa

l Ürü

nle

r

10

-Mad

en

21

-Kağ

ıt

36

-Mo

bily

a

33

-Tıb

bi A

letl

er

13

-Me

tal C

evh

erl

eri

20

-Ağa

ç ve

Man

tar

14

-Taş

oca

kçılı

ğı

27

-An

a M

eta

l

32

-Rad

yo, T

V, H

abe

r. T

eç.

31

-Ele

ktri

kli M

ekin

a ve

30

-Bü

ro,B

ilgi İ

şlem

22

-Bas

ım v

e Y

ayım

17

-Te

ksti

l

19

-De

ri ü

rün

leri

35

-Diğ

er

Ula

şım

Ara

çlar

ı

18

-Giy

im

23

-Ko

k K

öm

ürü

, Raf

ine

Specialization of Exports for TR52, 2012

0,0

1,0

2,0

3,0

4,0

5,0

6,0

7,0

8,0

29

-Mak

ine

ve

Teçh

izat

15

-Gıd

a ve

İçec

ek

34

-Mo

torl

u K

ara

Taşı

1-T

arım

ve

Hay

van

cılık

28

-Me

tal E

şya

2-O

rman

cılık

25

-Pla

stik

&K

auçu

k

26

-Min

era

l Ürü

nle

r

24

-Kim

yasa

l Ürü

nle

r

10

-Mad

en

21

-Kağ

ıt

36

-Mo

bily

a

33

-Tıb

bi A

letl

er

13

-Me

tal C

evh

erl

eri

14

-Taş

oca

kçılı

ğı

27

-An

a M

eta

l

20

-Ağa

ç ve

Man

tar

32

-Rad

yo, T

V, H

abe

r. T

eç.

31

-Ele

ktri

kli M

ekin

a ve

30

-Bü

ro,B

ilgi İ

şlem

17

-Te

ksti

l

22

-Bas

ım v

e Y

ayım

19

-De

ri ü

rün

leri

35

-Diğ

er

Ula

şım

Ara

çlar

ı

18

-Giy

im

23

-Ko

k K

öm

ürü

, Raf

ine

Specialization of Imports for Konya, 2012

Page 51: Sunum Başlık Konusu · Energy Potential of Region MONTHS Global Radiation (kWh/m2-day) Sunshine Duration ( Hour ) Turkey Konya Karaman Karapınar Turkey Konya Karaman Karapınar

The firms which can be work about solar industry

Photovoltaic Panel

• Solimpeks

• Derya Güneş Kollektör

• Bağdaş Alüminyum

• EEM Mühendislik

• Heray Güneş

• Kamer Elektrik

• Sunstrip

• Anıtcam

• Akdeniz Cam

• Çıraylar Cam

• AYD

• Endüstriyel Elektronik

EVA

• Derya Güneş Kolektörü

Energy Industry in our Region

Page 52: Sunum Başlık Konusu · Energy Potential of Region MONTHS Global Radiation (kWh/m2-day) Sunshine Duration ( Hour ) Turkey Konya Karaman Karapınar Turkey Konya Karaman Karapınar

The firms which can be work about solar industry

Metal Support

• Acar MPG Makine

• Hidrokon

• Has Pompa

• Betokav

• AYD

• Isıl Çelik Döküm

• Telefoncular

• Derya Güneş Kolektör

• Kondöksan

• Üçel Paslanmaz Çelik

• Gülmez Makine

• Bağdaş Alüminyum

• AF Enerji

Glass

• Derya Güneş Kolektör

• Akdeniz Cam

• Çıraylar Cam

• Konkar Cam

Energy Industry in our Region

Page 53: Sunum Başlık Konusu · Energy Potential of Region MONTHS Global Radiation (kWh/m2-day) Sunshine Duration ( Hour ) Turkey Konya Karaman Karapınar Turkey Konya Karaman Karapınar

Solar TrackingSystem

• Erdirenler Dişli

• OSR Robotics

• Hidrokon

• Has Pompa

• Anka Kalıp

• AYD

• Hidrosur

• Telefoncular

• Derya Güneş Kolektör

• Yasinoğulları

• Tavşan Saç

• Solimpeks

• Hantaş

• Zafer Dişli

• Şalt Otomasyon

• Samur Elektrik

• Özsamur Elektronik

• EEM Mühendislik

• Endüstriyel Elektrik Elektronik

• Konya Enerji

Energy Industry in our RegionThe firms which can be work about solar industry

Page 54: Sunum Başlık Konusu · Energy Potential of Region MONTHS Global Radiation (kWh/m2-day) Sunshine Duration ( Hour ) Turkey Konya Karaman Karapınar Turkey Konya Karaman Karapınar

Battery and

The Gel

• Has Pompa

• Makkon Mühendislik

• Derman Akü

• Aktif Akü

• Öztürk Akü

ConnectionEquipments

• EEM Mühendislik

• Samur Elektrik

• BAF Enerji

• Atiker Metal

• Şalt Otomasyon

Energy Industry in our RegionThe firms which can be work about solar industry

Page 55: Sunum Başlık Konusu · Energy Potential of Region MONTHS Global Radiation (kWh/m2-day) Sunshine Duration ( Hour ) Turkey Konya Karaman Karapınar Turkey Konya Karaman Karapınar

Electronic ControlSystems

• Erdirenler Dişli

• OSR Robotics

• Hidrokon

• Has Pompa

• Anka Kalıp

• AYD

• Hidrosur

• Telefoncular

• Derya Güneş Kolektör

• Yasinoğulları

• Tavşan Saç

• Solimpeks

• Hantaş

• Zafer Dişli

• Şalt Otomasyon

• Samur Elektrik

• Özsamur Elektronik

• EEM Mühendislik

• Endüstriyel Elektrik Elektronik

• Konya Enerji

Energy Industry in our RegionThe firms which can be work about solar industry

Page 56: Sunum Başlık Konusu · Energy Potential of Region MONTHS Global Radiation (kWh/m2-day) Sunshine Duration ( Hour ) Turkey Konya Karaman Karapınar Turkey Konya Karaman Karapınar

Charge Control

• EEM Mühendislik

• Samur Elektronik

• Konya Enerji

• BAF Enerji

• Atiker Metal

• Has Pompa

• Şalt Otomasyon

Electric Metering• Samur Elektronik

• EEM Mühendislik

Energy Industry in our RegionThe firms which can be work about solar industry

Page 57: Sunum Başlık Konusu · Energy Potential of Region MONTHS Global Radiation (kWh/m2-day) Sunshine Duration ( Hour ) Turkey Konya Karaman Karapınar Turkey Konya Karaman Karapınar

ConnectedEquipments

• ACAR MPG Makine

• Konya Metalurji

• AYD

• Telefoncular

• Derya Güneş Kolektör

• Akkaya Isı

• Bilir Metalurji

• Yıldız Pul

• Üçel Paslanmaz Çelik

• Gülmez Makine

• Bağdaş Alüminyum

• BAF Enerji

• Hidrosan

• Samur Elektronik

• Kamer Elektrik

• Heray Güneş

• Solimpeks

• Konya Enerji

• Montaş

• Mor Çelik

Energy Industry in our RegionThe firms which can be work about solar industry

Page 58: Sunum Başlık Konusu · Energy Potential of Region MONTHS Global Radiation (kWh/m2-day) Sunshine Duration ( Hour ) Turkey Konya Karaman Karapınar Turkey Konya Karaman Karapınar

Cables

• Lukas

• Derya Güneş

• Nirvana Elektronik

• Üçel Paslanmaz

• Bağdaş Alüminyum

• Hidrosan

• Samur Elektronik

• Solimpeks

• BAF Enerji

• Kamer Elektrik

• Heray Güneş

• Konya Enerji

Energy Industry in our RegionThe firms which can be work about solar industry

Page 59: Sunum Başlık Konusu · Energy Potential of Region MONTHS Global Radiation (kWh/m2-day) Sunshine Duration ( Hour ) Turkey Konya Karaman Karapınar Turkey Konya Karaman Karapınar

What MEVKA made

97,46 98,31 97,24 94,37100,00

87,13

2,54 1,69 2,76 5,630,00

12,87

0,00

20,00

40,00

60,00

80,00

100,00

120,00

2008 2009 2010 2011 2012 2013 2014

%

Energy Sector Ratio for Applications to MEVKA Grants

Other Sector Applications Energy Sector Applications

96,55 98,39 97,0391,24

100,00

3,45 1,61 2,978,76

0,00

0,00

20,00

40,00

60,00

80,00

100,00

120,00

2008 2009 2010 2011 2012 2013

%

The Ratio of Energy Sector for Granted Project Numbers

Granted Projects for Other Sectors Granted Projects for Energy Sector

Page 60: Sunum Başlık Konusu · Energy Potential of Region MONTHS Global Radiation (kWh/m2-day) Sunshine Duration ( Hour ) Turkey Konya Karaman Karapınar Turkey Konya Karaman Karapınar

What MEVKA made

Total ProjectApplications

Granted Projects

Other Sectors 97,53 96,61

Energy Sector 2,47 3,39

2,47 3,39

97,53 96,61

0,00

20,00

40,00

60,00

80,00

100,00

120,00

%

The Ratio of Energy Sector Projects

23,65

17,67

0,00

5,00

10,00

15,00

20,00

25,00

Energy Sector Other Sectors

%

Requested/Granted Ratios by Sectors

TOTAL

Total Project Application Number 2.594

Energy Sector Project Application Number 64

Granted Project Number 738

Granted Energy Sector Project Number 25

Requested Amount for Total Applications ( TL ) 391.586.971,93 TL

Requested Amount for Energy Applications ( TL ) 16.796.189,37 TL

Total Granted Amount 70.209.512,55 TL

Granted Amount for Energy Sector 3.972.598,31 TL

Page 61: Sunum Başlık Konusu · Energy Potential of Region MONTHS Global Radiation (kWh/m2-day) Sunshine Duration ( Hour ) Turkey Konya Karaman Karapınar Turkey Konya Karaman Karapınar

Investment Consultancy Support

Sectoral Database

• To make data up to date

• Coordination with sectoral institutions(TEİAŞ, MEDAŞ )

FeasibilityStudies

• PV Panel Production Feasibility Studies

• Nuclear Industry Feasibility Studies

What MEVKA planning to do?

Page 62: Sunum Başlık Konusu · Energy Potential of Region MONTHS Global Radiation (kWh/m2-day) Sunshine Duration ( Hour ) Turkey Konya Karaman Karapınar Turkey Konya Karaman Karapınar

Call for Proposals

• In our call for proposal we willprioritize increasing EnergyEfficiency in enterprises

• In social projects projects on increasing awareness forenergy efficiency will be prioritized.

Energy efficiency

What MEVKA planning to do?

Page 63: Sunum Başlık Konusu · Energy Potential of Region MONTHS Global Radiation (kWh/m2-day) Sunshine Duration ( Hour ) Turkey Konya Karaman Karapınar Turkey Konya Karaman Karapınar

Call for Proposals

• Using Renewable EnergySources,

• Production andexportation of renewableand nuclear energytechnologies on R&D basis

Renewable and Nuclear Energy

What MEVKA planning to do?

Page 64: Sunum Başlık Konusu · Energy Potential of Region MONTHS Global Radiation (kWh/m2-day) Sunshine Duration ( Hour ) Turkey Konya Karaman Karapınar Turkey Konya Karaman Karapınar

Specialist of Energy

Mücahit Yasir KINALI

Electric-Electronic Engineer

[email protected]

90 554 551 62 76

Konya Investment SupportOffice

[email protected]

Tel : 90332 236 32 90

Medrese Mahallesi Ulaşbaba Caddesi No:28 Selçuklu/KONYA Türkiye 42060

Karaman Investment SupportOffice

[email protected]

Tel : 90338 213 00 20

İmaret Mahallesi Atatürk Bulvarı No:2 Merkez/KARAMAN Türkiye 70100

Contact