160 I STRUCTURES KONSTRUKCE 161 Fig. 1 View of the completed SHPP Obr. 1 Pohled na dokončenou elektrárnu Fig. 2 View of the completed SHPP Obr. 2 Pohled na dokončenou elektrárnu SMALL HYDRO POWER PLANT TROJA MALÁ VODNÍ ELEKTRÁRNA TROJA 32 Oldřich NEUMAYER Pöyry Environment a.s. [email protected] Jiří PECHAR Povodí Vltavy s.p. [email protected] Pavel KASAL Metrostav a.s. [email protected] SHPP is equipped with 2 straight-flow Kaplan block turbines with rectangular gear to vertical synchronous generators. Diameter of turbines runners D = 2 600 mm, maximal discharge Q T = 2 x 40 = 80 m 3 /s, design head H n = 3.0 m and output P T = 2 x 1.15 = 2.3 MW. Average annual energy generation is expected to be E = 13 GWh. Inlet structure and a headrace canal create two separate dilatation blocks, which consist of reinforced concrete bottom and walls which are anchored to the existing pier and concrete cut off wall. The bottom surface is shaped in the nature of right-lined spatial warp. As a part of the inlet structure, there are two reinforced concrete baffling wings. The shape of these wings was verified by evaluation of a 3D numerical analysis of turbulent flow. The substructure is box watertight reinforced concrete framework, in which the turbines are located, as well as all necessary equipment of SHPP, such as machine-room with assembly crane, high and low voltage switch rooms, transformer station, dewatering pits and access staircase. A matter of interest is that SHPP can be overflowed during flood flows. The reinforced concrete ceiling of the substructure is able to resist water level of a height of 4 m above its top edge, which means flooding by more than Q 100 . There are four assembly waterproof steel covers in the ceiling, which spreads loads to the ceiling structure. The superstructure is only a reinforced concrete tower for location of an entry staircase and air conditioning ducts. The altitude of the superstructure and existing neighbouring weir control room is the same. In terms of appearance, this control room is arranged analogous to the superstructure. The SHPP entrance is located above Q 100 water level. The outlet structure is also a separate dilatation block. It is a sub- frame reinforced concrete structure consisting of right-lined skew surface shaped bottom, bank wall curved on plan and dividing pier arranged to be streamlined. SHPP REINFORCED CONCRETE STRUCTURE The structures are made of two types of concrete. Weatherproof structures and structures affected by water level fluctuation are made of waterproof concrete C30/37 XC4 XF3; others are made of concrete C20/25. The steel 10 505 (R) was used for reinforcement. The structure was designed with the help of 3D program InfoCAD of the firm Infograph Aachen, according to Euro code. During the designing check of substructure global stability against floating, all possible load cases were considered. All construction joints were consequently sealed with indoor and outdoor PVC sealing strips. Critical places were extra sealed by injectable sleevings and expansion strips. For a waterproof guarantee, there was used a system with water stop in between the formwork triggering. The holes for coupling were on the face side additionally equipped by sealing cones. The result is very good quality even in the lower part of the substructure, where the water pressure is 0.1 MPa during normal operating conditions. This pressure can be increased up to 0.16 MPa during flood conditions. BASIC PROJECT DATA TYPE OF STRUCTURE Cast-in-situ reinforced concrete structure GROUND PLAN DIMENSIONS approx. 115 x 18 m TURBINE TYPE 2 x straight-flow Kaplan block turbine MAX. DISCHARGE 2 x 40 m 3 /s TURBINE OUTPUT 2 x 1,150 kW CLIENT Povodí Vltavy s.p. GENERAL DESIGNER Pöyry Environment a.s. CONTRACTOR OF CIVIL PART Metrostav a.s. CONTRACTOR OF TECHNOLOGICAL PART Siemens Engineering a.s. CONSTRUCTION TIME 2007–2009 INTRODUCTION The small hydro power plant (SHPP) is situated nearby Troja weir on the Vltava River in river km 45.580 on the north outskirts of the capital city of Prague in Troja fold. SHPP was erected in the period 2007-2009. The bulk of the reinforced concrete structures were erected in 2008. PROJECT DESCRIPTION Run off SHPP was erected within a very narrow area on the left river bank between the weir control room and the navigation canal Troja-Podbaba. The structure was realized under the protection of upstream and downstream steel sheet pile cofferdam, additionally anchored left bank pier of the weir and existing reinforced concrete cut off wall primarily erected for widening of the existing navigation canal.

Upload: nguyenthien

Post on 06-Mar-2018

219 views

Category:

Documents


4 download

TRANSCRIPT

Page 1: STRUCTURES SMALL HYDRO POWER PLANT TROJA …pl.metrostav.cz/pdf/reference/CBS_NZ2010_32_PRINT.pdf · to resist water level of a height of 4 m above its top ... IN THE CZECH REPUBLIC

160 I

STRUCTURES

KONSTRUKCE

161

Fig. 1 View of the completed SHPP

Obr. 1 Pohled na dokončenou elektrárnu

Fig. 2 View of the completed SHPP

Obr. 2 Pohled na dokončenou elektrárnu

SMALL HYDRO POWER PLANT TROJA

MALÁ VODNÍ ELEKTRÁRNA TROJA

32Oldřich NEUMAYERPöyry Environment a.s.

[email protected]

Jiří PECHARPovodí Vltavy s.p.

[email protected]

Pavel KASALMetrostav a.s.

[email protected]

SHPP is equipped with 2 straight-flow Kaplan block turbines

with rectangular gear to vertical synchronous generators.

Diameter of turbines runners D = 2 600 mm, maximal discharge

QT = 2 x 40 = 80 m3/s, design head H

n = 3.0 m and output P

T = 2 x

1.15 = 2.3 MW. Average annual energy generation is expected

to be E = 13 GWh.

Inlet structure and a headrace canal create two separate dilatation

blocks, which consist of reinforced concrete bottom and walls

which are anchored to the existing pier and concrete cut off wall.

The bottom surface is shaped in the nature of right-lined spatial

warp. As a part of the inlet structure, there are two reinforced

concrete baffling wings. The shape of these wings was verified

by evaluation of a 3D numerical analysis of turbulent flow.

The substructure is box watertight reinforced concrete

framework, in which the turbines are located, as well as all

necessary equipment of SHPP, such as machine-room with

assembly crane, high and low voltage switch rooms, transformer

station, dewatering pits and access staircase.

A matter of interest is that SHPP can be overflowed during flood

flows. The reinforced concrete ceiling of the substructure is able

to resist water level of a height of 4 m above its top edge, which

means flooding by more than Q100

. There are four assembly

waterproof steel covers in the ceiling, which spreads loads to

the ceiling structure.

The superstructure is only a reinforced concrete tower for

location of an entry staircase and air conditioning ducts. The

altitude of the superstructure and existing neighbouring weir

control room is the same. In terms of appearance, this control

room is arranged analogous to the superstructure. The SHPP

entrance is located above Q100

water level.

The outlet structure is also a separate dilatation block. It is a sub-

frame reinforced concrete structure consisting of right-lined

skew surface shaped bottom, bank wall curved on plan and

dividing pier arranged to be streamlined.

SHPP REINFORCED CONCRETE STRUCTURE

The structures are made of two types of concrete. Weatherproof

structures and structures affected by water level fluctuation are

made of waterproof concrete C30/37 XC4 XF3; others are made

of concrete C20/25.

The steel 10 505 (R) was used for reinforcement. The structure

was designed with the help of 3D program InfoCAD of the

firm Infograph Aachen, according to Euro code. During the

designing check of substructure global stability against floating,

all possible load cases were considered.

All construction joints were consequently sealed with indoor

and outdoor PVC sealing strips. Critical places were extra sealed

by injectable sleevings and expansion strips.

For a waterproof guarantee, there was used a system with

water stop in between the formwork triggering. The holes for

coupling were on the face side additionally equipped by sealing

cones. The result is very good quality even in the lower part of

the substructure, where the water pressure is 0.1 MPa during

normal operating conditions. This pressure can be increased up

to 0.16 MPa during flood conditions.

BASIC PROJECT DATA

TYPE OF STRUCTURE Cast-in-situ reinforced concrete structure

GROUND PLAN DIMENSIONS approx. 115 x 18 m

TURBINE TYPE 2 x straight-flow Kaplan block turbine

MAX. DISCHARGE 2 x 40 m3/s

TURBINE OUTPUT 2 x 1,150 kW

CLIENT Povodí Vltavy s.p.

GENERAL DESIGNER Pöyry Environment a.s.

CONTRACTOR OF CIVIL PART Metrostav a.s.

CONTRACTOR OF TECHNOLOGICAL PART Siemens Engineering a.s.

CONSTRUCTION TIME 2007–2009

INTRODUCTION

The small hydro power plant (SHPP) is situated nearby Troja

weir on the Vltava River in river km 45.580 on the north outskirts

of the capital city of Prague in Troja fold. SHPP was erected

in the period 2007-2009. The bulk of the reinforced concrete

structures were erected in 2008.

PROJECT DESCRIPTION

Run off SHPP was erected within a very narrow area on the left

river bank between the weir control room and the navigation

canal Troja-Podbaba. The structure was realized under the

protection of upstream and downstream steel sheet pile

cofferdam, additionally anchored left bank pier of the weir and

existing reinforced concrete cut off wall primarily erected for

widening of the existing navigation canal.

Page 2: STRUCTURES SMALL HYDRO POWER PLANT TROJA …pl.metrostav.cz/pdf/reference/CBS_NZ2010_32_PRINT.pdf · to resist water level of a height of 4 m above its top ... IN THE CZECH REPUBLIC

STRUCTURAL CONCRETE IN THE CZECH REPUBLIC 20062009

KONSTRUKČNÍ BETON V ČESKÉ REPUBLICE 20062009

160

161

Fig. 4 Outlet structureObr. 4 Výtokový objekt

Fig. 3 Aerial viewObr. 3 Letecký pohled

ZÁKLADNÍ DATA PROJEKTU

TYP KONSTRUKCE Železobetonová monolitická konstrukce

PŮDORYSNÉ ROZMĚRY cca 115 x 18 m

TYP TURBÍNY 2 x přímoproudá Kaplanova turbina

MAX. HLTNOST 2 x 40 m3/s

VÝKON TURBÍNY 2 x 1150 kW

INVESTOR Povodí Vltavy s.p.

PROJEKTANT STAVBY Pöyry Environment a.s.

DODAVATEL STAVEBNÍ ČÁSTI Metrostav a.s.

DODAVATEL TECHNOLOGICKÉ ČÁSTI

Siemens Engineering a.s.

DOBA VÝSTAVBY 2007 až 2009

ÚVOD

Malá vodní elektrárna Troja se nachází u jezu Troja na řece

Vltavě v ř. km 45,580 na severním okraji hlavního města Praha

v Trojské kotlině. Elektrárna byla vybudována v letech 2007 až

2009. Hlavní objem železobetonových konstrukcí byl vybudo-

ván v roce 2008.

POPIS PROJEKTU

Příjezová MVE byla vybudována ve velmi stísněném prostoru

na levém břehu řeky mezi velínem jezu a plavebním kanálem

Troja – Podbaba. Stavba byla provedena pod ochranou návodní

a povodní jímky z ocelových štětovnic, dodatečně zakotveného

levobřežního pilíře jezu a původní dodatečně zakotvené žele-

zobetonové podzemní stěny, která měla původně sloužit pro

rozšíření plavebního kanálu.

V elektrárně jsou osazeny 2 přímoproudé Kaplanovy blokové

turbiny s pravoúhlými převody na vertikální synchronní gene-

rátory. Turbiny mají průměr oběžného kola D=2600 mm, max.

hltnost QT=2x40=80 m3/s, návrhový spád H

n=3,0 m a výkon

PT=2x1,15=2,3 MW. Průměrná roční výroba elektrické energie se

předpokládá E=13GWh.

Vtokový objekt a přívodní kanál tvoří 2 samostatné dilatační

bloky, které sestávají ze železobetonového dna a stěn tvoře-

ných přibetonovanými přikotvenými konstrukcemi ke stávající

konstrukci pilíře jezu a podzemní stěny. Dno je provedeno jako

přímková zborcená plocha. Součástí vtoku jsou i 2 usměrňovací

železobetonová křídla se zakřiveným tvarem stanoveném po-

mocí 3D modelu turbulentního proudění.

Spodní stavbu tvoří krabicová vodotěsná železobetonová kon-

strukce sloužící pro umístění výše uvedených turbin a veškeré-

ho nutného vybavení MVE tj. strojovny s montážním jeřábem,

rozvoden vn a nn, trafostanice, jímek pro vyčerpání hydraulické-

ho obvodu a prosáklé vody a přístupového schodiště.

Zajímavostí řešení spodní stavby je to, že je navržena jako pře-

lévaná při průtocích velkých vod. Železobetonový strop spodní

stavby je navržen tak, aby odolal výšce hladiny 4m nad jeho

horní hranou při průtoku více než 100 leté povodně. Součástí

stropu jsou i 4 montážní vodotěsné ocelové poklopy, jejichž

zatížení se přenáší do konstrukce stropu.

Horní stavba je tvořena pouze železobetonovým vodotěsným

Page 3: STRUCTURES SMALL HYDRO POWER PLANT TROJA …pl.metrostav.cz/pdf/reference/CBS_NZ2010_32_PRINT.pdf · to resist water level of a height of 4 m above its top ... IN THE CZECH REPUBLIC

162 I

STRUCTURES

KONSTRUKCE

163

SMALL HYDRO POWER PLANT TROJA

MALÁ VODNÍ ELEKTRÁRNA TROJA

Fig. 5 Draft tube framework – lower part

Obr. 5 Bednění savky – spodní část

Fig. 6 Assembly of draft tube reinforcement

Obr. 6 Montáž výztuže savky

Fig. 7 View into the draft tube after striking

Obr. 7 Pohled do savky po odbednění

The most difficult part of SHPP was draft tubes and inlets of

the turbines. In both cases this is a complicated transformation

from a rectangular to circle cross-section. The draft tubes and

inlets were formed and concreted in two stages. First of all, there

was concreted the lower part with a horizontal construction

joint in the middle of total height, and after installation of the

reinforcement and formwork concreting of the upper part was

completed. For concreting of the lower part, there was used

self compacting concrete C20/25 SCC. Formwork of the lower

part was anchored to the foundation structures using screw

rods and was ensured against uplift pressure during concreting.

The basic bearing system of the framework was created from

wooden stiffening trusses. Coating was made of planks and in

case of plane surface there was used formply.

CONCLUSION

SHPP Troja is another contribution to increasing the exploitation

of renewable energy in the Czech Republic. The reinforced

concrete structure of the SHPP is designed as a water tight

structure. Water tightness was reached not only by using

waterproofing concrete but also by a suitable distribution of the

structure into the concreting steps, the reinforcing of particular

structural elements and by a system of sealing of construction

and dilatation joints and bushings. A crucial impact on the

quality of the whole work was to fulfil the method statement at

the construction process.

CONSUMPTION OF MATERIALS AND COST

TOTAL

CONCRETE 5,800 m3

REINFORCING STEEL 505 t

COST 13,500,000 EUR

Page 4: STRUCTURES SMALL HYDRO POWER PLANT TROJA …pl.metrostav.cz/pdf/reference/CBS_NZ2010_32_PRINT.pdf · to resist water level of a height of 4 m above its top ... IN THE CZECH REPUBLIC

STRUCTURAL CONCRETE IN THE CZECH REPUBLIC 20062009

KONSTRUKČNÍ BETON V ČESKÉ REPUBLICE 20062009

162

163

Fig. 8 SHPP under constructionObr. 8 Pohled na rozestavěnou elektrárnu

Fig. 9 Longitudinal sectionObr. 9 Podélný řez

Základní nosný systém bednění tvořily dřevěné ramenáty. Plášť

byl tvořen z prken a v rovných plochách byla použita překližka.

ZÁV ĚR

Malá vodní elektrárna Troja je dalším příspěvkem ke zvýšení po-

dílu využití obnovitelných zdrojů energie v České republice.

Železobetonová konstrukce malé vodní elektrárny je řešena

jako vodotěsná konstrukce. Vodotěsnost byla dosažena nejen

použitím vodostavebního betonu, ale i vhodným rozdělením

konstrukce do betonážních celků, vyztužením jednotlivých kon-

strukčních prvků a systémem utěsnění pracovních spár a pro-

stupů. Rozhodující vliv na kvalitu celého díla mělo dodržování

technologické kázně při výstavbě.

SPOTŘEBA MATERIÁLŮ A CENA

CELKEM

BETON 5800 m3

BETONÁŘSKÁ VÝZTUŽ 505 t

CENA 13 500 000 EUR

dříkem sloužícím pro umístění vstupního schodiště a kanálů

vzduchotechniky. Horní stavba je vyvedena do stejné výšky jako

sousední stávající velín jezu, který je pohledově upraven ve stej-

ném stylu jako horní stavba MVE. Vstup do MVE je umístěn nad

úrovní hladiny HQ100

.

Výtokový objekt tvoří opět samostatný dilatační blok, tvořený

polorámovou železobetonovou konstrukcí sestávající ze dna

ve tvaru přímkové zborcené plochy, půdorysně zakřivené ná-

břežní zdi a proudnicově upraveného dělícího pilíře.

ŽELEZOBETONOVÁ KONSTRUKCE MVE

Konstrukce jsou provedeny ze dvou typů betonů. Konstrukce

vystavené povětrnosti a kolísání hladiny jsou provedeny z vo-

dostavebného betonu C30/37 XC4 XF3, ostatní konstrukce jsou

provedeny z betonu C20/25.

Jako výztuž byla použita ocel 10 505 (R). Konstrukce byla di-

menzována pří použití 3D programů InfoCAD firmy Infograph

Aachen podle Eurokódu. Při dimenzování bylo nutno dbát

i na posouzení globální stability spodní stavby proti vyplavání

při všech možných zatěžovacích stavech.

Při realizaci horní a spodní stavby byly veškeré pracovní spáry

důsledně těsněny pomocí vnitřních a venkovních těsnících pá-

sů z PVC. Kritická místa byla dotěsňována pomocí injektovatel-

ných hadiček a expanzních pásů. K zajištění vodotěsnosti míst

pro spínání bednění byl použit speciální systém se zábranou

uprostřed stěny. Otvor po spínání byl v lících konstrukce navíc

uzavřen těsnícími kónusy. Výsledkem této snahy je dosažení

velmi dobrých výsledků i ve spodní části MVE, kde je za nor-

málního provozu tlak vody 0,10 MPa, který se při povodni může

zvýšit až na 0,16 MPa.

Nejnáročnější konstrukcí MVE byly savky a vtoky na turbiny.

V obou případech se jedná o tvarově složité konstrukce pře-

chodů z kruhových na obdélníkové profily. Savky i vtoky byly

bedněny a betonovány ve 2 etapách. Nejprve byla vybetonová-

na spodní část s vodorovnou pracovní spárou v polovině výšky

a po montáži výztuže a bednění horní části byla dobetonována

horní část. Pro betonáž první části savek a vtoků byl použit

s ohledem na kvalitní zabetonování konstrukce savky pod nasa-

zeným bedněním samozhutňující beton C20/25 SCC. Bednění

spodních částí savky bylo přes soustavu příčných a podélných

ocelových nosníků přikotveno k základovým konstrukcím po-

mocí závitových tyčí, čímž bylo zajištěno proti vztlakové síle při

betonáži.