successful watershed planning - fb environmental …...workshop agenda 8:30 –9:00: registration...

33
Successful Watershed Planning Forrest Bell, FB Environmental Associates

Upload: others

Post on 14-Jul-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Successful Watershed Planning - FB Environmental …...Workshop Agenda 8:30 –9:00: Registration and Refreshments 9:00 –9:10: Welcome (Forrest Bell, FBE) Part 1: Watershed Management

Successful Watershed Planning

Forrest Bell, FB Environmental Associates

Page 2: Successful Watershed Planning - FB Environmental …...Workshop Agenda 8:30 –9:00: Registration and Refreshments 9:00 –9:10: Welcome (Forrest Bell, FBE) Part 1: Watershed Management

Workshop Agenda

8:30 – 9:00: Registration and Refreshments

9:00 – 9:10: Welcome (Forrest Bell, FBE)

Part 1: Watershed Management

9:10 – 9:55: Watershed Planning and Septic System Issues (Forrest Bell, FBE and Pat Tarpey, LWWA)

9:50 – 10:20: Using Build-Out Analyses for Lake Watershed Protection in the Region’s Rapidly Growing Communities (Forrest Bell,

FBE)

10:20 – 10:35: Watershed Grants (Andy Chapman, NH DES and Pat Tarpey, LWWA)

10:35 – 10:50: Youth Conservation Corps (Dustin Johnson, AWWA)

10:50-11:00: Break

Part 2: Pollutant Source Tracking

11:00 – 11:10: Pollutants in Surface Waters (Emily DiFranco, FBE)

11:10 – 11:30: Pollutant Source Tracking Methods (Emily DiFranco, FBE)

11:30 – 11:45: Canine Detection Video Demonstration (Environmental Canine Services)

11:45 – 12:00: Questions and Discussion

Page 3: Successful Watershed Planning - FB Environmental …...Workshop Agenda 8:30 –9:00: Registration and Refreshments 9:00 –9:10: Welcome (Forrest Bell, FBE) Part 1: Watershed Management

FB Environmental Associates

Offices in Portsmouth, NH and Portland, ME

Small business founded in 2001 to provide lake assessment, protection, and restoration assistance

Work with public sector clients located throughout New England

Page 4: Successful Watershed Planning - FB Environmental …...Workshop Agenda 8:30 –9:00: Registration and Refreshments 9:00 –9:10: Welcome (Forrest Bell, FBE) Part 1: Watershed Management

Lake Winnipesaukee Watershed

Page 5: Successful Watershed Planning - FB Environmental …...Workshop Agenda 8:30 –9:00: Registration and Refreshments 9:00 –9:10: Welcome (Forrest Bell, FBE) Part 1: Watershed Management

WHY DEVELOP A PLAN?

Because we care about the health of our lakes and want to keep them clean for future generations to enjoy.

If a lake doesn’t meet State standards it is required.

Page 6: Successful Watershed Planning - FB Environmental …...Workshop Agenda 8:30 –9:00: Registration and Refreshments 9:00 –9:10: Welcome (Forrest Bell, FBE) Part 1: Watershed Management

Pollution Sources

Past

Point source pollutiondischarged from pipe

Present

Now polluted runoff or nonpoint source pollution(NPS) from many smaller, diffuse sources

Page 7: Successful Watershed Planning - FB Environmental …...Workshop Agenda 8:30 –9:00: Registration and Refreshments 9:00 –9:10: Welcome (Forrest Bell, FBE) Part 1: Watershed Management

Phosphorus

Phosphorus is one of the major nutrients needed for plant growth.

Naturally present in small amounts.

Generally, as phosphorus increases, the amount of algae also increases.

Too Much P= Algae Blooms, Low DO, Fish Kills!

Page 8: Successful Watershed Planning - FB Environmental …...Workshop Agenda 8:30 –9:00: Registration and Refreshments 9:00 –9:10: Welcome (Forrest Bell, FBE) Part 1: Watershed Management

Water Quality & Property Values

For every 3 ft. decline in water

clarity, shorefront property

values can decline as much as

20%.

Declining property values affect

individual landowners and

economics of entire

communities.

With property rights comes

property responsibility

Page 9: Successful Watershed Planning - FB Environmental …...Workshop Agenda 8:30 –9:00: Registration and Refreshments 9:00 –9:10: Welcome (Forrest Bell, FBE) Part 1: Watershed Management

10,000’s YEARS IN NATURAL CONDITIONS

10’s to 100’s YEARS UNDER HUMAN INFLUENCE

Speeding aging of lakes

Page 10: Successful Watershed Planning - FB Environmental …...Workshop Agenda 8:30 –9:00: Registration and Refreshments 9:00 –9:10: Welcome (Forrest Bell, FBE) Part 1: Watershed Management

WATERSHED MANAGEMENT PLANNING

Build Public Support

Inventory of the Watershed

Define the Problems

Set Goals

& Develop Solutions

Create an Action Plan

Implement &

Evaluate

WatershedManagement

Cycle

Page 11: Successful Watershed Planning - FB Environmental …...Workshop Agenda 8:30 –9:00: Registration and Refreshments 9:00 –9:10: Welcome (Forrest Bell, FBE) Part 1: Watershed Management

BUILD STRONG LOCAL SUPPORT

Form a Steering Committee

Landowners NH DES

Conservation Districts Town Manager/Planner

USDA/NRCS Town Planners

Lake Associations Conservation Comm.

Page 12: Successful Watershed Planning - FB Environmental …...Workshop Agenda 8:30 –9:00: Registration and Refreshments 9:00 –9:10: Welcome (Forrest Bell, FBE) Part 1: Watershed Management

Develop a Landowner List

Send Postcards

Personal Letters w/map

Watershed Forum

Social Media

Press Releases

Posters & Website

Phone Calls

Publicize the Effort

Page 13: Successful Watershed Planning - FB Environmental …...Workshop Agenda 8:30 –9:00: Registration and Refreshments 9:00 –9:10: Welcome (Forrest Bell, FBE) Part 1: Watershed Management

ASSESS WATER QUALITY

Collect, Organize & Interpret Data

Identify Trends

Compare to Standards

Determine Assimilative Capacity

Set Water Quality Goal

0

1

2

3

Par

ts P

er B

illi

on

(pp

b)

Mean Annual Chloropyll-a Station 1-Fullers, Lake Wentworth, NH

Page 14: Successful Watershed Planning - FB Environmental …...Workshop Agenda 8:30 –9:00: Registration and Refreshments 9:00 –9:10: Welcome (Forrest Bell, FBE) Part 1: Watershed Management

INVENTORY THE WATERSHED

What is contributing to the problem?

Roads /Road Crossings

Residential Properties

Commercial Properties

Municipal Land

Forestry Activities

Agriculture

Golf Courses

Septic Systems

Page 15: Successful Watershed Planning - FB Environmental …...Workshop Agenda 8:30 –9:00: Registration and Refreshments 9:00 –9:10: Welcome (Forrest Bell, FBE) Part 1: Watershed Management

BMP Evaluation

GOAL: Decrease TSS & TP Loadings to the Lakes

Soil Erosion

Winter Sanding

Yard Waste

Fertilizers

Page 16: Successful Watershed Planning - FB Environmental …...Workshop Agenda 8:30 –9:00: Registration and Refreshments 9:00 –9:10: Welcome (Forrest Bell, FBE) Part 1: Watershed Management

IDENTIFY SOURCES OF POLLUTION

Methods

Volunteer Watershed Survey

Shoreline Survey

Septic System Survey

Stream Crossing Survey

Page 17: Successful Watershed Planning - FB Environmental …...Workshop Agenda 8:30 –9:00: Registration and Refreshments 9:00 –9:10: Welcome (Forrest Bell, FBE) Part 1: Watershed Management

ESTIMATE LOADING

Land-Use Modeling

Aerial pollutant loading

Known coefficients

Estimates pollutant load

Local factors added

Identify land uses with highest loading

Can be used to predict water quality in the future

Page 18: Successful Watershed Planning - FB Environmental …...Workshop Agenda 8:30 –9:00: Registration and Refreshments 9:00 –9:10: Welcome (Forrest Bell, FBE) Part 1: Watershed Management
Page 19: Successful Watershed Planning - FB Environmental …...Workshop Agenda 8:30 –9:00: Registration and Refreshments 9:00 –9:10: Welcome (Forrest Bell, FBE) Part 1: Watershed Management

DETERMINE REDUCTIONS NEEDED

# and Types of BMPs needed

Consider Future Development

Page 20: Successful Watershed Planning - FB Environmental …...Workshop Agenda 8:30 –9:00: Registration and Refreshments 9:00 –9:10: Welcome (Forrest Bell, FBE) Part 1: Watershed Management

What are the priorities?

How much will it cost?

Who will pay for the costs?

When will tasks be implemented?

Who will do the work?

How will it be tracked/monitored?

DEVELOP AN ACTION PLAN

Education & Outreach

BMPsMonitoring & Assessment

Municipal Ordinances

Page 21: Successful Watershed Planning - FB Environmental …...Workshop Agenda 8:30 –9:00: Registration and Refreshments 9:00 –9:10: Welcome (Forrest Bell, FBE) Part 1: Watershed Management

DEVELOP AN ACTION PLAN

Education & Outreach

BMPsMonitoring & Assessment

Municipal Ordinances

Page 22: Successful Watershed Planning - FB Environmental …...Workshop Agenda 8:30 –9:00: Registration and Refreshments 9:00 –9:10: Welcome (Forrest Bell, FBE) Part 1: Watershed Management

Components of a WBMP Plan

EPA’s 9 ELEMENTS

Source ID

Load Reduction Estimates

Management Measures

Technical & Financial Assist.

Education & Outreach

Schedule

Milestones

Evaluation Criteria

Monitoring Component

WQ Analysis & Goal Setting

Proposed Management

Measures

Action Plan

Monitoring & Adaptive Management

Page 23: Successful Watershed Planning - FB Environmental …...Workshop Agenda 8:30 –9:00: Registration and Refreshments 9:00 –9:10: Welcome (Forrest Bell, FBE) Part 1: Watershed Management

Example: Lake Wentworth/ Crescent Lake WBMP

Wolfeboro, New Hampshire

Page 24: Successful Watershed Planning - FB Environmental …...Workshop Agenda 8:30 –9:00: Registration and Refreshments 9:00 –9:10: Welcome (Forrest Bell, FBE) Part 1: Watershed Management

Active Steering Committee

Build-out Analysis

Door-to-Door Septic Survey

Municipal Ordinance Review

BMP Matrix

Conceptual Engineering Designs

Demonstration Sites

PROJECT COMPONENTS

Page 25: Successful Watershed Planning - FB Environmental …...Workshop Agenda 8:30 –9:00: Registration and Refreshments 9:00 –9:10: Welcome (Forrest Bell, FBE) Part 1: Watershed Management

LAKE WENTWORTH WBMP

Part of NH DES 319 Grant for HQW

FBE Developed Watershed-Based Management Plan 2011-2012

Page 26: Successful Watershed Planning - FB Environmental …...Workshop Agenda 8:30 –9:00: Registration and Refreshments 9:00 –9:10: Welcome (Forrest Bell, FBE) Part 1: Watershed Management

STORMWATER/SEPTIC SURVEY

Conduct a Septic and StormwaterSurvey to help address P and DO

concerns in lake

Collect baseline information about the state of septic systems in the shorezone(250 ft.)

Estimate P loading from septic systems

Educate watershed citizens about NPS

Page 27: Successful Watershed Planning - FB Environmental …...Workshop Agenda 8:30 –9:00: Registration and Refreshments 9:00 –9:10: Welcome (Forrest Bell, FBE) Part 1: Watershed Management

SURVEY PLANNING

Identify all properties within250 ft of waterbodies

Determine sector boundaries

625 Parcels Identified

Contact Volunteers

Notify Landowners

Page 28: Successful Watershed Planning - FB Environmental …...Workshop Agenda 8:30 –9:00: Registration and Refreshments 9:00 –9:10: Welcome (Forrest Bell, FBE) Part 1: Watershed Management

Recruiting Volunteers by “Shore”

Coordinated by LWF

Contact “Shore Reps”

Assign Shore Rep to Technical Staff

Set Survey Dates

Page 29: Successful Watershed Planning - FB Environmental …...Workshop Agenda 8:30 –9:00: Registration and Refreshments 9:00 –9:10: Welcome (Forrest Bell, FBE) Part 1: Watershed Management

Inform “Shore Residents”

Hand-Deliver Postcards

Inform neighbors of survey date

Page 30: Successful Watershed Planning - FB Environmental …...Workshop Agenda 8:30 –9:00: Registration and Refreshments 9:00 –9:10: Welcome (Forrest Bell, FBE) Part 1: Watershed Management

AGE- Septic Survey Results

1-10 yrs21%

10-15 yrs10%

15-20 yrs12%

20-25 yrs18%

Greater than 25 yrs21%

I don't know6%

No Response

Not Applicable

8%Other19%

How old is the septic system?

21% = New (1-10 yrs)

22%= (10-20 yrs)

39%= (>20 yrs)

5%= No Response

Page 31: Successful Watershed Planning - FB Environmental …...Workshop Agenda 8:30 –9:00: Registration and Refreshments 9:00 –9:10: Welcome (Forrest Bell, FBE) Part 1: Watershed Management

Pumping Frequency & Distance

20-50 ft6%

50-75 ft22%

Greater than 75 ft

61%

No Response4%

Not Applicable8%

Other12%

What is the approximate distance of your septic system from the lake or

stream?

Every 1-2 yrs38%

Every 3-5 yrs35%

Every 6-10 yrs3% More than 10

yrs2%

Never1%

I don't know5%

No Response

2%

Not Applicable15%

Other21%

How often do you have your septic tank pumped?

Page 32: Successful Watershed Planning - FB Environmental …...Workshop Agenda 8:30 –9:00: Registration and Refreshments 9:00 –9:10: Welcome (Forrest Bell, FBE) Part 1: Watershed Management

Perceptions/Behavior Results

Always, most of the time

53%

Sometimes15%

No, not really27%

No Response4%

When buying laundry detergents or dish

detergents, do you check the labels to buy no-phosphate or low phosphate products?

Page 33: Successful Watershed Planning - FB Environmental …...Workshop Agenda 8:30 –9:00: Registration and Refreshments 9:00 –9:10: Welcome (Forrest Bell, FBE) Part 1: Watershed Management

Success by Sector

79%

69%

48% 50%

74%

37%

76%

49% 51%

65%

11%20%

1 2 3 4 5 6 7 8 9 10 11 12

Sector Number

Total = 54%

Overall Success: 54% Septic and 88% Stormwater