Submitting the Bill of Material Comparison Report
Trigger:
Concept
You can use the Bill of Material Comparison Report to report the comparison between two
manufacturing assemblies. You can compare primary bills, manufacturing and engineering bills,
alternates, and different revisions. Based on your comparison criteria, if the assemblies have
identical components, item sequences, operation sequences, yields, quantities, and
implementations, one line is printed for each identical component. Otherwise, the report prints a
separate line for each different component.
In this topic, you will submit a bill of material comparison report.
Required Field(s) Comments
Output - Result(s) Comments
Additional Information
Last changed on: 1/18/2010 09:40:00 AM Page 1
-
8/14/2019 Submitting the Bill of Material Comparison Report_SPD
2/19
System Process DocumentSubmitting the Bill of Material Comparison Report
Procedure
Step Action
1. Begin by navigating to the Report Bill of Material Comparison page.
Click the vertical scrollbar.
Page 2 Last changed on: 1/18/2010 09:40:00 AM
-
8/14/2019 Submitting the Bill of Material Comparison Report_SPD
3/19
System Process DocumentSubmitting the Bill of Material Comparison Report
Step Action
2. Click the Manufacturing and Distribution Manager link.
Last changed on: 1/18/2010 09:40:00 AM Page 3
-
8/14/2019 Submitting the Bill of Material Comparison Report_SPD
4/19
System Process DocumentSubmitting the Bill of Material Comparison Report
Step Action
3. Click the vertical scrollbar.
Step Action
4. Click the Comparison link.
Page 4 Last changed on: 1/18/2010 09:40:00 AM
-
8/14/2019 Submitting the Bill of Material Comparison Report_SPD
5/19
System Process DocumentSubmitting the Bill of Material Comparison Report
Step Action
5. Use the Organizations page to select your organization.
Last changed on: 1/18/2010 09:40:00 AM Page 5
-
8/14/2019 Submitting the Bill of Material Comparison Report_SPD
6/19
System Process DocumentSubmitting the Bill of Material Comparison Report
Step Action
6. Click the M1 Seattle Manufacturing list item.
Step Action
7. Click the OKbutton.
orPress [Alt+O].
Page 6 Last changed on: 1/18/2010 09:40:00 AM
-
8/14/2019 Submitting the Bill of Material Comparison Report_SPD
7/19
System Process DocumentSubmitting the Bill of Material Comparison Report
Step Action
8. Use the Report Bill of Material Comparison page to enter the items to be
compared.
Last changed on: 1/18/2010 09:40:00 AM Page 7
-
8/14/2019 Submitting the Bill of Material Comparison Report_SPD
8/19
System Process DocumentSubmitting the Bill of Material Comparison Report
Step Action
9. Click in the Item field.
Step Action
10. Enter the desired information into the Item field. Enter "CM15138".
Page 8 Last changed on: 1/18/2010 09:40:00 AM
-
8/14/2019 Submitting the Bill of Material Comparison Report_SPD
9/19
System Process DocumentSubmitting the Bill of Material Comparison Report
Step Action
11. Click in the Item field.
Last changed on: 1/18/2010 09:40:00 AM Page 9
-
8/14/2019 Submitting the Bill of Material Comparison Report_SPD
10/19
System Process DocumentSubmitting the Bill of Material Comparison Report
Step Action
12. Enter the desired information into the Item field. Enter "CM15140".
Step Action
13. Click the Report button.
orPress [Alt+R].
Page 10 Last changed on: 1/18/2010 09:40:00 AM
-
8/14/2019 Submitting the Bill of Material Comparison Report_SPD
11/19
System Process DocumentSubmitting the Bill of Material Comparison Report
Step Action
14. Use the Note page to note the request ID.
Last changed on: 1/18/2010 09:40:00 AM Page 11
-
8/14/2019 Submitting the Bill of Material Comparison Report_SPD
12/19
System Process DocumentSubmitting the Bill of Material Comparison Report
Step Action
15. Click the OKbutton.
orPress [Alt+O].
Step Action16. Click the View menu.
orPress [Alt+V].
Page 12 Last changed on: 1/18/2010 09:40:00 AM
-
8/14/2019 Submitting the Bill of Material Comparison Report_SPD
13/19
System Process DocumentSubmitting the Bill of Material Comparison Report
Step Action
17. Click the Requests menu.
orPress [R].
Last changed on: 1/18/2010 09:40:00 AM Page 13
-
8/14/2019 Submitting the Bill of Material Comparison Report_SPD
14/19
-
8/14/2019 Submitting the Bill of Material Comparison Report_SPD
15/19
System Process DocumentSubmitting the Bill of Material Comparison Report
Step Action
20. Click in the Request ID field.
Last changed on: 1/18/2010 09:40:00 AM Page 15
-
8/14/2019 Submitting the Bill of Material Comparison Report_SPD
16/19
-
8/14/2019 Submitting the Bill of Material Comparison Report_SPD
17/19
-
8/14/2019 Submitting the Bill of Material Comparison Report_SPD
18/19
System Process DocumentSubmitting the Bill of Material Comparison Report
Step Action
24. Click the View Output button.
Step Action
25. Based on the comparison criteria, if the assemblies have identical components, itemsequences, operation sequences, yields, quantities, one line is printed for eachidentical component.
Page 18 Last changed on: 1/18/2010 09:40:00 AM
-
8/14/2019 Submitting the Bill of Material Comparison Report_SPD
19/19
System Process DocumentSubmitting the Bill of Material Comparison Report
Step Action
26. You have completed the Submitting the Bill of Material Comparison Report
procedure.
End of Procedure.