studie 2 studie 3 december 2012 studie 3 - dr | tv, radio ...€¦ · advance with dr production...

12
STUDIE 3 DECEMBER 2012 Technical specifications Koncerthuset Studie 3 Studie 3

Upload: others

Post on 09-May-2020

13 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: STUDIE 2 STUDIE 3 DECEMBER 2012 Studie 3 - DR | TV, radio ...€¦ · Advance with DR production coordinator Light Advance with DR production coordinator . STUDIE 3 DECEMBER 2012

STUDIE 2

DECEMBER 2012

STUDIE 3

DECEMBER 2012

Technical specifications KoncerthusetStudie 3

Studie

3

Page 2: STUDIE 2 STUDIE 3 DECEMBER 2012 Studie 3 - DR | TV, radio ...€¦ · Advance with DR production coordinator Light Advance with DR production coordinator . STUDIE 3 DECEMBER 2012

Studie

3Welcome to Koncerthuset

This introduction to Studie 3 will hopefully answer some of the questions you may have regarding the facilities of Studie 3.

Please do not hesitate to contact us if you have need for further information or assistance.

Page 3: STUDIE 2 STUDIE 3 DECEMBER 2012 Studie 3 - DR | TV, radio ...€¦ · Advance with DR production coordinator Light Advance with DR production coordinator . STUDIE 3 DECEMBER 2012

STUDIE 2

DECEMBER 2012

Content

Ground 4

Studie 3 5

Studio dimensions 7

Studio equipment 7

Sound control room 8

Cable connection and suspension points 10

Elevation 10

Stage and seating A 11

Stage and seating B 12

Page 4: STUDIE 2 STUDIE 3 DECEMBER 2012 Studie 3 - DR | TV, radio ...€¦ · Advance with DR production coordinator Light Advance with DR production coordinator . STUDIE 3 DECEMBER 2012

STUDIE 3

DECEMBER 2012

4

Ground

5K15

5K135K11

5K03

5K02

5K04

5K225K105K125K14

5K16

5K17

5K18

5K19

5K21

5K23

5K24

5K25 5K26

5K31

5K30

5K32

5K33

5K34

5K35

5K40

5K60

5K41

5K42

5K43

5K44

5K45

5K46

5K48

5K475K49 5K50

5K51

5K52

5K53

5K00

5K01

5K20

08.07.2009 esbs - nel

Page 5: STUDIE 2 STUDIE 3 DECEMBER 2012 Studie 3 - DR | TV, radio ...€¦ · Advance with DR production coordinator Light Advance with DR production coordinator . STUDIE 3 DECEMBER 2012

STUDIE 3

DECEMBER 2012

5

Studie 3

Studie 3Studie 3 is a medium sized recording studio that suits many purposes. The variable acoustics, spanning from 0.7 to 1.1 seconds makes it ideal for pop/rock/jazz, but serves also well for smaller classical ensembles. The all black and white room is a great setting for a nightclub atmosphere. With a 6 x 8 meter stage the room will seat 210 persons, while standing, the capacity is 300. The room is often used for TV productions

Parking and Load in Parking is located at ØRESTADS BOULEVARD 19, 2300 KØBENHAVN S. When you reach the parking gate, take a ticket, and the gate will open. When you are in the parking lot, drive left and you will reach the ramp leading you to the loading dock. Call your contact person in Koncerthuset, who will open the gate to the load-ing dock. (height of the gate is 4,30 meters) Busses will be parking on the right side of the ramp. Landline power is available immediately upon arrival. (3x16A blue CEE) LOAD IN is located on stage floor (-1). We will provide you with carts for the equipment. Distance from load in to stage: approximately 50 meters.

Entrance Entrance to Studie 3 is located next to load in.

Internet Production coordinator will provide you with internet access.

Dressing Rooms 1 dressing rooms located next to the stage, with toilet and bath, sofa, TV, fridge and upright piano.

Guided tours Please note that DR provide guided tours every day and that some of these tours will arrive at Koncerthuset. The tour guides will respect the nature of the ongoing productions.

ContactHead of planningFlemming Bo Nielsen

Telephone (+45) 2854 4320

Email [email protected]

Head of eventLars Skovgaard

Telephone (+45) 2214 2022

Email [email protected]

Head of facilitiesNiels Erik Lund

Telephone: (+45) 4018 2669

Email [email protected]

Page 6: STUDIE 2 STUDIE 3 DECEMBER 2012 Studie 3 - DR | TV, radio ...€¦ · Advance with DR production coordinator Light Advance with DR production coordinator . STUDIE 3 DECEMBER 2012

STUDIE 3

DECEMBER 2012

6

Page 7: STUDIE 2 STUDIE 3 DECEMBER 2012 Studie 3 - DR | TV, radio ...€¦ · Advance with DR production coordinator Light Advance with DR production coordinator . STUDIE 3 DECEMBER 2012

STUDIE 3

DECEMBER 2012

7

Studio dimensions

Studio dimensionsMax width: 15 meter

Max Length: 17 meters

Ceiling height: 8 meters

Total area of Studie 3: 235 m2

Studio equipment

EquipmentTo make sure to get the right equipment, please notify the DR production coordinator of your needs in proper time.

MicrophonesKoncerthuset has a wide selection from central storage. Please let the DR production coordinator know your preferred needs.

F.O.H.Advance with DR production coordinator

PA-System Advance with DR production coordinator

LightAdvance with DR production coordinator

Page 8: STUDIE 2 STUDIE 3 DECEMBER 2012 Studie 3 - DR | TV, radio ...€¦ · Advance with DR production coordinator Light Advance with DR production coordinator . STUDIE 3 DECEMBER 2012

STUDIE 3

DECEMBER 2012

8

Sound control room

Studie 3 is equipped with a high quality sound control for recording, mixing and broadcasting. From the sound control room there is a great view overlooking the studio.

ConsoleSSL C200 128 ch @48K, 48 fader

96ch @88.2 or 96K

96 mic pres (SSL C-SB)

MultitrackProTools 8 HD3 96 i/o

(Waves Diamond, Sonnox, Autotune, Pitch´n Time, Ampfarm, Echo Farm)

Monitoring Dynaudio AIR25 main 5.1 monitor

Yamaha NS10 (stereo)

Genelec1031 (stereo)

Aviom 16ch personal monitor system

OutboardReverbs and FX

Lexicon 960

Lexicon 480

Lexicon 224

Lexicon 200

Lexcicon PCM70

TC System 6000

TC M5000

TC 2290 x2

EMT 250

EMT 140

EMT245

AMS DMX

AMS RMX16

SPX90

Eventide H3000SE

EQs

Massenburg 8200

Neumann W495B x 4

TubeTech PE1C x2

PAST EQ x2

Dynamics

TubeTech CL1B x 2

NTP 179-120 x 3

NTP 179-160 x 4

UA 2-1176

Distressor x 2

Neve 8051

DBX 902 x 4

TubeTech LCA 2A

UA LA4

Channel strips/mic pres

Neve 8081 x2

TubeTech MP1 x2

Page 9: STUDIE 2 STUDIE 3 DECEMBER 2012 Studie 3 - DR | TV, radio ...€¦ · Advance with DR production coordinator Light Advance with DR production coordinator . STUDIE 3 DECEMBER 2012

STUDIE 3

DECEMBER 2012

9

Cable connection and suspension points

esbs - nel 28.08.2009

STUDIE 3 - SUSPENSION POINTS, EL TAVLER

A3-1:100

03_B

1

03_Plan+SP+El_Tavler

esbs - nel28.08.2009

STUDIE 2 - SUSPENSION POINTS, EL TAVLER

A3-Ikke i Skala

02_B

1

02_Plan+SP+El_Tavler

esbs - nel28.08.2009

STUDIE 3 - SUSPENSION POINTS, EL TAVLER

A3-1:100

03_B

1

03_Plan+SP+El_Tavler

Elevation

length/width

Page 10: STUDIE 2 STUDIE 3 DECEMBER 2012 Studie 3 - DR | TV, radio ...€¦ · Advance with DR production coordinator Light Advance with DR production coordinator . STUDIE 3 DECEMBER 2012

STUDIE 3

DECEMBER 2012

10

Stage and seating A

200 seats

Page 11: STUDIE 2 STUDIE 3 DECEMBER 2012 Studie 3 - DR | TV, radio ...€¦ · Advance with DR production coordinator Light Advance with DR production coordinator . STUDIE 3 DECEMBER 2012

STUDIE 3

DECEMBER 2012

11

Stage and seating B

170 seats

Page 12: STUDIE 2 STUDIE 3 DECEMBER 2012 Studie 3 - DR | TV, radio ...€¦ · Advance with DR production coordinator Light Advance with DR production coordinator . STUDIE 3 DECEMBER 2012

STUDIE 3

DECEMBER 2012

12

STUDIE 3

DECEMBER 2012