submitting the bill of material structure report_spd

Upload: larry-sherrod

Post on 30-May-2018

217 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/14/2019 Submitting the Bill of Material Structure Report_SPD

    1/31

    System Process DocumentSubmitting the Bill of Material Structure Report

    Department

    Responsibility/Role

    File Name 27762470.docRevision

    Document Generation Date 18/01/2010 09:40:00

    Date Modified 1/18/2010 09:40:00 AM

    Last Changed by

    Status

    Submitting the Bill of Material Structure Report

    Trigger:

    Concept

    The Bill of Material Structure Report enables you to report the details for all levels of an

    engineering or manufacturing bill of material. You can multiply the component usage by an

    explosion quantity to get an extended quantity. You can restrict the details of the report by

    entering the values of parameters in the Parameters page.

    In this topic, you will submit a bill of material structure report.

    Required Field(s) Comments

    Output - Result(s) Comments

    Additional Information

    Last changed on: 1/18/2010 09:40:00 AM Page 1

  • 8/14/2019 Submitting the Bill of Material Structure Report_SPD

    2/31

    System Process DocumentSubmitting the Bill of Material Structure Report

    Procedure

    Step Action

    1. Begin by navigating to the Bill of Material Reports page.

    Click the vertical scrollbar.

    Page 2 Last changed on: 1/18/2010 09:40:00 AM

  • 8/14/2019 Submitting the Bill of Material Structure Report_SPD

    3/31

    System Process DocumentSubmitting the Bill of Material Structure Report

    Step Action

    2. Click the Manufacturing and Distribution Manager link.

    Last changed on: 1/18/2010 09:40:00 AM Page 3

  • 8/14/2019 Submitting the Bill of Material Structure Report_SPD

    4/31

    System Process DocumentSubmitting the Bill of Material Structure Report

    Step Action

    3. Click the vertical scrollbar.

    Step Action

    4. Click the Bills link.

    Page 4 Last changed on: 1/18/2010 09:40:00 AM

  • 8/14/2019 Submitting the Bill of Material Structure Report_SPD

    5/31

    System Process DocumentSubmitting the Bill of Material Structure Report

    Step Action

    5. Use the Organizations page to select your organization.

    Last changed on: 1/18/2010 09:40:00 AM Page 5

  • 8/14/2019 Submitting the Bill of Material Structure Report_SPD

    6/31

    System Process DocumentSubmitting the Bill of Material Structure Report

    Step Action

    6. Click the M1 Seattle Manufacturing list item.

    Step Action

    7. Click the OKbutton.

    orPress [Alt+O].

    Page 6 Last changed on: 1/18/2010 09:40:00 AM

  • 8/14/2019 Submitting the Bill of Material Structure Report_SPD

    7/31

    System Process DocumentSubmitting the Bill of Material Structure Report

    Step Action

    8. Use the Submit a New Request page to enter either a single request or a set.

    Last changed on: 1/18/2010 09:40:00 AM Page 7

  • 8/14/2019 Submitting the Bill of Material Structure Report_SPD

    8/31

    System Process DocumentSubmitting the Bill of Material Structure Report

    Step Action

    9. Click the OKbutton.

    orPress [Alt+O].

    Step Action10. Use the Bill of Material Reports page to enter the name of the report that you

    want to run.

    Page 8 Last changed on: 1/18/2010 09:40:00 AM

  • 8/14/2019 Submitting the Bill of Material Structure Report_SPD

    9/31

    System Process DocumentSubmitting the Bill of Material Structure Report

    Step Action

    11. Click in the Name field.

    Last changed on: 1/18/2010 09:40:00 AM Page 9

  • 8/14/2019 Submitting the Bill of Material Structure Report_SPD

    10/31

    System Process DocumentSubmitting the Bill of Material Structure Report

    Step Action

    12. Enter the desired information into the Name field. Enter "Bill of Material

    Structure Report GUI".

    Step Action

    13. Use the Parameters page to enter the parameters for the Bill of Material Structure

    Report.

    Page 10 Last changed on: 1/18/2010 09:40:00 AM

  • 8/14/2019 Submitting the Bill of Material Structure Report_SPD

    11/31

    System Process DocumentSubmitting the Bill of Material Structure Report

    Step Action

    14. Click in the Item field.

    Last changed on: 1/18/2010 09:40:00 AM Page 11

  • 8/14/2019 Submitting the Bill of Material Structure Report_SPD

    12/31

    System Process DocumentSubmitting the Bill of Material Structure Report

    Step Action

    15. Use the System Items page to enter the item for which you want to run the

    structure report.

    Step Action

    16. Click in the Item field.

    Page 12 Last changed on: 1/18/2010 09:40:00 AM

  • 8/14/2019 Submitting the Bill of Material Structure Report_SPD

    13/31

    System Process DocumentSubmitting the Bill of Material Structure Report

    Step Action

    17. Enter the desired information into the Item field. Enter "RT_MODEL".

    Last changed on: 1/18/2010 09:40:00 AM Page 13

  • 8/14/2019 Submitting the Bill of Material Structure Report_SPD

    14/31

    System Process DocumentSubmitting the Bill of Material Structure Report

    Step Action

    18. Click the OKbutton.

    orPress [Alt+O].

    Step Action19. Click the vertical scrollbar.

    Page 14 Last changed on: 1/18/2010 09:40:00 AM

  • 8/14/2019 Submitting the Bill of Material Structure Report_SPD

    15/31

    System Process DocumentSubmitting the Bill of Material Structure Report

    Step Action

    20. Click in the Implemented Only REQUIRED field.

    Last changed on: 1/18/2010 09:40:00 AM Page 15

  • 8/14/2019 Submitting the Bill of Material Structure Report_SPD

    16/31

    System Process DocumentSubmitting the Bill of Material Structure Report

    Step Action

    21. Enter the desired information into the Implemented Only field. Enter "No".

    Step Action

    22. Click in the Component Item Detail field.

    Page 16 Last changed on: 1/18/2010 09:40:00 AM

  • 8/14/2019 Submitting the Bill of Material Structure Report_SPD

    17/31

    System Process DocumentSubmitting the Bill of Material Structure Report

    Step Action

    23. Enter the desired information into the Component Item Detail REQUIRED field.

    Enter "Yes".

    Last changed on: 1/18/2010 09:40:00 AM Page 17

  • 8/14/2019 Submitting the Bill of Material Structure Report_SPD

    18/31

    System Process DocumentSubmitting the Bill of Material Structure Report

    Step Action

    24. Click in the Assembly Detail field.

    Step Action

    25. Enter the desired information into the Assembly Detail REQUIRED field. Enter

    "Yes".

    Page 18 Last changed on: 1/18/2010 09:40:00 AM

  • 8/14/2019 Submitting the Bill of Material Structure Report_SPD

    19/31

  • 8/14/2019 Submitting the Bill of Material Structure Report_SPD

    20/31

    System Process DocumentSubmitting the Bill of Material Structure Report

    Step Action

    27. Enter the desired information into the Leadtime and Other Detail REQUIRED

    field. Enter "Yes".

    Step Action

    28. Click the OKbutton.

    orPress [Alt+O].

    Page 20 Last changed on: 1/18/2010 09:40:00 AM

  • 8/14/2019 Submitting the Bill of Material Structure Report_SPD

    21/31

    System Process DocumentSubmitting the Bill of Material Structure Report

    Step Action

    29. Click the Submit button.

    orPress [Alt+m].

    Last changed on: 1/18/2010 09:40:00 AM Page 21

  • 8/14/2019 Submitting the Bill of Material Structure Report_SPD

    22/31

    System Process DocumentSubmitting the Bill of Material Structure Report

    Step Action

    30. Use the Decision page to note the request ID.

    Step Action

    31. Click the No button.

    orPress [Alt+N].

    Page 22 Last changed on: 1/18/2010 09:40:00 AM

  • 8/14/2019 Submitting the Bill of Material Structure Report_SPD

    23/31

    System Process DocumentSubmitting the Bill of Material Structure Report

    Step Action

    32. Use the Navigator page to navigate to the Find Requests page.

    Last changed on: 1/18/2010 09:40:00 AM Page 23

  • 8/14/2019 Submitting the Bill of Material Structure Report_SPD

    24/31

    System Process DocumentSubmitting the Bill of Material Structure Report

    Step Action

    33. Click the View menu.

    orPress [Alt+V].

    Step Action34. Click the Requests menu.

    orPress [R].

    Page 24 Last changed on: 1/18/2010 09:40:00 AM

  • 8/14/2019 Submitting the Bill of Material Structure Report_SPD

    25/31

    System Process DocumentSubmitting the Bill of Material Structure Report

    Step Action

    35. Use the Find Requests page to enter the request ID.

    Last changed on: 1/18/2010 09:40:00 AM Page 25

  • 8/14/2019 Submitting the Bill of Material Structure Report_SPD

    26/31

    System Process DocumentSubmitting the Bill of Material Structure Report

    Step Action

    36. Click the Specific Requests option.

    Step Action

    37. Click in the Request ID field.

    Page 26 Last changed on: 1/18/2010 09:40:00 AM

  • 8/14/2019 Submitting the Bill of Material Structure Report_SPD

    27/31

    System Process DocumentSubmitting the Bill of Material Structure Report

    Step Action

    38. Enter the desired information into the Request ID field. Enter "5597442".

    Last changed on: 1/18/2010 09:40:00 AM Page 27

  • 8/14/2019 Submitting the Bill of Material Structure Report_SPD

    28/31

    System Process DocumentSubmitting the Bill of Material Structure Report

    Step Action

    39. Click the Find button.

    orPress [Alt+i].

    Step Action40. Use the Requests page to find the status of the request submitted.

    Page 28 Last changed on: 1/18/2010 09:40:00 AM

  • 8/14/2019 Submitting the Bill of Material Structure Report_SPD

    29/31

    System Process DocumentSubmitting the Bill of Material Structure Report

    Step Action

    41. Click the View Output button.

    orPress [Alt+p].

    Last changed on: 1/18/2010 09:40:00 AM Page 29

  • 8/14/2019 Submitting the Bill of Material Structure Report_SPD

    30/31

    System Process DocumentSubmitting the Bill of Material Structure Report

    Step Action

    42. The Bill of Material Structure Report displays the detail for all levels of a

    manufacturing bill of material.

    Step Action

    43. Click the vertical scrollbar.

    Page 30 Last changed on: 1/18/2010 09:40:00 AM

  • 8/14/2019 Submitting the Bill of Material Structure Report_SPD

    31/31

    System Process DocumentSubmitting the Bill of Material Structure Report

    Step Action

    44. You have completed the Submitting the Bill of Material Structure Report

    procedure.

    End of Procedure.