1 Submission to Office of Legislative Audits & Board of Public Works Downtown Frederick Hotel & Conference Center by Peter Samuel March 18, 2019 SUMMARY: The Downtown Frederick Hotel and Conference Center project (DFH&CC or just ‘hotel project’) sponsored by the City of Frederick is the subject of extraordinary waste and fraud. Under Maryland law §12–102 it is the Board of Public Works’ duty to see that state funds flow only to projects that are efficiently and competitively procured. 1 Similarly at §2–1217 the Office of Legislative Audits exists to investigate and prevent fraud or waste by state agencies, and to advise the legislature where this occurs. 2 The City of Frederick’s (City) procurement of the hotel developer Plamondon Hospitality Partners (Plamondon) for the hotel project deserves investigation by the Office of Legislative Audits. Meanwhile the Board of Public Works should freeze all funds appropriated for this project. From 2010 on key aspects of the procurement of a hotel developer were outsourced by the City to a shady public-private body most commonly known as the Downtown Hotel Advisory Committee (DHAC 3 ). The DHAC specified the hotel to be sought in the RFP, decided sites to be considered, the form of the procurement, the selection of consultants. The Request for Proposals, RFP14J issued by the City in February 2014, was issued in the name of the DHAC. The DHAC formed the selection committee when proposals were received, and it scored the two proposals, presenting the Mayor and Board of Aldermen with what it claimed was a clear winner in Plamondon 4 . The DHAC has also been the source of promotional advocacy on behalf of the project. It has organized supporters to dominate meetings and paid for ‘independent’ experts to place favorable articles in newspapers and magazines. 5 1 http://mgaleg.maryland.gov/webmga/frmStatutesText.aspx?pid=&tab=subject5&stab=&ys= 2015RS&article=gsf&section=12-102&ext=html&session=2015RS/ 2 https://www.ola.state.md.us/top_pgs/Organizational%20Structure/organization_struc_main.htm l 3 Pronounced ‘dee-hack’ 4 Plamondon is used to mean Pete Plamondon Jr and his family business Plamondon Hospitality Partners which is the largest hotel operator in Frederick. 5 http://frederickhotelboondoggle.us/2016/09/griffin-key-points-for-recruited-speakers-says- no-taxpayer-s-to-be-used-calls-for-demolition-of-dilapidatedfire-damaged-tannery/

Upload: others

Post on 06-Aug-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Submission to Office of Legislative Audits & Board of ...frederickhotelboondoggle.us/wp-content/uploads/... · 3/18/2019  · From 2010 on key aspects of the procurement of a hotel

1

Submission to Office of Legislative Audits & Board of Public Works

Downtown Frederick Hotel & Conference Center by Peter Samuel March18,2019SUMMARY:TheDowntownFrederickHotelandConferenceCenterproject(DFH&CCorjust‘hotelproject’)sponsoredbytheCityofFrederickisthesubjectofextraordinarywasteandfraud.UnderMarylandlaw§12–102itistheBoardofPublicWorks’dutytoseethatstatefundsflowonlytoprojectsthatareefficientlyandcompetitivelyprocured.1Similarlyat§2–1217theOfficeofLegislativeAuditsexiststoinvestigateandpreventfraudorwastebystateagencies,andtoadvisethelegislaturewherethisoccurs.2TheCityofFrederick’s(City)procurementofthehoteldeveloperPlamondonHospitalityPartners(Plamondon)forthehotelprojectdeservesinvestigationbytheOfficeofLegislativeAudits.MeanwhiletheBoardofPublicWorksshouldfreezeallfundsappropriatedforthisproject.From2010onkeyaspectsoftheprocurementofahoteldeveloperwereoutsourcedbytheCitytoashadypublic-privatebodymostcommonlyknownastheDowntownHotelAdvisoryCommittee(DHAC3).TheDHACspecifiedthehoteltobesoughtintheRFP,decidedsitestobeconsidered,theformoftheprocurement,theselectionofconsultants.TheRequestforProposals,RFP14JissuedbytheCityinFebruary2014,wasissuedinthenameoftheDHAC.TheDHACformedtheselectioncommitteewhenproposalswerereceived,anditscoredthetwoproposals,presentingtheMayorandBoardofAldermenwithwhatitclaimedwasaclearwinnerinPlamondon4.TheDHAChasalsobeenthesourceofpromotionaladvocacyonbehalfoftheproject.Ithasorganizedsupporterstodominatemeetingsandpaidfor‘independent’expertstoplacefavorablearticlesinnewspapersandmagazines.5

1http://mgaleg.maryland.gov/webmga/frmStatutesText.aspx?pid=&tab=subject5&stab=&ys=2015RS&article=gsf&section=12-102&ext=html&session=2015RS/2https://www.ola.state.md.us/top_pgs/Organizational%20Structure/organization_struc_main.html3Pronounced‘dee-hack’4PlamondonisusedtomeanPetePlamondonJrandhisfamilybusinessPlamondonHospitalityPartnerswhichisthelargesthoteloperatorinFrederick.5http://frederickhotelboondoggle.us/2016/09/griffin-key-points-for-recruited-speakers-says-no-taxpayer-s-to-be-used-calls-for-demolition-of-dilapidatedfire-damaged-tannery/

Page 2: Submission to Office of Legislative Audits & Board of ...frederickhotelboondoggle.us/wp-content/uploads/... · 3/18/2019  · From 2010 on key aspects of the procurement of a hotel

2

ItconductedrepeatedlobbyingexpeditionstoAnnapolisinpursuitofstatefunds,whilebeingsupportedbylobbyistshiredbytheFrederickCountyChamberofCommerce,butwithmajorityfundingbyCityandCountygovernments.6TheDHACwasrifewithconflictsofinterestcomprisingCity-appointedofficialsandinterestgroupswantingpublicfundingforahotelunderCitysponsorship.7TheDHACwasformedbytheCityoutofapre-existingChamberofCommercelobbygroupforapubliclysupportedhotelandconferencecenter.AtakeypointinitsworkthechosendeveloperPetePlamondonJrhimselfwasamemberoftheDHAC.8Plamondoncompanyrepresentativesappeartohavebeeninstrumentalinabandonmentofthecompetitivetwo-stageprocedurerecommendedbyCity/DHACconsultant,JonesLangLaSalle(JLL).PlamondonwasthencloselyinvolvedwiththewritingoftheRequestforProposals(RFP).JLL’sfunctionincludedestablishingcriteriaforselectingthedeveloperandsettingupthescoringmethodologyoftheDHAC.Plus,aJLLstafferwasamemberoftheDHACwhichscoredthebidsandchosethewinner.TherewascontinuousPlamondon-JLLcommunicationformanyweeksbeforetheRFPwasissuedandbetweentheissuanceoftheRFPandthedeadlineforsubmissions,allthisinflagrantviolationofCityPurchasingRulesandestablishedcompetitiveprocurementpractices.9http://frederickhotelboondoggle.us/2018/03/anirban-basu-downtown-hotel-shill-paid-1600-for-frederick-news-post-article-paid-byguess-who/6http://frederickhotelboondoggle.us/2017/02/city-continues-lobbying-for-dhcc-10750-being-spent-this-session-in-annapolis/7The DHAC comprises City and County ‘economic development’ officials and representatives of five business groups — Frederick County Chamber of Commerce, Major Employers Group, Downtown Frederick Partnership, Tourism Council of Frederick County, and East Frederick Rising. The latter are the interest groups who want a publicly funded DFH&CC. The selected developer Pete Plamondon Jr was apparently a member of the DHAC until not long before the procurement. He was publicly recognized as a member of DHAC, being introduced as such by DHAC chairman Robbins at the beginning of a DHAC presentation to the Mayor & Board of Aldermen meeting, February 6, 2013. Video of the meeting.8See footnote 5.9Theseprovidefora‘blackout’betweenRFPissuanceuptothedeadlineforproposalsduringwhichtheonlycommunicationsbetweenproposersandprocurementofficialsmaybequestionsinwriting,withquestionsandanswerssharedwithotherproposer(orproposers.)

Page 3: Submission to Office of Legislative Audits & Board of ...frederickhotelboondoggle.us/wp-content/uploads/... · 3/18/2019  · From 2010 on key aspects of the procurement of a hotel

3

BadstartTheDHACgotofftoabadstartin2010.ThefirstChairmanoftheDHAC,appointedbythen-MayorRandyMcClement10waslocalbusinessmanMarkGaver,awell-knowncharmingFredericksocialitebut,unknownatthetime,aseriousconman.WenowknowthataroundthetimeofhisappointmenttochairtheDHACGaverhadbegunalong,patientbankfraudwhichovereightyearsgarnerednearly$50millionaccordingtotheUSJusticeDepartmentindictmentinDecember2017–almostcertainlythelargestfraudinFrederick’shistory.11TheGaverfraudbasedonforgedfinancialreportsandclaimsof‘classified’governmentcontractswasconductedattheexpenseofshareholdersoftheSantanderbankandtheemployeesofhisowncompany.InlessthantwoyearsGaverhadgivenuphispositionaschairoftheCityhotelcommittee,butthisscoundrelhadsetthepatternfortheDHAC’sshadymodeofoperation.ClaimedforthebenefitofStateofficials12tobeprimarilyaFrederickCountyChamberofCommerceoperation,theDHAC’smeetingswereconvenedbyRichardGriffin,theMayor’sDirectorofEconomicDevelopmentandtheCity’sprojectmanagerforthehotel.Griffin,asalariedCityofficialsettheagenda,sentoutemails,briefedthechairmanandactedasthecommittee’sexecutivesecretaryinfollow-up.DHACmeetingswereusuallyheldinCityHall.13AppointedbytheMayor,runbytheCityDED,andgivenCitytaskstoperform,theDHACwasclearlyaCity‘publicbody’requiredtoobservethestateOpenMeetingsActrequirementstoprovidepublicnoticeofmeetings,publishanagenda,operateonlywithaquorum,compileminutesandadmitthepublicincludingreportersto10Gaver’sappointmentasthefirstchairmanoftheDowntownHotelAdvisoryCommitteewasannouncedbythen-MayorRandyMcClementonFebruary3,2010.FrederickNews-Post2010/02/04.11GaverwasconvictedofalltencountsofbankfraudandmoneylaunderingbyajuryinUSDistrictCourtinBaltimoreAugust1,2018andwassentencedbyUSJudgeRichardD.Bennettto17yearsinprisonDecember13,2018.seehttp://frederickhotelboondoggle.us/2018/08/gaver-guilty-first-hac-chair-mark-gaver-convicted-for-50m-bank-fraud/Earlierhttp://frederickhotelboondoggle.us/2017/12/first-hac-chairman-mark-gaver-arrested-and-charged-with-50m-bank-fraud-fnp/#more-2513/Sentencing:https://www.fredericknewspost.com/news/crime_and_justice/cops_and_crime/former-frederick-business-owner-sentenced-to-years-for-m-fraud/article_d195cd63-0769-5934-b24d-bd24d5bf75eb.html/12CitysubmissiontotheStateOpenMeetingsComplianceBoarddated2018/04/13inchallengebytheauthor.13ThisdescriptionoftheoperationsoftheDHACisbasedona90-minuteinterviewwiththesuccessortoGaverasDHACchairmanEarlRobbinsinStarbucksonNMarketStreet,August28,2017aswellascommunicationsobtainedthroughPIAfilings.

Page 4: Submission to Office of Legislative Audits & Board of ...frederickhotelboondoggle.us/wp-content/uploads/... · 3/18/2019  · From 2010 on key aspects of the procurement of a hotel

4

observethosemeetings.However,theDHACoperatedforsevenyearsdoingpublicbusinessontheCityhotelprojectbehindcloseddoors.ItcontinueduntilafteritwaschallengedbymeatthestateOpenMeetingsComplianceBoardinthefallof2017.14ThroughPublicInformationActfilingsandwiththehelpofoneCityAldermanwehavemanagedtogetanumberofDHACandotherCitydocumentswhichmakeclearthattheDHACmissionwastocontriveaprocurementthatlookedcompetitive,buttosteerthecontracttoPlamondon.Inemailsprojectofficialssaidthattheappearanceofcompetitionwasessentialtoobtainstatemonies.15Evidenceofthefraudfollows:1.BackroomCitycommitteerejectedcompetition-friendlytwo-stageprocurementrecommendedbyconsultantJLLTheCity’sleadconsultantJonesLangLaSalle(JLL)proposedtoDHACatwo-stageprocurementinordertomeettheCitydesiretocontrolthehotelsite.TheCitywouldprocureahotelsiteinthefirststage,negotiatingwiththeownersoffoursitesjudgedsimilarinsuitability.HavingsecuredasitetheCityprocurementwouldproceedtoasecondstageinwhichanunlimitednumberofhoteldeveloperscouldmakeproposalsfordevelopingthechosenCitysite.Thiswouldallowfullandopencompetitionfortherighttodevelopthehotelonthatsite.Moreimportant,competitionfortherighttotheCity,CountyandStatefinancialsupportbeingheldoutasinducement.JLLalsopointedoutthatbysecuringthesitefirsttheCitywouldbeinabetternegotiatingpositiontogetagoodbuyontheland.InitiallytheDHACsupportedthe

14There the City Attorney argued the DHAC was a local Chamber of Commerce, not a City, entity. This contradicted repeated public statements that the DHAC was appointed by the Mayor. And it was inconsistent with City Hall being the normal venue for DHAC meetings and the central role of the City’s Richard Griffin in calling meetings, setting the agenda, and the City’s financing of DHAC consultants to the tune of about $300,000. In calling DHAC a Chamber of Commerce entity the City was saying, in effect, it had outsourced procurement of a developer as City ‘partner’ to a business group, the very group which had been lobbying for taxpayer underwriting of the project. 15ExtensionofthedeadlineinRFP14JwasurgedbyGriffinonthesegroundswhenWormaldsaidhewasotherwiseunabletosubmitaproposal–inanemailtoCitypurchasingofficerKandiFullerton.

Page 5: Submission to Office of Legislative Audits & Board of ...frederickhotelboondoggle.us/wp-content/uploads/... · 3/18/2019  · From 2010 on key aspects of the procurement of a hotel

5

two-stageprocurement.16Thesite-first/developer-secondprocedurewasanintegralpartoftheDHACpresentationattheJuly31,2013Mayor&BoardWorkshop.Therewasnomentionatalloftheoptionofthesingle-stage,bring-your-siteoption,eventuallyimplementedsevenmonthslaterasRFP14JintheSpringof2014.AttheJuly31,2013meetingtherewaswide-rangingdiscussionofotherissues,butthepro-competitiontwo-stageprocurementwasacceptedbyallasThePlan.Promisesweremadeofanotherhearingbeforetheprocurementwasfinalized,butnofollow-uphearinghappened.Thesummer2013Workshopwasthelastpublichearingontheprocurementbeforethesingle-stageRequestforProposalswasissuedasRFP14JonFebruary19,2014.Theadviceofatwo-stageprocurementwasclearlyarticulatedinaJLLreportfortheDHACdatedOctober11,2013butthereportwasnotdistributedorreleasedtothepublic.17Itstates:“JLL’srecommendationwas(andcontinuestobe)toselectasitefirstandsecureitthroughanoptionagreementorlandpurchasecontract.Oncethe(hotel)siteissecured,stepstoselectahoteldeveloperthroughanRFPprocesscancommence.”(p4)JLL’swording“was(andcontinuestobe)”suggeststherewasadisagreementinwhichDHACwantedtolimitcompetitionwhileitsconsultantJLLwantedtobeontherecordasfavoringopencompetition.WiththeDHACalwaysmeetingbehindcloseddoorsknowledgeofthisdisagreementwaskeptundercoverattheverytimethatthetermsoftheRFPwerebeingrewrittenandtheprocurementconducted.16AtaMayor&BoardofAldermen(M&B)WorkshoponJuly31,2013,RichardGriffinonbehalfoftheDHACdistributedJLLslidesoneofwhichwasaProjectScheduleshowingasiteacquisitionfirstfollowedbyaseparateprocurementofadeveloper.MonthlycolumnsshowedtheSiteacquisitioncompletedinsevenmonthsendinginSeptember,andthedeveloperprocurementthenbeginninginOctoberandtakingsixmonthsafterthat.JLLpresenterJohnGibbalsospoketoatwo-stageprocurement.Seehttp://frederickhotelboondoggle.us/2018/03/procurement-rfp14j-workshopped-but-never-presented-discussed-or-voted-on-by-mayor-board-at-public-hearing/#more-275317IsoughtacopyofthisreportunderthePublicInformationActinthesummerof2017.ItwasinitiallydeniedbytheCityinvoking‘deliberativeprivilege.’IprotestedandasympatheticAldermanintervenedwithCityofficialstoreleasethedocument.TheCityrelentedandwegotthereport.Aldermenwe’vespokentoseemedunawareofitsexistence,soitappearstohavebeenkeptwithintheDHACandtheCityDED.

Page 6: Submission to Office of Legislative Audits & Board of ...frederickhotelboondoggle.us/wp-content/uploads/... · 3/18/2019  · From 2010 on key aspects of the procurement of a hotel

6

2.Plamondondraftthebasisforthesingle-stageRFPThequestionarises:howdidtheDHACcometoabandonthecompetitivetwo-stageprocurementagainsttheadviceofconsultantJLL,andincontradictionoftheDHAC’slaststatementtotheBoardofAldermenandthepublic.PlamondonanditssupportersontheDHACapparentlydidnotwantarealcompetitiveprocurement,onlytheappearanceofit.Thesubjectmusthaveariseninthelatefallof2013whenJLLfelttheneedtoputonrecordtheirrecommendationthattheDHACstickwithatwo-stageprocurementtomaximizecompetition.Theyworkedona‘siteacquisitionstrategy,finalsubmission’November6,2013throughNovember25,JLLtimesheets18show.AshortDecemberandthefirstweeksofJanuary2014occupiedJLLwithworkon‘Plamondonproposal/presentationcorrespondence,’theirbillingsshow.AtthispointtimesheetssuggestPlamondonsubmittedsuggestionsontheprocurementRFPinthefirstweeksof2014.JLL’sPeteLambisreported3hours“CoordinatewithPl(amondon)regardingdraftinghotelRFP…”onJanuary15,2014andJanuary26hereported4hoursworkas“Review/editPl(amondon)versionofRFP,submittoRichard(Griffin,Cityprojectmanager.)”PlamondonmadeaprivatepresentationoftheirsubmissiontoaspecialDHACmeetingJanuary13afterwhichJLLbilledsevenhoursforreview.Theconsultantsthenbilleddayafterdayfor“draftingRFP”and“Plamondoncorrespondence.”BehindcloseddoorsPlamondonandtheDHACwereinstrumentalinjettisoningtheannouncedtwo-stageprocurementinfavorofthePlamondon-authoredsinglestageprocurement.GiventhattheMayor&Boardwerepresentedwiththetwo-stageprocurementinwhichtherewouldbeunlimitedcompetitionfortherighttodevelopaselectedsiteattheirlastmeetingbeforetheissuanceofthesingle-stageanti-competitiveRFPinFebruary2014itcouldbearguedthattheRFP-as-issuedwasunauthorized19andlegallyinvalid.Insteadofthepromisedfollow-upataformalpublicmeetingoftheMayor&Board

18JaneWeirandIobtainedhundredsofJLLinvoicestotheCitythroughPublicInformationActfilings.TheinvoicescontainedtimesheetsshowingdaybydayworkbyfiveJLLconsultantsworkingfortheDHAConCitycontract.19“Allpurchasesforcommoditiesorservicesthathaveacumulativetotalforthelifeofthecontractof$50,000ormoremustbemadebyformalcompetitivesolicitations.TheapprovalofTheBoardofAldermenisrequired.”Page25,SectionIVofCityofFrederickPurchasingPoliciesandProceduresManual.NoapprovalforRFP14JwasgivenbytheBoardofAldermenanditstermswerelessthanfullycompetitive.

Page 7: Submission to Office of Legislative Audits & Board of ...frederickhotelboondoggle.us/wp-content/uploads/... · 3/18/2019  · From 2010 on key aspects of the procurement of a hotel

7

ofAldermenthereseemtohavebeensomeselectiveprivatemeetings,buttheirscopeisunknown.OneoftheAldermanatthetime,ShelleyAloi,toldustherewereprivatemeetingsofAldermenwithCityprojectmanagerandDHACsecretaryRichardGriffin.ButthenewMayor,thenAlderman,MichaelO’Connorhasheatedlydeniedanyclosed-doormeetingonthesubject.20AnotherAldermanDonnaKuzemchakhascharacterizedtheabandonmentofthetwo-stagecompetitiveformatasaunilateralactionofthethen-MayorMcClementandDEDheadGriffinandhascomplainedthatitwasneverproperlyputtotheBoardofAldermen.Inanycasethesingle-stageRFPwentforwardinsuchamannerastodrasticallylimitcompetition.Onlyeligibletobidwerehoteldeveloperswith‘control’--eitherownershiporanegotiatedcontract-to-buy–ofanapprovedsite.ProposalshadtobelinkedtooneoffourDHAC-selecteddowntownsites.Fewerreally,sinceoneofthesiteswasthedowntownPostOffice.TherehasbeentalkthatthePostOfficemaybedownsized(sortingofmailnolongeroccurshere)buttheUSPShasnotproposedsellingtheproperty,soitwasnotarealchoiceforahotel,atleastnotintheCity’splannedtimeframe.Theownerofanotherofthefoursites(Jemal/UnionMills)alreadyhadplansfordevelopingofficespaceandwasn’tinterestedindoingahotel,reducingpotentialbidstoamaximumoftwo.TheDHACthereforereceivedonlytwoproposals,onefromPlamondonforahotelcomplexontheoldFrederickNews-Postsite21andasecondfromtheEdWormald,amajorcommercialdeveloperwhoownedasitenearbyknownastheGalleriasite.Hewaspartneredwithhotelspecialists.Compoundingthelimitedopportunityforcompetitionwastheearlydeadlineforproposals.AsissuedonFebruary19,2014RFP14JrequiredproposalstobesubmittedbyApril3–injust43daysor6weeks!Onlydeveloperswithadvanceinsideinformationaboutthehotelspecifications,andmuchofaproposalalreadyworkedupatthetimeofRFPissue,couldmeetsuchshortadeadline.Asitwasthesecondproposer,Wormaldsaidwithjusttwoweekstogothathecouldn’tcomplete20Giventheimportanceoftheextraordinaryswitchfromthetwo-stageprocurementtoasingle-stageRFPneverbeingheardatapublichearingIsubmittedacomplainttothestateOpenMeetingsComplianceBoard2018/03/28aboutthisbeingdecidedinprivatemeetings.Seehttp://frederickhotelboondoggle.us/2018/03/complaint-to-state-open-meetings-compliance-board-about-backroom-deal-on-city-procurement/TheBoard,unfortunately,saiditdidnothaveenoughinformationtomakearuling.21ChoiceoftheoldFrederickNews-Postsitemeantuntilarecentchangeinownershipthelocalnewspaper’sownershadamajorfinancialinterestinthesuccessofthehotelproject.Thishassurelybeenafactorinthenewspaper’sunwillingnesstoinvestigatethescandalsurroundingtheprocurementandtodownplaycriticismsandbadnewsabouttheproject.

Page 8: Submission to Office of Legislative Audits & Board of ...frederickhotelboondoggle.us/wp-content/uploads/... · 3/18/2019  · From 2010 on key aspects of the procurement of a hotel

8

hissubmissionwithoutmoretime.Extensionsweremadetokeephimintheofficialrace,anditendedup73daysor10.5weeks.3.ClosePlamondon-GriffinrelationshipgoeswaybackThishotelasaCity-sponsoredprojectwasinitiatedbyPetePlamondonJr,principalofthePlamondoncompany.Hehassaidasmuchhimself.SpeakingatacelebratorypubliceventApril13,2016PlamondontracedcollaborativethinkingontheprojecttothedaythatstatefundingforanewFrederickI-70Interchangewasannounced--November17,2005.ThatnewinterchangeandtheassociatedextensionofEastStreetproducedanew‘gateway’totheDowntown.PlamondonsaidinhistalkthatherememberedthedayhehadpickeduptheFrederickNews-PostfromhisfrontlawnandreadtheirreportthatthelongplannednewinterchangewasnowfundedforconstructionbytheState.HesaidhehadthencalledRichardGriffin,longtimedirectoroftheCity’sdepartmentofeconomicdevelopmentandsaidtoGriffin:“Nowwecantalkseriouslyaboutadowntownhotel.”22Emphasizingthe‘seriously’theclearimplicationwasthattheyhadpreviouslytalkedofaCity-sponsoreddowntownhotel,butthathehadtakenthepositionthatapre-requisitewasthenewEastStreet‘gateway.’Withnewsthatthenew‘gateway’interchangewasbeingbuiltPlamondonhadinitiatedtalkswithGriffin.Thetwohavebeencloseontheprojecteversince.PlamondonasamemberoftheDowntownHotelAdvisoryCommittee(DHAC)untilatleastFebruary2013wasinontheclosed-doordeliberationsaboutsitesandthespecificationsforthehotelinthelead-uptotheissueoftheRequestforProposals.234.ShamcompetedprocurementSo,therearemanyindicationsthattheselectionofPlamondon-developer/FrederickNewsPost-sitewasadonedealbythebeginningof2014andthattheRFP14Jprocurementwasconductedtoproducemerelytheappearanceofcompetition.22Imadeatranscriptwasmadefromthese56-minutevideos:http://cityoffrederick.granicus.com/MediaPlayer.php?view_id=27&clip_id=2886Alsohttps://youtu.be/41AkVsQxrXw23AtaMayor&BoardWorkshopFebruary6,2013toendorsetheDHACrecommendationofJonesLangLaSalle(JLL)asprincipalconsultantHACchairmanEarlRobbinsbeganbyintroducingthemembersoftheDHACinthemeetingroom.“PetePlamondonfromPlamondonEnterprises”wasoneofthoseintroducedasamemberoftheDHAC.24http://mgaleg.maryland.gov/webmga/frmStatutesText.aspx?article=ggp&section=5-508&ext=html&session=2015RS&tab=subject5

Page 9: Submission to Office of Legislative Audits & Board of ...frederickhotelboondoggle.us/wp-content/uploads/... · 3/18/2019  · From 2010 on key aspects of the procurement of a hotel

9

Statedsimply,itwasashamcompetedprocurement.Plamondon’swinningproposalwasknowninsomedetailtotheCityDepartmentofEconomicDevelopment(DED)andtotheDHACwellbeforetheofficialRequestforProposals(RFP14J)wasissuedFebruary19,2014.January13,Plamondongaveafullpresentationofitsproposaltoaspeciallyscheduled2-hourmeetingofDHAC.AwrittencopyofthePlamondonproposalwasreceivedbyDecember2013--atleasttenweeksbeforetheRFPwasissued(February19,2014)andatleastfivemonthsbeforeproposalswereofficiallydue(May9,2014,afterextension.)WeknowthatfromPIA-obtainedtime-sheetsthatJLLsubmittedtotheCityinsupportoftheirmonthlyinvoicesforservicesrenderedtothehotelproject.ThetimesheetsshowthatJLLwasworkingonPlamondon’ssubmission(orproposal)fromDecember10,2013.AtthesametimeJLLwaswritingtheRFP!Infederallawandbestprocurementpracticesanyunsolicitedproposalisunacceptableifacompetedprocurementiscontemplated.Theroutineisthatitsreceiptshouldbeannounced,andtheproposalisreturnedtotheofferorunread.Federallawmakesclearanunsolicitedproposalcannotbeusedbyoneproposertogetmoretimeforconsiderationthancompetitors.AlsoStatelawat§5–508states:“(a)Anindividualwhoassistsanexecutiveunitinthedraftingofspecifications,aninvitationforbids,arequestforproposalsforaprocurement,ortheselectionorawardmadeinresponsetoaninvitationforbidsorrequestforproposals,orapersonthatemploystheindividual,maynot…(2)assistorrepresentanotherperson,directlyorindirectly,whoissubmittingabidorproposalforthatprocurement.”24TheactivitiesofJLLconsultantsunderCitysupervisioncontravenethisprovisioninlaw.JLLconsultantswereassistingtheDHACandtheCityindraftingtheprocurementRFPforweeks,whilealsoworkingwithPlamondononshapingitsbidbeforeformalsubmission.Furthermore,aspreviouslyoutlined,JLLworkedwithadraftRFPandanewlyanti-competitivesingle-stageprocedurewhosedraftwasprovidedbynoneotherthanPlamondon.JLL’sPeteLambisandTylerKrehbieleachincludeasServicesRenderedinthetimesheetswithJLLInvoice008848datedJanuary31,2014thefollowing:“Plamondon24http://mgaleg.maryland.gov/webmga/frmStatutesText.aspx?article=ggp&section=5-508&ext=html&session=2015RS&tab=subject5

Page 10: Submission to Office of Legislative Audits & Board of ...frederickhotelboondoggle.us/wp-content/uploads/... · 3/18/2019  · From 2010 on key aspects of the procurement of a hotel

10

proposal/presentationcorrespondence”2hoursonDecember10,2013(Citybill$620)fivemonthsbeforeanyproposalshouldhavebeenavailabletoanyonebuttheCityPurchasingManager,andtenweeksbeforetheRFPwasissued.LambishadmetPlamondonpeopletwomonthsearlieronOctober10,2013for5billablehours(Citybill$775.)WeknowthePlamondonproposalwasreceivedbeforeDecember10,2013fromtheconsultants’invoice-supportingtimesheets.CallitanunsolicitedproposalorafirstdraftsubmissionfortheplannedRFP,thehighlyprematurePlamondonproposalwasnotannounced,letalonereleased.ItsreceiptwasnevermentionedinCitypresentationstotheMayorandBoard.OnlydiscoveredinourinvestigationitwaskeptsurreptitiouslybehindthecloseddoorsoftheDHACandtheCityDEDduringthetimewhenitshouldhavebeenatopicforconsiderationofelectedofficialsandthecitizensofFrederickwhosefuturetaxeswereontheline.25CallittheSecretPlamondonProposal.JLLconsultantsworked35.5hoursonthisSecretPlamondonProposalandbilled$5503.WorkcontinuedinFebruary2014accordingtoanotherInvoice011530(datedApril30)ondraftingtheRFPinparallelwithworkonthePlamondonProposal.Therewasanothermeetingscheduledand8hoursbilledFebruary13($1240)“Plamondonproformareview.”‘Proforma’orprofitandlossprojectionsaretheheartofaproposal,thebottomlineliterally.5.CityPurchasingDepartmentsidelinedbyDEDandDHAC,purchasingrulesfloutedTheCityPurchasingDepartmentwasalmostcompletelysidelinedbytheDepartmentofEconomicDevelopment(DED)andtheDowntownHotelAdvisoryCommittee(DHAC)inthesubstanceofthishoteldeveloperprocurement.OnFebruary20,2014Lambisbilled3hours,$465for“DistributeRFP.”26

25ByonereadingtheCityhadthelegalrighttoacceptthePlamondonproposalofDecember2013oruseittonegotiateacontractprovidingCityassistance,omittinganycompetitiveprocurement.Bythisaccountthe‘competition’inthespringof2014wasmountedsolelyonthegroundsthatitwasneededtogainstatefinancialsupport.26UnderCityrulesheshouldn’thavedonethat.TheveryRFPtheyhaddraftedandweredistributingcontainedthisonp4:“I.NOTICETOPROPOSERS,AUTHORITYTODISTRIBUTERFPPACKAGES:TheCityofFrederickPurchasingOffice(andwebsite,ifapplicable)isthesoleentityauthorizedtoprovidethisRFPpackagetointerestedcompaniesorindividuals.”Distributiondoesn’tinitselfseemabigdeal,thoughtheintentionistoensurethatallbiddersreceivethefull

Page 11: Submission to Office of Legislative Audits & Board of ...frederickhotelboondoggle.us/wp-content/uploads/... · 3/18/2019  · From 2010 on key aspects of the procurement of a hotel

11

Tothispointaround50hoursandabout$7,800ofJLLtimehadbeenspentonPlamondon’ssecretproposal.Bycontrast1.5hours($233)wasbilledforameetingbackinOctoberwiththeotherproposerEdWormald.Apartfromthe90-minuteMeet&GreetnofurthercontactwithWormaldoccurreduntilaftertheRFPwasissued.That’sabout97percentattentiontoPlamondonto3percentWormald.WiththeRFPofficiallypostedFeb20,2014thesamepatternofdealingswithPlamondoncontinued—asiftheCityprocurementruledidnotexistthatlimitscommunicationbetweenaproposerandtheCitytowrittenquestionsviathepurchasingmanager.ApparentlytheSecretPlamondonProposalmorphedintotheofficialPlamondonProposalthatisdressedupwiththeMay9duedate.PerhapsitwasamendedindiscussionswithJLL?WhatisclearisthataftertheRFPwasofficiallypostedJLLwentonasbefore,havingameetinglessthanaweeklateronthePlamondonProFormaof8consultanthours($1240billed)onFebruary26.JLLerJohnGibbbilled3.5hours($543),alsoonFeb26studying“PlamondonFinancials.”11moreconsultanthourswerespentonreviewofPlamondon’s“ProForma”March2.Fivemorebillingslist“PlamondonCorrespondence”March15andMarch17.Twomorearecalled“RFPCorrespondence.”April24therewere“CallswithProspectiveDevelopers”—againincompletedisregardofCityPurchasingrules.OneofthesewouldhavebeenEdWormaldwhohadotherwisebeentotallyleftoutofallthemeetings,thereview,thecorrespondenceandpresentationsandthefinancialanalysisdonewithPlamondon.Thetime-sheetsweobtainedshowsome81JLLconsultant-hourscostingtheCityover$12,000weredevotedtoPlamondonthroughMay9,2014whenproposalswereofficiallyopened.Wormaldbycontrastgotthatinitial1.5hoursbilledat$233,andnomore.OnthatbasisJLLgavePlamondon97percentoftheirattentionbeforethebeginningoftheofficialassessment.AttentiontoWormaldlookstohavebeenameregesturetosupportthenarrativeofacompetedprocurement.27ResponsibilityRFPpackageandareonalisttoreceiveanyamendmentsorQuestions&Answers.ItdoeshoweversuggestacasualattitudetowardCityrules.27WormaldhimselftoldJaneWeirinatelephoneconversationthathegottheclearimpressiontheDHACselectioncommitteewasnotinterestedinhisproposalandhadmadeuptheirmindonthewinner.ButhehasmadenopubliccomplaintabouttheprocessandhasplayednopartintheoppositiontotheCity-Plamondonproject.

Page 12: Submission to Office of Legislative Audits & Board of ...frederickhotelboondoggle.us/wp-content/uploads/... · 3/18/2019  · From 2010 on key aspects of the procurement of a hotel

12

fordeploymentofJLLtimeultimatelylayswiththeCityofficialandDHACexecutive,RichardGriffinwhosawwhatworkwasbeingdoneandinitialed‘OKtopay’theinvoiceswithtime-sheetslayingoutworkperformed.6.ConsultantJLLdeployedoutsidespecifiedcontracttasksJonesLangLaSalle(JLL)wasemployedbytheCitythroughprocurementRFP#13-F,2012plusextensionsofa“DowntownHotelDevelopmentConsultant”contract.Theconsultant’sresponsibilitiesarelaidoutintwolists:“ForthepurposesofthisRFP,consultingservicesaredefinedas,butnotlimitedto:—Attendingmeetings—Developingappropriatesite/developerselectionmechanism—Analyzingfinancialproposals&developingfinancialplans—Evaluatingproposalsandotherdocuments—Reportinginbothwrittenandoralformats—Developingrecommendations—Providinglabor,personnel,equipment(computersetc.),suppliesandtravelasnecessaryforprovidingconsultingservices—EnsuringthattheCityandtheAdvisoryCommitteeinterestsareprotectedandgoalsareaccomplished.(RFPp16)Underaheading‘SpecificServices’theRFPhasthis:“TheConsultantshallprovideataminimumbutnotlimitedtothefollowingspecificservices:1.Developanoverallapproachtotheproject.2.Developaprojectscheduleandkeybenchmarkdates/milestones.3.ServeasanadvisortotheCityandHotelAdvisoryCommitteeandprovide“bestpractices”adviceandrecommendations.4.Attendandleadmeetingswithstakeholdergroups.5.Reviewpertinentdocumentsandstudies.6.Attendpublichearingsandworkshopswithelectedofficials.7.DevelopappropriateselectiontoolssuchasbutnotlimitedtoaRequestforProposals(RFP’s)tosolicitandselectthedowntownhotelsiteanddevelopmentteam.8.AnalyzeproposalsandmakeawardrecommendationstotheHotelAdvisoryCommittee.9.Developprojectcostestimatesandrecommendafinancingstrategywithsourcesandusestoassistwiththeimplementationoffinancingtools.10.Coordinatewithmajorhotelbrandstoensurethatindustrystandardsarebeingconsidered.28ThesametwolistsoftaskswerecontainedinsubmissionstotheMayor&BoardwhentheydiscussedawardofthehoteldevelopmentconsultantcontracttoJLLinFebruary2013.2928RFP#13-F, p16, 1729ThetermsofJLL’semploymentasconsultantstotheDHACwerediscussedbytheMayor&BoardofAldermenataworkshopFebruary6,2013,andatahearingFebruary21.See

Page 13: Submission to Office of Legislative Audits & Board of ...frederickhotelboondoggle.us/wp-content/uploads/... · 3/18/2019  · From 2010 on key aspects of the procurement of a hotel

13

ThosewerethetaskstheMayor&BoardassignedtoJLLinawardingthecontract.TheMayor&BoardapprovedcontractdidNOTauthorizeJLLtoworkwithPlamondononitsRFP.TheydidNOTauthorizeJLLtohelpPlamondoninitspresentationstotheCity.TheMayor&BoarddidNOTauthorizeJLLasanagentoftheCitytomeetwithadeveloper,PlamondonanddealwithPlamondoncorrespondenceandbilltheCityforallofthisworkwithPlamondonintherunuptotheissuanceoftheRFP.AndtheMayor&BoardofAldermendidNOTauthorizeJLLtoserveontheselectioncommitteeviarepresentationontheDHAC.30Noneofthosetaskswerecontractedfor,andtheirperformancehelpedmakeamockeryofacompetitiveprocurementprocess.AccordingtoinvoicesobtainedunderthePublicInformationActalargeportionofJLL’sworkwasoutsidethescopeofitscontractasapprovedbyelectedofficials.UnderCityprocurementrulesallcorrespondenceontheRFPfrombidderswassupposedtoberoutedthroughKandiFullerton,then-directorofpurchasing.Normallyshepublisheditfortheotherbidders,orinthiscase,theotherbiddertoseealso.March15and17therewerebillingsfromPeteLambisforPlamondonCorrespondence—1.5hours.That’sintheperiodthebidderisnotsupposedtomakeanycontactwithanyCityemployeeoragentoftheCitylikeJLLexceptthroughMsFullerton.Thatrulewasflouted.Theyhadbeenreviewingthe‘proforma’orsensitiveheartofthePlamondonbidbothbeforeandimmediatelyaftertheRFPwentoutandhandlingcorrespondencewithPlamondondirectly,itappears,notthroughpurchasingchiefMsFullerton.7.ScoringoftwoproposalsbiasedInthesummerof2014thedowntownhotelselectioncommittee(DHACplusPeterLambisofJLL)scoredtheproposalsofPlamondonandWormald.TheresultwasannouncedthiswayinasubmissiontotheMayor&BoardofAldermendatedAug28,2014foraworkshopSept3,2014:“TeamPlamondonreceivedthehighscoreof84.0(winning)byasignificantmargin.TheSelectionTeamisunanimousinits

http://cityoffrederick.granicus.com/MediaPlayer.php?view_id=12&clip_id=1594&meta_id=35636#30The RFP (p4/5) specifically forbade proposers from being in contact with members of the selection committee. JLL consultant Peter Lambis was a member of the selection committee and billed the City for time spent in correspondence with Plamondon – see details in examples of documentary evidence.

Page 14: Submission to Office of Legislative Audits & Board of ...frederickhotelboondoggle.us/wp-content/uploads/... · 3/18/2019  · From 2010 on key aspects of the procurement of a hotel

14

recommendation.”ButWormald’stotalscoreandthebreakdownsofthescoringremainedamysteryformorethantwoyears.Aftermultiplerequestswefinallygotthedetailedscoring,anExcelspreadsheet.Itaveragedthescoresofthevariousmembersoftheselectioncommitteeandroundedtheresults.Weweretoldtherewasnoreportbytheselectioncommittee.Wormaldscored70.5outofapossible100,comparedtoPlamondon’strumpeted84.0/100.SuchaclearcutwinforPlamondonwasoddonmanycounts,andthecloseronelookedtheodderitgot.Herewe’llhighlightjusttwoissues.First,streetfrontageisacrucialissueforanyhotelbecausethatestablishesitsvisualpresence.Visitorswanttofinditeasily.InasmallcitylikeFrederickithelpsifthehotelisonaprimaryentryroutejustoffinterstatehighways.Wormald’sGalleriasiteisidealhavingfullfrontagetoEastStreetwhichcomesdirectlyofftheinterstates.Italsohasunobstructedstreetfrontageontwoothersides,thefourthbeingboundedbyCarrollCreekPark.Plamondon’ssiteisterribleonthisscorebecauseitislargelylandlockedbehindthehistorictrolleybuilding.IthaslimitedstreetfrontageonnarrowCarrollStreetandonlyspaceforaproblematicdrivewayonanarroweasementoveraneighbor’sparkinglotonPatrickStreet.That’sit.YetundertheheadingBuildingOrientationtoStreets/ParktheDHACscorersgaveeachproposal2.0/2.5.BuildingOrientationtoStreetsisabigissueforahotelanddeservessomethingintherange10to15pointsoutofatotal100score,not2.5/100.BothsitesmakeequaluseofaCarrollCreekParkfrontage,theirfourth-side.Wormald’ssiteiswaysuperiorforahotel.AnobjectivescoringwouldhavegivenWormaldascoreof8/10or12/15toPlamondon1.5/10or2/15.Second,historicpreservationissuesareimportantgiventhatalotofthevisitorappealofdowntownFrederickisits18thand19thcenturyurbancharacteranditsstatusasanationallyrecognizedhistoricpreservationdistrict.31Again,historicissuesareunderweightedbyDHACat2.5/100.Moreappropriatewouldbe5/100or10/100.Wormaldisalmostcompletelyclearofhistoricpreservationissuessincethesiteisunbuilt.ItisalsoslightlyfurtherfromthehistoricallyscaledbuildingsofPatrickStreetthanthePlamondonsite.Butthebiggestdifferenceisthatthe31Frederick’sdowntownretainstheambienceofitshistoryfromcolonialtimeswithdensestreetfrontsoftwo-andthree-storybuildings.AverypopulardaytripforresidentsofthenearbyWashingtonmetroareathesevisitorssustainitsdowntowneconomyofspecialtyshopsandrestaurantsinawalkable,historicsetting.

Page 15: Submission to Office of Legislative Audits & Board of ...frederickhotelboondoggle.us/wp-content/uploads/... · 3/18/2019  · From 2010 on key aspects of the procurement of a hotel

15

Plamondonsitehastwohistoricbuildingsdeemedbyhistoricpreseravtionagenciesof“unusualimportance”(atrolleyterminalbuilding,andtheBirelyTannery)plusanarcheologicalsitedeemedworthyofextensivework.Thetanneryisthelastremainingleathertanningbuildinginthestatedatingbacktothe19thcentury.Thesearemajorhandicapsforthekindoflargescalemodernconferencehotelproposedfordevelopmentonthissite.Halfthetrolleybuildingandallofthetanneryareproposedfordemolition,whereasontheWormaldsitethereisnothingtobedemolished.AnobjectivehistoricpreservationscoringwouldbePlamondon0.5/2.5andWormald2.0/2.5.WithlargerweightingthescoreswouldoftheorderWormald4/5or8/10toPlamondon1/5or2/10.TheDHACscoredPlamondon2/2.5toWormald1/2.5--atravestyrevealingblatantbias.7.Majordeparturesin2017fromthePlamondonproposalof2014andthePlamondon-CityMOUofDecember2015Publicfundingofabout$23m32immediatelyaftertheselectiondeclinedto$19.6mintheMOUinDecember2015andgrewto$31mbyMarch2017.Thentheprojectchangeditscolorsagain.Majorchangestotheprojectwereannouncedbythethen-MayorRandyMcClementatameetinghecalledMay18,2017:thehotelwhichwasbeingdownsizedfrom207roomstoabout180andtheconferencecenterreducedfrom24,000sfto20,000sf.Oneoffivestorieswasbeingtakenoffthehotelandanewwingaddedmidlot.AlargerCitybasementparkinggarageunderthehotelcomplexwasnowproposed—for160carsversusabout100previously.ButthebiggestnewswasthatPlamondonwaspreparedtotakeonthecostofbuildingtheconferencecenterwhichinthefirstMOUwasapublicsectorresponsibility.ThenMayorMcClementsaid:“Iamthrilledwithwherewearetodaywiththisproject…Iamevenmoreproudtobeabletostandhereandtellyouthatnopublicdollarswillgointotheconstructionoroperationofthehotelorconferencecenter.”3313monthslater(June22,2018)therepackageddealwasformallyincorporatedintoanAmendedandRestatedMemorandumofUnderstandingwithPlamondon(A&RMOU).32SourcesofPublicFundingslidep19ofDHACpresentationtoProposalSelectionWorkshopofMayorandBoardSept42015.33TranscriptbyauthorMay18,2017.

Page 16: Submission to Office of Legislative Audits & Board of ...frederickhotelboondoggle.us/wp-content/uploads/... · 3/18/2019  · From 2010 on key aspects of the procurement of a hotel

16

Thereisatradehere.InreturnfortakingoverthecapitalcostoftheConferenceCentertheCityistakingonthefullcostsofthefoundationsofthehotelcomplexinanexpandedCity-fundedbasementparkinggarage.Thiswillprovidea‘podium’orengineeredplatformonwhichthedevelopercanbuildhishotel,relievinghimofthecostsandrisksofexcavation,soilcontamination,floodproofing,pilingsandcolumns.TheparkinggarageinthenewMOUisabout50percentlargerwith160spaces.34Publicsector(City,County,State)costswereputat$17.5million,anapparentmajordropfrom$31millionpreviouslycited.35BytheendoftheyearasCityofficialsgeareduptolobbyyetagainforStatemoneytheycontemplatednewadditionstothecostoftheproject:purchaseofextraland($527,000)andtheadditionofanotherfloortotheundergroundparkinggaragetakingthenumberofcarsparkedfrom160to234.Thisraisedtheestimateofpublicfundingto$22.25million,$10.5millionofwhichwastobeStatecapitalgrants.36Costestimateforthetwin-deckgarageisjustover$16.1millionor$69,000perparkingspace.ThisisoverfourtimesthecapitalcostforparkingspacesthatisfinanciallyviableinFrederick.37Three-quartersofthecostorover$12millionshouldberegardedasmoneybeingspenttobuildthefoundationsofthePlamondonhotelabove.Thisistheoldfloodplainwhichwouldneverotherwisebechosenasthelocationforaparkinggarage.AndwithoutStatesupportitisunlikelyanyFrederickofficialswoulddareproposesuchgrosslywastefulcarparking.8.DishonestyandsecrecyPromotersoftheDFH&CChavefrequentlyresortedtosecrecyanddishonestytopromotetheirscheme.DishonestyhasbeenexhibitedinrepeatedclaimsthatconsultantsrankedthechosenFrederickNews-Postsitethebestofthoseavailable.WhentheconsultantJLLsiterankingwasfinallyobtaineditshowedtheyputthePostOfficesitetopand

34TheinitialMOUofDecember2015providedfor104parkingspaces35Page3ofnewMOUJune2018.36DowntownFrederickPublicInfrastructureBudget,DowntownHotelandConferenceCenter–LandandParking,anundatedSourcesandUsesofFundsspreadsheetobtainedbyPIArequest,apparentlyproducedinNovember201837WalkerParkingConsultants2015studyfortheCitycalculatedthatanynewparkingbuiltformorethan$15,900percarspacewouldnotbefinanciallyviableandwouldrequiresubsidization.The234-spacegaragetobeviableasagarageshouldcostnomorethan$3.72millionascomparedtotheproposed$16.5mstructureforwhichtheCityseeksStatesupport.

Page 17: Submission to Office of Legislative Audits & Board of ...frederickhotelboondoggle.us/wp-content/uploads/... · 3/18/2019  · From 2010 on key aspects of the procurement of a hotel

17

theNews-Post(Plamondon)andGalleria(Wormald)equal-second.Dishonesttoohasbeentheconstantrefrainthattaxpayercontributionsaregoingonlyto‘publicinfrastructure’associatedwiththeproject.Taxpayermoneyisbeingsoughtforthelandpurchaseandforasubstantialshareofso-called‘softcosts’(studies,consultants,lobbyistsetc)noneofwhichare‘infrastructure.’Themajor‘infrastructure’costisabasementparkinggarage,whichasdiscussedearlierputsontaxpayerstherisksandcostsofallthefoundationworkforthehotelcomplex.Land,lobbyists,code-requiredparking,andfoundationsarenot‘publicinfrastructure.’Also,dishonesthavebeentherepeatedclaimsbyCityofficialsaboutthe‘returnoninvestment’fromthehotel,supposedly:$25.8mannualspending,$1.5mextrastatetaxes,110netnewjobs,$745,000,catalystforover$100mfollowupdevelopmentdowntown.38Allthesecalculationsdependon(1)theprojectbeingfinanciallyviable,and(2)theyallassumethat100%ofthebusinessattractedtothenewhotelisnewbusinesscomingtotheCityandtheStatewith0%attractedawayfromcompetinglodgingfacilities.Experienceelsewhere,andcommonsense,indicateagoodproportionofnewactivityattheCity-sponsoredhotelwouldbeattractedawayfromotherhotelsandeventvenues,sonetlocalbenefitswouldbemuchlowerthancitedinCitypropagandaforthehotel.SecrecyhasbeenbuiltintotheprojectfromitsverybeginningthroughtheCity’soutsourcingofkeydecisions(specificationsforthehotel,site)andkeyadministrativeandpoliticalprocesses(procurement,scoring)totheDowntownHotelAdvisoryCommittee(DHAC.)AndtheCitythroughitsdirectorofeconomicdevelopmentworkingbehindcloseddoorshasconcealeddecision-makingfromthetaxpayersitexpectstoprovidesometensofmillionsofdollars.OriginalrationaleforCity-sponsorshipandStatefundingwasthatwithoutthissupportnobusinesswoulddevelopadowntownhotel.39ThisrationalecollapsedinNovember2017wheninvestorsannouncedplanstodevelopahotelonthesiteoftheoldVisitationAcademyjusttwoblocksawayfromthePlamondonsite.TheyhaveaskedfornoCity(orState)financialsupport.38Page2ofProjectOverview‘one-pager’December27,2018.39AtleastonehoteldeveloperhassaidthatasfarbackastenyearsagohewasdiscouragedfromdevelopingahoteldowntownbyCityofficialsandtheDHACgroup,whowerecandidaboutopposinganycompetitionwiththeCity-sponsoredproject.

Page 18: Submission to Office of Legislative Audits & Board of ...frederickhotelboondoggle.us/wp-content/uploads/... · 3/18/2019  · From 2010 on key aspects of the procurement of a hotel

18

9.Costescalation,wasteandmismanagement

SincetheCity-sponsoreddowntownhotelprojectwaslaunchedtheoverallcosthasclosetodoubled,goingfrom$45millionin201140to$81mtoday.Upfronttaxpayersupportproposedhasvariedwildlyfromalowof$11milliontoahighof$54million,thelatestnumberbeing$22.3million.Thechangingcostsinpartreflectchangingspecificationsoftheproject.Carparkingforexamplehasvariedwidely:250spaces,104,750,830,167,234,someatgrade,someelevatedinadeck,someburrowedunderground.Thehotelitselfhasvariedbetween180and207rooms.Andthemeetingspacehasvariedbetween14,000squarefeetand24,350.Thehotelhasquietlyshedsomefeaturesofaso-called5-starestablishment,droppinganindoorpoolandotherluxuryfeatures.In2015/2016theMarylandStadiumAuthoritywasbeingcourtedforsupport.ItaskedtheCityforindependentcostestimates.ThenorthernVirginiabasedForellaGroupcostedtheprojectasthenconfiguredat$121m41ratherthantheCity’sestimateof$84m.Thepublicfundingrequiredhadballoonedto$54m.Inresponsetheprojectwasseriouslyscaledback,car-parkingbeingthemainsubjectofcuts.FortwoyearstheCitystuckwith$31mastheirestimateofneededpublicsupport.Thentheprojectwasparedbackagain,especiallythecarparkinggarageunderneaththehotel,butalsothehotel.BythetimeoftherevisedMOUinthesummerof2018thepublicsectorcontributionwaspareddownto$17.5m.AtvarioustimestheCityhaspresentedabasicprojectandan‘enhanced’project,theenhancementconsistingofextraparkingspaceandpurchaseoftheneighboringproperty.The‘enhancements’(allpublicsectorcosts)havevariedbetween$19min2015and$5.75minthe2019legislativesession.SomeCityofficialssaythese‘enhancements’40BriefingforMayor&BoardMay31,2011.41Ashasbeentypicalwiththisprojectsuch‘badnews’waskeptfromthepublicandtheBoardofAldermenatthetimeandhasonlybeenobtainedlongafterviaPublicInformationActfilings.

Page 19: Submission to Office of Legislative Audits & Board of ...frederickhotelboondoggle.us/wp-content/uploads/... · 3/18/2019  · From 2010 on key aspects of the procurement of a hotel

19

are‘essentials’notoptionalitems.OneinvolvespurchaseofneighboringlandtoallowarampbetweenthestreetandtheCityparkinggarage.Thatundergroundparkinggarage(deemed‘publicinfrastructure’)hasvariedbetweenonelevelandtwolevels,parkingbetween160and234cars.Designedtosupportthehotelcomplexabove,itistoberoofedwitha‘structuralpodium.’Attwolevelsand234parkingspacesthecostisestimatedbytheCityat$16.15mor$69,000perspace—comparedtolessthan$20,000perspaceinregularabove-groundparkinggarages.At$69,000perspacetaxpayersaren’tjustbuyingparkingspacesor‘publicinfrastructure,’they’rebuyinganexpensivefoundationstructureforthehotel.UntilthishotelprojecttheCityofFrederickhasalwaysmanagedtofinanceitsparkinggarages(ithasfive)asaself-supportingbusinessoperation,parkingfeesbeingsettopaytoservicethedebtalongwiththeoperatingcosts.TheCitydidnotneedtoaskforstatesupportforanyofthoseparkinggarages.But$69,000perspaceparkingattheCityhotelisnotabusinessproposition.Itisverbalwrappingaroundalavishsubsidytoafavoredhoteldeveloper.Mayorsays"Noquarterback"IncommentsonthehotelprojectasanewMayoriinearly2018MichaelO’Connorsaid:“what’softenbeenfrustratingformeasIwatchedthis(project)fromtheperspectiveoftheBoardofAldermenis,I’mnotreallysuresomeoneisactuallythequarterbackofthisproject.”42Hewasreflectingontheglacialpaceoftheproject.Predictedin2010toopenin2014aseachyearhaspasseditsscheduledopeningdatehasbeenputbackayear,suchthat,fornineyearsnow,ithasbeenperpetuallythreeorfouryearsfromopening.Keystudiesusedtojustifytheprojectarebasedonmarketdatafrom2009and2010.AfterinitialsupportboththeMarylandStadiumAuthorityandMarylandEconomicDevelopmentCorporationdeclinedtobeinvolvedintheproject.ThoseagenciesjudgedtheFrederickhotelprojecttobeespeciallypoorlyconceivedandpoorlymanaged.Theprojecthasemployedabouttenconsultinggroupsorconsultantsatacostofseveralmilliondollars.Muchoftheirworkhasprovedworthlessbecauseplanshavechangedorbecausesomuchtimehaspassedthatthedataandassumptionsarecompletelyoutofdate.Thelastmarketsurveyfortheproject,lookingatthedemand

42quotedFrederickNews-Post2018/03/24

Page 20: Submission to Office of Legislative Audits & Board of ...frederickhotelboondoggle.us/wp-content/uploads/... · 3/18/2019  · From 2010 on key aspects of the procurement of a hotel

20

andsupplyofhotelaccommodationintheFredrickareawascompletedinOctober2013.Therehavebeenhugechangessincethen!ThereisstillnosetofsiteplansordrawingscapableofmeetingCitybuildingandplanningcode.TheonehotelsiteplansubmittedtoCityplanners--inNovember2017--generatedaresponselisting25problemissues.43Someofthemaresmallissues,rathereasilyaddressed,butotherslikevehicularaccessareverydifficultbecauseofthesite'slimitedstreetfrontageanditsclosenesstoamajorsignalizedintersection.Inresponsetoacommentthatthesitethatthey'dchosenforthehotelwasthemostdifficultsite,aseniorCityofficialoncecommented:"Yeswedeliberatelychosethemostdifficultsite.It'ssuchadifficultsiteonlytheCityiscapableofdevelopingit."44Wasthishubris,theideathatCityofficialsaresomuchsmarter,somuchmoreingeniousthanprivatedevelopers?OrareminderthattheCitywiththepoliticalsupportitcanmusterhasaccesstomoremoneytospenditswayoutofdifficulties?OrwasthereasuggestionthatsincesomanyruleshavetobebrokenatthissiteonlytheCityitselfasanapplicantcangetthepermits?Maybeabitofallthree?CONCLUSION:CitysponsorshipandpublicsupportforadowntownhotelinFrederickisunnecessary,wastefulandunfair.Hotelsareabusinessandarenormallyandproperlyprovidedbyinvestorswithoutlocalgovernmentsponsorshiporpublicfunds.TheCityofFrederick’sDowntownHotelprojectisatravesty,acasestudyinwhygovernmentshouldnotsponsorahotel.Afternearlytenyearsofconsultants,lobbying,publicmeetingsandpoliticalposturingtheprojecthasstillnotevenproducedbasicplanscapableofgettingCitypermits.StategrantshavebeenmadebuttheCityhasbeenunabletodocumenttheprojectandtherefore,ithasforfeitedthosegrants.RationaleforCitysponsorshipandpublicsubsidiesforadowntownhotelcollapsedin2017wheninvestorsboughtthevacantVisitationAcademynearbyandannouncedtheywereconvertingitintoahotelasaself-supportingprivateinvestment.TheCity’sdowntownhotelprojecthasbeenacorruptboondoggleofasmallcabalofpoliticalinsidersfromthebeginningin2010whenitwasledbyMarkGaver,alocalbusinessmansubsequentlychargedandconvictedofsome$50millionoffraudand43LettertoBohlerEngineeringfromPamReppert,CityPlanner,Dec18,2017.44Commenttotheauthorinconversation,noclearmemoryofdate,butlikely2015or2016.

Page 21: Submission to Office of Legislative Audits & Board of ...frederickhotelboondoggle.us/wp-content/uploads/... · 3/18/2019  · From 2010 on key aspects of the procurement of a hotel

21

currentlyserving17yearsinfederalprison.Gaver’sDowntownHotelAdvisoryCommittee(DHAC)assignedbytheCitytochooseasiteandadeveloperwasclearlyaCityentitybutwasallowedtoflagrantlyviolatetheStateOpenMeetingslaw.Behindcloseddoorsitjettisonedtheconsultants’recommendedcompetitiveprocurementaspresentedtotheMayorandBoardinthesummerof2013andunilaterallyadoptedarestrictive‘competition.’DHAC’sadoptedRequestforProposals(RFP)wasbasedonadocumentproducedbyoneofthe‘competitors’—Plamondon.Doesaprocurementgetmorecorruptthanthat?MakingafurthermockeryofthepubliclystagedprocurementPlamondon’sdetailedproposalwaspresentedtotheDHAC—inclosedsessionnaturally—weeksbeforetheformalRFPwasevenissued.CityconsultantsJLLinbreachoftheircontractandofCityrulesworkedwithPlamondononhisproposalastheRFPwasbeingwritten.TheexistenceofaprematurePlamondonproposalwasconcealedfromtheBoardofAldermen,thepublicandtheStateandonlyrevealedyearsaftertheeventwhenCitydocumentswereobtainedwithPublicInformationActfilings.ExtensivediscussionwithJLLandtheproposalpresentationmeetingwithDHACpriortotheissuanceoftheRFPgavePlamondontheopportunitytofine-tuneit,givinghimanunfairadvantageoverhissolecompetitorWormald.DespitethatadvantageWormald’sproposalwas,arguably,superiorbecausehissiteismuchbettersuitedforahotelthanPlamondon’ssite.45ButthescoringdownplayedimportantaspectsofthesitesandPlamondonwasdeclaredthewinnerbyDHAC.ClearlythewinnerwasinrealitychosenbytheDHACcaballongbeforetheofficialRequestforProposalsRFP14JwasissuedFebruary2014.TheCityofFrederick’sRFP14JusedtojustifytheselectionofthehoteldeveloperPlamondonwasafakecompetedprocurement—afraudonthecitizensofFrederickandacorruptcontrivancetomilktheStatetreasuryforthebenefitofapolitically-connectedfewinFrederick.

PeterSamuel2019.03.18

45Plamondon’ssiteislandlockedanddifficulttoaccessfromtheinterstateswhereasWormald’ssiteisdirectlyoffEastStreetandI-70.Wormald’ssiteisclearofbuildingswhereasPlamondon’ssitehastwohistoricallysignificantbuildings,aTrolleyBuildingandtheBirelyTannery.Evenin2019theCityisconsideringpurchaseoftheEaglesClubadjacenttothePlamondonsiteinordertoprovidearamptotheproposedundergroundparkinggarageundertheplannedhotel.Wormald’ssitehasclearstreetfrontageonthreesidesandisrightnexttoanunderutilizedCityparkinggarage.

Page 22: Submission to Office of Legislative Audits & Board of ...frederickhotelboondoggle.us/wp-content/uploads/... · 3/18/2019  · From 2010 on key aspects of the procurement of a hotel

22

NOTE:Examplesofourdocumentaryevidencefollowthroughpage32:

Page 23: Submission to Office of Legislative Audits & Board of ...frederickhotelboondoggle.us/wp-content/uploads/... · 3/18/2019  · From 2010 on key aspects of the procurement of a hotel

23

Page 24: Submission to Office of Legislative Audits & Board of ...frederickhotelboondoggle.us/wp-content/uploads/... · 3/18/2019  · From 2010 on key aspects of the procurement of a hotel

24

Page 25: Submission to Office of Legislative Audits & Board of ...frederickhotelboondoggle.us/wp-content/uploads/... · 3/18/2019  · From 2010 on key aspects of the procurement of a hotel

25

Page 26: Submission to Office of Legislative Audits & Board of ...frederickhotelboondoggle.us/wp-content/uploads/... · 3/18/2019  · From 2010 on key aspects of the procurement of a hotel

26

Page 27: Submission to Office of Legislative Audits & Board of ...frederickhotelboondoggle.us/wp-content/uploads/... · 3/18/2019  · From 2010 on key aspects of the procurement of a hotel

27

Page 28: Submission to Office of Legislative Audits & Board of ...frederickhotelboondoggle.us/wp-content/uploads/... · 3/18/2019  · From 2010 on key aspects of the procurement of a hotel

28

Page 29: Submission to Office of Legislative Audits & Board of ...frederickhotelboondoggle.us/wp-content/uploads/... · 3/18/2019  · From 2010 on key aspects of the procurement of a hotel

29

Page 30: Submission to Office of Legislative Audits & Board of ...frederickhotelboondoggle.us/wp-content/uploads/... · 3/18/2019  · From 2010 on key aspects of the procurement of a hotel

30

Page 31: Submission to Office of Legislative Audits & Board of ...frederickhotelboondoggle.us/wp-content/uploads/... · 3/18/2019  · From 2010 on key aspects of the procurement of a hotel

31

Page 32: Submission to Office of Legislative Audits & Board of ...frederickhotelboondoggle.us/wp-content/uploads/... · 3/18/2019  · From 2010 on key aspects of the procurement of a hotel

32

Page 33: Submission to Office of Legislative Audits & Board of ...frederickhotelboondoggle.us/wp-content/uploads/... · 3/18/2019  · From 2010 on key aspects of the procurement of a hotel

33

Spreadsheetshowsmanyhoursofconsultanttimespentworkingwithsubsequent‘winner’PlamondonbeforetheofficialprocurementbeganwithreleaseofanRFP.JLLfavoreda2-stageprocurementthatwouldselectasitefirst,thenopenthatsitetocompetitionfromanydeveloper.ButJLLwasover-ruledandaskedtowriteanRFPbasedonaPlamondondraftwhichlimitedcompetitionbyrequiringdevelopersto‘bring’asiteinasingle-stageprocurement.