subsea production systems (sc17)
DESCRIPTION
SUBSEA PRODUCTION SYSTEMS (SC17). UPDATE SUMMER 2014. SC 17 Report Summer 2014. High activity level on documents 16 of 27 documents being worked on 6 new TR Appointed l iaisons with Materials group, International Standards, Industry Standardization - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: SUBSEA PRODUCTION SYSTEMS (SC17)](https://reader036.vdocuments.us/reader036/viewer/2022082407/56812a5d550346895d8dc95d/html5/thumbnails/1.jpg)
SUBSEA PRODUCTION SYSTEMS(SC17)
UPDATE SUMMER 2014
![Page 2: SUBSEA PRODUCTION SYSTEMS (SC17)](https://reader036.vdocuments.us/reader036/viewer/2022082407/56812a5d550346895d8dc95d/html5/thumbnails/2.jpg)
SC 17 Report Summer 2014
• High activity level on documents– 16 of 27 documents being worked on– 6 new TR
• Appointed liaisons with Materials group, International Standards, Industry Standardization• 17A RP -Design &Operation of Subsea Production Systems- General requirements and Recommendations
– Will remove annex A and annex I. Material will go into TR – Annex G is covered in 17P; will delete
• 17E -Subsea Umbilicals– Will add Medium Voltage Cable (MV). Currently only includes Low Voltage (LV)
• 17F – Subsea Production Control Systems– Will remove chemical injection systems out of the document and turn it into new document TR/RP to be defined
• 17N –Subsea Reliability– Removing references to 17Q (Subsea Quality)– After completion, will address is 17Q is maintained or removed
• 17S –Subsea Multiphase Flow Meters– Under development– Will submit as Standard instead of RP
• 17W –Subsea Capping Stacks– Passed ballot. API currently editing for publishing
![Page 3: SUBSEA PRODUCTION SYSTEMS (SC17)](https://reader036.vdocuments.us/reader036/viewer/2022082407/56812a5d550346895d8dc95d/html5/thumbnails/3.jpg)
SC 17 Report Summer 2014
• Chemical Injection Systems– Sub comeette has 6 months to define scope adresing Operations, Systems, and Hardware– Once defined will create SRRR– will work under TR13 till
• Composite Thermoplastic Pipe– Motion passed for RP– Concern of limited suppliers (currently 2)– Currently referenced under 17G1