SUNCOAST HIGH SCHOOL REPLACEMENT Project No. 0151-7511 Revised GMP Proposal Phase 3 – Sitework/Ballfields/Stadium October 31, 2008 __________________________________________________

Upload: lehuong

Post on 19-Apr-2018

221 views

Category:

Documents


7 download

TRANSCRIPT

Page 1: Suncoast GMP Phase 3 - 10-31-08 November... · Project No. 0151-7511 Revised GMP Proposal ... Wellington Williams 8 66.99 535.92 (Asst. Project Manager ... (Assistant Project Manager)

SUNCOASTHIGH SCHOOL REPLACEMENT

Project No. 0151-7511

Revised GMP Proposal Phase 3 – Sitework/Ballfields/Stadium

October 31, 2008 __________________________________________________

Page 2: Suncoast GMP Phase 3 - 10-31-08 November... · Project No. 0151-7511 Revised GMP Proposal ... Wellington Williams 8 66.99 535.92 (Asst. Project Manager ... (Assistant Project Manager)

SUNCOAST HIGH SCHOOL REPLACEMENTGMP ProposalPhase 3 10/31/08

TABLE OF CONTENTS

1. NARRATIVEa. Executive Summaryb. Market Analysisc. Issues Pendingd. Schedule Narrativee. Accounting Narrative

2. GMPa. General Conditionsb. Qualifications & Assumptions

3. EXHIBITSa. Exhibit B - GMP Summaryb. Exhibit D - Personnel Assigned & Summary of Construction Phase Feec. Exhibit E - CM Staff Per Diemd. Exhibit F - Construction Team Assignede. Exhibit I - Builder's Risk Questionnairef. Beneficial Interest Affidavit

4. DRAWING LIST

5. MWBEa. Exhibit S - Subcontractors Minority Participationb. Exhibit S - List of Major Subcontractors

MWBE Subcontractor Certification and LOIc. Appendix B - School District MWBE Form

6. SCHEDULE

Page 3: Suncoast GMP Phase 3 - 10-31-08 November... · Project No. 0151-7511 Revised GMP Proposal ... Wellington Williams 8 66.99 535.92 (Asst. Project Manager ... (Assistant Project Manager)

SUNCOAST HIGH SCHOOL REPLACEMENT RIVIERA BEACH, FLORIDA

GMP PHASE 3

1. NARRATIVE

Page 4: Suncoast GMP Phase 3 - 10-31-08 November... · Project No. 0151-7511 Revised GMP Proposal ... Wellington Williams 8 66.99 535.92 (Asst. Project Manager ... (Assistant Project Manager)

SUNCOAST HIGH SCHOOL REPLACEMENT RIVIERA BEACH, FLORIDA

SDPBC No. 0151-7511

PHASE 3 GMP – SITEWORK/BALLFIELDS/STADIUMOctober 31, 2008

Suffolk Construction Company Page 1 of 2

a. EXECUTIVE SUMMARY

The Suncoast High School Replacement “Sitework/Ballfields/Stadium Phase 3” work is a Construction Management at Risk Project and the design is by MPA Architects, Inc. The project consists of all work 5’ outside of buildings #1-6. This work is to include parking lots, bus loop, underground utilities, earthwork, retention lakes, de-mucking, ball fields and a grandstand stadium with press box and concession stands/bathrooms.

b. MARKET ANALYSIS

There are clear signs that a slow down is beginning to occur with most subcontractors.We are experiencing strong interest in bidding upcoming projects and expect competition among these bidders to improve.

c. ISSUES PENDING

None at this time.

d. SCHEDULE NARRATIVE

The project time line is as follows:

100% Construction Documents Phase 3:

� 5/15/08 = A/E completes 100% Demolition drawings � 5/16/08 - 7/9/08 = Building Department Review � Phase 3 Sitework/Ballfield GMP to Board for 11/05/08 Board Meeting� 11/05/08 = Workshop Board Meeting to approve GMP Phase 3

Construction:

� Anticipated Notice to Proceed: 11/14/08 GMP Phase 3� Substantial Completion of Project: 1/04/09� Final Completion of Project: 1/19/10

Page 5: Suncoast GMP Phase 3 - 10-31-08 November... · Project No. 0151-7511 Revised GMP Proposal ... Wellington Williams 8 66.99 535.92 (Asst. Project Manager ... (Assistant Project Manager)

SUNCOAST HIGH SCHOOL REPLACEMENT RIVIERA BEACH, FLORIDA

SDPBC No. 0151-7511

PHASE 3 GMP – SITEWORK/BALLFIELDS/STADIUMOctober 31, 2008

Suffolk Construction Company Page 2 of 2

e. ACCOUNTING NARRATIVE

No additional Preconstruction Fee is being requested for Phase 3; therefore, no billings will be submitted for this phase of work until an NTP is issued.

Page 6: Suncoast GMP Phase 3 - 10-31-08 November... · Project No. 0151-7511 Revised GMP Proposal ... Wellington Williams 8 66.99 535.92 (Asst. Project Manager ... (Assistant Project Manager)

SUNCOAST HIGH SCHOOL REPLACEMENT RIVIERA BEACH, FLORIDA

GMP PHASE 3

2. GMP

Page 7: Suncoast GMP Phase 3 - 10-31-08 November... · Project No. 0151-7511 Revised GMP Proposal ... Wellington Williams 8 66.99 535.92 (Asst. Project Manager ... (Assistant Project Manager)

DATE: 31-Oct-08

PHASE 3 GMPGENERAL CONDITIONS WEEKS: 72.0

PROJECT: SUNCOAST HIGH SCHOOL MONTHS: 16.5OWNER: SCHOOL DISTRICT OF PALM BEACH COUNTY UNITS:

LOCATION: RIVIERA BEACH, FL AREA:LABOR MATERIAL/SUB COST REMARKS

CODE ITEM QTY. UNIT unit total unit total totalGeneral Expense Items

1010 Building Permit ls 0 0 0 0 By Owner1030 Plans and Copies 1 ls 0 7,500 7,500 7,5001030 Postage & Courier 1 ls 0 1,000 1,000 1,0001080 Testing & Inspection ls 0 0 0 0 By Owner1090 Aerial Photos 17 mo 0 105 1,733 1,7331310 Temp Toilets 16.5 mo 0 250 4,125 4,125

Subtotal General Expense 14,358

Construction Manager Fee (Overhead and Profit) $631,000MWBE CM Fee 15% of CM Fee $111,353

Total Construction Manager Fee (Overhead and Profit) including MWBE CM $742,352

2a.

Page 8: Suncoast GMP Phase 3 - 10-31-08 November... · Project No. 0151-7511 Revised GMP Proposal ... Wellington Williams 8 66.99 535.92 (Asst. Project Manager ... (Assistant Project Manager)

QUALIFICATIONS AND ASSUMPTIONS GMP

SUNCOAST COMMUNITY HIGH SCHOOL REPLACEMENT PHASE 3 RIVIERA BEACH, FLORIDA

October 31, 2008

GENERAL

1. This Guaranteed Maximum Price is based on the Suncoast Community High School ReplacementPhase 3 documents dated May 1, 2008 as prepared by MPA Architects, Inc., Addendum No. 1 dated May 13, 2008, Addendum No. 2 dated May 16, 2008, and Preconstruction RFIs Responses 1-13 and Phase 2 Civil Drawings as shown on the Drawing List.

2. We have not included impact or permanent utility fees or charges, offsite connections, sewer connection fees, water tap fees, water meters or water meter fees that may be required by local, state or federal authorities having jurisdiction. Relocation of any existing utilities (if required) not identified in the bid documents is not included nor have we included costs to repair/replace any damage to utilities that are not identified in the bid documents.

3. All allowances are inclusive of purchase, delivery and installation (labor and materials) to create a complete system. We have included allowances for the following items:

a. Replacement of Elementary School Playground $80,000 b. Remove and dispose of underground utilities not identified $100,000 c. Remove and dispose of excess borrow pit materials $50,000 d. Remove and dispose of surface and buried debris $100,000 e. Remove and dispose of Muck $50,000

4. The following items are excluded from our proposal:

a. Furnishing of the Security system CCTV cameras, monitors, card readers, etc. b. Furniture, fixtures & equipment unless otherwise noted on bid drawings and specifications

DEMOLITION

1. Demolition of the apartment complex, church buildings and underground around 18th street, as described in Note 1-1 on Drawing C-100.1 is not included. The owner will demolish and remove, off site, the entire building, including foundations, concrete slabs, concrete curbs, sidewalks, asphalt, etc. The only portion of the apartment complex and church to remain is the underground utilities and will be removed by SCCI on a Time and Material basis, see allowance in item 3b above, “Remove and dispose of underground utilities not identified.

SITEWORK

1. Removal of garbage and construction debris, i.e. concrete and steel, from the borrow pit on site in the amount of 1,733 cubic yards or 2,425 tons is included per the URS Report dated January 10, 2006. Removal of quantities above and beyond this amount is not included, but can be provided as required at an additional cost, see allowance in item 3c above, “Remove and dispose of excess borrow pit materials”.

2. Removal of surface and buried construction debris, i.e. concrete and steel, as described in Note 1-7 on Drawing C-100.1 is not included because the quantity is not indicated nor possible to measure. Removal of debris can be

Page 1 of 2 2b.

Page 9: Suncoast GMP Phase 3 - 10-31-08 November... · Project No. 0151-7511 Revised GMP Proposal ... Wellington Williams 8 66.99 535.92 (Asst. Project Manager ... (Assistant Project Manager)

Page 2 of 2 2b.

provided on a Time and Material basis, see allowance in item 3d above, “Remove & dispose of surface & buried debris”.

3. We have included the removal and disposal of 11,465 cubic yards of muck as shown in the Tierra Muck Delineation Report dated November 13, 2007. Removal of quantities above and beyond this amount is not included, but can be provided as required on a Time and Material cost of $3.50 per cubic yard, see allowance item 3e above, “Remove and dispose of Muck”.

4. We have included dewatering of the “Wetland” pond located between the location of the New Multipurpose field and the new Baseball field and replacing with 6,300 cubic yards of fill.

5. We have included earthwork and utilities to within five feet of the Phase 2 buildings.

6. We have not included replacing or repairing of existing fence that is shown to remain and is not damaged by Suffolk Construction.

PLUMBING

1. The water distribution system and the sanitary sewer system for the Phase 2 buildings will connect to stub-outs provided in Phase 2. The stub-outs terminate five feet outside the Phase 2 building footprints.

Page 10: Suncoast GMP Phase 3 - 10-31-08 November... · Project No. 0151-7511 Revised GMP Proposal ... Wellington Williams 8 66.99 535.92 (Asst. Project Manager ... (Assistant Project Manager)

SUNCOAST HIGH SCHOOL REPLACEMENT RIVIERA BEACH, FLORIDA

GMP PHASE 3

3. EXHIBITS

Page 11: Suncoast GMP Phase 3 - 10-31-08 November... · Project No. 0151-7511 Revised GMP Proposal ... Wellington Williams 8 66.99 535.92 (Asst. Project Manager ... (Assistant Project Manager)
Page 12: Suncoast GMP Phase 3 - 10-31-08 November... · Project No. 0151-7511 Revised GMP Proposal ... Wellington Williams 8 66.99 535.92 (Asst. Project Manager ... (Assistant Project Manager)

Ray Bernard(General Superintendent)

John Murphy (Safety Director)

Bob Klopp(Scheduling Director)

Peter Supple(Project Executive)

John Colombier(Senior Project Manager)

Val Pfeffer(Project Manager)

Floyd Brooks(Assistant Project Manager)

Wellington Williams(Assistant Project Manager-MWBE)

Michelle Hargrett(Secretary)

Richard Archer(Lead Superintendent)

Jim Davis(Area Superintendent)

Randy Warren(Area Superintendent)

Matthew Goodman(Assistant Superintendent)

Jake Cohbern(Assistant Superintendent-MWBE)

George Wood(Safety Engineer)

John Gantner(MIS)

Pat Gravellese(Accounting)

TOTAL N/A for this phase

EXHIBIT D

PERSONNEL ASSIGNED DURING CONSTRUCTION

PROJECT NAME: SUNCOAST HIGH SCHOOL REPLACMENTPROJECT NO.: 0151-7511

SUMMARY OF CONSTRUCTION PHASE FEES

PHASE 3 GMP

NAME/ TITLEDURATION(WEEKS)

PERCENTAGE OF TIME RATE/ WK

3b.

Page 13: Suncoast GMP Phase 3 - 10-31-08 November... · Project No. 0151-7511 Revised GMP Proposal ... Wellington Williams 8 66.99 535.92 (Asst. Project Manager ... (Assistant Project Manager)

NAME/ TITLE HRS/ DAY RATE/ HR PER DIEM RATE

Ray Bernard 1.6 127.00 203.20 (General Superintendent)

John Murphy 0.8 98.75 79.00 (Safety Director)

Bob Klopp 0.8 98.75 79.00 (Scheduling Director)

Peter Supple 1.6 127.00 203.20 (Project Executive)

John Colombier 8 113.56 908.48 (Senior Project Manager)

Val Pfeffer 8 91.28 730.24 (Project Manager)

Floyd Brooks 8 54.98 439.84 (Assistant Project Manager)

Wellington Williams 8 66.99 535.92 (Asst. Project Manager - MWBE)

Michelle Hargrett 8 34.72 277.76 (Secretary)

Richard Archer 8 122.45 979.60 (Lead Superintendent)

Jim Davis 8 89.86 718.88 (Area Superintendent)

Randy Warren 8 86.90 695.20 (Area Superintendent)

Matthew Goodman 8 66.91 535.28 (Assistant Superintendent)

Jacob Cohbern 8 148.06 1,184.48

CONSTRUCTION MANAGER'S STAFF PER DIEM FOR TIME EXTENSIONS

EXHIBIT E

PROJECT NAME: SUNCOAST HIGH SCHOOL REPLACMENTPROJECT NO.: 0151-7511

PHASE 3 GMP

3c.

Page 14: Suncoast GMP Phase 3 - 10-31-08 November... · Project No. 0151-7511 Revised GMP Proposal ... Wellington Williams 8 66.99 535.92 (Asst. Project Manager ... (Assistant Project Manager)

(Assistant Superintendent - MWBE)

George Wood 8 66.72 533.76 (Safety Engineer)

John Gantner 8 56.96 455.68 (MIS)

Pat Gravellese 8 56.96 455.68 (Accounting)

TOTAL STAFF PER DIEM 8,570.47

3c.

Page 15: Suncoast GMP Phase 3 - 10-31-08 November... · Project No. 0151-7511 Revised GMP Proposal ... Wellington Williams 8 66.99 535.92 (Asst. Project Manager ... (Assistant Project Manager)

EXHIBIT FPHASE 3 GMP

CONSTRUCTION TEAM ASSIGNED REPRESENTATIVES

PROJECT NAME: SUNCOAST HIGH SCHOOL REPLACMENTPROJECT NO.: 0151-7511

Owner: School District of Palm Beach County

Owner's Authorized Representative:

Glen Armbruster, SPAMarianne Neu, Project Coordinator

Construction Manager: Suffolk Construction, Inc.

Ray Bernard Richard Archer(General Superintendent) (Lead Superintendent)

John Murphy Jim Davis(Safety Director) (Area Superintendent)

Bob Klopp Randy Warren(Scheduling Director) (Area Superintendent)

Peter Supple Matthew Goodman(Project Executive) (Asst. Superintendent)

John Colombier Jacob Cohbern(Senior Project Manager) (MWBE Asst. Super.)

Val Pfeffer George Wood(Project Manager) (Safety Engineer)

Floyd Brooks John Gantner(Assistant Project Manager) (MIS)

Wellington Williams Pat Gravelesse(Asst. Project Manager - MWBE) (Accounting)

Michelle Hargrett(Secretary)

Architect-Engineer: MPA Architects, Inc.

Rick Logan, President

3d.

Page 16: Suncoast GMP Phase 3 - 10-31-08 November... · Project No. 0151-7511 Revised GMP Proposal ... Wellington Williams 8 66.99 535.92 (Asst. Project Manager ... (Assistant Project Manager)

EXHIBIT IPHASE 3 GMP

PROJECT NAME: SUNCOAST HIGH SCHOOLPROJECT NO.: 0151-7511

Builder’s Risk QuestionnaireOwner: School District of Palm Beach County, Florida

Contractor Name & Address: Suffolk Construction , 515 North Flagler Drive, 5th Floor, West Palm Beach, FL, 33401

Project Title, Project Number & Description: Suncoast High School Replacment, Project No. 0151-7511, Construction of a

new high school consisting of six buildings that will replace the existing Suncoast High School.

Project Address: 1717 Avenue S, Riviera Beach, Fl 33404

Estimated Cost of Construction: New- 13,339,552$ Modernization-

Intended Use of Completed Structure: Athletic Fields and Parking Lots

Number of Stories: 2 Number of Buildings: 4

Total GSF of Construction: -

Construction Commencement: Approximately 11/14/08 Construction Completion: 1/19/2010

Type of Construction: Walls- CMU Block Roof: Modified Bitumen Roofing System

Footings on Fill, Ground, Piles or Other: Footings on Fill

Foundation Materials: Concrete

Distance to Nearest Fire Hydrant: 75 Feet

Distance to Fire Department: 1.8 Miles

Distance to Nearest Structure: 50 Feet

Will Sprinklers Be Installed: YES

Site Security (Fencing, Lighting, Security Service): Fencing

Material Storage On-Site- YES

How Will Material Be Stored: Locked Container Value: TBD

Will Flammables Be Stored On-Site & How: NO

List the Major Subcontractors and Estimated Percent of Work:- Site Subcontractor = 40%, Electrical Sub = 25%

Landscaping Sub = 12%, Bleacher Sub = 10%

Is Demolition Required (Describe): NO

Completed By: John Colombier Date: 10/22/08

3e.

John ColombierDigitally signed by John Colombier DN: cn=John Colombier, o=Suffolk Construction Company, Inc., ou, [email protected], c=US Date: 2008.10.22 11:58:00 -04'00'

Page 17: Suncoast GMP Phase 3 - 10-31-08 November... · Project No. 0151-7511 Revised GMP Proposal ... Wellington Williams 8 66.99 535.92 (Asst. Project Manager ... (Assistant Project Manager)
Page 18: Suncoast GMP Phase 3 - 10-31-08 November... · Project No. 0151-7511 Revised GMP Proposal ... Wellington Williams 8 66.99 535.92 (Asst. Project Manager ... (Assistant Project Manager)

SUNCOAST HIGH SCHOOL REPLACEMENT RIVIERA BEACH, FLORIDA

GMP PHASE 3

4. DRAWING LIST

Page 19: Suncoast GMP Phase 3 - 10-31-08 November... · Project No. 0151-7511 Revised GMP Proposal ... Wellington Williams 8 66.99 535.92 (Asst. Project Manager ... (Assistant Project Manager)

Received Date: 5/6/2008Original Set Revision #1 Revision #2

DRAWING # DRAWING TITLE PREPARED BY DRAWING DATE DRAWING DATE DRAWING DATE

Landscape DrawingsRoy Fisher & Associates

LP-1 Landscape Plan 4/17/2008 5/16/2008LP-2 Landscape Plan 4/17/2008 5/16/2008LP-3 Landscape Plan 4/17/2008 5/16/2008LP-4 Landscape Plan 4/17/2008 5/16/2008LP-5 Landscape Details & Specifications 4/17/2008 5/16/2008I-1 Partial Site Irrigation Plan Southwest 5/15/2008I-2 Partial Site Irrigation Plan Northwest 5/15/2008I-3 Partial Site Irrigation Plan Central 5/15/2008I-4 Partial Site Irrigation Plan East 5/15/2008I-5 Irrigation Details 5/15/2008I-6 Irrigation Details 5/15/2008

Civil Drawings BRPH1 of 7 Boundary and Topographic Survey 12/11/20072 of 7 Boundary and Topographic Survey 12/11/20073 of 7 Boundary and Topographic Survey 12/11/20074 of 7 Boundary and Topographic Survey 12/11/20075 of 7 Boundary and Topographic Survey 12/11/20076 of 7 Boundary and Topographic Survey 12/11/20077 of 7 Boundary and Topographic Survey 12/11/2007

CG-001 Cover Sheet 5/1/2008 5/13/2008CG-002 Abbreviations & Legend 5/1/2008C-001 Key Plan 5/1/2008C-002 Master Paving, Grading & Drainage 5/1/2008 5/13/2008C-003 Master Water & Sewer Plan 5/1/2008 5/13/2008C-100 Drainage Demolition Plan 5/1/2008

C-100.1 Site Demolition Plan 5/1/2008C-101 Paving Grading & Drainage Plan 5/1/2008C-102 Paving Grading & Drainage Plan 5/1/2008C-103 Paving Grading & Drainage Plan 5/1/2008C-104 Paving Grading & Drainage Plan 5/1/2008C-105 Student Parking - Paving Bid Alternate 5/1/2008C-106 Horizontal Control Plan 5/1/2008C-107 Horizontal Control Plan 5/1/2008C-108 Horizontal Control Plan 5/1/2008C-109 Horizontal Control Plan 5/1/2008C-110 Pavement Marking & Signage Plan 5/1/2008C-111 Pavement Marking & Signage Plan 5/1/2008C-301 Site Sections 5/1/2008C-302 Sanitary Sewer Profile 5/1/2008C-501 Paving Grading & Drainage Details 5/1/2008C-502 Paving Grading & Drainage Details 5/1/2008C-503 Paving Grading & Drainage Details 5/1/2008C-504 Water & Sewer Details 5/1/2008C-505 Water & Sewer Details 5/1/2008C-506 Lift Station Mechanical Details 5/1/2008C-507 Lift Station Electrical Details 5/1/2008

Architectural Drawings MPA Architects, Inc.Cover Cover Sheet 7/13/2007IND-1 Phase 3B Drawing Index 7/13/2008 5/13/2008 5/16/2008MSP-1 Master Site Plan 5/1/2008MSP-2 Partial Master Site Plan 5/1/2008MSP-3 Partial Master Site Plan 5/1/2008MSP-4 Partial Master Site Plan 5/1/2008

Suncoast Community High School ReplacementRiviera Beach, FL

Phase 3 Site Package Document List

PHASE 3 GMP

4.

Page 20: Suncoast GMP Phase 3 - 10-31-08 November... · Project No. 0151-7511 Revised GMP Proposal ... Wellington Williams 8 66.99 535.92 (Asst. Project Manager ... (Assistant Project Manager)

Received Date: 5/6/2008Original Set Revision #1 Revision #2

DRAWING # DRAWING TITLE PREPARED BY DRAWING DATE DRAWING DATE DRAWING DATE

Suncoast Community High School ReplacementRiviera Beach, FL

Phase 3 Site Package Document List

SP-1 Enlarged Baseball Field Plan, Elev., & Section 5/1/2008SP-2 Enlarged Softball Field Plan and Details 5/1/2008SP-3 Baseball & Softball Dugout Details 5/1/2008SP-4 Basketball, Volleyball, & Tennis Plans & Details 5/1/2008SP-5 Football Field Plan & Details 5/1/2008SP-6 Recreation Field Miscellaneous Details 5/1/2008SP-7 Miscellaneous Site Details 5/1/2008SP-8 Miscellaneous Site Details 5/1/2008SP-9 Gate and Fence Details 5/1/2008SP-10 Courtyard Layout Plan 5/1/2008SP-11 Bus Loop / Parent Drop-Off Plan & Section 5/1/2008SP-12 Homeside Bleacher Plan 5/1/2008SP-13 Homeside Bleacher Sections 5/1/2008SP-14 Homeside Bleacher Section at Interior Stair 5/1/2008SP-15 Homeside Bleacher Section at Pressbox 5/1/2008SP-16 Visitor Bleachers Plan & Section 5/1/2008A-7.1 Building 7 Plans 5/1/2008A-7.2 Building 7 - Exterior Elevations & Schedules 5/1/2008 5/13/2008A-7.3 Building 7 - Sections & Details 5/1/2008A-7.4 Building 7 - Enlarged Plan & Int Elevations 5/1/2008A-8.1 Building 8 Pressbox Plan Elevations and Sections 5/1/2008 5/13/2008A-9.1 Building 9 Plans 5/1/2008A-9.2 Building 9 Section & Interior Elevations 5/1/2008A-9.3 Building 9 Details and Schedules 5/1/2008 5/13/2008A-10.1 Building 10 Plans & Section 5/1/2008A-10.2 Building 10 - Exterior Elevations & Sections 5/1/2008A-10.3 Building 10 - Enlarged Plan, Details & Schedules 5/1/2008 5/13/2008A-16.6 Wall Firestop Details 5/1/2008A-16.7 Roof Details 5/1/2008A-16.13 Accessibility Details 5/1/2008A-16.16 Door Details 5/1/2008A-16.18 Door Details 5/1/2008A-16.19 Window Details 5/1/2008A-16.25 Coiling Door Details 5/1/2008

Structural DrawingsLakdas / Yohalem Engineering Inc.

S-7.1 Building 7 Floor Plan, Roof Plan, Notes and Sections 5/1/2008S-7.2 Building 7 Sections and Details 5/1/2008S-9.1 Building 9 Sections and Details 5/1/2008S-10.1 Building 10 Floor Plan, Roof Plan, Notes and Sections 5/1/2008S-10.2 Building 10 Sections and Details 5/1/2008

Fire ProtectionJohanson, Levinson, Ragan, Davila, Inc.

NO DRAWINGS INCLUDED

PlumbingJohanson, Levinson, Ragan, Davila, Inc.

P-0.1 Schedules Legend and Details 5/1/2008P-0.2 Football Stadium Plumbing Plan 5/1/2008P-1.1 Plumbing Floor Plan Bldg 7 Sanitary, Storm, Piping 5/1/2008P-1.2 Plumbing Floor Plan Building 10 5/1/2008P-1.3 Plumbing Floor Plan Building 7 Domestic Water 5/1/2008P-2.1 Plumbing Riser Diagrams 5/1/2008

Mechanical DrawingsJohanson, Levinson, Ragan, Davila, Inc.

M-0.1 Mechanical Legend, General Notes and Schedules 5/1/2008M-1.1 Bldg 7 Mechanical Floor Plan 5/1/2008M-1.2 Bldg 9 and 10 Mechanical Floor Plan 5/1/2008M-2.1 Mechanical Details 5/1/2008M-2.2 Mechanical Details 5/1/2008

4.

Page 21: Suncoast GMP Phase 3 - 10-31-08 November... · Project No. 0151-7511 Revised GMP Proposal ... Wellington Williams 8 66.99 535.92 (Asst. Project Manager ... (Assistant Project Manager)

Received Date: 5/6/2008Original Set Revision #1 Revision #2

DRAWING # DRAWING TITLE PREPARED BY DRAWING DATE DRAWING DATE DRAWING DATE

Suncoast Community High School ReplacementRiviera Beach, FL

Phase 3 Site Package Document List

Electrical DrawingsJohanson, Levinson, Ragan, Davila, Inc.

E-0.1 Electrical Sheet Index 5/1/2008E-0.2 Legend and General Electrical Notes 5/1/2008E-0.3 Electrical Site Plan 5/1/2008E-0.4 Parking Lot Lighting Plan 5/1/2008 5/16/2008E-0.5 Football Stadium Lighting Plan 5/1/2008E-0.6 Ballfields Lighting Plan 5/1/2008E-0.7 Basketball & Tennis Courts Lighting Plans 5/1/2008E-1.1 Building 7 Lighting, Power & Systems Plan 5/1/2008E-1.2 Building 8 Pressbox Lighting, Power & Systems Plan 5/1/2008E-1.3 Building 9 Lighting, Power & Systems Plan 5/1/2008E-1.4 Building 10 Lighting, Power & Systems Plan 5/1/2008E-2.1 Riser Diagrams 5/1/2008E-2.2 Riser Diagrams 5/1/2008E-2.3 Riser Diagrams 5/1/2008E-3.1 Fixture Schedule 5/1/2008E-3.2 Miscellaneous Schedules 5/1/2008E-3.3 Panelboard Schedules 5/1/2008E-3.4 Panelboard Schedules 5/1/2008E-3.5 Panelboard Schedules 5/1/2008E-3.6 Panelboard Schedules 5/1/2008E-4.1 Miscellaneous Details 5/1/2008E-4.2 Miscellaneous Details 5/1/2008E-4.3 Miscellaneous Details 5/1/2008E-4.4 Miscellaneous Details 5/1/2008E-4.5 Miscellaneous Details 5/1/2008E-4.6 Miscellaneous Details 5/1/2008E-4.7 Miscellaneous Details 5/1/2008E-4.8 Miscellaneous Details 5/1/2008E-4.9 Miscellaneous Details 5/1/2008E-4.10 ITV Tower Details 5/1/2008

Food Service Drawings Merlino AssociatesNO DRAWINGS INCLUDED

END OF SECTION

4.

Page 22: Suncoast GMP Phase 3 - 10-31-08 November... · Project No. 0151-7511 Revised GMP Proposal ... Wellington Williams 8 66.99 535.92 (Asst. Project Manager ... (Assistant Project Manager)

Received Date: 7/18/2008Original Set Revision #1

DRAWING # DRAWING TITLE PREPARED BY DRAWING DATE DRAWING DATE

Civil Drawings BRPHCover Civil, Food Service & Theatrical Cover Sheet 7/13/07IND-6 Drawing Index Civil, Food Service & Theatrical 7/13/07 8/14/07

CG-001 Cover Sheet - Civil Improvement Plans 5/29/07 8/14/07CG-002 Abbreviations & Legend 5/29/07C-001 Phase 3 Grading & Drainage Plan 5/29/07 8/14/07C-002 Phase 3 Water and Sewer Plan 5/29/07 8/14/07C-003 Phase 3 Water and Sewer Plan 5/29/07 8/14/07C-301 Sanitary Sewer Profile 5/29/07 8/14/07C-601 Paving Grading & Drainage Details 5/29/07 8/14/07C-602 Paving Grading & Drainage Details 5/29/07 8/14/07C-604 Paving Grading & Drainage Details 5/29/07C-701 Water & Sewer Details 5/29/07C-702 Water & Sewer Details 5/29/07 8/14/07C-703 Water & Sewer Details 5/29/07C-704 Water & Sewer Details 5/29/07

Suncoast Community High School ReplacementRiviera Beach, FL

Phase 2 Building Document List

PHASE 3 GMP

4.

Page 23: Suncoast GMP Phase 3 - 10-31-08 November... · Project No. 0151-7511 Revised GMP Proposal ... Wellington Williams 8 66.99 535.92 (Asst. Project Manager ... (Assistant Project Manager)

DOCUMENT TITLE Date Received: 5/6/08

DIVISION 0 BIDDING AND CONTRACT DOCUMENTS00001 Title Page00002 Table of Contents

DIVISION 1 GENERAL REQUIREMENTS01010 Summary of Work01027 Applications For Payment01028 Modification Requirements01039 Coordination and Meetings01045 Cutting and Patching01060 Regulatory Requirements01100 Alternates01300 Submittals01311 Network Analysis Schedules01400 Quality Control01410 Testing Laboratory Services01500 Construction Facilities and Temporary Controls01540 Security01560 Temporary Controls01600 Material Equipment and Approved Equals01650 Starting of Systems01700 Contract Closeout01730 Operation and Maintenance Data01740 Warranties

DIVISION 2 SITEWORK02010 Subsurface Investigation02110 Site Clearing02200 Earthwork02280 Soil Treatment for Termite Control02400 Asphalt Paving02520 Concrete Paving02540 Athletic Surfacing02580 Pavement Marking02660 Water Distribution System02685 Gas Pipes02700 Storm Drainage Utilities02730 Sanitary Sewerage Utilities02733 Waste Water Pump Stations

Phase 3 GMPSuncoast Community High School Replacement

Riviera Beach, FLPhase 3 Site Package Specifications List

4.

Page 24: Suncoast GMP Phase 3 - 10-31-08 November... · Project No. 0151-7511 Revised GMP Proposal ... Wellington Williams 8 66.99 535.92 (Asst. Project Manager ... (Assistant Project Manager)

DOCUMENT TITLE Date Received: 5/6/08

Phase 3 GMPSuncoast Community High School Replacement

Riviera Beach, FLPhase 3 Site Package Specifications List

02800 Site Improvements and Amenities02810 Underground Irrigation System02831 Chain Link Fencing02853 Parking Bumpers

DIVISION 3 CONCRETE03100 Concrete Formwork03200 Concrete Reinforcement03300 Cast-In-Place Concrete03341 Fibrous Concrete Reinforcing03342 Lightweight Insulating Concrete (LWIC) Roof Deck System03346 Concrete Floor Finishing03353 Colored and/or Patterned Concrete03411 Structural Precast Concrete03521 Insulating Concrete Fill

DIVISION 4 MASONRY04100 Mortar and Grout04300 Unit Masonry System04340 Reinforced Unit Masonry System

DIVISION 5 METALS05120 Structural Steel05400 Cold Formed Metal Framing05500 Metal Fabrications

DIVISION 6 WOOD AND PLASTICS06100 Rough Carpentry06410 Custom Casework

DIVISION 7 THERMAL MOISTURE PROTECTION07120 Fluid Applied Waterproofing07135 Sheet Membrane Waterproofing07160 Bituminous Dampproofing07191 Vapor Retarders07214 Foamed-In-Place Insulation07270 Firestopping07536 Modified Bitumen Roofing System07620 Sheet Flashing and Trim07724 Roof Hatches07900 Joint Sealants

4.

Page 25: Suncoast GMP Phase 3 - 10-31-08 November... · Project No. 0151-7511 Revised GMP Proposal ... Wellington Williams 8 66.99 535.92 (Asst. Project Manager ... (Assistant Project Manager)

DOCUMENT TITLE Date Received: 5/6/08

Phase 3 GMPSuncoast Community High School Replacement

Riviera Beach, FLPhase 3 Site Package Specifications List

DIVISION 8 DOORS AND WINDOWS08110 Hollow Metal Doors & Frames08305 Access Doors / Hatches08333 Rolling Counter Doors08520 Aluminum Windows08580 Aluminum Ticket Windows08710 Finish Hardware08800 Glass & Glazing

DIVISION 9 FINISHES09111 Metal Stud Framing System09206 Metal Furring and Lathing09210 Gypsum Veneer Plaster09215 Veneer Plaster09220 Portland Cement Plaster09250 Gypsum Board Systems09650 Resilient Flooring09900 Painting

DIVISION 10 SPECIALTIES10171 Toilet Compartments, Urinal Screens, Shower Cubicles10200 Extruded Aluminum Stationary Louvers10211 Fixed Metal Wall Louvers10350 Flagpoles10441 Identifying Devices10443 Illuminated Exterior Signage10522 Fire Extinguishers, Cabinets and Accessories10532 Aluminum Walkway Covers10675 Metal Shelving10800 Toilet and Bath Accessories

DIVISION 11 EQUIPMENT11450 Residential Appliances / Three Compartment Sink11480 Athletic and Recreational Equipment

DIVISION 12 FURNISHINGSNOT USED

DIVISION 13 SPECIAL CONSTRUCTION 13125 Home Side Grandstand and Seating System13126 Visitor Side Aluminum Seating System13127 Modular Press Box

4.

Page 26: Suncoast GMP Phase 3 - 10-31-08 November... · Project No. 0151-7511 Revised GMP Proposal ... Wellington Williams 8 66.99 535.92 (Asst. Project Manager ... (Assistant Project Manager)

DOCUMENT TITLE Date Received: 5/6/08

Phase 3 GMPSuncoast Community High School Replacement

Riviera Beach, FLPhase 3 Site Package Specifications List

13128 Portable Exterior Bleachers

DIVISION 14 CONVEYING SYSTEMS14245 Hydraulic Elevators - Passenger

DIVISION 15 MECHANICAL SYSTEMS15000 Basic Mechanical Requirements15135 Liquid & Air Flow Meters, Gages and Thermometers15140 Supports, Bases and Anchors15170 Motors15190 Mechanical Identification15242 Vibration Isolation15260 Piping Insulation15280 Equipment Insulation15290 Ductwork Insulation15411 Potable Water Systems15412 Soil and Waste Systems15413 Storm Water Systems15420 Plumbing Piping15430 Plumbing Specialties15440 Plumbing Fixtures & Accessories15450 Plumbing Equipment15510 Hydronic Piping15515 Hydronic Specialties15535 Refrigeration Piping and Specialties15671 Air Cooled Air Conditioning Condensing Units15870 Power Ventilators15885 Air Filters15895 Ductwork Accessories15900 Energy Management and Control System (Automated Logic)15936 Grilles, Registers, Diffusers

15990 Start-Up Requirements for Heating, Ventilating & Air Conditioning (HVAC) Systems

15991 Testing Adjusting and Balancing (TAB) of Heating, Ventilating and Air Conditioning (HVAC) Systems

15992 Tests - Piping Systems

DIVISION 16 ELECTRICAL16010 Basic Electrical Requirements16020 Work Included16025 Codes, Fees and Standards

4.

Page 27: Suncoast GMP Phase 3 - 10-31-08 November... · Project No. 0151-7511 Revised GMP Proposal ... Wellington Williams 8 66.99 535.92 (Asst. Project Manager ... (Assistant Project Manager)

DOCUMENT TITLE Date Received: 5/6/08

Phase 3 GMPSuncoast Community High School Replacement

Riviera Beach, FLPhase 3 Site Package Specifications List

16050 Basic Materials and Methods16111 Conduit16115 Indoor Service Poles16117 Manholes16123 Building Wire and Cable16130 Boxes16141 Wiring Devices16160 Cabinets and Enclosures16180 Equipment Wiring Systems16190 Supporting Devices16195 Electrical Identification16420 Service Entrance16425 Switchboards16440 Disconnect Switches16450 Grounding16461 Dry Type Transformers16470 Panelboards16476 Enclosed Circuit Breakers16477 Fuses (600 Volts and Below)16480 Motor Controls16485 Contactors16495 Transfer Switch16510 Interior Luminaries16530 Site Lighting16535 Emergency Lighting Equipment16550 Sports Lighting16610 Transient Voltage Surge Suppression16622 Packaged Engine Generator Systems16650 Energy Management and Control System16670 Lightning Protection Systems16721 Fire Alarm and Smoke Detection Systems16722 Intrusion Detection and Security Access System16723 Video Surveillance System16724 Emergency Radio Communications Systems16725 Card Access System16730 G.P.S. Wireless Clock Systems16765 Intercom Systems16770 Public Address System16781 Master Television Antenna System (MTAS)16902 Electric Controls and Relays16905 Communications System (Data & Voice)16906 Ceiling Projector System

4.

Page 28: Suncoast GMP Phase 3 - 10-31-08 November... · Project No. 0151-7511 Revised GMP Proposal ... Wellington Williams 8 66.99 535.92 (Asst. Project Manager ... (Assistant Project Manager)

DOCUMENT TITLE Date Received: 5/6/08

Phase 3 GMPSuncoast Community High School Replacement

Riviera Beach, FLPhase 3 Site Package Specifications List

END OF SECTION

4.

Page 29: Suncoast GMP Phase 3 - 10-31-08 November... · Project No. 0151-7511 Revised GMP Proposal ... Wellington Williams 8 66.99 535.92 (Asst. Project Manager ... (Assistant Project Manager)

SUNCOAST HIGH SCHOOL REPLACEMENT RIVIERA BEACH, FLORIDA

GMP PHASE 3

5. MWBE

Page 30: Suncoast GMP Phase 3 - 10-31-08 November... · Project No. 0151-7511 Revised GMP Proposal ... Wellington Williams 8 66.99 535.92 (Asst. Project Manager ... (Assistant Project Manager)

PR

OJE

CT

NA

ME

:S

UN

CO

AS

T H

IGH

SC

HO

OL

PR

OJE

CT

NO

:01

51-7

511

AP

PR

OV

ED

GM

P A

MO

UN

T FO

R P

HA

SE

:$1

3,33

9,55

2

ITE

M #

CO

ST

(AC

TUA

L)B

UD

GE

T(E

ST.

CO

ST)

SU

BC

ON

TRA

CTO

RN

AM

E

M/W

BE

(YE

SO

R N

O)

$A

MO

UN

T%

143

,846

Nat

iona

l Ren

tal F

ence

NO

00.

00%

23,

536,

942

J.W

. Che

atam

N

O

0

0.0

0%3

341,

046

OC

Unl

imite

d

YE

S

34

1,04

6

100

.00%

454

,875

Pap

ico

NO

00.

00%

595

8,79

9A

razo

za B

roth

ers

NO

00.

00%

683

9,42

5Tr

opic

Fen

ceY

ES

839,

425

100.

00%

796

9,44

7Tr

inity

Man

agem

ent

Y

ES

9

69,4

47

10

0.00

%8

193,

410 t

ALL

PH

AS

ES

Y

ES

1

93,4

10

10

0.00

%9

79,4

53H

MB

Ste

elN

O0

0.00

%10

5,98

8C

aym

on C

asew

ork

NO

00.

00%

1110

,923

Met

ro C

aulk

ing

NO

00.

00%

1210

0,24

6C

row

ther

Roo

fing

NO

00.

00%

1379

,460

Cyn

amon

Bro

ther

sN

O0

0.00

%14

25,8

39D

oor S

yste

ms

NO

00.

00%

1522

,591

Sup

erio

r Win

dow

sN

O0

0.00

%16

146,

900

D&

D Q

ualit

y C

onst

ruct

ors

YE

S14

6,90

010

0.00

%17

2,21

1Za

hario

n's

Floo

ring

YE

S2,

211

100.

00%

1879

,152

Adv

ance

d P

aint

ing

NO

00.

00%

1951

,050

Lots

peic

hN

O0

0.00

%20

4,94

0P

ole-

Tech

NO

00.

00%

2123

,335

LMS

Sig

nsN

O0

0.00

%22

39,7

93B

aron

Sig

nY

ES

39,7

9310

0.00

%23

1,93

0Tr

iang

le F

ireN

O0

0.00

%24

89,2

91A

mer

ican

Wal

kway

NO

00.

00%

254,

390

Lots

peic

hN

O0

0.00

%26

22,5

60Lo

tspe

ich

NO

00.

00%

Alu

min

um W

alkw

ay C

over

sM

etal

She

lvin

gTo

ilet &

Bat

h A

cces

sorie

s

Tem

pora

ry C

onst

ruct

ion

Fenc

ing

Ear

thw

ork

Flag

pole

s

Rol

ling

Cou

nter

Fill

and

Roc

k

Uni

t Mas

onry

Sys

tem

Stru

ctur

al S

teel

Cus

tom

Cas

ewor

k

Site

Impr

ovem

ents

& S

urfa

cing

Und

ergr

ound

Irrig

atio

n S

yste

m

Sub

ject

to A

gree

men

t with

the

Con

stru

ctio

n M

anag

er, t

he S

ubco

ntra

ctor

firm

s lis

ted

belo

w w

ill p

artic

cipa

te in

this

pro

ject

for t

he C

ontra

ct (T

rade

) ite

ms

and

the

dolla

r am

ount

s sh

own.

Sub

cont

ract

ors

repr

esen

ted

as M

/WB

E C

erifi

ed a

re a

ccor

ding

to re

quire

men

ts e

stab

lised

in th

e P

ropo

sal D

ocum

ents

. Atta

ch a

cop

y of

the

Cer

tific

atio

n fo

r eac

h S

ubco

ntra

ctor

list

ed.

DE

SC

RIP

TIO

N

EXH

IBIT

S

PRO

JEC

T N

AM

E: S

UN

CO

AST

HIG

H S

CH

OO

LPR

OJE

CT

NO

: 015

1-75

11SU

BC

ON

TRA

CTO

R'S

MIN

OR

ITY

PAR

TIC

IPA

TIO

N

PHA

SE 3

GM

P

Cha

in L

ink

Fenc

ing

Cas

t-in-

Pla

ce C

oncr

ete

Illum

inat

ed E

xter

ior S

igna

ge

Flui

d A

pplie

d W

ater

proo

fing

Gyp

sum

Boa

rd S

yste

ms

Pai

ntin

g

Mod

ified

Bitu

men

Roo

fing

Sys

tem

Hol

low

Met

al F

ram

es

Iden

tifyi

ng D

evic

es

Alu

min

um W

indo

ws

Res

ilien

t Flo

orin

g

Toile

t Com

partm

ents

, Urin

al S

cree

ns, S

how

er C

ubic

les

Fire

Ext

ingu

ishe

rs, C

abin

ets

& A

cces

sorie

s

5a.

Page 31: Suncoast GMP Phase 3 - 10-31-08 November... · Project No. 0151-7511 Revised GMP Proposal ... Wellington Williams 8 66.99 535.92 (Asst. Project Manager ... (Assistant Project Manager)
Page 32: Suncoast GMP Phase 3 - 10-31-08 November... · Project No. 0151-7511 Revised GMP Proposal ... Wellington Williams 8 66.99 535.92 (Asst. Project Manager ... (Assistant Project Manager)

Mechanical Farmer & Irwin Steve Irwin CMC12496233300 Avenue KWest Palm Beach, FL 33401

Plumbing Wilbur Plumbing Wesley W. Oldham RF00670791312 Commerce LaneSuite 1AJupiter, FL 33458

HVAC Thermal Concepts John Satterfield CAC0396212201 College Ave.Davie, FL 33317

Roofing Crowther Roofing Lee Crowther, Jr. CCC036985 / CCC0398222543 Rockfill RoadFort Myers, FL 33916

Concrete Trinity Management Jennifer Poteroff CGC15040602945 West Midway RdFort Pierce, FL 34981772-464-8160

Structural Incl. in Concrete

EXHIBIT S

LIST OF MAJOR SUBCONTRACTORS

PROJECT NAME: SUNCOAST HIGH SCHOOL REPLACEMENTPROJECT NO. 0151-7511

PHASE 3 GMP

Corporate Name and Address Principal or Officer's NameDivision of Work License Number

5b.

Page 33: Suncoast GMP Phase 3 - 10-31-08 November... · Project No. 0151-7511 Revised GMP Proposal ... Wellington Williams 8 66.99 535.92 (Asst. Project Manager ... (Assistant Project Manager)
Page 34: Suncoast GMP Phase 3 - 10-31-08 November... · Project No. 0151-7511 Revised GMP Proposal ... Wellington Williams 8 66.99 535.92 (Asst. Project Manager ... (Assistant Project Manager)
Page 35: Suncoast GMP Phase 3 - 10-31-08 November... · Project No. 0151-7511 Revised GMP Proposal ... Wellington Williams 8 66.99 535.92 (Asst. Project Manager ... (Assistant Project Manager)
Page 36: Suncoast GMP Phase 3 - 10-31-08 November... · Project No. 0151-7511 Revised GMP Proposal ... Wellington Williams 8 66.99 535.92 (Asst. Project Manager ... (Assistant Project Manager)
Page 37: Suncoast GMP Phase 3 - 10-31-08 November... · Project No. 0151-7511 Revised GMP Proposal ... Wellington Williams 8 66.99 535.92 (Asst. Project Manager ... (Assistant Project Manager)
Page 38: Suncoast GMP Phase 3 - 10-31-08 November... · Project No. 0151-7511 Revised GMP Proposal ... Wellington Williams 8 66.99 535.92 (Asst. Project Manager ... (Assistant Project Manager)
Page 39: Suncoast GMP Phase 3 - 10-31-08 November... · Project No. 0151-7511 Revised GMP Proposal ... Wellington Williams 8 66.99 535.92 (Asst. Project Manager ... (Assistant Project Manager)
Page 40: Suncoast GMP Phase 3 - 10-31-08 November... · Project No. 0151-7511 Revised GMP Proposal ... Wellington Williams 8 66.99 535.92 (Asst. Project Manager ... (Assistant Project Manager)
Page 41: Suncoast GMP Phase 3 - 10-31-08 November... · Project No. 0151-7511 Revised GMP Proposal ... Wellington Williams 8 66.99 535.92 (Asst. Project Manager ... (Assistant Project Manager)
Page 42: Suncoast GMP Phase 3 - 10-31-08 November... · Project No. 0151-7511 Revised GMP Proposal ... Wellington Williams 8 66.99 535.92 (Asst. Project Manager ... (Assistant Project Manager)
Page 43: Suncoast GMP Phase 3 - 10-31-08 November... · Project No. 0151-7511 Revised GMP Proposal ... Wellington Williams 8 66.99 535.92 (Asst. Project Manager ... (Assistant Project Manager)
Page 44: Suncoast GMP Phase 3 - 10-31-08 November... · Project No. 0151-7511 Revised GMP Proposal ... Wellington Williams 8 66.99 535.92 (Asst. Project Manager ... (Assistant Project Manager)
Page 45: Suncoast GMP Phase 3 - 10-31-08 November... · Project No. 0151-7511 Revised GMP Proposal ... Wellington Williams 8 66.99 535.92 (Asst. Project Manager ... (Assistant Project Manager)
Page 46: Suncoast GMP Phase 3 - 10-31-08 November... · Project No. 0151-7511 Revised GMP Proposal ... Wellington Williams 8 66.99 535.92 (Asst. Project Manager ... (Assistant Project Manager)
Page 47: Suncoast GMP Phase 3 - 10-31-08 November... · Project No. 0151-7511 Revised GMP Proposal ... Wellington Williams 8 66.99 535.92 (Asst. Project Manager ... (Assistant Project Manager)
Page 48: Suncoast GMP Phase 3 - 10-31-08 November... · Project No. 0151-7511 Revised GMP Proposal ... Wellington Williams 8 66.99 535.92 (Asst. Project Manager ... (Assistant Project Manager)
Page 49: Suncoast GMP Phase 3 - 10-31-08 November... · Project No. 0151-7511 Revised GMP Proposal ... Wellington Williams 8 66.99 535.92 (Asst. Project Manager ... (Assistant Project Manager)
Page 50: Suncoast GMP Phase 3 - 10-31-08 November... · Project No. 0151-7511 Revised GMP Proposal ... Wellington Williams 8 66.99 535.92 (Asst. Project Manager ... (Assistant Project Manager)

PR

OJE

CT

NA

ME

CO

NTR

AC

TOR

'S N

AM

E

PBSD

152

8 (R

EV. 9

/9/2

005)

Orig

inal

- O

ffice

of D

iver

sity

in B

usin

ess

Prac

tices

C

OPY

- C

onst

ruct

ion

Dep

artm

ent

page

2 o

f 2

23.

FEDE

RAL

IDNU

MBER

24.

SUBC

ONTR

ACTO

R/ S

UB-C

ONSU

LTAN

T NA

ME25

.MI

NORI

TYST

ATUS

26. W

ORK

DESC

RIPT

ION

27.

AMOU

N T F

ORPR

OJEC

T

28. A

MOUN

TDR

AWN

THIS

MONT

H

29.

TOTA

L PA

ID T

ODA

TE30

. ACT

UAL

STAR

T DA

TE31

.SC

HEDU

LED

COM-

DATE

Sunc

oast

Hig

hSc

hool

Rep

lace

men

tSu

ffol

kC

onst

ruct

ion,

Inc.

Cro

wth

erR

oofin

gN

Roo

fing

100,

246

Cyn

amon

Bro

ther

sN

Doo

rsan

dH

ardw

are

79,4

60

Doo

rSys

tem

sN

Rol

ling

Doo

rs25

,839

Supe

riorW

indo

ws

NA

lum

inum

Win

dow

s22

,591

D&

DQ

ualit

yC

ouns

truct

ors

DD

ryw

alla

ndSt

ucco

146,

900

Zaha

rion'

sFlo

orin

gI

Res

ilien

tFlo

orin

g2,

211

Adv

ance

dPa

intin

gN

Pain

ting

79,1

52

Lots

peic

hN

Toile

tCom

partm

ents

&A

cc.

51,0

50

Pole

-Tec

hN

Flag

pole

s4,

940

LMS

Sign

sN

Iden

tifyi

ngD

evic

es23

,335

Bar

onSi

gnI

Illum

inat

edEx

terio

rSig

nage

39,7

93

Tria

ngle

Fire

NFi

reEx

tingu

ishe

rs,C

abin

ets&

Acc

.1,

930

Am

eric

anW

alkw

ayN

Alu

min

umW

alkw

ayC

over

s89

,291

Lots

peic

hN

Met

alSh

elvi

ng4,

390

Papi

coN

Ath

letic

&R

ecre

atio

nalE

quip

men

t13

6,79

0

Sout

hern

Ble

ache

rN

Ble

ache

rSea

ting

&Pr

essB

ox91

2,39

9

Thys

senK

rupp

NEl

evat

ors

64,0

36

Wilb

urPl

umbi

ngN

Plum

bing

278,

831

Ther

mal

Con

cpet

sN

HV

AC

130,

155

Dav

coEl

ectri

cN

Elec

trica

l2,

224,

600

Page 51: Suncoast GMP Phase 3 - 10-31-08 November... · Project No. 0151-7511 Revised GMP Proposal ... Wellington Williams 8 66.99 535.92 (Asst. Project Manager ... (Assistant Project Manager)

INST

RU

CTI

ON

S

1.N

ame

of P

roje

ct.

Scho

ol D

istri

ct P

roje

ct N

umbe

r.2.

27.

List

pro

ject

tota

l for

eac

h su

bcon

tract

or /s

ub-c

onsu

ltant

.Ap

plic

atio

n N

umbe

r - fr

om A

IA d

ocum

ent G

702

or fr

om p

roje

ct m

anag

er.

3.

28.

4.

29.

5.

30.

Star

t dat

e fo

r eac

h su

bcon

tract

or/ s

ub-c

onsu

ltant

.6.

31.

Sche

dule

d co

mpl

etio

n da

te fo

r eac

h su

bcon

tract

or/ s

ub-c

onsu

ltant

.7. 8.

9-10

.

11-1

4.

NO

TES:

All 1

528

Form

s m

ust b

e su

bmitt

ed w

ith e

very

pay

app

licat

ion.

1.

15.-1

7 .Am

ount

of c

ontra

ct in

clud

ing

base

bid

, cha

nge

orde

rs, a

nd e

xerc

ised

alte

rnat

ives

.

2.

18.

Perc

enta

ge o

f min

ority

par

ticip

atio

n to

dat

e.

19.

You

shou

ld s

ubm

it th

e pa

rtial

rele

ase

of li

ens

with

the

draw

appl

icat

ion.

20.

The

tota

l am

ount

dra

wn

on th

is p

roje

ct s

ince

it c

omm

ence

d.

Perc

enta

ge o

f pro

ject

com

plet

ed to

this

dat

e.

21.

22.

Busi

ness

nam

e of

sub

cont

ract

or/ s

ub-c

onsu

ltant

.24

.

Subc

ontra

ctor

's/ s

ub-c

onsu

ltant

's m

inor

ity s

tatu

s.25

.

A =

Blac

k M

ale

F =

Indi

an/A

lask

an F

emal

eB

= Bl

ack

Fem

ale

G =

Asi

an M

ale

C =

His

pani

c M

ale

H =

Asi

an F

emal

eD

= H

ispa

nic

Fem

ale

I = W

hite

Fem

ale

E =

Indi

an/A

lask

an M

ale

26.

Brie

f des

crip

tion

of w

ork

each

sub

will

per

form

. (R

oofin

g, H

VA

C,

trash

rem

oval

, con

sulti

ng, e

tc.)

Prim

e co

ntra

ctor

's p

hone

and

fax

num

bers

.

The

tota

l of t

his

draw

as

auth

oriz

ed o

n th

e AI

A do

cum

ent G

702.

Proj

ect M

anag

er's

nam

e, p

hone

, and

fax

num

ber.

Prim

e co

ntra

ctor

's m

ailin

g ad

dres

s.

Appl

icat

ion

date

is s

ame

date

as

on d

raw

app

licat

ion.

Rep

ortin

g Pe

riod

- fro

m A

IA d

ocum

ent G

702

"Per

iod

to".

Min

ority

Goa

l as

set b

y th

e Sc

hool

Dis

trict

for t

his

proj

ect.

Sche

dule

d co

mpl

etio

n da

te fo

r thi

s pr

ojec

t.

Busi

ness

nam

e of

prim

e co

ntra

ctor

.

This

mon

th's

dra

w a

mou

nt fo

r eac

h su

bcon

tract

or/ s

ub-c

onsu

ltant

.

To d

ate

tota

l pai

d to

eac

h su

bcon

tract

or/ s

ub-c

onsu

ltant

.

3.Yo

u sh

ould

hav

e a

copy

of t

he m

inor

ity c

ertif

icat

ion

for e

very

certi

fied

min

ority

sub

cont

ract

or/ s

ub-c

onsu

ltant

on

the

job.

N =

Non

-min

ority

4.Th

is fo

rm m

ust b

e no

tariz

ed.

Fede

ral I

dent

ifica

tion

Num

ber

23.

Page 52: Suncoast GMP Phase 3 - 10-31-08 November... · Project No. 0151-7511 Revised GMP Proposal ... Wellington Williams 8 66.99 535.92 (Asst. Project Manager ... (Assistant Project Manager)

SUNCOAST HIGH SCHOOL REPLACEMENT RIVIERA BEACH, FLORIDA

GMP PHASE 3

6. SCHEDULE

Page 53: Suncoast GMP Phase 3 - 10-31-08 November... · Project No. 0151-7511 Revised GMP Proposal ... Wellington Williams 8 66.99 535.92 (Asst. Project Manager ... (Assistant Project Manager)

���

�����

��

����

���

���

� ���

��

����

��

���

���

����

���

����

����

����

���

���

���

���

��

��

��!!

#$���

%�%���

&�%

�*���

%�%�%����

%��

+:�

;�

!#<�

>?

!@!

���

!!K!

�*���

%�%�%����

%�>

%�Q

X�������%

+>�

����

<#Z[

#<�

>?

!@!<

\��

#!!

���

!!K]

�*���

%�%�%�

QX�������%

+>�

����

>�

!!<

\��

#!!

���

!!�#

���%

+>�

����

>�

%�%�

*���

%�!

#^\��

#!!

��

��

�%

%�%�

���

_���

%�

���

��

��!#

!!��

�X

+%�

>%>

X����

%����

%�>

%�

%�&

>��

&�`

%�%�

*���

%�!

KZ\Q!

Z�

���

!#!]

�Q

&?�

`%q

%&�������

;%�

>�

%X>

&��

;�

%�%�

*���

%�KK

�!\Q!

Z�K@�

Q;

!Z�

���

!##!

+�?�

%����;�

%�%�

*���

%�@]

K^�

Q;

!Z�

#]��

`!@�

���

!##]

#!!{

%+>���&

Q+��

>�

%�>

+Q�����

%�%�

*���

%�#$

$K^�

Q;

!Z�

#]��

`!@�

���

!#K!

��

�X

+%X

Q����

;%��

��|���

%#!!

{%&�

?���

%�%�

*���

%�KK

#$��

`!@�

#$\Q�

!@�

���

!#K]

;�

�%X�����

;%#

!!{

%�>

+��

%�%�

*���

%��K

#$��

`!@�

K!\Q�

!@�

���

!#�]

�+

+�%�

%�&�

��

&�

%;�

�%��

+:�

;�

%�%�

*���

%�@

K�\Q�

!@�

!K\Q!

@�

���

!#�!

&��

�>��

%�>

%��

�X

+%+

>������

%�%#!

!{%�%

�*���

%�<

!�\Q!

@�!^

\Q!

@�

���

!#<!

��

�X

+%&�

?���

|X>�

&�

%;�

�%�

&�

��

&���

>�

%�%�

*���

%�@<

[#!

\Q!

@�!<�

>?

!@!

���

!#<]

��

�X

+%X

>�

&�

%;�

�%�

��

&>

?�%

�%�*���

%�#

!]�

>?

!@!]�

>?

!@!

��

��

�%�

%�%�

���

_���

�K�

!<<!

�����

%������

&`

%����

&#]

KK\��

!^##�

X!^

��

�K�

!<Z]

��

+�

%;&����

%�&�

��

#!#K�

X!^

K]�

X!^

$�

�K�

!<]]

�����

%�&�

%����

K!#K�

X!^

##��

&!^

��

�K�

!<]!

�����

%�>�����

+%����

&%����

%�%�

*���

%�K!

K!��

&!^

#$�

�&

!^KZ

��

��

�%

%�%�

���

_���

%��

��

����

���

��

��!!

!]>

X����

%��

��

%��

&���

%�%�������

%����;���

>�

#��[

K$��

&!@�

�!��

�!@

�K

���

!!#!

��

��

%��

&���

%��

�&

>?��

%�%�������

%����;���

>�

!�!��

�!@

�K

���

!!##

���

%�%�

*���

%�!

#<�

>?

!@!

���

]!!!

�����

>&

:%�%

�*���

%�K]

]#<�

>?

!@#$�

>?

!^!

���

!<$]

�����

%�%��

&?�+�

%+>��

Q��

#!!@��

+!@

#^��

+!@

!

���

!<Z!

���%

q%���

&;�}�

%�&���>

&��

&%~

��

]#]��

+!@

[#^��

+!@

!

���

]!!]

����

%Q�������

%�%�

*���

%�#K

]KK

\��

!^#Z

\Q!

^!

���

]!#!

��>

&�

%�&����

;�

%�%�

*���

%�#!

<!]�

X!^

!#\Q!

^!

���

]!#]

X�

;��

%q%������

%�%�

*���

%�#^

K#Z�

X!^

#$�

>?

!^!

���

]!K!

��

&:��

;%

>��

%q%&

>���

%�%�

*���

%�#K

@#Z�

�&

!^#$

>+�!

^KZ

���

]!K]

X�

%����

%�%�

*���

%�#<

^#Z�

�&

!^#$�

>?

!^!

����

����

����

����

����

����

���

%�%�

���

�%��

��

�%

%�%�

���

%����

��

��

��

�%

%�%��

��

%��

%���

���

���

��%��

��

����

��

��

�%

%�%���

���

���

��%��

��

�����

���

��%��

��

�����

�%�%��

��

�%

����

%��

%��

����

%���

��%��

%���

%����

��

��%�%��

��

�%

���

��

%!%�

��

���

���

%��

��%���

���

�%�%��

��

�%

��

��%

��

���

%�%��

��

�%

���"

%��

��

����

���

�%���

��

���

%�%��

��

�%

����

%��

��

���

%��

�#�

����

%���"

%��

��_

%�%��

��

�%

���

%��

���

%���"

%��

��%�%��

��

�%

���

�%�%��

��

��

�%�

��

%����

��

�%�%��

��

�%

��

���

%��

%����

%��

��

��

��%�%���"

%�%��

��

�%

����

%��

��_#��

��

%�

��

%��

��

��

����

�%�%��

��

�%

����

%��

��

%�

��

%�����

��%�%��

��

�%

���

����

%��

���

���

%��

_��

����

�%��

��

��

%��

��

���

����

%���

�%�

���

���

����

%�

��

����

%_�

���

%��

��%�%��

��

�%

��

����

%��_

%���

���

%�%_

���

��

%���

���

���

��_

%���

���

%�����

%�%_

���

��

%���

���

���

���

%�%��

��

�%

���

�_���

%�%��

��

�%

���

����

%��

�%�

��

���

%��

��

��

��

�%!

%��

���

�$�

%��

��

���

��

��

%%��

�&

���

�%�

����

���

�%�%��

��

�%

���

��

%�

���

��

�%�%��

��

�%

���

��%!

%���

�%�%��

��

�%

����

���

%��

��%!

%��

�%�%��

��

�%

��

��%�

���

�%�%��

��

�%

�%�'(�

)*+')%�,-.+

�-�

%�/0�

�.)'.%�).+

K#�

Q;

!$(/(-1

%�).+

#^\��

#!�).)%�).+

K@�

Q;

!@&2/

%�).+

K#>

+�!

@%#]

�<Z

�)'3,

%X)'

�'4

�'+--%

X)'

+'(.(0)3

%�0.(*(.,

�*�

��

���

��%��

��

����

���

�%��56%

���5

��

���

��

�%�

���

%�����

��

��

%��

��

�%

%��

��

����

���

�%����1++.

%#%4

�%K

��

��

�%

���

Page 54: Suncoast GMP Phase 3 - 10-31-08 November... · Project No. 0151-7511 Revised GMP Proposal ... Wellington Williams 8 66.99 535.92 (Asst. Project Manager ... (Assistant Project Manager)

���

�����

��

����

���

���

� ���

��

����

��

���

���

����

���

����

����

����

���

���

���

]!�!

����

%q%�

�>

&�%�

;*���

;%�%

�*���

%�$�

#<\Q!

^!^

>+�!

^!

���

]!�]

��

`%+

>Q

&��

%q%�

&�

+:

%�%�

*���

%�$$

##�

Q;

!^##�

>?

!^^

���

]!<!

�&&�;���

>�

�%�>�

%q%����

+�

���

;%�%

�*���

%�Z]

##�

Q;

!^K<�

>?

!^!

���

]!<]

��

+��

;%q

%X�

+:��>

��

%�%�

*���

%�<<

#@��

�!^

#@�

>?

!^<

���

]!]!

��;��

;�

%q%��&����

;%�%

�*���

%�K#

#]>

+�!

^#K�

>?

!^@

���

]!]]

�Q�

+*���%

�%�*���

%�K<

K]�

>?

!^�#��

+!^

!

���

]!$!

�+>

%�%�

*���

%�#

!<\��

#!!<

\��

#!!

�&

�#]��

�&�

��

&�

%�Q

X������

%�%�

&�

%�����

#!#��

X!@�

#��

X!@�

�&

�!KX

#�

&�

��

&�

%X��

%�:

;%�%�����

>&

:%�

QX

%�%�

*���

%�#!

!]��

`!@�

K!��

`!@�

�&

�!KX

K�

>�

+��

%X���

%�%�����

>&

:%�

QX

%�%�

*���

%�K<

K#��

`!@�

!@��

�!@

##�

�&

�#]�

X�

��

&>

?�

%�Q

X������

%�%�

&�

%�����

#]K@�

Q;

!@#Z��

�!@

#K#

�&

�!KX

�&�

?���

%X���

%q%���

&�

%�%�����

>&

:%�

QX

%�%�

*���

%�#!

!^��

�!@

KK��

�!@

##�

�&

�#]�

+�

X&�+���

%�%�

&�

%�����

#!#@��

�!@

!#>

+�!

@#K

#

�&

�!K�

����

&�

%�%����

+�

��

%q%�&

&�;���

>�

%�Q

X%�

|�����

>&

:#

K���

�!@

K���

�!@

#^@

�&

�!K�

@�

>X��}�

%�%����

+�

��

%q%�&

&�;���

>�

%�%�

QX

�K<��

�!@

K$��

�!@

KK!

�&

�!K�

<�

&�

��

&�

%�Q

X������

%�%����

+�

��

%q%�&

&�;���

>�

#!K<��

�!@

!Z>

+�!

@#^

@

�&

�!K�

]�

��

&>

?�

%�Q

X������

%�%����

+�

��

%q%�&

&�;���

>�

#]!@

>+�!

@K@

>+�!

@#^

@

�&

�!KX

@�

>X��}�

%�%�����

>&

:%�

QX

%�%�

*���

%��

#^\��

!^K#

\��

!^��

�&

�#]��

���

?�

&%�%�

&�

%�����

�!^�

X!^

##�

X!^

��

����

����

����

����

����

����

���

�%!

%����

�%����

����

%�%��

��

�%

����

%����

��%!

%��

���

%�%��

��

�%

���

���

���

�6%��

%!

%��

��

��

���

%�%��

��

�%

����

���

%!%�

���

���

��

%�%��

��

�%

���

���

�%!

%���

�����

%�%��

��

�%

��

���

���

�%�%��

��

�%

���

%�%��

��

�%

��

��

��

�%���

���

����

%�%���

�%�

���

��

��

��

�%�

�%���

%�%�

���

_���

%���

%�%��

��

�%

��

���

��%�

��

%�%�

���

_���

%���

%�%��

��

�%

�����

�%���

���

����

%�%���

�%�

���

��

��_

%��

�%!

%�_

��

%�%

���

�_���

%���

%�%��

��

�%

����

���

��%�%

���

�%�

���

�_

��

%�%

���

��

��

�%!

%���

���

���

�%���

%_#�

���

_���

���

���$

�%�%

���

��

��

�%!

%���

���

���

�%�%

���

��

��

��

�%���

���

����

%�%��

��

��

�%!

%���

���

���

�����

�%���

���

����

%�%��

��

��

�%!

%���

���

���

���

���$

�%�%

���

�_���

%���

%�%��

��

�%

��

��

%�%���

�%�

���

�%�'(�

)*+')%�,-.+

�-�

%�/0�

�.)'.%�).+

K#�

Q;

!$(/(-1

%�).+

#^\��

#!�).)%�).+

K@�

Q;

!@&2/

%�).+

K#>

+�!

@%#]

�<Z

�)'3,

%X)'

�'4

�'+--%

X)'

+'(.(0)3

%�0.(*(.,

�*�

��

���

��%��

��

����

���

�%��56%

���5

��

���

��

�%�

���

%�����

��

��

%��

��

�%

%��

��

����

���

�%����1++.

%K%4

�%K

��

��

�%

���