submit 1 copy to appropriate district state of new mexico...
TRANSCRIPT
Submit 1 Copy To Appropriate District State o f N e w M e x i c o -Office • . District i - (575) 393-6161 Energy, Minerals and Natural Resources 1625 N. French Dr., Hobbs, NM 88240
S I T F L £ Arte4!! NM 882.0 OIL CONSERVATION DIVISION District in (505) 334-6178 1220 South St. Francis Dr. 1000 Rio Brazos Rd., Aztec, NM 87410 „ „ X T . , r , - ™ .
District iv - (505) 476-3460 Santa Fe, NM 87505 1220 S. St. Francis Dr., Santa Fe, NM 87505
Form C-103 Revised July 18,2013
Submit 1 Copy To Appropriate District State o f N e w M e x i c o -Office • . District i - (575) 393-6161 Energy, Minerals and Natural Resources 1625 N. French Dr., Hobbs, NM 88240
S I T F L £ Arte4!! NM 882.0 OIL CONSERVATION DIVISION District in (505) 334-6178 1220 South St. Francis Dr. 1000 Rio Brazos Rd., Aztec, NM 87410 „ „ X T . , r , - ™ .
District iv - (505) 476-3460 Santa Fe, NM 87505 1220 S. St. Francis Dr., Santa Fe, NM 87505
WELL API NO. 30-045-24037
Submit 1 Copy To Appropriate District State o f N e w M e x i c o -Office • . District i - (575) 393-6161 Energy, Minerals and Natural Resources 1625 N. French Dr., Hobbs, NM 88240
S I T F L £ Arte4!! NM 882.0 OIL CONSERVATION DIVISION District in (505) 334-6178 1220 South St. Francis Dr. 1000 Rio Brazos Rd., Aztec, NM 87410 „ „ X T . , r , - ™ .
District iv - (505) 476-3460 Santa Fe, NM 87505 1220 S. St. Francis Dr., Santa Fe, NM 87505
5. Indicate Type of Lease STATE • FEE •
Submit 1 Copy To Appropriate District State o f N e w M e x i c o -Office • . District i - (575) 393-6161 Energy, Minerals and Natural Resources 1625 N. French Dr., Hobbs, NM 88240
S I T F L £ Arte4!! NM 882.0 OIL CONSERVATION DIVISION District in (505) 334-6178 1220 South St. Francis Dr. 1000 Rio Brazos Rd., Aztec, NM 87410 „ „ X T . , r , - ™ .
District iv - (505) 476-3460 Santa Fe, NM 87505 1220 S. St. Francis Dr., Santa Fe, NM 87505
6. State Oil & Gas Lease No. E-3149
SUNDRY NOTICES AND REPORTS ON WELLS (DO NOT USE THIS FORM FOR PROPOSALS TO DRILL OR TO DEEPEN OR PLUG BACK TO A DIFFERENT RESERVOIR. USE "APPLICATION FOR PERMIT" (FORM C-101) FOR SUCH PROPOSALS.)
1. TypeofWell: Oil Well • Gas Well |E1 Other
7. Lease Name or Unit Agreement Name
State Com AH
SUNDRY NOTICES AND REPORTS ON WELLS (DO NOT USE THIS FORM FOR PROPOSALS TO DRILL OR TO DEEPEN OR PLUG BACK TO A DIFFERENT RESERVOIR. USE "APPLICATION FOR PERMIT" (FORM C-101) FOR SUCH PROPOSALS.)
1. TypeofWell: Oil Well • Gas Well |E1 Other 8. Well Number 30E
2. Name of Operator ConocoPhillips Company
9. OGRID Number 217817
3. Address of Operator P.O. Box 4289; Farmington, NM 87499-4289
10. Pool name or Wildcat BASIN DAKOTA
4. Well Location Unit Letter: N; 1000' feet from the SOUTH lined 1640' line and West feet from line Section 36 Township 30N Range 12W NMPM SAN JUAN County
11. Elevation (Show whether DR, RKB, RT, GR, etc.) 5808' GL
12. Check Appropriate Box to Indicate Nature of Notice, Report or Other Data
NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: PERFORM REMEDIAL WORK • PLUG AND ABANDON REMEDIAL WORK • ALTERING CASING • TEMPORARILY ABANDON • CHANGE PLANS • COMMENCE DRILLING OPNS.D PANDA • PULL OR ALTER CASING • MULTIPLE COMPL • CASING/CEMENT JOB • DOWNHOLE COMMINGLE • CLOSED-LOOP SYSTEM • OTHER - • OTHER: •
13. Describe proposed or completed operations. (Clearly state all pertinent details, and give pertinent dates, including estimated date of starting any proposed work). SEE RULE 19.15.7.14 NMAC. For Multiple Completions: Attach wellbore diagram of proposed completion or recompletion.
ConocoPhillips requests permission to plug and abandon the subject well per the attached procedure, current and proposed wellbore schematics. A Closed Loop System will be utilized. HW, ^ p / u i Vo w d - z W 0U.C0NS.DWDIST.3 AoU cUcf* P u 5 (Vo~v3afco/-'?'3(/0 / JUN moot. Macros plujj, Cro^ ^(aOO'- ^1°°
Spud Date: Rig Release Date:
I hereby certify that the information above is true and complete to the best of my knowledge and belief.
TITLE Staff Regulatory Technician DATE: 6/16/15 SIGNATURE
Type or print name Patsy Clugston E-mail address: [email protected] PHONE: 505-326-9518 For State Use Only
APPROVED BY: ̂ J x ^ ^ i M U T Y 0 1 L « GAS IN8P E CT 0 RDATE 7 W ) * T Conditions of Approval (if any): DISTRICT T%~
ConocoPhillips STATE COM AH 30E
Expense - P&A
Lat 36" 45' 50.396" N Long 108° 3' 10.8" W PROCEDURE This project requires the use of an A-Plus steel tank to handle waste fluids circulated from the well and cement wash up.
1. Hold pre-job safety meeting. Comply with all NMOCD, BLM, and COPC safety and environmental regulations. Test rig anchors prior to moving in rig Before RU, run wireline to remove downhole equipment. If an obstruction is found, set a locking-3-slip-stop in the tubing. 2. MIRU workover rig. Check casing, tubing, and bradenhead pressures and record them in Wellview. If there is pressure on the BH, contact the Wells Engineer.
3. Remove existing piping on casing valve. RU blow lines from casing valves and begin blowing down casing pressure. Kill well as necessary. Ensure well is dead or on a vacuum.
4. ND wellhead and NU BOPE. Pressure and function test BOP to 250 psi low and 1,000 psi over SICP high to a maximum of 2,000 psi held and charted for 10 minutes as per COP Well Control Manual. PU and remove tubing hanger
5. TOOH with tubing (per pertinent data sheet). Tubing size: 2-3/8" 4.7# J-55 EUE Set Depth: 6460' KB: 15
6. PU 4-1/2" bit and watermelon mill and round trip as deep as possible above top perforation at 6423".
7. PU 5-1/2" cement retainer on tubing, and set a 6373'. Pressure test tubing to 1,000 psi. Sting out of CR. Load hole, and pressure test casing to 800 psi. If casing does not test, then spot or tag subsequent plugs as appropriate. POOH w/ tubing.
8. RU wireline and run CBL with 500 psi on casing from CIBP/CR to surface to identify TOC. Adjust plugs as necessary for new TOC. Email log copy to Troy Salyers (BLM) at [email protected] and Brandon Powell (NMOCD) at [email protected] upon completion of logging operations.
All cement volumes use 100% excess outside pipe and 50' excess inside pipe. The stabilizing wellbore fluid will be 8.3 ppg, sufficient to balance all exposed formation pressures. All cement will be ASTM Class B mixed at 15.6 ppg with a 1.18 cf/sk yield.
9. Plug 1 (Dakota Perforations and Dakota/Graneros Formation Tops, 6273-6373", 17 Sacks Class B Cement) Mix cement as described above. Spot plug on top of cement retainer to isolate the Dakota and Graneros Formation tops as well as the Dakota perforations. Pull up hole.
10. Plug 2 (Gallup Formation Top, 5533-5633', 17 Sacks Class B Cement) Mix cement as described above and spot a balanced plug inside casing to isolate the Gallup Formation top. Pull up hole.
11. Plug 3 (Mancos Formation Top, 4630-4730'? 17 Sacks Class B Cement) Mix cement as described above and spot a balanced plug inside casing to isolate the Mancos Formation Top. Pull up hole.
12. Plug 4 (Mesa Verde Formation Top and Perforations, 3532=3633^7 Sacks Class B Cement) Mix cement as described above and spot a balanced plug inside casing to isolate the Mesa Verde Formation Top. Pull up hole.
13. Plug 5 (Pictured Cliffs and Fruitland Formation Top, 1350-2042', 85 Sacks Class B Cement) Mix cement as described above and spot a balanced plug inside casing to isolate the Pictured Cliffs and Fruitland Formation Tops. Pull Up hole.
14. Plug 6 (Kirtland and Ojo Alamo Formation Tops and Surface Casing Shoe, 0-800', 97 Sacks Class B Cement) Connect the pump line to the bradenhead valve and attempt to pressure test the bradenhead (BH) annulus to 300 psi. Note the volume to load. If the BH annulus holds pressure, then establish circulation out casing valve with water. Mix cement as described above and spot balanced plug inside casing from 800 to surface, circulating good cement out casing valve. Pull out of hole and lay down tubing. Shut in well and WOC. If the BH annulus does not test, then perforate at the appropriate depth and attempt to circulate cement to surface, filling the casing and the BH annulus to surface. Shut well in and WOC.
15. Nipple down BOP and cut off casing below the casing flange. Install P&A marker with cement to comply with regulations. Rig down, move off location, cut off anchors, and restore location.
ConocoPhillips CURRENT SCHEMATIC
STATE COM AH 30E District (Field Name API / UWI County State Province NORTH |DK 3004524037 SAN JUAN NEW MEXICO Original Spud Date Surface Legal Location E,W Out (ft) EJW Ret n i l D m in; HIS Ref
S.'IC I960 NMPM-30N-12W-36-N i MO.00 .'. 1 COO X s Vertical - Original Hole. 4/30/2015 9 16 59 AM
'.•2 if.Ke Vertical schematic (actual) Formalion Tops
I I I
464 9
485 9
4770
549 9
750 0
1.399 9
1.992.1
2.185.0
2.215.9
22169
2.431 1
3 023 0
3 669 9
3.682 1
3.691 9
3.7100
43199
4.328 1
4 341 9
4.3520
4.680 1
4.7290
4,7300
5 683 0
6.313.0
6.373.0
64199
6.4229
6459.0
6 460 0
6 502 0
6 529 9
6 545 9
6.674 1
6 676 1
6.577.1
6.591 9
6 624 0
66260
I. Surface. 8 5/8 in: 8.097 in: 15.0 ftKB. 466 0 ftKB
DV Tool (8 22171-
:ategory Perf Depth (MD) 3.682 0-3 692 0
l r-.ic-o-e I 'lc IrSI 3 632 0-3 692~ Acid Squeeze 1/16/1931. 3 682 0-
3.692 0
raciu-e l i e 1rc1 4 30c 0-4 350 0 Acid Squeeze: 1/14/1981 4.328 0-
4.3520 Dategory Perf. Depth tMD):4.328.0-
4.352 0
iDVTool iS 47 lo l -
l~ractu-e 1^ l £c l 6 - : T \ - - : Oategory Perf. Deptn (MDi 6 423 0
6.530 0 Acid Squeeze 1/7/1981 6 423 0-
6 530 0
?: Production 1; 51/2 in; 4 950 in: 1 S O ftKB: 6 626 0 ftKB
Surface Casing Cement 15 0-466 0 8/11/1980
Production Casing Cement:150-2.217 0. 8/26/1980
Tubing: 2 3/8 in: 4.70lb/ft J-55; Assumed 4 6*. SN on bottom. 15 C ftKB; 6.459 0 ftKB
Cement Squeeze 3 682 0-3 692 0 1/25/1931
Oemen: Squeeze 4 325 0-4 352 0 1/21/19»1 Cement Squeeze 4 342 0-4.362.0: 1/30/1981
Production Casing Cement 2 431 0-4.730 0: 8/26/1980
Seal Nipple 2 3/8 in. 6.459 0ftKB 6.460 0 ftKB
I Auto cement plug 6 574 0-6 625 0 8/26/1980 Production Casing Cement: 4.7300-6.626 0; 8/26/1980
OJO ALAMO
KIRTLAND
FRUITLAND
PICTURED CLIFFS LEWIS
CHACRA
CUFF HOUSE
MENEFEE
POINT LOOKOUT
MANCOS
UPPER GALLUP
GREENHORN
GRANEROS
TWO WELLS
PAG U ATE
CUEERO
ENCINAL
Page 1/1 Report Printed: 4/30 2015
ConocoPhillips Schematic - Proposed STATE COM AH 30E
District NORTH
Field Name DK
API / U W I
3004524037 County SAN JUAN
State/Province NEW MEXICO
Original Spud Date 8/10/1980
Surf Loc NMPM-30N-12W-36-N
East/West Distance (ft) 1.640 00
East/West Reference W
N/S Dist (ft) 1 000 00
North/South Reference S
Vertical - Original Hole, 1/1/2020 5:00:00 AM
Vertical schematic (actual) MD (ftKB) Formation
Tops
1: Surface: 8 5/8 in 8 097 in. 15 0 ftKB 466 0 ftKB
|DV Tool@22Tf1
PERF - CLIFF HOUSE MASSIVE: 3.682 0-3.692 0:
1/16/1981
PERF - POINT LOOKOUT; 4.328 0-4.352 0. 1/14/1981
| DV Tool @ 4730'
Cement Retainer; 6,373 0-6.375 0
PERF GRANEROS; 6,530.0.
6,423 0-1/6/1981
2: Productionl, 5 1/2 in. 4.950 in. 15.0 ftKB: 6.625 0 ftKB
Surface Casing Cement, 15 0-466 0; 8-11'1980. Cemented w 275 sx C'ass 6
rx 6 bb's to surface
PkJ8»6; 15 0-800.0. 1/1/2020. Mx 97 sx ass E err: end spot balanced plug made
csg from 800 to surface. e>x good cnt out csg valve
Piug«5. 1.350 0-2.042 0. 1/1/2020: M x 85 sx Class B cm*, and spot a balanced plug ns>d« csg to isolate the PC and Fruitland formation tops. Producton Casing Cement. 15.0-2.217,0.
. ' Cemented 3rd stage: 325 sx 55 -35 poz foki.ved by 275 sx 50 50 O x 54 sx to surface
Plug «"4. 3.532 0-3.632 0; 1'17020: Msx 17 sx Class B cm*, and spot a balanced plug nsde csg to isolate the MV' fotnaton lop
Cement Squeeze: 3.682 0-3.692 0. 175 '1981. Squeeze w' 200 sx Class B to 2000"
Cement Squeeze; 4.328 0-«.352 0. 1 28 19S1: 250 sx Pass B to 2500« Cement Squeeze. 4.342.0-*.352.0. 1'30'1981. Spot 100 G acd . BD @ 5 bpm I 2200 Sqz w 100 sx Cass E to 300 N a n : 4.630 0-4.730 0: M ' 2 0 2 0 : Mx 17 sx Class B cmt and spot a balanced plug M M a csg to isolate tne t.1ancos formation too Production Cas.ng Cement. 2.431.0-4.730.0. 876 '1980. Cemented 2nd stage 4 5 0 sx 5 0 50 p o z T O C @ 2 * 3 1 pe r 7 5 %
eff cac
Plug »2. 5.533 0-5.633 0. 1'17020; Mx 11 sx Class 6 cmt. spot a balanced plug <ns>de csg to isolate the Gallup formatcn t o p .
Plug » 1 . 6.273 0-6.373 0. 1'17020. Mx 17 sx Class B cmt. spot plug on top of cement retainer to isolate the DK and G-aneros formation lops as wen as the DK perfs
Production Casing Cement; 4.730 0-6.625 0. 8 26'1980. Cemented 1st stage 225 sx 50'50 poz TOC @ 4730 per 75% eff caic
Auto cement plug. 6.574.0-6.625 0. 876'1980. Automat-ca'V ceated cement plug fx-m the casng cement because it nad a tagged depth
15,1
4 6 6 9
477.0
549 9
750.0
7 9 9 9
1.3501
1.399.9
1.992.1
2 .0420
2 .1850
2.216.9
2.431.1
3.023.0
3.6322
3.631.9
3.669.9
3.682 1
3.691 9
3.710.0
4,319.9
4.32S.1
4.341.9
4.352.0
4.629.9
4.680.1
4.730 0
5.533.1
5.583.0
5.6329
6 .2730
6,313.0
6 .3730
6 .3750
6.419.9
6 .4229
6.502.0
6.529.9
6.545.9
6.574.1
6.591 9
6.625.0
OJO ALAMO
KIRTLAND
FRUITLAND
PICTURED
LEWIS
CHACRA
CLIFF HOU.
MENEFEE
POINT LOO
MANCOS
UPPER GA..
GREENHO..
GRANEROS
TWO WELLS
PAGUATE
CUBERO
ENCINAL
Page 1/1 Report Printed: 5/1/20...