Obj ect i ve of

• To produce products conforming to predetermined specification• To produce Product of consistent

quality• To minimize contamination

Page 3: Gmp presentation
Page 4: Gmp presentation

Regul at or y Agenci es |

The United States Food and Drug Administration

European Directorate of Quality Medicines

International Conference on Harmonization. This consist of EU, US and Japan .

Page 5: Gmp presentation

I CH Modul es

Q1 - Stability testing

Q2 – Validation of Analytical ProceduresQ3 – ImpuritiesQ4 – Evaluation – Pharmacopoeia Texts

Q5 – Biotechnology ProductsQ6 – Specifications

Q7 – Good Manufacturing PracticesQ8 – Pharmaceutical DevelopmentQ9 – Quality Risk ManagementQ10 – Pharmaceutical Quality System

Page 6: Gmp presentation

PrinciplesQuality should be the responsibility of all persons involved in manufacturing.

Responsibil i t ies of the Quality Unit(s)involved in all quality-related matters.

review and approve

Establishing a system to release packaging and labeling materials

Internal Audits (Self Inspection)Regular internal audits should be performed in accordance with an approved schedule.

Performing product quality reviews

Document audit findings and corrective actionsAgreed corrective actions should be completed in a timely and effective manner.

Page 7: Gmp presentation

Responsibil i ty for Production Activit ies

new and, when appropriate, modified facilities and equipment are qualified.

production facilities are clean and when appropriate disinfected

The responsibility for production activities should be described in writing

All deviations are reported and critical deviations are investigated and the conclusions recorded

the necessary calibrations are performed and records kept

validation protocols and reports are reviewed and approved

Product Quality ReviewRegular quality reviews of APIs should be conducted with the objective of verifying the consistency of the process.

Page 8: Gmp presentation

Personnel Qualif icationsThere should be an adequate number of personnel qualified by appropriate education, training and/or experience to perform and supervise the manufacture of intermediates and APIs.

Personnel Hygiene

Consultants should have sufficient education, training, and experience, or any combination thereof, to advise on the subject

Consultants

should practice good sanitation and health habits.

should avoid direct contact with intermediates or APIs.

Personnel suffering from an infectious disease or having open lesions on the exposed surface of the body should not engage in activities that could result in compromising the quality of APIs.

Page 9: Gmp presentation

Buildings and faci l i t ies should be:Located, Designed, and Constructed to facilitate cleaning, maintenance, and operations as appropriate to the type and stage of manufacture

Uti l i t ies should be:

minimize potential contamination.

designed to limit exposure to objectionable microbiological contaminants

Qualified and appropriately monitored

action should be taken when limits are exceeded..

Drawings for these utility systems should be available

Water should be:Water used in the manufacture of APIs should be demonstrated to be suitable for its intended use.

Page 10: Gmp presentation

ContainmentDedicated production areas, air handling equipment and/or process equipment, should be employed in the production of highly sensitizing materials, such as penicillins or cephalosporins.

Lighting should be:Adequate lighting should be provided in all areas to facilitate cleaning, maintenance, and proper operations.

disposed of in a safe, timely, and sanitary manner. Containers and/or pipes for waste material should be clearly identified.

Sewage should be:

Buildings should be properly maintained and repaired and kept in a clean condition and establish written procedures

Sanitat ion and Maintenance:

Page 11: Gmp presentation

Design and ConstructionEquipment should be of appropriate design and adequate size, and suitably located for its intended use

Equipment Maintenance and Cleaning

preventative maintenance of equipment.

Cleaning procedures should contain sufficient details to clean each type of equipment in a reproducible and effective mannerEquipment should be identified as to its contents and its cleanliness status

Written procedures should be established

Acceptance criteria should be defined and justified.

Page 12: Gmp presentation

CalibrationControl, weighing, measuring, monitoring and test equipment that is critical for assuring the quality of intermediates or APIs should be calibrated according to written procedures and an established schedule.

Computerized Systems

installation qualification and operational qualification should demonstrate the suitability to perform assigned tasksComputerized systems should have sufficient controls to prevent unauthorized access or changes to data.

GMP related computerized systems should be validated

Changes to the computerized system should be made according to a change procedure

If system breakdowns or failures would result in the permanent loss of records, a back-up system should be provided.

Page 13: Gmp presentation

Documentation System and Specif ications All documents related to the manufacture of intermediates or APIs should be prepared, reviewed, approved and distributed according to written procedures. Such documents can be in paper or electronic form.

Equipment Cleaning and Use RecordRecords of major equipment use, cleaning, sanitization and/or sterilization and maintenance should show the date, time (if appropriate), product, and batch number of each batch processed in the equipment, and the person who performed the cleaning and maintenance.

Records should be maintained including: name, identity, quantity; name of the supplier; supplier's control number(s), the number allocated on receipt & date of receipt;

Raw Material Records

Master (approved) labels should be maintained for comparison to issued labels.

Page 14: Gmp presentation

Master Production and Control Records) To ensure uniformity from batch to batch, master production instructions for each intermediate and API should be prepared, dated, and signed by one person and independently checked, dated, and signed by a person in the quality unit(s).

Batch Production and Control Records) Batch production records should include complete information relating to the production and control of each batch.

Documentation of completion of each significant step in the batch production

Laboratory Control RecordsLaboratory control records should include complete data derived from all tests conducted to ensure compliance with established specifications and standards, including examinations and assays,

These records should be numbered with a unique batch or identification number, dated and signed when issued.

Page 15: Gmp presentation

General Controls There should be written procedures describing the receipt, identification, quarantine, storage, handling, sampling, testing, and approval or rejection of materials.

Receipt and Quarantine

should have a system for evaluating the suppliers of critical materials.

each container or grouping of containers of materials should be examined visually

Changing the source of supply of critical raw materials should be treated according to Change Control.

Materials should be held under quarantine until they have been sampled, examined or tested as appropriate, and released for use.

Each container or grouping of containers (batches) of materials should be assigned and identified with a distinctive code, batch, or receipt number.

Page 16: Gmp presentation

Sampling and TestingSampling should be conducted at defined locations

Re-evaluation

Materials should be handled and stored in a manner to prevent degradation, contamination, and cross-contamination.

Materials should be re-evaluated as appropriate to determine their suitability for use

Rejected materials should be identified and controlled under a quarantine system

Storage

Containers from which samples are withdrawn should be marked to indicate that a sample has been taken.

At least one test to verify the identity of each batch of material should be conducted, A supplier's Certificate of Analysis can be used in place of performing other tests

Page 17: Gmp presentation

Product ion Operations Raw materials for intermediate and API manufacturing should be weighed or measured under appropriate conditions that do not affect their suitability for use.

In-process Sampling and Controls

time limits should be met to ensure the quality of intermediates and APIs

Written procedures should be established to monitor the progress and control the performance of processing

Intermediates held for further processing should be stored under appropriate conditions to ensure their suitability for use.

Time Limits

The processing status of major units of equipment should be indicated either on the individual units of equipment

Materials to be reprocessed or reworked should be appropriately controlled to prevent unauthorized use.

Page 18: Gmp presentation

Product ion Operations Raw materials for intermediate and API manufacturing should be weighed or measured under appropriate conditions that do not affect their suitability for use.

In-process Sampling and Controls

time limits should be met to ensure the quality of intermediates and APIs

Written procedures should be established to monitor the progress and control the performance of processing

Intermediates held for further processing should be stored under appropriate conditions to ensure their suitability for use.

Time Limits

The processing status of major units of equipment should be indicated either on the individual units of equipment

Materials to be reprocessed or reworked should be appropriately controlled to prevent unauthorized use.

Page 19: Gmp presentation

Blending Batches Blending is defined as the process of combining materials within the same specification to produce a homogeneous intermediate or API.

Contamination Control

Precautions to avoid and prevent contamination

Residual materials can be carried over into successive batches of the same intermediate or API if there is adequate control.

Blending processes should be adequately controlled, tested for conformance and documented

The batch record of the blending process should allow traceability back to the individual batches that make up the blend.

Page 20: Gmp presentation

GeneralPackaging and labelling materials should conform to established specifications.

Packaging Materials

If containers are re-used, they should be cleaned in accordance with documented procedures

Containers should be clean, provide adequate protection against deterioration or contamination

Records should be maintained for each shipment of labels and packaging materials

Label Issuance and ControlAccess to the label storage areas should be limited to authorised personnel.Obsolete and out-dated labels should be destroyed.

Page 21: Gmp presentation

Packaging and Labell ing Operations

Labels used on containers of intermediates or APIs should indicate the name or identifying code, the batch number of the product, and storage conditions, when such information is critical to assure the quality of intermediate or API.

For intermediates or APIs with a retest date, the retest date should be indicated on the label and/or Certificate of Analysis.

Page 22: Gmp presentation

Warehousing ProceduresFacilities should be available for the storage of all materials under appropriate conditions

Distr ibution Procedures

transported in a manner that does not adversely affect their quality.

APIs and intermediates should only be released for distribution to third parties after they have been released by the quality unit(s).

separate storage areas should be assigned for their temporary storage until the decision as to their future use has been taken.

Special transport or storage conditions for an API or intermediate should be stated on the label.

A system should be in place by which the distribution can be readily determined to permit its recall.

Page 23: Gmp presentation

General Controls adequate laboratory facilities.

Testing of Intermediates and APIs

Any out-of-specification result obtained should be investigated and documented according to a procedure

documented procedures describing sampling, testing, approval or rejection of materials

primary reference standard & Secondary reference standards, reagents and standard solutions

An impurity profile describing the identified and unidentified impurities present should normally be established for each API.

Appropriate microbiological tests should be conducted on each batch

Page 24: Gmp presentation

Validation of Analyt ical Procedures

Cert if icates of Analysis

Authentic Certificates of Analysis should be issued for each batch

The Certificate should list each test performed in accordance with compendial or customer requirements, including the acceptance limits, and the numerical results obtained (if test results are numerical).

Stabil i ty Monitoring of APIs

Expiry and Retest Dating

Reserve/Retention Samples

A documented, on-going testing program should be designed to monitor the stability characteristics of APIs,

API expiry or retest date should be based on an evaluation of data derived from stability studies.

Page 25: Gmp presentation

Validation Policy

Validation Documentation

The critical parameters/attributes should normally be identified during the development stage or from historical data,

Qualif ication

The company's overall policy, intentions, and approach to validation,

A written validation protocol should specify critical process steps and acceptance criteria as well as the type of validation to be conducted

A validation report cross-referencing the validation protocol summarising the results obtained, commenting on any deviations observed, should be prepared

Before starting process validation activities, appropriate qualification of critical equipment and ancillary systems should be completed.

Design Qualification (DQ), Installation Qualification (IQ), Operational Qualification (OQ) & Performance Qualification (PQ)

Page 26: Gmp presentation

Approaches to Process Validation

Process Validation Program

retrospective validation

Periodic Review of Validated Systems

There are three approaches to validation. Process Validation (PV), Prospective validation & Concurrent validation

The number of process runs

Critical process parameters

Process validation should confirm that the impurity profile for each API is within the limits specified.

Systems and processes should be periodically evaluated to verify that they are still operating in a valid manner.

Page 27: Gmp presentation

Cleaning Validation

Validation of Analyt ical Methods

In general, cleaning validation should be directed to situations or process steps where contamination or carryover of materials poses the greatest risk to API quality.

Validation of cleaning procedures should reflect actual equipment usage patterns

cleaning validation protocol

Sampling should include swabbing, rinsing, or alternative methods

Analytical methods should be validated unless the method employed is included in the relevant pharmacopoeia or other recognised standard reference.

Appropriate qualification of analytical equipment

Page 28: Gmp presentation

CHANGE CONTROLchange control system

Any proposals for GMP relevant changes should be drafted, reviewed, and approved

Evaluate potential impact of the proposed change on the quality

When implementing approved changes, measures should be taken to ensure that all documents affected by the changes are revised.

Page 29: Gmp presentation

REJECTION

Intermediates and APIs failing to meet established specifications should be identified as such and quarantined. The final disposition of rejected materials should be recorded.

Introducing back into the process and reprocessing by repeating a crystallization step or other appropriate chemical or physical manipulation steps is generally considered acceptable.

Before a decision is taken to rework batches that do not conform to established standards or specifications, an investigation into the reason for non-conformance should be performed.

REPROCESSING

REWORKING

Page 30: Gmp presentation

All quality related complaints, whether received orally or in writing, should be recorded and investigated according to a written procedure.

The recall procedure should designate who should be involved in evaluating the information, how a recall should be initiated, who should be informed about the recall, and how the recalled material should be treated.

There should be a written procedure that defines the circumstances under which a recall of an intermediate or API should be considered.

Page 31: Gmp presentation

Recovery of Materials and SolventsSolvents can be recovered and reused in the same processes or in different processes,

Returned intermediates or APIs should be identified as such and quarantined.

Records of returned intermediates or APIs should be maintained.

Returns

If the conditions under which returned intermediates or APIs have been stored casts doubt on their quality, the returned intermediates or APIs should be reprocessed, reworked, or destroyed, as appropriate.

Fresh and recovered solvents and reagents can be combined if adequate testing has shown

Solvents can be recovered and reused in the same processes or in different processes,