    PRESENTATION

    ON

    POWER SUPPLY POSITION

    OF HYDERABAD CITY

    23-12-2010

  • 7/29/2019 Sub-sation construction Presentation

    2/17

    Exist ing Infrastruc ture

    to meet load in GHMC Area

    Particulars

    Substations

    400 KV 3 Nos.

    220 KV 10 Nos.

    132 kV 14 Nos.Total 27 Nos.

    Length of Transmission Lines

    400 KV 756 CKM

    220 KV 742 CKM132 kV 660 CKM

    Total 2158 CKM

    No.

  • 7/29/2019 Sub-sation construction Presentation

    3/17

    Inf rastructu re added du r ing last one year

    Sl.No.

    Details ProjectCost

    (Rs. Crs.)

    Date ofCommissioning

    1 400 KV Substation Malkaram 350.00 17-05-2010

    2 2nd Ckt. LILO to 220 KV Sivarampally SS 3.18 03-06-2010

    3 50 MVA PTR at Malkaram 220 KVSS 1.12 23-04-2010

    4 50 MVA PTR at Gachibowli 220 KVSS 5.31 05-06-2010

    5 50 MVA PTR at Jubilee Hills 13 KVSS 4.23 19-07-2010

    6 31.5 MVA PTR at Shamshabad 220 KVSS 2.35 31-08-2010

    7 50 MVA PTR at Ramachandrapuram 132 KVSS 4.25 20-09-2010

    Total Cost 370.44

  • 7/29/2019 Sub-sation construction Presentation

    4/17

    Infrastruc ture Development Plan

    for next two years

    Sl.

    No.

    Name of

    Substation with Line/

    UG Cable

    Cost of the

    Project

    (` Crs.)

    StatusDate of

    Commencement

    Programmed

    date of

    Completion400 KV Substations

    1 Shankarpalli 437.00 Under Execution Sept. 2010 Mar. 2012

    220 KV Substations

    1

    Erragadda GIS with

    XLPE Cable223.00 Under Execution Sept. 2010 Dec. 2011

    2

    Osmania University GIS

    with XLPE Cable223.00 Under Execution Sept. 2010 Dec. 2011

    3

    Imlibun GIS with

    XLPE Cable306.00 Under Execution Dec. 2010 Dec. 2011

    4

    Gunrock (Conventional)

    with XLPE Cable360.00 Work awarded Dec. 2010 Dec. 2011

    5

    Hayatnagar(Conventional)

    with XLPE Cable202.00

    Tenders under

    FinalisationMar. 2011 Jun. 2012

    6

    Fab City (Conventional)

    with OH Line 55.00 Work awarded Dec. 2010 Mar. 2012

    7

    Rayadurg (Conventional)

    with XLPE Cable145.00 Tendering Stage Mar. 2011 Jun. 2012

    8

    Manikonda (Conventional)

    with XLPE Cable35.00 Tendering Stage Mar. 2011 Jun. 2012

    Total 220 KV 1549.00

    XLPE: Cross Linked Poly Ethylene; GIS : Gas Insulated Switchgear; OH : Overhead Line

  • 7/29/2019 Sub-sation construction Presentation

    5/17

    Sl.

    No.

    Name of

    Substation with Line/

    UG Cable

    Cost of the

    Project

    (` Crs.)

    StatusDate of

    Commencement

    Programmed

    date of

    Completion

    132 KV Substations

    1

    Balkampet GIS

    with XLPE Cable60.00 Under Execution Oct. 2010 Dec.2011

    2

    Fever Hospital GIS

    with XLPE Cable69.00 Under Execution Oct. 2010 Dec.2011

    3

    Patigadda GIS

    with XLPE Cable69.00

    Tenders under

    finalisationMar. 2011 Jun. 2012

    4Moosarambagh GISwith XLPE Cable

    48.00 Tenders underfinalisation

    Mar. 2011 Jun. 2012

    5

    Police Transport Orgn. GIS

    with XLPE Cable85.00

    Tenders under

    finalisationMar. 2011 Jun. 2012

    6

    Narayanaguda GIS

    with XLPE Cable55.00 Work awarded Dec. 2010 Jun. 2012

    7

    Mamidipalli Conventional

    with OH Line 13.00

    Tenders under

    finalisation Mar. 2011 Dec. 2011

    8

    LGM Pet Conventional

    with OH Line15.00

    Tenders under

    finalisationMar. 2011 Mar. 2012

    9

    NIMS GIS with

    XLPE Cable100.00

    Tenders under

    finalisationMar. 2011 Dec. 2012

    Total 132 KV 514.00

    2500.0018 Nos. Grand Total

    Infrastruc ture Development Plan

    for next two years

  • 7/29/2019 Sub-sation construction Presentation

    6/17

    Problems and intervent ion s

    in the next 100 days

    Sl.

    No.

    Name of the Work

    Cost of

    Project

    (Rs.Crs)

    1Line augmentation with INVAR Conductor and

    construction of 132/33 KVSS Chintal21.00

    2 132 KV 2nd Circuit at Madhapur 132 KV SS 1.60

    3 2nd Circuit at Medchal 132 KV SS 1.76

    4Line augmentation with INVAR Conductor at

    Bandlaguda 132 KV SS5.40

    5132 KV Line augmentation with AL 59 conductor from

    Gachibowli SS to Madhapur SS1.00

    Total 30.76

  • 7/29/2019 Sub-sation construction Presentation

    7/17

    Sl.No.

    Name of the Work

    Cost of

    ProjectRs.Crores

    1 160 MVA PTR at 220 KV Medchal SS 4.52

    2 Addl. 100 MVA PTR at 220 KV Shamshabad SS 4.42

    3 80 MVA PTR at 132 KV Bandlaguda SS 3.10

    4 80 MVA PTR at 132 KV Erragadda SS 3.21

    5 50 MVA PTR at 132 KV Asifnagar SS 2.13

    6 50 MVA PTR at 132 KV Medchal SS 1.90

    7 31.5 MVA PTR at 220 KV Ghanapur SS 1.73

    Grand total 51.77

    Problems and intervent ion s

    in the next 100 days

  • 7/29/2019 Sub-sation construction Presentation

    8/17

    Benefi ts accru ing from Inf rast ructure

    improvement planned for next 100 days

    100 MVA Additional capacity availability

    Relief on two major 220 KV substations

    Gachibowli

    Shapoornagar

    Marginal load relief at existing 132 KV Madhapur,

    Bandlaguda and Medchal Substations

  • 7/29/2019 Sub-sation construction Presentation

    9/17

    Future Plann ing

    400KV Sub-station at Maheswaram and Narsapur

    To meet the load growth along the ORR following Sub-stations also envisaged at :

    220KV SS

    1. Miyapur

    2. Bandlaguda

    3. RC Puram/Patancheru4. Turkayamjal

    5. Golkonda Kalan

    6. Raviryal (ITIR)

    7. Sardarnagar (ITIR)

    8. Nadargul (ITIR)

    9. Mankal (ITIR)

    132KV SS

    1. Mohammednagar

    (Yakutpura)

    2. IIT area

    3. Danthanpalli

    4. Pocharam

    5. Gowlidoddi

    6. Adibhatla7. APPA

    8. Peerjadiguda

    Total No. of Substations : 17ITIR : Information Techn olog y Investment Region

  • 7/29/2019 Sub-sation construction Presentation

    10/171

    Support Requested

    Land requirements for new sub-stations

    Corridor for transmission lines/UG cables

    Road cutting permissions from GHMC, R&B, HMWS&SB

    and National Highway

    Permission from Traffic Police & Railways

    Site required for construction of already programmed

    works:

    220 KV sub-station at Miyapur area

  • 7/29/2019 Sub-sation construction Presentation

    11/17

    THANK YOU

    C i f

  • 7/29/2019 Sub-sation construction Presentation

    12/17

    Compar ison o f

    Conduc tor Character is t ics

    Particulars ACSR AL 59 INVAR

    Current carrying capacity 100% 125% 200%

    Cost 100% 130% 700%

    Operating Temperature 75oC 95oC 210oC

    Thermal expansion Normal Low Very Low

    Conductor sag NormalSlightly

    higher

    Normal at

    higher Temp.

    Conductor Material

    Alumunium

    Conductor

    Steel re-inforced

    All Aluminium

    Alloy

    Conductor

    Thermal

    Aluminium

    Alloy withINVAR

    (Nickel+Steel)

    Core

    N t k i t t d

  • 7/29/2019 Sub-sation construction Presentation

    13/17

    1

    Netwo rk requ irement to reduceoverloading of 220 kV Feeders

    S

    No

    Name of the

    Constraint

    220kV Feeder

    Type of the

    conductor

    Present

    loading

    ( MW)

    Additional Substations & Lines

    already proposed as a remedia l

    measure

    1 Tadikonda -VTPS-I Zebra 205

    Proposed 400/220kV

    Narsaraopeta,220/132kV Parchuru,Narsaraopeta substations (New)

    2 Tadikonda -VTPS-II Zebra 205

    Proposed 400/220kV

    Narsaraopeta,220/132kV Parchuru,

    Narsaraopeta substations (New)

    3 Shivarampally-Mamidipally Zebra 220Proposed LILO of 220kV Mamidipally -

    Gachibowli 2nd ckt at Shivarampally

    4Ghanapur-Malkaram-I-

    Shapurnagar IZebra 205

    Proposed 400/220 kV Malkaram SS will

    relieve

    5Ghanapur-Malkaram-II-

    Shapurnagar-IIZebra 205

    Proposed 400/220 kV Malkaram SS will

    relieve

    6 Wadekothapally -Budidampadu Zebra 200Proposed LILO of Budidampadu -

    Bhongiri at Waddekothapally

    7 Shamshabad-Mamidipally Zebra 190400/220kV Yeddumailaram SS (New) -

    provides relief

    8 Shapurnagar-KTPS Zebra 206

    Proposed 400/220kV Malkaram SS and

    400/220kV Yeddumailaram SS -

    provides relief

    9 Budidampadu-Bhongir Zebra 190Proposed LILO of Budidampadu -

    Bhongiri at Waddekothapally

    10 Chinakampalli - Kalikiri Deer 211 Proposed 220 kV Palamaneru SS whichrelieves the overloading

    11 HIAL - Gachibouli Zebra 190400/220kV Yeddumailaram SS (New) -

    provides relief

    12 Narnoor - Wanaparthy Moose 190 220 kKV Jurala SS is proposed

    13 VTPS-Narasaraopet Moose 210Proposed 400/220kV Narsaraopeta

    relieves over loading

    14 VTPS - Podili Moose 210Proposed 400/220kV Narsaraopeta

    relieves over loading

  • 7/29/2019 Sub-sation construction Presentation

    14/17

    1

    Netwo rk requi rement to reduce

    overloading o f 132 kV Feeders

    1 Renigunta - Puttur Panther 2x80 Proposed 220kV SS at Nagari

    2 Renigunta - Tirupati - K.P.Mitta Bear 70 Proposed 220kV SS at Palamaneru

    3 Gachibowli-Madhapur Panther 90 Proposed 220kV SS at Madhapur

    4 Gachibowli-Erragadda Bear 82 Proposed 220kV SS at Erragadda

    5 Ghanapur-Bandlaguda Panther 80 Proposed 220kV SS at Bandlaguda6 Nekkonda-KTS Bear 92 Proposed 132kV KTS - Nekkonda 2nd ckt

    7 Yeddumailaram - Kandi -II Panther 85 Proposed 220kV SS at Sadhashivpeta

    8 Yeddumailaram - Kandi -I Panther 85 Proposed 220kV SS at Sadhashivpeta

    9 Moulali-Gunrock Panther 70 Proposed 220kV SS at Gunrock

    10 Yeddumailaram - Sadasivpet Panther 95 Proposed 220kV SS at Sadhashivpeta

    11 Siddipet - Gajwel Panther 97 Proposed 400kV SS at Gajwel - Provides Relief

    12 Tadikonda -Guntur-I Panther 90 Proposed 220kV SS at Narsaraopeta and

    Parchuru - Provides Relief

    13 Tadikonda -Guntur-II Panther 90 Proposed 220kV SS at Narsaraopeta and

    Parchuru - Provides Relief

    14 Ch'Gutta-Bandlaguda Panther 90 Proposed 220kV SS at Hayatnagar

    15 Siddipet - Habsipur Panther 75 Proposed 400kV SS at Gajwel

    S.

    No.Name of the Feeder

    Type of the

    conductor

    Presentloading

    (MW)

    Additional Substations & Linesalready proposed as a remedial

    measure

  • 7/29/2019 Sub-sation construction Presentation

    15/17

    1

    Network requirement to reduce

    overloading o f 132 kV Feeders

    16 Ch'Gutta-Imlibun Panther 90 Proposed 220kV SS at Imlibun

    17RSS-Sultanabad

    Panther80

    Proposed 200 kV DC line from 400/220 kV

    Warangal SS - Durshed

    18RSS-Bellampally

    Panther70

    Proposed 220kV SS at Bellampally -

    Provides Relief

    19 RSS-Mancherial Panther 70 Proposed 220kV SS at Bellampally-Provides Relief

    20 AP Carbides - Gadwal AAA C Panther 85 Proposed 220kV SS at Jurala -

    Provides Relief

    21 Pashamailaram - R.C.Puram Panther 80 Proposed 220kV SS at Sadhashivapeta

    22 CHG - Ibrahimpatnam - KM Palli Panther 80 Proposed 220 kV Hayatnagar provides relief

    23 Minpur - Lingampet - Kamareddy Panther 100 Proposed 2nd 100 MVA at Kamareddy

    24Ramachandrapuram - Bollaram -

    Shapurnagar

    Panther 100

    Proposed 220 kV Bachupalli provides relief25 Shapurnagar - Erragadda - IDPL Panther 90 220 kV Erragadda SS is proposed

    26 Kalwakurthy - KM Palli Panther 110 Proposed 220 kV Hayatnagar provides relief

    27 Warangal - Waddepalli Panther 100 Proposed 2nd circuit

    28 Durshed - RSS 1,2,3 Panther 100 Proposed 200 kV DC line from 400/220 kV

    Warangal SS - Durshed

    S.

    No.Name of the Feeder

    Type of the

    conductor

    Present

    loading

    (MW)

    Additional Substations & Lines

    already proposed as a remedial

    measure

  • 7/29/2019 Sub-sation construction Presentation

    16/17

    1

    Network requirement to reduce

    over loading PTRs

    S.No.

    Sub-Station Name

    No of

    Transformers

    MVA

    Present

    Loading

    (MW)

    Remarks

    1 Siddipeta 2*100 2*90

    2 Dichpally 3*100 3*100

    3 Yeddumylaram 3*100 3*85 220 kV Sadasivapet SS will relieve

    4 Kalwakurthi 2*100 2*90 Proposed IIIrd 100MVA

    5 Bhootpur 3*100 3*90 Proposed 220 kV Jurala SS

    6 A.P. carbide 3*100 3*90 Proposed 1 No. 160 MVAAugmentation

    7 Wanaparthy 2*100 2*90 Proposed 220 kV Jurala SS

    8 Hindupur 2*100 2*90 220 kV Pulivendula proposed

    9 Kalikiri 3*100 3*90 220 kV Palamaneru proposed

    10 Renigunta 3*100 3*90 220 kV Nagari proposed

    11 Chittoor 2*100 2*90 Proposed IIIrd 100MVA

    12 Tadikonda 1*160+3*100 90% 220 kV Narsaraopet & Parchurproposed

    13 Nagarjuna sagar 2*100 2*90 220 kV Narasaraopet proposed

    14 Chandrayangutta 2*160+2*100 90% City Ring mains proposed

    15 Kadapa 2*100 2*80 220 kV Pulivendala SS proposed

    Will be relieved after commissioning

    of 400kV Gajwel SS

    N t k i t t d

  • 7/29/2019 Sub-sation construction Presentation

    17/17

    1

    Network requirement to reduce

    over loading PTRsS.

    No.Sub-Station Name

    No of

    Transformers

    MVA

    Present

    Loading

    (MW)

    Remarks

    16 KM Palli 2*100 2*90 220 kV Hayatnagar SS is proposed17 Kakinada 2*100 2*90 3rd 100 MVA transformer proposed18 Kondapalli 2*100 2*86 3rd 100 MVA transformer proposed

    19 Kalyandurg 1*100 1*85 2nd 100 MVA transformer proposed

    20 Tandur 2*100 2*902nd circuit from Yeddumailaramproposed

    21 Kamareddy 1*100 1*802nd 100 MVA transformer proposedalong with 2nd 220 kv circuit from

    Gajwel already proposed

    22 Nandyal 2*100 2*80 3rd 100 MVA transformer proposed

    23 Shapurnagar 2*100+1*160 90% 220 kV Bachpalli SS already proposed

    24 Sivarampalli 3*100 3*90Hyderabad Augmentation Scheme willrelieve

    II 315MVAS

    1 Ghanapur 3*315 100%

    Over loading will be relieved

    after commissioning of 400 KVMalkaram & Yeddumailaraml SSs

    2 Veltur 1*315 100% Proposed another 2*315MVA

    3 Mamidipalli 3*315 90%Over loading will be relievedafter commissioning of 400 KVMalkaram & Yeddumailaraml SSs

    4 Malayalapalli (RSS) 1*315+2*250+2*200 90%

    Once the 220 kv lines from Wgl. ToDurshed from 400 kV Warangal SS arein place overloading of this SS will get

    relieved