-- May 2, 1995. APPLICANT: Tennessee Valley Authority (TVA) FACILITY: Watts Bar Nuclear Plant, Unit 1 SUBJECT: MEETING SUMMARY - APRIL 28, 1995, MEETING WITH THE TENNESSEE VALLEY AUTHORITY REGARDING STATUS OF SAFETY ISSUES (TAC M90068) REFERENCE: Meeting notice by P. S. Tam, April 13, 1995 On April 28, 1995, NRC and TVA representatives met in the NRC office in Rockville, Maryland, to discuss the status of various Unresolved Safety Issues (USIs), Generic Safety Issues (GSIs), TMI Issues, and other multi-plant issues applicable to Watts Bar Unit 1. Results of the staff's audit of the status of various issues were provided to TVA by letter (F. Hebdon to 0. D. Kingsley) dated February 23, 1995. Enclosure 1 is the list of participants. Enclosures 2 and 3 are handout materials provided by TVA and the staff, respectively. These summarize TVA's and the staff's understanding of the status of issues that were identified as open in the February 23, 1995, letter. Participants agreed that in general, and where applicable, the Office of Nuclear Reactor Regulation is responsible for licensing action, TVA for implementation, and Region II for verification of each issue. TVA plans to make an initial response to the staff's letter by May 12, 1995. Original signed by Peter S. Tam, Senior Project Manager Project Directorate II-3 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation Docket Nos. 50-390 Enclosures: 1. 2. 3. Participants list TVA Generic Issues NRC disposition of Task Report 84 open licensing actions cc w/enclosures: See next page DOCUMENT NAME: G:42895MTG.SUM To receive a copy of this document, indicate in the box: "El = Copy with attachment/encLosure "I" = No copy OFFI( NAME DATE "C" = Copy without attachment/enclosure :E PDII-4/LA C PDII-4i9 v I E PDII-4/D C Region II I E BClayton* PTam V ' t FHebdon 44& JJaudon* 05/1 /95 05/ 2.- 95 05/ ^./95 05/1 /95 *see previous concurrence 9505050228 950502 PDR ADOCK 05000390 - -PDR, OFFICIAL RECORD COPY a -. WS En [E71 grn9779 Tv ..

Upload: others

Post on 19-Jul-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Summary of 950428 meeting w/util in Rockville,MD to discuss … · 2012-11-30 · Frederick Hebdon Johns Jaudon Bruce Schofield Peter Tam Everett Whittaker TVA NRC/Region II NRC/NRR/Project

--May 2, 1995.

APPLICANT: Tennessee Valley Authority (TVA)

FACILITY: Watts Bar Nuclear Plant, Unit 1

SUBJECT: MEETING SUMMARY - APRIL 28, 1995, MEETING WITH THE TENNESSEEVALLEY AUTHORITY REGARDING STATUS OF SAFETY ISSUES (TAC M90068)

REFERENCE: Meeting notice by P. S. Tam, April 13, 1995

On April 28, 1995, NRC and TVA representatives met in the NRC office inRockville, Maryland, to discuss the status of various Unresolved Safety Issues(USIs), Generic Safety Issues (GSIs), TMI Issues, and other multi-plant issuesapplicable to Watts Bar Unit 1. Results of the staff's audit of the status ofvarious issues were provided to TVA by letter (F. Hebdon to 0. D. Kingsley)dated February 23, 1995. Enclosure 1 is the list of participants.

Enclosures 2 and 3 are handout materials provided by TVA and the staff,respectively. These summarize TVA's and the staff's understanding of thestatus of issues that were identified as open in the February 23, 1995,letter. Participants agreed that in general, and where applicable, the Officeof Nuclear Reactor Regulation is responsible for licensing action, TVA forimplementation, and Region II for verification of each issue. TVA plans tomake an initial response to the staff's letter by May 12, 1995.

Original signed by

Peter S. Tam, Senior Project ManagerProject Directorate II-3Division of Reactor Projects - I/IIOffice of Nuclear Reactor Regulation

Docket Nos. 50-390

Enclosures: 1.2.3.

Participants listTVA Generic IssuesNRC disposition of

Task Report84 open licensing actions

cc w/enclosures: See next page

DOCUMENT NAME: G:42895MTG.SUMTo receive a copy of this document, indicate in the box:"El = Copy with attachment/encLosure "I" = No copy

OFFI(NAMEDATE

"C" = Copy without attachment/enclosure

:E PDII-4/LA C PDII-4i9 v I E PDII-4/D C Region II I EBClayton* PTam V ' t FHebdon 44& JJaudon*05/1 /95 05/ 2.- 95 05/ ^./95 05/1 /95

*see previous concurrence

9505050228 950502PDR ADOCK 05000390

- -PDR,

OFFICIAL RECORD COPY

a -. WS En [E71 grn9779 Tv

..

Page 2: Summary of 950428 meeting w/util in Rockville,MD to discuss … · 2012-11-30 · Frederick Hebdon Johns Jaudon Bruce Schofield Peter Tam Everett Whittaker TVA NRC/Region II NRC/NRR/Project

U0cc:

Mr. Oliver D. Kingsley, Jr.President, TVA Nuclear andChief Nuclear Officer

Tennessee Valley Authority6A Lookout Place1101 Market StreetChattanooga, Tennessee 37402-2801

Mr. 0. J. Zeringue, Sr. Vice PresidentNuclear OperationsTennessee Valley Authority3B Lookout Place1101 Market StreetChattanooga, TN 37402-2801

Dr. Mark 0. Medford, Vice PresidentEngineering & Technical ServicesTennessee Valley Authority3B Lookout Place1101 Market StreetChattanooga, TN 37402-2801

Mr. D. E. Nunn, Vice PresidentNew Plant CompletionTennessee Valley Authority3B Lookout Place1101 Market StreetChattanooga, TN 37402-2801

Mr. J. A. Scalice, Site ViceWatts Bar Nuclear PlantTennessee Valley AuthorityP.O. Box 2000Spring City, TN 37381

General CounselTennessee Valley AuthorityET 11H400 West Summit Hill DriveKnoxville, TN 37902

Mr. P. P. Carier, ManagerCorporate LicensingTennessee Valley Authority4G Blue Ridge1101 Market StreetChattanooga, TN 37402-2801

Mr. B. S. SchofieldSite Licensing ManagerWatts Bar Nuclear PlantTennessee Valley AuthorityP.O. Box 2000Spring City, TN 37381

President

WATTSPO NUCLEAR PLANT

TVA RepresentativeTennessee Valley Authority11921 Rockville PikeSuite 402Rockville, MD 20852

Regional AdministratorU.S. Nuclear RegulatoryRegion II101 MariettaAtlanta, GA

Senior ResideWatts Bar NucU.S. Nuclear1260 NuclearSpring City,

Commission

Street, NW., Suite 290030323

znt Inspectorgear PlantRegulatory CommissionPlant RoadTN 37381

The Honorable Robert AikmanCounty ExecutiveRhea County CourthouseDayton, TN 37321

The Honorable Garland LanksfordCounty ExecutiveMeigs County CourthouseDecatur, TN 37322

Mr. Michael H. Mobley, DirectorDivision of Radiological Health3rd Floor, L and C Annex401 Church StreetNashville, TN 37243-1532

Ms. Danielle DroitschEnergy ProjectThe Foundation for

Global SustainabilityP.O. Box 1101Knoxville, TN 37901

Mr. Bill HarrisRoute 1, Box 26Ten Mile, TN 37880

Ms. Beth Zilbert, Energy CampaignerGreenpeace20 13th Street, NE.Atlanta, GA 30309

Page 3: Summary of 950428 meeting w/util in Rockville,MD to discuss … · 2012-11-30 · Frederick Hebdon Johns Jaudon Bruce Schofield Peter Tam Everett Whittaker TVA NRC/Region II NRC/NRR/Project

U U0

LIST OF PARTICIPANTS

MEETING ON WATTS BAR UNIT 1. SAFETY ISSUES STATUS

NRE OFFICE. ROCKVILLE. MARYLAND

APRIL 28. 1995

Affiliation

Raul R. BaronJoe BradyFrederick HebdonJohns JaudonBruce SchofieldPeter TamEverett Whittaker

TVANRC/Region IINRC/NRR/Project Directorate II-4NRC/Region IITVA/Watts Bar Site LicensingNRC/NRR/Project Directorate II-4TVA/Watts Bar Site Licensing

Enclosure 1

Name

Page 4: Summary of 950428 meeting w/util in Rockville,MD to discuss … · 2012-11-30 · Frederick Hebdon Johns Jaudon Bruce Schofield Peter Tam Everett Whittaker TVA NRC/Region II NRC/NRR/Project

Generic Issues Task Report

II TIAI I.A.1.I.1 _Il-_-

STAi.A.1.1.2 -- 11

Vl STAI.|:A. ' ' 3 -| -

~~LI - Shift Supv RespI . . -1.2

Shift Manning

Il.A. 1.3.1- 11 _ _ __ _ _ __ _

Shift Manning

I. A. 1. 3.2 -||

RO/SRO Training &Iuals

I. A. 2. 1. 1RO/SRO Training &

| ||Quala,

I.A.2.1 .2 ||_

RO/SRO Training &

Ouals

I. A.2.11.3

RO/SRO Training &Guast

I.A.2. 1.4RO/SRO Training &Ouils

l.A. 2.1.5 11.A. 2.3 Training Programs

Operator LicensingI.A.3.l.1 Exams_ _

Operator Licensing|IA. 3.1.2 _ lExams

Operator LicensingI.A. 3.1.3.A -||Exams

SEG

1.B.1.2 11

EOPsI.C.1 11

EOP3

EIOPsI.C. 1. 3.A 11

I C. | . EOPS

WatkinsWhitakerWatkinsWhitakerWatkinsWhitaker

Watkins

Watkins

Watkins

Watkins

Watkins

Watkins

, Watkins

Watkins

WatkinsWatkins

Watkins

Watkins

Whitaker

Watkins

- atkins

Watkins

Watkins

W iatkins

1- -4 -/ - -5 /13/1 4/95 5/4/9 5

3/14/95 6/4/95

3/1 5/95

3/15/9 5

3/1 5/95

3/1 5/9 5

3/1 5/95

-31 5/95

3/1 5/95

3/1 5/95

3/1 5/953/1 5/95

3/1 5/95

3/1 5/95

3/1 6/95 3/22/95- /59

3/1 5/95

3/1 5/95

3/15/95

-3/15/9 5

3/15/95

Open Open

Open Open

Open Complete

Open

Open

4/5/95

4 /6/9 5

4/7/9 5

9

n

Open

Opn

4/27/95 GlTworkcontrol 10:10 AM

-

Open I -

.Open

Open

9pnX

K Open

KOpen

Copet

Open

Open

Open

Open

Open

I

IOpen |Open

02.--- l a-- 94-5 ositdon , a .eCOe l~osure Pkg (IR 95-01) Reg. II to reverity, function of now

- | |g C |po~sitionOOpen p Closure Pkg TVA Is Implementing program IAN GL 86-04; Reg

. | |ackIn to Rev T S/U|Open | Cosure Pkg IR83 15 closed but not specific

Open Closure Pkg SER closed l.A.1.3 but not l.A.1.3.1 ;New GL 82-

I |OFC 02&-12 later; 94-55 closed IFI and xfer'dIracking to TMI#

[Open C losure Pkg SER closed l.A.1.3 but not l.A. 1.3.2 ;New GL 82-I | 02&-12 later; 94-55 closed IFI and xfer'd

l l | . ]tracking to TMI#tN/A SSER9 dosed l.A.2.1 but not l.A.2.1.1

superceded by 10CFR55.31a4, 55.59c andGL87-07 ... Accredited prog. accepted but notspecifically; IR94-65 closed but not specific.

N/A SSER9 dosed l.A.2.1 but not l.A.2.1.2Superceded by 10CFR55.31a4, 55.59c andGL87-07...Accredited prog. accepted but notIspecically; IR94-65 closed but not specitic.

N/A SSER9 dosed l.A.2.1 but not l.A 2.1.3Superceded by 10CFR55.31a4, 55.59c andGL87-07...Accredited prog. accepted but notspecifically; IR94-65 closed but not specific.

Open SSER9 dosed l.A.2.1 but not l.A.2.1.4Superceded by 10CFR55.31a4, 55.59c andGL87-07 ... Accredited prog. accepted but notspecifically; IR94-65 closed but not specific.

N/A SSER9 dosed I.A.2.1 but not l.A.2.1.5Superceded by 10CFR55.31a4, 55.59c andGL87-07 ... Accredited prog. accepted but notspecifically; IR94-65 closed but not specific.

N/A Open because Reg II said so ..lR 91-04N/A SER & SSER9 dosed but not specifically; IR94-55

xfer'd to TMIN/A l lSER & SSER9 dosed but not specifically; IR94-55

xIer'd to TMI|N/A l SER & SSER9 dosed but not specifically; IR94-65= der'd to TMI

9pen N/A Closure Pkg Complete based on TS; ISEG now in NOAP; Reg II| -C.C to reverity tunction of new org;lR94-55 xferd to

Open Closure Pkg SER & SSER9 dosed but not specifically; IR 85-08|_|___ ___ |_left open

N/A SER & SSER9 closed but not specifically; IR 85-08left open

Open SER & SSER9 closed but not specifically; IR 85-08left open

ON/A SER & SSER9 closed but not specifically; IR 85-08left open

|Open | SER B SSER9 closed but not specifically; IR 85-08l l left open

Page 5: Summary of 950428 meeting w/util in Rockville,MD to discuss … · 2012-11-30 · Frederick Hebdon Johns Jaudon Bruce Schofield Peter Tam Everett Whittaker TVA NRC/Region II NRC/NRR/Project

Generic Issues Task Report

Ir u = urnover

Shift SupvResponsibility

NMCR Access

I. C. 2

I.C.-3-

I. C-- -

I. C. 8-

1. C.7.lI

1. C. 7.2

NSSS vendor review ofProcedures

NSSS vendor review ofProcedures

~onitorfng EOPs

watkns 3/1 01v95 Complete Open cosure Pkgi ... I I - IQ 1- I F -

Watkins

Watkins

3/1 5/95

3/1 5/95

Open

Open

Complete

Complete

Open

Open

Open

Open

Closure PkgaNFC

Closure Pikg(tC

I .. . - I I tBize

Bize

IBize

3/1 4/95 13/24/95 3127/95 CompletelComplete no Complete CompleteComplete Complete

... I I .. 4- . -. .

3/27/95

3/15/95 13/28/95 3/28/95 i

Open

4. _______ �1. _______ 1 _______ 1 JO(XKXXXX

Bize

Bize

Brown

3/15/95 14/20/95

3/21/95 14/21/95

4121/95 Complete

4/21/95 m

I4 _II -VQQVW1/1/95 Open

Complete Open Closure PkggFzC

Jpgrades alsoncl. vendoreview

Upgrades aesoIncl. vendorreview

I 4 I- I- 4 I- 4- 4 L ______Brown 1/1/9 5 Open Open Open

Open

N/A

N/A

..'.',....'....,.'....................

i/A

Prol Plan8/13/95 - NRCClosinoProl Plan8/13/95 - NRCflIojinn

- -

StEH closed; IR 91-04 reopened;lH 94-bb xler a to

LA complete despite no specifics from techpersonnel; SER dosed; IR 91-04 reopened;IR 94-55 xferd to TMI-SER closed; 'IR 91-04 reopened;IR 94-55 xter'd toTMIR 94-63 verifies IAW TI but need SER? Status iscomplete...words are open? Reg II waiting on

I 1 OE .- ,i^ -{ -rv onc

Low Power Test prog not specifically discussed.but PAT Is mentioned In SER [FSAR definitionncludes LPT within PAT programi.Complete despite only upper tier ret; Impi open tilupgraded tests reviewed. Procedures R&A'd byNestinghouseR 93-30 did not close it; Reg 11 shows dosed[NUREG660->737->GL82-33->799->899->ERGsso pilot monitoring Is N/Al

Recent team inspection will dose

Recent team inspection will dose

SPI Brown 1/1/95 Open Open Open Open Proj Plan Recent team inspection will close8/13/95 - NRCClosing

Preop and Low Power see MPA Complete Complete N/A N/A Closed In SER10 and IR 93-36Tests 8066Preop and Low Power see MPA Complete Complete N/A N/A Closed In SER10 and IR 93-36Tests B066 ____II

Preop and Low PowerTeltsIRCS Vents

see MPAE066

Complete lComplete N/A N/A

- r.. 1 1 1 A 1- -1 I + 4- I- -4- IBize 1/1/95 Open Complete Open N/A

Closed In SER10 and IR 93-36

Project Plan - LA Complete despite only upper tier ref andWA response to seven open issues; IR91-04 raised more Issues;

, - -A- ---- ----. - l/fl r

RCS Vents Bize 1/1/95 Open Open Open Open Project Plan- iA Complete despite only upper ter ref andTVA response to seven open Issues; IR91-04 raised more Issues;

--- 7?s - 5/14/95 Open pending TVA letterRCS Vents Bize 1/1/9 5 Open Complete Open Open Project Plan - LA Complete despite only upper tier ref and

TVA response to seven open issues; IR91-04 raised more issues;7?s - 5/14/95 Open pending TVA letter

Shielding Mays 1/1/95 TVA It/ Open Complete Open N/A Closure Pkg LA open since specifics not addressed and TvA5/24/94 revised position 4 times after SER; IR 94-43

questioned PASS mission times.Shielding Mays 1/1/9 5 TvA Itr Open Complete Open N/A closure Pkg LA open since specifics not addressed and TvA

5/24/94 WFC revised posibon 4 times after SER; IR 84-41dlosed 11.B.2.2 but not specific enough.

Shielding Mays I/1/9 5 TvA Itr Open Open Open Open Closure Pkg LA open since specifics not addressed and TVA5/24/94 lFNC revised position 4 times after SER; IR 84-90

cdosed but Is open due to LA being open.I II/So

I VA 1f .4p Open N/A Project Plan - SER not specific enough

5

a

4/27195 GiTworkcontrol 10:10 AM

Verifying Correct Pertof Operating Activities

I.C.ti

I.D.2.1

1.0.2.2-

I.D.2.3--

1.0.1.1

I.0.1.2

1.0.1.3 -

II.B .1.t

II. B. I. 111.8.1.2

II.B.1.3

II. B. 21-

II.B.2.2

11..223FI. R 3

I L OOOOOOOO 8 / 2U/95 I

rAan I ouchbion

1AI - r- l~eS- e 5 I - - # =r---- IM 5 I -. ., AII- I IE - .--- . . rA - - . AAe -. 1 *.

- - -:a: I- . ., .- , - .- - .--

- -A-i-- -n: I -7 -e -A

:

-

I

I -,-

Page 6: Summary of 950428 meeting w/util in Rockville,MD to discuss … · 2012-11-30 · Frederick Hebdon Johns Jaudon Bruce Schofield Peter Tam Everett Whittaker TVA NRC/Region II NRC/NRR/Project

Generic Issues Task Report

PASS Touchston 1/1/95 TVA Itr6/10/94

IOpen IOpen IOpen I N/A I Project Plan -8/20/95

SER not specific enough

PASS Touchston 1/1/95 9TVA Itr Open ProN/A 8 9Rotect Plan-ic enough

YY6/10/94 .IS 14 -Openspci /2c enoughIPASSf:APASS Touchston 1/1 /95

Mitigating Core Damage WatkinslTr.- inin

11.8.3.2

11.8.3.3

II B.3.4

|I.B.41.1

11.B..4.2

II.D. 1

It.D. 1.2-

|II.D. 1.3-

II.D.3

II. E. 1. 1.21

It. E. 1. 2

II. E. 2. 1.

II.E.1.2.1.

II.E.41.2.2.E

II. E. 3. 1

II.E.4.2. 1..-

II!. E. 4. 2. 5

|II. E.4. 2.6

II E.4.2.7

II.F 1.I-

II.F.1 .2.A

|II F 1 .2.B8

Al

3

4

Valve PositionIndIcationAI-W system Evaluation

AFW System Evaluation

AFW System Int andFlow

Watkins

3/1 5/95

3/15/95

TVA Itr6/10/94 IOpen Open

OpOpen

i - Open

I I___ ___ I ____I___ _ 4S vW____I____Horning

Horning

Horning

1/1/95

1/1/9 5

1 /1/9 5

TVA ltr

12/26/937/19/94

Open

Open

Open

Open

Open

Open

Open I Open I

|Open L

.-., :::

Open

Open

Open

4 4 F F F + 4 I

Watkins 1/1/9b HI-F-2

Complete Complete

mUomplete

Complete

-: ........ . .. - :

*,..,..,.,.,: .:..:

,:... "''',...

iCompit

N/A

Project Plan -8/20/95

Project Plan5/1 4/95

Project Plan5/1 4/95

Project Plan5/14/95

4 a.

Project Plan -5/89

- .. .. I -, - -, - - --Watkins

Bize

1/1/9 5

4/1 7/95

HFT-2 Open Open

Complete Complete Complete

Open

Complete IN/A

Open

Complete N/A

Project Plan -5/28/95

Implemented SGAFW Inst

SER not specific enough; IR 94-43 left open

SER not specific enough; IR 85-08 &85-59 closed

SER not specific enough; PR 85-08 &85-59 closed

SER not specific enough; NRC owes response to1993 letters; reopened by NRC Itr 10/10/91

SER not specific enough; NRC owes response to1993 letters; reopened by NRC Itr 10/10/91

SER not specific enough; NRC owes response to1993 letters; reopened by NRC ltr 10/10/91

Complete

liSt- not specific enough BUT1 CLOSED?

SER not specific enough SO LA OPEN? B&Vreport led to changes not approved by NRC; Veritopen III 48 hour endurance run comoletedSER not specific enough BUT CLOSED? (TVAstated that Inst Is safety grade so no short termcontrol grade action req'd

AFW System Init and 1ize 4/17/951795SER not specific enough BUT CLOSED? IR84-20Rlow I& P 85-08 dlosed, 1R88-01 opened ... whal does

1 1.. ___ _______ _cl___josed mean?AFW System Init andRowAFW System Int andRow

PZR Htr EmergencyPower

Cont IsolationDependability

Cont Isolation

Bize

Bize

Grozan

Bize

4/1 7/95

4/1 7/95

3/21/9b

l/26/b9

IComplete lComplete

3/24/9b 144/95

muomplele

ompompletelComplette

M Open

Completc

mm Open

Open

_ _-- -_ . .

Complete

4 ?.I-ei , I aBize 4/26/95 IComplete |Complete Complete

SER not specific enough BUT CLOSED? Shortterm control reamts more than metSER not specific enough BUT CLOSED? IR84-20& IR 85-08 dosed, IR88-01 opened. what doesdosed mean?

SER closed LA; IR 84-20 closed impl but did notWIfwT T STQ .n-r-i is in. n-nd-nt ot TMI

SSER5 resolved LC7 & Conf Issue 18; NRC owesresponse to TVA ltrs dated prior to SSER 5; IR84-35 closed but now open due to LA open and TVAnodlfied responses after iR84-35SER closed LA; IR 54-35 closed Impl

Cont Isolation Bize 4/26/95 Complete Open SSER5 closed LA;IR84-35 dosed before LA whichDependability req'd block vivs on 24 line was closed so it

- > -stays openCont Isolation Bize 4/26/95 Complete Open SER dosed LA;IR 84-35 did not address vlv

-_ DependabilYty cl I _ _ _ _ _ _ 1A____-_A____ dosure on HI rAd--- Ufl monrioring --.. MMWAAW---

mays 9I /in - N/A SER not specific;:R85-36 closed but IR91-04

D1 - - vomll reopneaAccident Monitoring Mays 1/1/95 TVA ltr fOOpen pen Project Plan- Open

1 - 15/19194 _ _ 1 _ _ 8/20/95Accident Monitoring Mays 1/1/95 TVA Itr

5/1 9/94Open Open Open Open Project Plan -

8/20/9lOpen

L .1. .L. ________ U I ___________________________________

5

4/27/95 GlTworkcontrol 10:10 AM

Mitigating Core Damag4mtrIing~

Safety and Relief ValveTest Requirements

Safety and Relief ValveTest Requirements

Safety and Relief ValveTest Requirements

.,.,.,,.,... ,. ...g.

11

4 - -, ..- ,............-- - . - .- -11 ..- r.:.. . - ..- ::g:: :g: :::: .:

I s-mlwy - i.. - I

., . -. - I - l::: : :- . -. :t |

-- I

vW . - -.. E. .-. i. . -& - i- - .- 444tA T- .9/ . i I A - C. --. -:.. - -. A T - C

x {AAAgA+.-w ^-A Z ......

--- - , A 1 - . - -.- - 1- - a- - ' - - ' -- - .

. . - -,auu - .uuu Iuc -- -u-- | - l -E -- 0- ! 8 - - A } - --

-

l|Complete

|Complete

Acciaent monnoring OpenN/A N/A Open 111mOpenrA Pan -A

Page 7: Summary of 950428 meeting w/util in Rockville,MD to discuss … · 2012-11-30 · Frederick Hebdon Johns Jaudon Bruce Schofield Peter Tam Everett Whittaker TVA NRC/Region II NRC/NRR/Project

Generic Issues Task Report

Accident Monitoring 1/1/95 TVA Itr5/19/9 4

Open Open Open Open Project Plan -R820/95

OpenII.F.1.2.C

|ll F. 1 2.D0-

II F. 1. 2.E

II F..1 ZF

II.F.2.2--

II. F. 2.3

Ii. F. 2. 4

IL 0.1

II.K.1 .10

II. K.2.1 3

|II K 2.17 -

II K 2.1 t

ll.K.3.1

Il K 3.10II. K. 3.1 2.A

II.K,3.17

Instrumentation forDetection of ICC

Power Supplies for PZRRelief & Block Valves

Operability of SafetySystemsLow Pressure TripFunctionSafety Related Valves

1/1/95 Open

+ ____

Open

omplete

ipen

-~ -pen

Complete Complete

Open

N/A

Open

Open

Project Plan -8/1/95 - TVAImpl. Itr req'd

SSER 10 not specific enough; Impi Itr reportfrom TVA Is required

IR 85-25 not specific enough

N/A IR 85-08 not specific enough

N/A SER not specific enough

N/A TVA to clarity SER &TVA did not link TMI and IEB80-06 andconformance to SSER 3 and IR 85-08 are not specific enough

I IEB? a _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

N/A Complete

S voiding dunng Complete Complete N/A N/A Complete

ityasi of sequential j Complete Complete N/A N/A CompleteW flow

Auto 1301 of PZR PORV

Ali cli

- ouages

Complete Complete

- loumplete

N/A N/A

Open IVA to verity7

I . - 1 4 complete. - W W W III

Complete

lpen pending verif that anticipatory trip mod is

F i I A f A | jLomPlete -ilComplete IUomplete N/A N/A Complete

Stuck open PORV Complete Complete Complete N/A CompleteeffectsRCP seals w/o AC Complete Complete Complete N/A Complete

5.A power

FRCP seals w/o AC Complete Complete Complete Complet CompleteSB I rpower

Safety & Relief Valve Complete N/A IR 85-08 did not address whether Admin ProcFailures > _ revisedSBLOCA Model Open N/A TVA Itr req'd? SER not specific enough; TVA Itr req'd to say

O.A |model constitutes Implementation70. i3-- SBLOCA Model . _ _ Open N/A TVA Itr req'd? SER/iR1TVA not specific enougho.C SBLOCA Model N/A VA Itr req'd SER4l/TVA not specific enough

I Compliance w/ Compl ete Complete N/A Complete

10|CFR5TIA0 .46- I I.Complete lOpen |N/A l N/A

-- I n L eeds clar icadonSSER 5 not specific enough; Impi discussion

I--A--l-1;-IA

4/27/95 GlTworkcontrol 10:10 AM

Johnson

Horning

Accident Monitoring Size 1 /1/9 5 TVA Itr 3/281/95 Open Open Open Open Open Open Open Project Plan - Open5/1 9/94 8/6/95 5

Accident Monitoring Bize 1/1/95 TVA Itr Open Open Open Open Project Plan - Open5/1 9/94 5/14/95

Accident Monitoring Horning 1/1/95 TVA Itr Open Open Open Open Project Plan - Open5/19/94 7/9/95

Instrumentation for Horning 1/1/9 5 Open Open Open Open Project Plan - SSER 10 not specific enough; Impi Itr reportDetection of ICC 8/1/95 - TVA from TVA Is required

Instrumentation for Horning 1/1/9 5 Open Open Open N/A Project Plan - SSER 10 not specific enough; Impl lIr reportDetection of ICC 8/1/95 - TVA from TvA Is required

-- __ -_ _ - impi Itr req'd ---

RPV Integrityw/SBLOCARCATnAnmA-

xcg(NPRDS1

II. K. 3. 2

II. K. 3. 2

iI. K. 3. 2

II. K. 3. 3

II. K.3. 3CII K.313CI.K.3 3C

II. K. 3. 31

II. K. 3. 5. A IAuto Irip or HCrs

il

in ii 5A 1 ;A--, A . -S -- -I - - - - - 1- ..l-nlw-oz rpI

In-tn.^w trin KlBA

Page 8: Summary of 950428 meeting w/util in Rockville,MD to discuss … · 2012-11-30 · Frederick Hebdon Johns Jaudon Bruce Schofield Peter Tam Everett Whittaker TVA NRC/Region II NRC/NRR/Project

Generic Issues Task Report

1 s-.u a rIA- -u AA I I I Ir A s A I I I a I HAA E --

PiD Controller Mods

S- =open IopenI .___... 1 ______''.AA- .I.-..-. ' I _ _ I _ __ _ _-_

IComnlete IComnlete

11 K 3.5.FII. K. 3. 9IlilA_ 1.2.

III. A. 2.1

MCR HabitabilIty

MCR Habitability

mR

Water Hammer

Asymmetric Blowdown

Loads on RCS

S/0 Tube Integrity

ATWS

RPV MaterialTouahnessSystem Interactions

Mays 1/1/9 5 Open

. -i- i IMays 1/1/9 5 IOpen Open Iopen

bScH 5 not specafc enoughin ar-a u aoes noidn--umn imnl nt .utn trin nt RPrs onR rOA

IR R4-35 not IAW TIN/A Complete Complete SER 13 & IR94-57 closed but not specific enoughN/A Complete Complete SER 13 & IR93-64 closed but not specific

_ enough. VlP4-57 closes item]

met program discussion. IR 93-64 did notaddress met equip

Open Project Plan -5/2 1195

IR 85-60 left open pending review of leakreductIon program

1 |EP Facilitles Schneck 3/21/9 5 3/30/9 5 4/3/95 Complete CompleteEmergency Schneck 3/21/9 5 3/30/95 4/21/95 Complete CompletePreparedness

Emergency Schneck 3/21/95 4/4/9 5 4/4/95 Complete CompletePreparedness

Primary Coolant Mays 1/1/9 5 Open CompleteOutside ContainmentIodine Rad Monitoring Complete

Iodine Rad Monitoring mplete

2 1MCR Habitability Mays 1/1/95

-1 | ____- -- K

Open SER not specific enough BUT CLOSEDbased onradlolodine sampling discussion. IR 93-81reopened, IR 94-06 closed 93-81 but not speciticenounh

N/A Project Plan - SER not specific enough;8/20/95

N/A Project Plan - SER not specific enough;8/20/95 1

Open

-+ -4 A I V1 . ..Brown

Brown

Grozan

Grozan

1/1/95

I1/1/9

3/24/95 13/28/95

3/24/95 13130/95

4/4/9 5

3/31/9 5

|Complete |Complete

-.- - . , I IGrozan

Grozan

3/24/95 13/28/95

3/24/95 13/30/95

3/29/95

4/3/9 5

+ F + + 4 FSchneck 4/21/95

M M open

|N/A I

Open

JN/A

.:.::

Open N/A

Complete Complete Open

Complete Complete Open

Open

Open

N/A

Open N/A

N/A

N/A

N/A

Open

Open N/A

Project Plan -Ri8n0o/Project Plan -6/4/95Project Plan -6/4/95In SUT program

Complete

7/14/95 closureof 2 NCOs

mplete

SER not specific enough;TVA 55e reports discussdeficiencle therefore imol Is onen?

Complete

SER not specific or complete enough;

SER closure of LA is still valid since new guidanceaftected CPs after 1984; IR closures notdocumented well enoughNAR never closed Issue. NRC approved method &FSAR is revised

TS approval Is an Independent issue. Openpending completion of 2 NCOs on ISI program:NRC approval of GL 85-02 not documented.TS approval Is Independent Issue; IRs 94-55,94-84.and 95-05 dosed the Issue [On hold for PERon 0 listino of 2 AMSAC components]SER did not address long-term suitability of RPV;

'''- .I-- . .I - - a I_ I _ I _ I _I

Grozan 3/24/95 Open Open N/A Check If SysInteractions InGL 88-20n?

SER did not close LA; TVA to address SysInteractions In IPE (GL 88-20)

II. -A 1 I l- I - - -I -1 - -Gmzsn 3/24195 ('n... ('-o-

_- i. ll .-- . . I_--I.::l: t |A . --.- -.I I I I I I I - rRPv ransientProtection

tScrnecK 4/b/95 4/24/95 14/24/95 Complete Open Open Provide copy to Impi documents not in NUDOCs

RHR S/O Requirem::t CGrozan 3/24/95 | |Complete I | N/A ] | IR 84-2 8 did provide enough specific detail to

.. | - -- - - A tn|AA- - I - -Znr...(|..ll|ld

Grozan 3/24/95 Complete Open N/A Verify program Inplace orsc-heAdul

Impl of Phase I by first RFO

-- I - . - . 4 . 1 4- . . I I - I II__________Seismic Design Criteria |Grozan 3/24/95 Complete Complete N/A Complete

. .. - .1 . 1 __ L

K

4/27/95 GlTworkcontrol 10:10 AM

Open |SER not specific enough BUT CLOSED?based onradlolodine sampling discussion IR 93-81reopened, IR 94-06 closed 93-81 but not specific

- enough

III.A.2.2

II. D.1.1t

I[.D.3.3.

111.0.3.3.

llt.p.3.4.'

II.i .3.4.2

III.0. 3. 4.3-MPA F008 I.D.1

A-01

A-02

A-03

A-09

A-11 _

A-17A-24

A-26

A-31

A-36 (COl0

A-40 (B109]

3

I f-k,.n-

.^.71 I n s II - - . ne

.. I . I OOOW

1. . . 1 . . -l l

l l

I- aul "P r. -l 'r-

MIJA tUt1 LU.1.. D.I C

Heavy Loads near SFP

)

I

Page 9: Summary of 950428 meeting w/util in Rockville,MD to discuss … · 2012-11-30 · Frederick Hebdon Johns Jaudon Bruce Schofield Peter Tam Everett Whittaker TVA NRC/Region II NRC/NRR/Project

Generic Issues Task Report

SBO Grozan 3/24/95 Complete Open Open Verity Impi or Impl due by FL; IR 93-44 closed Issue?A -4 44 scheduledA-4 - RHARequirements Grozan 3/24/95 Complete Open N/A Complete

Control Systems Grozan 3/24/95 Open Open N/A SER did not close LA; TS item req d; NRC ImplA- 47 - -- review reqgdA-48 Hydrogen Control Whitaker 4/6/95 Complete O.__pen_ N/A IR85-84 not specific enough

PTS Schneck 6/4/95 Open Open N/A NRC closed Sb.61 but response req'd to TVAA-49 _______ _ - - App G Exemption request

Complete Open N/A

. .- .. . I .Complete Open Open Verity Impi or

IR 90-20 not specific enough

Impi was HFT now by FL; IRs not specific enough

'proved Accident I - Complete Open Open F fAIIR 94-31 & 94-56 not specific enough

- - - - - I- -Open Open N/A

-> .-- - - - -- -- !-4/7/95 Complete|Complete IComplete |Complete N/A N/A Complete

- t - - + . . - - . - - 5.. ..4/20/95 4/21/95 CompletelComplete |Open Open Open Open Finish Vendor Infc

CAP

NRC 1/g/91 not specific enough; TS req d perSSER 6; IR 90-203 not specific enough/requiresLA compietion

Complete

[mpl of Vendor Info CAP & C/A on deficienciesreq 'd

43 LBI07)

51 (1913)

67.3.3

70 (8114)__

75 (B0786)

75 ( 8077)

4/2 1/95 4/2 1/95

Complete I Complete Complete 'Complete N/A N/A

CompletelComplete |Open

II ,t IOpen Open Open

Complete

omplete

I

Complete

SERs closed on program but IRs not foundcovering implementation [TVA Itr 1/28/94 & IR94-27 not found by NRC_TVA modified response 11/1/93 & NRC has notdocumented review & approval; IR 94-73 stated

I I I turther review req dL 83-28 - PMT Grozan 3/4/9 5 4/25/95 4/25/95 Complete Complete Complete Complete Complet Complete Complete IR not IAW TI BUT CLOSED?No Dev or NOV=I adequate?

0L 83-28 - Rx Trip Sys Grozan 3/4/9 5 4/25/9 5 4/25/95 Complete Open N/A Tech Specs TS req'd to close Impl.Rellablitty

L 83-28 - Rx Trip Sys Grozan 3/4/95 4/24/95 4/26/95 Complete Open Open Tech Specs TS reqd BUT LA CLOSED? Impl not documented:Rebilty IR 86-04 not specific enough [Hold open for TS?l0L 83-28 - Rx Trip Sys Grozan 3/4/95 4/24/95 Complete Open N/A Tech Specs TS req d BUT LA CLOSED? Impl left open due to

TelSay 1S0L 83-28 - Vendor Grozan 3/4/95 4/21/95 4/21/95 Complete Complete Open Open Open Open Finish Vendor lnf IR 86-04 closed. IR 89-03 opened. IR 93-27 moreInterlace - CAP problems, NOV 95-10-01Steam binding of AFW Complete Open Complet Review of Proc Mods not documented; IR 90-20Pumps closed BL 85-01

itOP Schneck- 4/6/95 4/22/95 4/22/95 Opn O Open N/A No NRA response to 5/16/91 TVA ItrComplete Open Open Verify Impl or SE not specific enough BUT LA CLOSED? No

4/27/95 GlTworkcontrol 10:10 AM

iteliabIlity of AirSystemsOpen Cycle CoolingSystem RAeIabiltv

IVA Itr5/23/94

0L 83-28 - PMT Grozan 3/4/9 5 Open Open Open TVA modified response 11/1/93 & NRC has notdocumented review & approval; IR 94-73 statedfurther review reqd

GL 83-28 - PMT Grozan 3/4/95 4/7/95 4/7/95 Complete Complete Complete Complete Complet Complete Complete Recent NRC Inspection verified; TCG verified TSI.still valid

GL 83-28 - Rx Trip Sys Grozan 3/4/95 4/7/95 4/7/95 Complete Complete Complete Complete Complet Complete Complete Recent NRC inspection verifiedReliabiltty_ I I

GL 83-28 - Rx Trip Sys Grozan 3/4/9 5 4/7/9 5 4/7/9 5 Complete Complete Complete Complete Open Complete Complete Insp Rpt closure not lAW TIReliably__

0L 83-28 - Ax Trip Sys Grozan 3/4/95 4/25/95 4/25/95 Complete Complete Complete Complete N/A N/A Complete Complete - IR verifed shunt trip modsReliabiliy_

Gl- O.37C . runt rip F 7e zI - Y ne AI ne- - ...-..... .-

1rWiV A DIOCK VlV

ReliabilityScnnecK I/4/9b

GL 83-28 Post TripReview

GL 83-28 - Equip Classand Vendor Interface

Grozan 3/4/95

Grozan

4/7/9 5

3/4/9 5

75

75

7s

75

75-

75

(8078) --

(BO79)

(8080[

(B081) -

(8082)

(8085)D at a -r "pDate

75 (B086)

GL 83-28 - Equip Class Grozan

UL 5J-W0 - I'MI

3 /4/9 5

Grozan 3/4/9 5

75

75

75

75

75

75

9394

99

(B087)__

.(BOSS) --

(B0-92).-

(8093)_

(L003)

(8098)(B115)

1181 7 IValve- .- .- .ched [documentation of Implementation

11

- - --

I

lfl

M

�ru�n- -4 %J ~*II4IeI

Page 10: Summary of 950428 meeting w/util in Rockville,MD to discuss … · 2012-11-30 · Frederick Hebdon Johns Jaudon Bruce Schofield Peter Tam Everett Whittaker TVA NRC/Region II NRC/NRR/Project

Generic Issues Task Report

|iiHydraulic Snubbers Open Open N/A Tech Specs TS req'd to close LA; IFI 90-22-03 open on functA-13 (B017J I _insp before FL

- Mechanical Snubbers Open Open N/A Tech Specs TS req'd to close LA; IFI 90-22-03 open on functA3 (i3022) nsp before FLiSLOCA Open Open N/A SER not specific enough did not address GL89-04

or 80-14 IST not complete although it is in MPAB-63 A025 (SSER 14)AOual of Personnel Open Open N/A SERs & IRs not speafic enough, did not address

Ao16 ||-_ GL81-01 or MPA A-016RG 1.99 PTS Rule Schneck 4/6/95 4/19/95 4/21/95 Open Open Open Open N/A N/A Complete w/ TS req'd to dose LA&Impl; Subsequently

2 PTLR submittal removed per STS; NRC review of 3/29/95 PTLRA03____ ____ ____ ____3/29/95 submittal Is neededIST Reviews and Complete Open OpenIs doc of ST implementation Is not sufficient

A025 schedules although It Is In MPA A025 (SSER 14)Cont Purge and Open Open Open' SERs & IRs not specific enough, did not addressVenting GL79-46 or MPA 8024; IA did not cover valve

0024 blocksDeep Draft Pump Schneck 3/29/95 4/6/95 4/7/95 Openn ---- - Complete No SER on TVA revised response 1/24/92: Insp

B031 Deficiencies - ___i_| Rpt closure not considered good enoughB043 FW Pipe cracking - Complete Complete N_/A Complete

EOPS and training for Open Open /A SER did not address long term83063 Soo

6 Natural Circulation Complete N/A N/A Complete066 -- Cooldowns

i3089 --- | Salem ATWS Grozan 4/3/95 4/24/95 4/26/95 Complete Complete N/A N/A N/A N/A Complete CompleteB095 Loss of RHfl Completel N/A N/A | Complete

Complete N/A /A Complete8096

Boric Acid Corrosion of Complete Open Open Verity Impi or Impl. completion not documented8101 -__ -_ - | R schedule

MOV Testing and Surv TVA Itr Open Open Open Address/Close No SER on GL89-10 program as revised through1 9/28/93 NOV 3/3/94; IR 94-36 NOV and deficiencies mean

8110 program Is St Il openHill FiE Grozan 4/25/95 Complete Open N/A Verity Impi or Impr completion not documented

8111t -|- scheduleS/G Tube Mechanical Complete Complete N/A Complete

81I17 plugs____I?- -E Grozan 4/25/95 Open Open N/A Verity Impi or IPEEE 120 days after RFO

120~fl CDV I2..-I.. OL r- ^--- -.- ed-- . - e - s -RosemountTransmitten

dicanostlc equipment 9,A / 281/

Lumpiele

tomplele

Complete

Complete

-o NI IN/i A itomplexe 4 UompleteComplete

N/A

Complete

Complete

No SER on TVA 11/1/90 Itr; Impl due after firstDII III IR N I Io I IB I IA digoai eqimn 9128 -iI III I

Upen Open N/A Verity Impi or__ __ __ __ ___M__ __LA G_ _ __ _330_ _ ___1__ _ I_ __ _ _ _ _ _ _ _Scneaule Ff0

THERMO LAG 330- Open Open N/A Reach closure ThermoLag GL 92-08 is openFire BarriersRod control system Open Open N/A Verity Impl or TVA owes response to 12/9/94 Itr7failure and withdrawal schedule Documentation of impi

Vehicular Bomb Threat Complete Open Open Verity Impl or Documentation of Vehicular Bomb Threatl______ _______o _____ ___schedule I Implementation: IR needed on GL 89-07

induced pipe thinning'-UmllaL Ojpen N/A Verity Impi or

schedule

Erosion/Corrosion Implementation documentatior

11111111

4/27/95 GiTworkcontrol 10:10 AM

8122_

8 1 22-8123--

F072-. .

L208

L304

L907

L908III l l l l lI

I~~~ I I/A

I

II-1- 4/ 1-Y9514219 - 1. rig I

I -CI *

lI

Page 11: Summary of 950428 meeting w/util in Rockville,MD to discuss … · 2012-11-30 · Frederick Hebdon Johns Jaudon Bruce Schofield Peter Tam Everett Whittaker TVA NRC/Region II NRC/NRR/Project

Generic Issues Task Report

Rosemount

Westinghouse circuit

Complete N/A N/A

I ____ I I I I I- I I .. .. I I-VComplete Complete N/A

Complete

Complete

-- . . -Open |Open i N/A I 0No SER on noA 3/1/89 suppi response to BL 88-

___________ ____ ____ II-1-I I I102; IR does not close thea issueGE HiFA R.Iv- Comolete Comlete N/A

_I- I I r.I A- - 4. --

x0ol _XOOI --

X802 ____

X803

X804

X805

X809 -_

X81 o --

X901--

X902

X903

i-.:.':: j,,::

Complete Open Open TVA Itr reqgd?7?

-II II I I I - r - -Non-conformingmaterials by pipingsuppliers

Thermal stress onIipinaThimble tube thinning

Circuit breaker material

Complete Complete N/A

I _ I I I _ 4 _ .I I -TVA Itr Open Open N/A

_ _ _ _ _ I I I I _ 1 _ 4 _ _ _ _ _ _ _ _ 4 4A

Open Open N/A

TVA ResponseReod1

-. I I I I lI P i .11 - -- . - - I -Complete Open N/A

CompleteNo SER on revised response to BL 88-04 butCLOSED? IR 94-10 closed the Issue but issue isopen due to lack of TVA Itr sayingcomplete 7?7 Veni open due to concerns???

Complete

TVA response to 10/21/94 RAI

No SER on TVA 3/11/94 Itr

IR 93-11 closed but lett open here due toexistenc ot CR~ 90-06

_ _ _ _ I _ _ _ _ I _ I _ I I I I 1 I _ 4 _ _ _ _ _ V 4 4 -VThermal StratificationIn PZR Surge Une

S/G Mechanical TubePlugsAnchor-Darting VlvStress CorrosionCrackino

TVA Itr7/5/9 4

Complete Open N/A Verify ImpI orschedule

I I I I I I I I .Complete Complete N/A

-- I - I I I I I IComplete Complete N/A

-It---- 4 4 F I- 4 F + + I- 4 4 I ILoss of S/D Margin Complete Open N/A Verity Impi or

TVA to modify supports and provide data fromFiFT of surge line pipe whip restraint gaps

Complete

Complete

No documentation of Implementation; reqd for

mean it'sbeenreturned

a

4/27/95 GlTworkcontrol 10:10 AM

Safety-related pump

l oss

I

r r .w-

Page 12: Summary of 950428 meeting w/util in Rockville,MD to discuss … · 2012-11-30 · Frederick Hebdon Johns Jaudon Bruce Schofield Peter Tam Everett Whittaker TVA NRC/Region II NRC/NRR/Project

40 -

bize _ _ _ I i _ ,Planned 1 2i 21 3! 21 3! 21 3! 2 3 2i 3! 2 3 2 3Actual 0 0 0 O i !_I___!_i_ i_ jI

Grozan _ _ _ I _ 1Planned j 1] 21 3i 2 31 2 3! 2i 3 2i 3 2! 31 21 3Actual j 2j71 I i __ _ I 7i 1 1 i

Schneck _ I _ I I _ _ I I i _ IPlanned I 11 21 31 21 31 21 3 21 3 21 31 21 31 2 3Actual I 01 3[ i i i i _ I * 1

Watkins I IPlanned 21 2 21 31 21 3! 21 31 2 3 3 2 31 2_ 3Actual 01 11 21 i I T ! 1 1 -

WBN Lic I IPlanned o0 ol ol1 0| ol oA o 0 1 21 2i1 1i1Actual 01 o 1i T I I 1 i I

W hitaker i | | | _ j . _ i | _ _ _

Aculan e I 01 1 1 1 i 1 l 1 i 1 i 1 1 iActual I 0 i 21 I I I I I I I I

Total 31 61 91 121 91 12 91 1220 161 121 11 1 41 10 0 121 9 13Actual 01 31 1 51 0 1o 2 o o! l ol o

Cum ulative I I ! I I I I I I I I I I I IPlanned 31 91 181 301 391 51] 60 721 88| 100] 111 1251 135 I1471 1561 169Actual ol 3! 1 81 241 321 381 381 3 81 381 381 381 38j 38 381 381 38o .rk ./ 1 1 . . 128. f / 6 1 3 61 7 -714Planned 180l 1741 165 153 1441 1321 123111| 95 831 721 ... 48 36 27 14Actual 1831 180 1651 159 151| 145i I I i

Generic Issue License Basis Review Workoff

200 tL|Planned

j 150 - Actual

1 100

50

0

1 1 1 - 01 10i0 I I I i i F

j | 3/24 3/31 4/7 4/14 4/21 4/28 5/5 5/12 5/19 5/26 6/2 6/8 6/16 6/23 6/30 7/7

Workoff

Page 13: Summary of 950428 meeting w/util in Rockville,MD to discuss … · 2012-11-30 · Frederick Hebdon Johns Jaudon Bruce Schofield Peter Tam Everett Whittaker TVA NRC/Region II NRC/NRR/Project

Watts Bar Generic Issues Task - Project Plan

3/17 3/24 3131 4/7 4114 4/21 4/28 5/5 5/12 5/19 5/26 6/2 6/9 6/16 6/23 6/30 7/7Define Licensing Basis Review ProcessAssemble / Indoctrinate Team

Pilot Issue Reviews

Refine Understanding of NRC criteria

Production Reviews m El-, " i -

Mtg to define form, content, and [lagschedule of TVA response to Scientech

Licensing Basis Review Part 1 - InitialResponse - Focus on New "Open"

Licensing Basis Review Part 2 pa=-Intermediate Response - Focus on

Licensing Basis Review Part 3 -Final I IResponse - Focus on Issues Open Due

to NRC Documentation RequirementUpgrades

gnEreu- 3

Page 14: Summary of 950428 meeting w/util in Rockville,MD to discuss … · 2012-11-30 · Frederick Hebdon Johns Jaudon Bruce Schofield Peter Tam Everett Whittaker TVA NRC/Region II NRC/NRR/Project

Generic Issue License Basis Review Workoff

3/24 3/31 4/7 4/14 4/21 4/28 5/5 5/12 5/19 5/26 6/2 6/8 6/16 6/23 6/30 7/7

S

I

Page 1

200

1 50

as.: -

0 100n

V)5)50

0

Page 15: Summary of 950428 meeting w/util in Rockville,MD to discuss … · 2012-11-30 · Frederick Hebdon Johns Jaudon Bruce Schofield Peter Tam Everett Whittaker TVA NRC/Region II NRC/NRR/Project

iEnf i.5j -re 3

A. No Longer

DISPOSITION OF 84 OPEN LICENSING ACTIONS

Applicable interim. short term. suDerseded)

I.A.1.1.1 - STA - Operating shift staff - superseded by NUREG-1021 &T.S.

I.A.1.1.2 - STA - Training and qualfications - superseded by NUREG-1021 and T.S.

I.A.1.1.3 - Upgrading of operating staff training - superseded byNUREG-1021 and Part 55

I.A.1.3.1 - Shift manning (overtime limit) - superseded by T.S.

I.A.1.3.2 - Shift manning (minimum shift crew) superseded by T.S.

I.A.2.1.1 - Applic. for SRO experience - superseded by NUREG-1021

I.A.2.1.2 - Applicant for SRO license shall have RO license -Superseded by NUREG-1021.

I.A.2.1.3 - Applic. for SRO or RO 3 months on shift - superseded byNUREG-1021

I.A.2.1.4 - Training program topics - superseded by NUREG-1021

I.A.2.1.5 - Certification for SRO or RO license application -superseded by Part 55

I.A.3.1.1 - Increase scope of SRO/RO exams - superseded by NUREG-1021and Part 55

I.A.3.1.2 - Increase passing grade for exams - superseded by NUREG-1021

I.A.3.1.3.A - Simulator exams - superseded by NUREG-1021 and Part 55

I.C.1.1 - Short-term SBLOCA Reanalysis - superseded by IIK.3.30 A, B& C

I.C.1.2.A - Short-term ICC reanalysis - superseded by SRP - Rev. 2,July 1981

I.C.1.3.A - Short-term other accident reanalysis - superseded by SRP -Rev. 2, July 1981

A-31 - RHR shutdown requirements - superseded by SRP - Rev. 2,July 1981

II.F.1.2.A - Accident Monitoring Instrument (Noble Gas) - superseded byR.G. 1.97,. Rev. 3, May 1983

r � � ����

Page 16: Summary of 950428 meeting w/util in Rockville,MD to discuss … · 2012-11-30 · Frederick Hebdon Johns Jaudon Bruce Schofield Peter Tam Everett Whittaker TVA NRC/Region II NRC/NRR/Project

2

II.F.1.2.B -

II.F.1.2.C -

II.F.1.2.D -

II.F.1.2.E -

II.F.1.2.F -

A-49 -

Accident Monitoring Instrument (iodine/part. sample),superseded by R.G. 1.97, Rev. 3., May 1983

Accident Monitoring Instrument (cont. hi rad) - supersededby R.G. 1.97, May 1983

Accident Monitoring Instrument (cont. press) - supersededby R.G. 1.97, May 1983

Accident Monitoring Instrument - (cont. H2 Level) -superseded by R.G. 1.97, May 1983

Accident Monitoring Instrument (cont. H2 Conc.) -superseded by R.G.1.97, May 1983

Pressurized Thermal Shock - superseded by 10 CFR 50.61

Page 17: Summary of 950428 meeting w/util in Rockville,MD to discuss … · 2012-11-30 · Frederick Hebdon Johns Jaudon Bruce Schofield Peter Tam Everett Whittaker TVA NRC/Region II NRC/NRR/Project

O of3

R Teeiin Fniind AcceDtable In SER But No Subtier Conclusion

II.B.2.1 -

II.B.2.2 -

II.B.3.1 -

II.B.3.2 -

II.B.3.3 -

II.B.4.1 -

II.B.4.2 -

II.F.2.2 -

II.F.2.3 -

II.K.3.30.A -

II.K.3.30.B -

II.K.3.30.C -

III.D.3.4.1 -

Shielding design

Shielding corrective actions to assure access

PASS Design Review

PASS Corrective Actions (N/A - applicable to operatingplants)

PASS procedures

Training for Mitigating Core Damage

Completion of training for mitigating core damage

ICCI saturation meter SSER 10 accepts ICCI not specific

ICCI other instr. incl. RCS level accepts ICCI notspecific

SBLOCA model program and schedule. Model approved.Program and schedule not addressed.

SBLOCA model (NOTRUMP) approved. II.K.3.30.B notaddressed.

SBLOCA model plant specific analysis. SSER 5 closesII.K.3.30. II.K.3.30.C not addressed.

Control room habitability. Identify and evaluate hazards.SER concludes protection acceptable.

III.D.3.4.2 - Control room habitablity. Propose modifications. SERconcludes protection acceptable.

aJ I WUIIU.

Page 18: Summary of 950428 meeting w/util in Rockville,MD to discuss … · 2012-11-30 · Frederick Hebdon Johns Jaudon Bruce Schofield Peter Tam Everett Whittaker TVA NRC/Region II NRC/NRR/Project

of4

C. AbDroved With Conditions

II.B.1.2 - Install RCS Vents - SSER 12 approves with condition. Noresponse.

D. Licensing Action Not Applicable Because Installation Issue Onlv

I.D.2.2 -

II.B.2.3 -

II.B.3.4 -

II.E.1.1.2

II.F.2.4 -

II.D.3.4.3 -

SPDS console installation

Complete shielding modifications

PASS - Install a permanent system

- Complete AFW system modifications

Install ICCI

- Install control room habitability modifications

, , . .. - - ...... .

Page 19: Summary of 950428 meeting w/util in Rockville,MD to discuss … · 2012-11-30 · Frederick Hebdon Johns Jaudon Bruce Schofield Peter Tam Everett Whittaker TVA NRC/Region II NRC/NRR/Project

U U*5

E. Tech. Spec. Issue

GSI-70 - PORV and block valve reliability - completed in SSER 6except T.S.

GSI-94 - Additional LTOP - Completed NRC letter dated 1/9/91 exceptT.S.

GSI A-13 - Hydraulic snubber tech. specs.

GSI A-13 - Mechanical snubber tech. specs.

MPA A-023 - Pressure/temperature limits tech specs

II.E.4.2.6 & MPA B-024 - Containment purging and venting

A-09 - ATWS - SSER 9 approves except for possibility of tech.specs.

F. To Be Accomplished After OL

I.D.2.3 -

MPA B-118 -

MPA F-072

SPDS fully implement - left open in SER after 1st REFOUT

IPE external events. NRC accepted submittal 120 daysafter 1st refueling

SPDS -Response to GL 89-02 (GL 89-06). No SER on 11/1/90submittal. SSER 6 LC43

Page 20: Summary of 950428 meeting w/util in Rockville,MD to discuss … · 2012-11-30 · Frederick Hebdon Johns Jaudon Bruce Schofield Peter Tam Everett Whittaker TVA NRC/Region II NRC/NRR/Project

066

G. Documentation Needed In SER SuDDlement

I.C.1.2.B -

I.C.1.3.B -

I.C.7.1 -

I.D.2.1 -

II.D.1.1 -

II.D.1.2 -

II.D.1.3 -

II.E.4.2.1-4

II.F.1.1 -

II.K.1.10 -

II.K.1.17* -

II.K.1.05 -

I.D.1.2 -

Short-Term ICC procedures - Not completed by 01 review

Short-Term other accident and trans procedures - Notcompleted by OL review

Vendor review low power tests - Not mentioned by TVA or inSER or Supplement.

SPDS console design - Will be closed in SSER 15.....

Safety and Relief Valve Test Program - NRR reviewed TVA7/19/94 submittal, and will close this issue in SSER15.....

Complete testing of S&R valves - NRR review TVA 7/19/94submittal, and will close this issue in SSER 15.....

Test pressurizer relief valves'reviewed TVA 7/19/94 submittal,in SSER 15.....

block valves - NRRand will close this issue

Containment - Implement diverse isolation. No staffevaluation of 2/20 and 25/85 TVA submittals although priorSER approval.

Accident monitoring instrument (procedures). No mentionof this item in SER or supplement.

Operability of safety related system IEB 79-05, 06 and 08.Inspection report 85-08 closed but no NRR document. Inthis period of time, bulletins were issued by the Officeof Inspection and Enforcement; there was no requirementfor NRR to issue safety evaluation on utilities'responses. The absence of NRR document does not precludethis issue be considered closed.

Low pressurizer with no coincidence Rx trip item closedexcept for specific statement in SER.

No auto reset of ESF functions. SSER 3 accepts but noreference to II.K.1.05. The licensing SER was written perStandard Review Plan guidance, which includes TMI issuessince 1981 (Revision 1). Since the technical informationwas in SSER 3 and found acceptable, II.K.1.5 is closed.

MPA F071 DCRDR -Results of March 1995 audit. SSER 15 willclose.....

Page 21: Summary of 950428 meeting w/util in Rockville,MD to discuss … · 2012-11-30 · Frederick Hebdon Johns Jaudon Bruce Schofield Peter Tam Everett Whittaker TVA NRC/Region II NRC/NRR/Project

407

Documentation Needed In SER Supplement

A-01

0f

Water Hammer - SER issued in 1982. A-01 resolved in 1984.Will update SER Appendix C in SSER 15......

Reactor Vessel Material Toughness - Issue was subsumed byequivalent margin analysis, which was evaluated and closedin SSER 14. This issue is thus closed.

Systems interaction - generically resolved withpublication of GL 89-18. Will update SER Appendix C inSSER 15 to cite GL 89-18....

Equipment qualification - TVA information under NRRreview. Will close out in SSER 15.....

Safety implications ofdated October 24, 1990SSER 15....

control systems - Closed by letter(TAC M75017); will cite that in

GSI75 (B078)

GSI B-63 -

MPA A-016 -

MPA B-031 -

MPA B-063 -

MPA B-110 -

Salem ATWS Items 3.1.1 and 3.1.2.after SSER5. Tam memo of Novemberrecorded efforts to have Region II

TVA letter 11/1/832, 1994 (TAC M64345),follow up on it....

Isolation of LP Systems from RCS - Awaiting resolution ofIST; SER 14 approves IST program but may not address thisGSI....

Qualifications of QA audit personnel (GL 81-01). SSER 5,Chapter 17, clearly stated that the TVA QA program is incompliance with Reg. Guide 1.58 and 1.146, the mainsubstance of GL 81-01. While MPA A-16 or GL 81-01 was notspecifically mentioned, the substance is there in SSER 5.This issue is thus closed.

Deep draft pump deficiencies- SER 4 approved. The staffdid not respond to a subsequent TVA letter dater 1/24/92(Find out if any of the previous letters issued by NRCamounted to safety evaluation. If yes, then we shouldreview the 1/24/92 letter. If no, then the letter shouldonly be addressed by Region II's closeout inspection.)

Emergency training and procedures for station blackoutevents - All station blackout issues were subsumed by 10CFR 50.63 (MPA A-44). The staff's letter dated 9/9/93(TAC M68624) found all Watts Bar SBO fixes acceptable,with full implementation by fuel load. This issueis thusclosed.

MOV testing and surveillance - The staff has reviewedTVA's response to Supplement 2 to GL 89-10 by letter dated9/14/90 (TAC M75736). Review of other supplements is an

A-11 -

A-17 -

A-24 -

A-47 -

Page 22: Summary of 950428 meeting w/util in Rockville,MD to discuss … · 2012-11-30 · Frederick Hebdon Johns Jaudon Bruce Schofield Peter Tam Everett Whittaker TVA NRC/Region II NRC/NRR/Project

8

ongoing generic effort.

MPA L-208 -

MPA L304 -

Thermo-Lag 330-1 (GL-92-08) - TVA's response is underreview under TAC M85622. Furthermore, TVA has undertakenplant-specific design and testing of Thermo-Lag; suchreview is ongoing under TAC M63648.

Rod control system failures and withrawal of RCCA (GL 93-04) - The staff found, by letter dated 12/9/94, that TVA'sresponse to the GL is acceptable (TAC 86877); this issueis thus closed. TVA is to notify the staff in writingupon full implementation.

MPA X802 (BL-88-02) -Rapidly propagating fatigue crack in steam generator tubes- NRC closed out in 6/7/90 letter (TAC M67329). TVAstated, and the staff agrees, that the staff did notconsider TVA's 3/1/89 letter, which proposed a moreconservative approach. On such basis, this issue isconsidered closed.

MPA X808 (BL-88-08) -

Thermal stress in RCS piping - Issue was originally closedby staff letter of 9/19/91 (TAC M69706). The issue wasreopened by TVA's submittal of 3/29/94; review is ongoingunder TAC 89581.

MPA X809 (L-88-09) -

Thimble tube thinning - TVA respone 3/11/94 fully complieswith the bulletin (TAC M72693). Based on instruction fromthe lead project manager (memo, B. Buckley to PMs,9/27/89), there is no need for additional action. Issueis closed.

Page 23: Summary of 950428 meeting w/util in Rockville,MD to discuss … · 2012-11-30 · Frederick Hebdon Johns Jaudon Bruce Schofield Peter Tam Everett Whittaker TVA NRC/Region II NRC/NRR/Project

io of

DISTRIBUTION (with enclosures)Docket or Central FilePUBLIC

DISTRIBUTION (without enclosures)WBN Rdg. FileW. Russell/F. MiragliaR. ZimmermanS. VargaJ. ZwolinskiOGCE. Joran, D\AEODACRS (4)G. Tracy, RIIG. Walton, RIIP. Fredrickson, RIIJ. Jaudon, RIIJ. Brady, RII