Summary a bout NCTC The National Center for Engineering & Consultancy were establish in 200 After union both of the adreesy & the national center . The National Center was establish in 1973 . & the Adreesy was establi So after the union NCEC become the best center in consultancy all Ir NCTC has many channels to share its experiences with scientific resea Universities also the institutes that deals with Engineering Projects. Also NCTC try to develop its staff by cooperation the other centers Side & inside Iraq.

Upload: gwendoline-hampton

Post on 18-Jan-2018

215 views

Category:

Documents


0 download

DESCRIPTION

The NCEC Rehabilitation The site position ( BAGHDAD- near al mothaff Square. The site position ( BAGHDAD- near al mothaff Square. The area about 6000 m^2 The total cost about 22.3 million US$. Execution duration 11 months

TRANSCRIPT

Page 1: Summary a bout NCTC The National Center for Engineering & Consultancy were establish in 2003 After union both of the adreesy & the national center. The

Summary a bout NCTC

The National Center for Engineering & Consultancy were establish in 2003After union both of the adreesy & the national center .

The National Center was establish in 1973 . & the Adreesy was establish in 1987So after the union NCEC become the best center in consultancy all Iraq .

NCTC has many channels to share its experiences with scientific research &Universities also the institutes that deals with Engineering Projects.

Also NCTC try to develop its staff by cooperation the other centers from outSide & inside Iraq.

Page 2: Summary a bout NCTC The National Center for Engineering & Consultancy were establish in 2003 After union both of the adreesy & the national center. The

Specialization of NCEC

Design project

Consultation

Supervision

Page 3: Summary a bout NCTC The National Center for Engineering & Consultancy were establish in 2003 After union both of the adreesy & the national center. The

The NCEC Rehabilitation

The site position ( BAGHDAD- near al mothaffSquare .

The area about 6000 m^2

The total cost about 22.3 million US$.

Execution duration 11 months

Page 4: Summary a bout NCTC The National Center for Engineering & Consultancy were establish in 2003 After union both of the adreesy & the national center. The

Rehabilitation of AL – MANSSOR Company

The site position ( BAGHDAD- near al mothaffSquare .

The area building about 7225 m^2

The total cost about 1.33 million US$.

Execution duration 11 months

Page 5: Summary a bout NCTC The National Center for Engineering & Consultancy were establish in 2003 After union both of the adreesy & the national center. The

Typical hall hospital ( 400 – 500) beds

Typical hospital has the Ability to built in any place

In I RAQ

The total area about 26132 m^2

Estimated cost about 64.9 million us $

Page 6: Summary a bout NCTC The National Center for Engineering & Consultancy were establish in 2003 After union both of the adreesy & the national center. The

Typical hall hospital ( 400 – 500) beds

Page 7: Summary a bout NCTC The National Center for Engineering & Consultancy were establish in 2003 After union both of the adreesy & the national center. The

Iraqi Embassy in Pakistan

The Iraqi Embassy willBe construction in Eslam –

Aabad

The total area about 7030 m^2

Estimated cost about 3.6 million us$ .

Page 8: Summary a bout NCTC The National Center for Engineering & Consultancy were establish in 2003 After union both of the adreesy & the national center. The
Page 9: Summary a bout NCTC The National Center for Engineering & Consultancy were establish in 2003 After union both of the adreesy & the national center. The
Page 10: Summary a bout NCTC The National Center for Engineering & Consultancy were establish in 2003 After union both of the adreesy & the national center. The

GOAL OF THE COURSE

Because of the good cooperation of KOICA and after we have had many site visits & we have seen & touched the developing & progressing which happened in KOREA and especially in the fields of : Transportation Housing Heavy industrial …etc.That coming because of decision makers & capable planners for ever. We Would like to transfer the experiment of our friends ( KOREAN ) to our country through the cooperation between the two parties to let the doors Of the planner, investors & civil community associations opened to havemore & fast progressing & developing so we thank you very much in advance For your cooperation starting for the courses that been taken place in KOREA.