Series 200 Structural Report and Calculations NSSE 5022 Sunrise Boulevard Fair Oaks CA 95628 (916) 536-9585 Page 2 Structural Report and Calculations Series 200 Ground Mount For SnapNrack 775 Fiero Lane, Suite 200 San Luis Obispo, CA 93401 Prepared By Norman Scheel Structural Engineer 5022 Sunrise Boulevard Fair Oaks, CA 95628 (916) 536-9585 July 6, 2016

Upload: others

Post on 10-Jun-2022

7 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Structural Report and Calculations Series 200 Ground Mount

Series 200 Structural Report and Calculations

NSSE 5022 Sunrise Boulevard Fair Oaks CA 95628 (916) 536-9585 Page 2

Structural Report and Calculations

Series 200 Ground Mount

For

SnapNrack 775 Fiero Lane, Suite 200

San Luis Obispo, CA 93401

Prepared By

Norman Scheel Structural Engineer 5022 Sunrise Boulevard

Fair Oaks, CA 95628 (916) 536-9585

July 6, 2016

Page 2: Structural Report and Calculations Series 200 Ground Mount

Series 200 Structural Report and Calculations

NSSE 5022 Sunrise Boulevard Fair Oaks CA 95628 (916) 536-9585 Page 3

Table of Contents Section Page

Cover Letter 1 Summary Report 2 to 96

Building Department Support Calculations

Design Notes and Specifications C1 Sketches and Details C2 Wind Calculations ASCE 7-10 C3 Seismic Calculations ASCE 7-10 C4 Snow Load Calculations ASCE 7-10 C5 Required Number of Rails for Four 39” X 65” PV Panels C6-7 Required Number of Rails for Four 39” X 78” PV Panels C8-9 Required Number of Rails for Three 39” X 65” PV Panels C10-11 Required Number of Rails for Three 39” X 78” PV Panels C12-13 Pipe Rail Specifications C14 Non Constrained Footing Calculations C15 Grade Beam Calculations C16 Brace A Calculation for Axial Forces C17-18 Brace C Calculation for Axial Forces C19-20 Brace D Calculation for Axial Forces C21-22 Brace E Calculation for Axial Forces C23-24 Brace F Calculation for Axial Forces C25-26 2D Frame Analysis for Example (90 mph Exp. C with 20 degree Tilt Angle) C27-29 Appendix A: ASCE-2010 to 2005 conversion sheet A1

Page 3: Structural Report and Calculations Series 200 Ground Mount

Series 200 Structural Report and Calculations

NSSE 5022 Sunrise Boulevard Fair Oaks CA 95628 (916) 536-9585 Page 4

Introduction This summary letter is referencing the Structural Calculation Packet for the SnapNrack Series 200 Mounting System. We performed the calculations in accordance with the International Building Code (IBC) and the ASCE 7-10. The racking system has been designed to withstand code-prescribed forces due to the racking system’s own weight, the weight of the solar panels, the snow loads, and both the wind and seismic forces. The limits of the structural design are as listed below.

Wind Speed from 100 mph to 170 mph (Page C3 of calculations) Seismic Design Category D (Page C4 of calculations) Ground Snow Loads from 0 to 120 psf (Page C5 of calculations)

In our opinion, the racking system, outlined in the SnapNrack Series 200 PV Mounting System Code Compliant Installation Manual, is acceptable and meets the loading requirements stated above. It should also be noted that the provided summary charts assume the site has a slope less than 15:1 or 15%. For sites with slopes greater than 15%, the listed foundation depths will be required to be increased as per the soils engineer or, if the project does not involve a soils engineer, SnapNrack’s drawing S200-D06.

Page 4: Structural Report and Calculations Series 200 Ground Mount

Series 200 Structural Report and Calculations

NSSE 5022 Sunrise Boulevard Fair Oaks CA 95628 (916) 536-9585 Page 5

Aluminum Ground Rail Spans The aluminum ground rails used to connect the PV panels to the racking system should be installed per the dimensions on the following detail for all tilt angles. With these lengths being constant the horizontal span between the footings will be different for every tilt angle. See detail and chart on page C2 for dimensions. The standard installation of the aluminum rail is two rails per row of PV panels. See chart located on page C14 for conditions where three rails per row of PV panels are required. The rails are to be connected to horizontal pipes with SnapNrack pipe clamps on the bottom of the rail and module clamps on the top in order to secure the PV panels.

Page 5: Structural Report and Calculations Series 200 Ground Mount

Series 200 Structural Report and Calculations

NSSE 5022 Sunrise Boulevard Fair Oaks CA 95628 (916) 536-9585 Page 6

Pipe Rails, Braces, and Vertical Post The racking system is composed of either a schedule 40 or a schedule 80 pipe, both of which are 1 ½” in diameter and have a minimum yield strength of 35 ksi. See following details for labels for individual pieces. The 50 ksi Flo-Coat Tube may be used as an alternative for the typical schedule 40 and 80 pipe as listed in these calculations. See manufacturer’s specifications for this pipe. There are two different kinds on installations: standard and braced. Each option comes with a 4 module panel or a 3 module panel choice. Using 2 rails is standard at the more common lower loads, but higher wind and snow loads will require 3 rails per panel. This makes for a total of 8 possible installation configurations. Each configuration has unique load capabilities for the wind and snow loads specific to each project. Pages C6-C13 illustrate the minimum number of rails required for every snow and wind load combination as well as for every tilt angle. Pages 7 through 14 show each of the 8 possible system configurations.

Page 6: Structural Report and Calculations Series 200 Ground Mount

Series 200 Structural Report and Calculations

NSSE 5022 Sunrise Boulevard Fair Oaks CA 95628 (916) 536-9585 Page 7

Standard Installation (4 Module Panels and 2 Rails per Panel)

Page 7: Structural Report and Calculations Series 200 Ground Mount

Series 200 Structural Report and Calculations

NSSE 5022 Sunrise Boulevard Fair Oaks CA 95628 (916) 536-9585 Page 8

Standard Installation (4 Module Panels and 3 Rails per Panel)

Page 8: Structural Report and Calculations Series 200 Ground Mount

Series 200 Structural Report and Calculations

NSSE 5022 Sunrise Boulevard Fair Oaks CA 95628 (916) 536-9585 Page 9

Standard Installation (3 Module Panels and 2 Rails per Panel)

Page 9: Structural Report and Calculations Series 200 Ground Mount

Series 200 Structural Report and Calculations

NSSE 5022 Sunrise Boulevard Fair Oaks CA 95628 (916) 536-9585 Page 10

Standard Installation (3 Module Panels and 3 Rails per Panel)

Page 10: Structural Report and Calculations Series 200 Ground Mount

Series 200 Structural Report and Calculations

NSSE 5022 Sunrise Boulevard Fair Oaks CA 95628 (916) 536-9585 Page 11

Braced Installation (4 Module Panels and 2 Rails per Panel)

Page 11: Structural Report and Calculations Series 200 Ground Mount

Series 200 Structural Report and Calculations

NSSE 5022 Sunrise Boulevard Fair Oaks CA 95628 (916) 536-9585 Page 12

Braced Installation (4 Module Panels and 3 Rails per Panel)

Page 12: Structural Report and Calculations Series 200 Ground Mount

Series 200 Structural Report and Calculations

NSSE 5022 Sunrise Boulevard Fair Oaks CA 95628 (916) 536-9585 Page 13

Braced Installation (3 Module Panels and 2 Rails per Panel)

Page 13: Structural Report and Calculations Series 200 Ground Mount

Series 200 Structural Report and Calculations

NSSE 5022 Sunrise Boulevard Fair Oaks CA 95628 (916) 536-9585 Page 14

Braced Installation (3 Module Panels and 3 Rails per Panel)

Page 14: Structural Report and Calculations Series 200 Ground Mount

Series 200 Structural Report and Calculations

NSSE 5022 Sunrise Boulevard Fair Oaks CA 95628 (916) 536-9585 Page 15

Configuration Tables See pages 19 thru 96 for installation of racking system per wind and snow load requirements. See example below for instructions on how to read tables. All dimensions are in inches.

Standard Installation

Tilt Angle Horizontal pipe spans (in) Footing depth at short pipe (in) Footing depth at tall pipe (in) Brace A requirements Brace C requirements Brace D requirements Braced Installation

Horizontal pipe spans (in) Footing depth at short pipe (in) Footing depth at tall pipe (in) Brace A requirements Brace E requirements Brace F requirements Number of aluminum ground rails required for either the standard or braced options per panel size. See pages C6 through C13 for 2 or 3 rail configurations.

Page 15: Structural Report and Calculations Series 200 Ground Mount

Series 200 Structural Report and Calculations

NSSE 5022 Sunrise Boulevard Fair Oaks CA 95628 (916) 536-9585 Page 16

Frame Section Standard Installation Rear View Bracing

Page 16: Structural Report and Calculations Series 200 Ground Mount

Series 200 Structural Report and Calculations

NSSE 5022 Sunrise Boulevard Fair Oaks CA 95628 (916) 536-9585 Page 17

Foundation Options

Pier foundations: piers will be 12” in diameter and be at the depth required in the

following charts based on wind speed, panel tilt, and snow load. The minimum depth of the footings is set to 30 inches and the concrete will be 2500 psi minimum.

Grade beam option: a grade beam may be used in place of the pier foundations See SnapNrack’s drawing S200 D07 for grade beam configuration. Grade beams will be a minimum of 12” wide x 12” deep and will run a minimum of 12’-0” centered under the posts. Two #4 Bars will be used at the top and the bottom of the grade beam, one on each side for the vertical pipe. These must have a minimum of 3” clear concrete cover and shall be Grade 40 minimum. See table on page C16 for grade beam sizes.

SOIL BEARING CAPACITY ALLOWABLE FOUNDATION AND LATERAL PRESSURE

Class of Materials Allowable Foundation

Pressure (psf)d

Lateral Bearing (psf/f below

natural grade)d

Lateral Sliding Coefficient of

friction Resistance

(psf)b

1. Crystalline bedrock 12,000 1,200 0.70 —

2. Sedimentary and foliated rock 4,000 400 0.35 —

3. Sandy gravel and/or gravel (GW and GP) 3,000 200 0.35 —

4. Sand, silty sand, clayey sand, silty gravel and clayey gravel (SW, SP, SM, SC, GM and GC)

2,000 150 0.25 —

5. Clay, sandy clay, silty clay, clayey silt, silt and sand silt (CL, ML, MH and CH)

1,500c 100 — 130

Referring to page C15, this report uses 1500 pcf foundation pressure into the calculations, In addition, it uses a footing diameter of 1 ft., making the foundation pressure 1500 psf. From these calculations, which are in terms of the worst-possible conditions, any of the choices for the Class of Materials listed above in the table would work for the ground-mount solar panels.

Page 17: Structural Report and Calculations Series 200 Ground Mount

Series 200 Structural Report and Calculations

NSSE 5022 Sunrise Boulevard Fair Oaks CA 95628 (916) 536-9585 Page 18

Site – Specific Analysis A site-specific analysis will be required if the location of the solar panel installation corresponds to any of the following criteria:

The pitch of the solar panel is greater than 45 degrees above the horizontal. A topographic factor applies to the location. Topographic factors apply, for general

purposes, when the structure is on a hill, mesa or bluff, or is adjacent to a large body of water. For complete descriptions of topographic, factors please refer to ASCE 7-10 section 26.8

A combination of loads and/or site conditions applies when not addressed in the attached charts.

If one or more of these factors applies to the project location, please contact NSSE, and we will analyze the site conditions and recommend post spacing for each specific site. Topographic Factors and Limits

It must be noted for any site location where the topographic factor is applied (e.g. hills, mesas, and seashore) the configurations listed in this packet may not be adequate for the given site. A registered structural engineer should evaluate the exact topographic conditions for this specific site prior to construction. Please note all sizes, material specifications, and weights have been provided by SnapNrack. Please see SnapNrack’s plans for limits on the bolt parameters. Torque all 5/16” diameter hardware as specified in SnapNrack’ plans (10-16 ft-lbs for Silver Stainless Steel and 7-9 ft-lbs for black Stainless Steel). SnapNrack has also provided estimated soil values, referenced on page 17, used to calculate the optimized size and depths of the footings. It is the responsibility of SnapNrack’s customer, otherwise known as the contractor or professional solar installer, to verify, that the site specific soil conditions match or exceed the estimated values given within this report. Installation of Series 200 is to be conducted in accordance with SnapNrack’s drawings S200 D01 thru D09 (all drawings are REV G). Please feel free to contact me with any questions or concerns, Thank you. Sincerely, Norman Scheel PE, SE LEED-AP BD+C, LEED-AP Homes Fellow SEAOC Fellow A.S.C.E.

Page 18: Structural Report and Calculations Series 200 Ground Mount

� ����� ������ ��� ���� ����� ������ ��� ���

����������� ������������ ��� ��

����������� ������������� ��� ��

���������� ������������� ��� ��

���������� ������������� ��� ��

���������� ������������� ��� ��

���������� ������������� ��� ��

���������� ������������� ��� ��

� ����� ������ ��� ���� ����� ������ ��� ���

����������� ������������ ��� ��

���������� ������������� ��� ��

���������� ������������� ��� ��

���������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

���������� ������������� ��� ��

� ����� ������ ��� ���� ����� ������ ��� ���

����������� ������������ ��� ��

���������� ������������� ��� ��

���������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ����� � �!

"#$$% &'() *�+ �&, �-�(. / �) (0 �1 *23� "!$45��!6 "7! 8� "4 "

9: ;< => ?@<

A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;<

A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E

A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;<

A��B� �CD B A��B� �CD B

� ����

: ;< => ?G<

A��B� �CD B� �

� ����

E => ?: ;<

A��B� �CD B� �

� ����

> HE

A��B� �CD B� �

� ����

I �JKL ��CD ����M �C K� ��L N�

OP

Q��R S��R��R S��R

��� TU�VL WCX �C� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��

9: ;< => ?@<

A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;<

A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E

A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;<

A��B� �CD B A��B� �CD B

� ����

: ;< => ?G<

A��B� �CD B� �

� ����

E => ?: ;<

A��B� �CD B� �

� ����

> HE

A��B� �CD B� �

� ����

I �JKL ��CD ����M �C K� ��L N�

OP

Q��R S��R��R S��R

��� TU�VL WCX �C� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��

9: ;< => ?@<

A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;<

A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E

A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;<

A��B� �CD B A��B� �CD B

� ����

: ;< => ?G<

A��B� �CD B� �

� ����

E => ?: ;<

A��B� �CD B� �

� ����

> HE

A��B� �CD B� �

� ����M �C K� ��L N�

OP

Q��R S��R��R S��R

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��I �JKL ��CD ����

x yz{| } ~���| yz� ��� ��{ y�� �y ~z�� y ~z�� ��� ��� ��{� zy �� y�� ���� y� ~� �� �z�� ��

��� TU�VL WCX �C� U�Y� W�Z

Page 19: Structural Report and Calculations Series 200 Ground Mount

� ����� ������ ��� ���� ����� ������ ��� ���

����������� ������������ ��� ��

���������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ����� ������ ��� ���� ����� ������ ��� ���

����������� ������������ ��� ��

���������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ����� ������ ��� ���� ����� ������ ��� ���

����������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ���$# � �!

"#$$% &'() *�+ �&, �-�(. / �) (0 �1 *23� "!$45��!6 "7! 8� "4 "

9: ;< => ?@<

A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;<

A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E

A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;<

A��B� �CD B A��B� �CD B

� ����

: ;< => ?G<

A��B� �CD B� �

� ����

E => ?: ;<

A��B� �CD B� �

� ����

> HE

A��B� �CD B� �

� ����

I �JKL ��CD ����M �C K� ��L N�

OP

Q��R S��R��R S��R

��� TU�VL WCX �C� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��

9: ;< => ?@<

A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;<

A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E

A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;<

A��B� �CD B A��B� �CD B

� ����

: ;< => ?G<

A��B� �CD B� �

� ����

E => ?: ;<

A��B� �CD B� �

� ����

> HE

A��B� �CD B� �

� ����

I �JKL ��CD ����M �C K� ��L N�

OP

Q��R S��R��R S��R

��� TU�VL WCX �C� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��

9: ;< => ?@<

A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;<

A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E

A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;<

A��B� �CD B A��B� �CD B

� ����

: ;< => ?G<

A��B� �CD B� �

� �����

E => ?: ;<

A��B� �CD B� �

� ����

OP

Q��R S��R��R S��R

> HE

A��B� �CD B� �

� ���

��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��I �JKL ��CD ����

M �C K� ��L N�

x yz{| } ~���| yz� ��� ��{ y�� �y ~z�� y ~z�� ��� ��� ��{� zy �� y�� ���� y� ~� �� �z�� ��

��� TU�VL WCX �C� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w

Page 20: Structural Report and Calculations Series 200 Ground Mount

� ����� ������ ��� ���� ����� ������ ��� ���

���������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ����� ������ ��� ���� ����� ������ ��� ���

���������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������ ��� ��

� ���$� � �!

"#$$% &'() *�+ �&, �-�(. / �) (0 �1 *23� "!$45��!6 "7! 8� "4 "

9: ;< => ?@<

A��B� �CD B A��B� �CD B

� �����

9E => ?9: ;<

A��B� �CD B A��B� �CD B

� �����

FF ;< => ?9E

A��B� �CD B A��B� �CD B

� �����

G< => ?FF ;<

A��B� �CD B A��B� �CD B

� ����

: ;< => ?G<

A��B� �CD B� �

� ����

E => ?: ;<

A��B� �CD B� �

� ����

> HE

A��B� �CD B� �

� ����

I �JKL ��CD ����M �C K� ��L N�

OP

Q��R S��R��R S��R

��� TU�VL WCX �C� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��

9: ;< => ?@<

A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;<

A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E

A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;<

A��B� �CD B A��B� �CD B

� ����

: ;< => ?G<

A��B� �CD B� �

� �����

E => ?: ;<

A��B� �CD B� �

� ����

OP

Q��R S��R��R S��R

> HE

A��B� �CD B� �

� ���

��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��I �JKL ��CD ����

M �C K� ��L N�

x yz{| } ~���| yz� ��� ��{ y�� �y ~z�� y ~z�� ��� ��� ��{� zy �� y�� ���� y� ~� �� �z�� ��

��� TU�VL WCX �C� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w

Page 21: Structural Report and Calculations Series 200 Ground Mount

� ����� ������ ��� ���� ����� ������ ��� ���

����������� ������������ ��� ��

���������� ������������� ��� ��

���������� ������������� ��� ��

���������� ������������� ��� ��

��������� ������������� ��� ��

���������� ������������� ��� ��

���������� ������������� ��� ��

� ����� ������ ��� ���� ����� ������ ��� ���

����������� ������������ ��� ��

���������� ������������� ��� ��

���������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

���������� ������������� ��� ��

� ����� ������ ��� ���� ����� ������ ��� ���

����������� ������������ ��� ��

���������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ���$$ � �!

"#$$% &'() *�+ �&, �-�(. / �) (0 �1 *23� "!$45��!6 "7! 8� "4 "

9: ;< => ?@<

A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;<

A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E

A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;<

A��B� �CD B A��B� �CD B

� ����

: ;< => ?G<

A��B� �CD B� �

� ����

E => ?: ;<

A��B� �CD B� �

� ����

> HE

A��B� �CD B� �

� ����

I �JKL ��CD ����M �C K� ��L N�

OP

Q��R S��R��R S��R

��� TU�VL WCX �C� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��

9: ;< => ?@<

A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;<

A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E

A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;<

A��B� �CD B A��B� �CD B

� ����

: ;< => ?G<

A��B� �CD B� �

� ����

E => ?: ;<

A��B� �CD B� �

� ����

> HE

A��B� �CD B� �

� ����

I �JKL ��CD ����M �C K� ��L N�

OP

Q��R S��R��R S��R

��� TU�VL WCX �C� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��

9: ;< => ?@<

A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;<

A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E

A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;<

A��B� �CD B A��B� �CD B

� ����

: ;< => ?G<

A��B� �CD B� �

� �����

E => ?: ;<

A��B� �CD B� �

� ����

OP

Q��R S��R��R S��R

> HE

A��B� �CD B� �

� ���

��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��I �JKL ��CD ����

M �C K� ��L N�

x yz{| } ~���| yz� ��� ��{ y�� �y ~z�� y ~z�� ��� ��� � y�� ��{� zy �� y�� ���� y� ~� �� �z�� ��

��� TU�VL WCX �C� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w

Page 22: Structural Report and Calculations Series 200 Ground Mount

� ����� ������ ��� ���� ����� ������ ��� ���

����������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ����� ������ ��� ���� ����� ������ ��� ���

���������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ����� ������ ��� ���� ����� ������ ��� ���

���������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ���$7 � �!

"#$$% &'() *�+ �&, �-�(. / �) (0 �1 *23� "!$45��!6 "7! 8� "4 "

9: ;< => ?@<

A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;<

A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E

A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;<

A��B� �CD B A��B� �CD B

� ����

: ;< => ?G<

A��B� �CD B� �

� ����

E => ?: ;<

A��B� �CD B� �

� ����

> HE

A��B� �CD B� �

� ����

I �JKL ��CD ����M �C K� ��L N�

OP

Q��R S��R��R S��R

��� TU�VL WCX �C� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��

9: ;< => ?@<

A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;<

A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E

A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;<

A��B� �CD B A��B� �CD B

� ����

: ;< => ?G<

A��B� �CD B� �

� ����

E => ?: ;<

A��B� �CD B� �

� ����

> HE

A��B� �CD B� �

� ����

I �JKL ��CD ����M �C K� ��L N�

OP

Q��R S��R��R S��R

��� TU�VL WCX �C� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��

9: ;< => ?@<

A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;<

A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E

A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;<

A��B� �CD B A��B� �CD B

� ����

: ;< => ?G<

A��B� �CD B� �

� �����

E => ?: ;<

A��B� �CD B� �

� ����

OP

Q��R S��R��R S��R

> HE

A��B� �CD B� �

� ���

��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��I �JKL ��CD ����

M �C K� ��L N�

x yz{| } ~���| yz� ��� ��{ y�� �y ~z�� y ~z�� ��� ��� � y�� ��{� zy �� y�� ���� y� ~� �� �z�� ��

��� TU�VL WCX �C� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w

Page 23: Structural Report and Calculations Series 200 Ground Mount

� ����� ������ ��� ���� ����� ������ ��� ���

���������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ����� ������ ��� ���� ����� ������ ��� ���

���������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������ ��� ��

� ���$� � �!

"#$$% &'() *�+ �&, �-�(. / �) (0 �1 *23� "!$45��!6 "7! 8� "4 "

9: ;< => ?@<

A��B� �CD B A��B� �CD B

� �����

9E => ?9: ;<

A��B� �CD B A��B� �CD B

� �����

FF ;< => ?9E

A��B� �CD B A��B� �CD B

� �����

G< => ?FF ;<

A��B� �CD B A��B� �CD B

� ����

: ;< => ?G<

A��B� �CD B� �

� ����

E => ?: ;<

A��B� �CD B� �

� ����

> HE

A��B� �CD B� �

� ����

I �JKL ��CD ����M �C K� ��L N�

OP

Q��R S��R��R S��R

��� TU�VL WCX �C� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��

9: ;< => ?@<

A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;<

A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E

A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;<

A��B� �CD B A��B� �CD B

� ����

: ;< => ?G<

A��B� �CD B� �

� �����

E => ?: ;<

A��B� �CD B� �

� ����

OP

Q��R S��R��R S��R

> HE

A��B� �CD B� �

� ���

��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��I �JKL ��CD ����

M �C K� ��L N�

x yz{| } ~���| yz� ��� ��{ y�� �y ~z�� y ~z�� ��� ��� � y�� ��{� zy �� y�� ���� y� ~� �� �z�� ��

��� TU�VL WCX �C� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w

Page 24: Structural Report and Calculations Series 200 Ground Mount

� ����� ������ ��� ���� ����� ������ ��� ���

���������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

���������� ������������� ��� ��

���������� ������������� ��� ��

� ����� ������ ��� ���� ����� ������ ��� ���

���������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

���������� ������������� ��� ��

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ���$ " � �!

"#$$% &'() *�+ �&, �-�(. / �) (0 �1 *23� "!$45��!6 "7! 8� "4 "

9: ;< => ?@<

A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;<

A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E

A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;<

A��B� �CD B A��B� �CD B

� ����

: ;< => ?G<

A��B� �CD B� �

� ����

E => ?: ;<

A��B� �CD B� �

� ����

> HE

A��B� �CD B� �

� ����

I �JKL ��CD ����M �C K� ��L N�

OP

Q��R S��R��R S��R

��� TU�VL WCX �C�� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��

9: ;< => ?@<

A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;<

A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E

A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;<

A��B� �CD B A��B� �CD B

� ����

: ;< => ?G<

A��B� �CD B� �

� ����

E => ?: ;<

A��B� �CD B� �

� ����

> HE

A��B� �CD B� �

� ����

I �JKL ��CD ����M �C K� ��L N�

OP

Q��R S��R��R S��R

��� TU�VL WCX �C�� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��

9: ;< => ?@<

A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;<

A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E

A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;<

A��B� �CD B A��B� �CD B

� ����

: ;< => ?G<

A��B� �CD B� �

� �����

E => ?: ;<

A��B� �CD B� �

� ����

OP

Q��R S��R��R S��R

> HE

A��B� �CD B� �

� ���

��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��I �JKL ��CD ����

M �C K� ��L N�

x yz{| } ~���| yz� ��� ��{ y�� �y ~z�� y ~z�� ��� ���� � y�� ��{� zy �� y�� ���� y� ~� �� �z�� ��

��� TU�VL WCX �C�� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w

Page 25: Structural Report and Calculations Series 200 Ground Mount

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ���$! � �!

"#$$% &'() *�+ �&, �-�(. / �) (0 �1 *23� "!$45��!6 "7! 8� "4 "

9: ;< => ?@<

A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;<

A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E

A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;<

A��B� �CD B A��B� �CD B

� ����

: ;< => ?G<

A��B� �CD B� �

� ����

E => ?: ;<

A��B� �CD B� �

� ����

> HE

A��B� �CD B� �

� ����

I �JKL ��CD ����M �C K� ��L N�

OP

Q��R S��R��R S��R

��� TU�VL WCX �C�� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��

9: ;< => ?@<

A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;<

A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E

A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;<

A��B� �CD B A��B� �CD B

� ����

: ;< => ?G<

A��B� �CD B� �

� ����

E => ?: ;<

A��B� �CD B� �

� ����

> HE

A��B� �CD B� �

� ����

I �JKL ��CD ����M �C K� ��L N�

OP

Q��R S��R��R S��R

��� TU�VL WCX �C�� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��

9: ;< => ?@<

A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;<

A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E

A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;<

A��B� �CD B A��B� �CD B

� ����

: ;< => ?G<

A��B� �CD B� �

� �����

E => ?: ;<

A��B� �CD B� �

� ����

OP

Q��R S��R��R S��R

> HE

A��B� �CD B� �

� ���

��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��I �JKL ��CD ����

M �C K� ��L N�

x yz{| } ~���| yz� ��� ��{ y�� �y ~z�� y ~z�� ��� ���� � y�� ��{� zy �� y�� ���� y� ~� �� �z�� ��

��� TU�VL WCX �C�� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w

Page 26: Structural Report and Calculations Series 200 Ground Mount

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������ ��� ��

� ���$ � � �!

"#$$% &'() *�+ �&, �-�(. / �) (0 �1 *23� "!$45��!6 "7! 8� "4 "

9: ;< => ?@<

A��B� �CD B A��B� �CD B

� �����

9E => ?9: ;<

A��B� �CD B A��B� �CD B

� �����

FF ;< => ?9E

A��B� �CD B A��B� �CD B

� �����

G< => ?FF ;<

A��B� �CD B A��B� �CD B

� ����

: ;< => ?G<

A��B� �CD B� �

� ����

E => ?: ;<

A��B� �CD B� �

� ����

> HE

A��B� �CD B� �

� ����

I �JKL ��CD ����M �C K� ��L N�

OP

Q��R S��R��R S��R

��� TU�VL WCX �C�� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��

9: ;< => ?@<

A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;<

A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E

A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;<

A��B� �CD B A��B� �CD B

� ����

: ;< => ?G<

A��B� �CD B� �

� �����

E => ?: ;<

A��B� �CD B� �

� ����

OP

Q��R S��R��R S��R

> HE

A��B� �CD B� �

� ���

��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��I �JKL ��CD ����

M �C K� ��L N�

x yz{| } ~���| yz� ��� ��{ y�� �y ~z�� y ~z�� ��� ���� � y�� ��{� zy �� y�� ���� y� ~� �� �z�� ��

��� TU�VL WCX �C�� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w

Page 27: Structural Report and Calculations Series 200 Ground Mount

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

���������� ������������� ��� ��

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

���������� ������������� ��� ��

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ���$4 � �!

"#$$% &'() *�+ �&, �-�(. / �) (0 �1 *23� "!$45��!6 "7! 8� "4 "

9: ;< => ?@<

A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;<

A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E

A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;<

A��B� �CD B A��B� �CD B

� ����

: ;< => ?G<

A��B� �CD B� �

� ����

E => ?: ;<

A��B� �CD B� �

� ����

> HE

A��B� �CD B� �

� ����

I �JKL ��CD ����M �C K� ��L N�

OP

Q��R S��R��R S��R

��� TU�VL WCX �C�� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��

9: ;< => ?@<

A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;<

A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E

A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;<

A��B� �CD B A��B� �CD B

� ����

: ;< => ?G<

A��B� �CD B� �

� ����

E => ?: ;<

A��B� �CD B� �

� ����

> HE

A��B� �CD B� �

� ����

I �JKL ��CD ����M �C K� ��L N�

OP

Q��R S��R��R S��R

��� TU�VL WCX �C�� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��

9: ;< => ?@<

A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;<

A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E

A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;<

A��B� �CD B A��B� �CD B

� ����

: ;< => ?G<

A��B� �CD B� �

� �����

E => ?: ;<

A��B� �CD B� �

� ����

OP

Q��R S��R��R S��R

> HE

A��B� �CD B� �

� ���

��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��I �JKL ��CD ����

M �C K� ��L N�

x yz{| } ~���| yz� ��� ��{ y�� �y ~z�� y ~z�� ��� ���� � y�� ��{� zy �� y�� ���� y� ~� �� �z�� ��

��� TU�VL WCX �C�� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w

Page 28: Structural Report and Calculations Series 200 Ground Mount

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ���$� � �!

"#$$% &'() *�+ �&, �-�(. / �) (0 �1 *23� "!$45��!6 "7! 8� "4 "

9: ;< => ?@<

A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;<

A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E

A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;<

A��B� �CD B A��B� �CD B

� ����

: ;< => ?G<

A��B� �CD B� �

� ����

E => ?: ;<

A��B� �CD B� �

� ����

> HE

A��B� �CD B� �

� ����

I �JKL ��CD ����M �C K� ��L N�

OP

Q��R S��R��R S��R

��� TU�VL WCX �C�� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��

9: ;< => ?@<

A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;<

A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E

A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;<

A��B� �CD B A��B� �CD B

� ����

: ;< => ?G<

A��B� �CD B� �

� ����

E => ?: ;<

A��B� �CD B� �

� ����

> HE

A��B� �CD B� �

� ����

I �JKL ��CD ����M �C K� ��L N�

OP

Q��R S��R��R S��R

��� TU�VL WCX �C�� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��

9: ;< => ?@<

A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;<

A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E

A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;<

A��B� �CD B A��B� �CD B

� ����

: ;< => ?G<

A��B� �CD B� �

� �����

E => ?: ;<

A��B� �CD B� �

� ����

OP

Q��R S��R��R S��R

> HE

A��B� �CD B� �

� ���

��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��I �JKL ��CD ����

M �C K� ��L N�

x yz{| } ~���| yz� ��� ��{ y�� �y ~z�� y ~z�� ��� ���� � y�� ��{� zy �� y�� ���� y� ~� �� �z�� ��

��� TU�VL WCX �C�� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w

Page 29: Structural Report and Calculations Series 200 Ground Mount

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������ ��� ��

� ���7# � �!

"#$$% &'() *�+ �&, �-�(. / �) (0 �1 *23� "!$45��!6 "7! 8� "4 "

9: ;< => ?@<

A��B� �CD B A��B� �CD B

� �����

9E => ?9: ;<

A��B� �CD B A��B� �CD B

� �����

FF ;< => ?9E

A��B� �CD B A��B� �CD B

� �����

G< => ?FF ;<

A��B� �CD B A��B� �CD B

� ����

: ;< => ?G<

A��B� �CD B� �

� ����

E => ?: ;<

A��B� �CD B� �

� ����

> HE

A��B� �CD B� �

� ����

I �JKL ��CD ����M �C K� ��L N�

OP

Q��R S��R��R S��R

��� TU�VL WCX �C�� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��

9: ;< => ?@<

A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;<

A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E

A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;<

A��B� �CD B A��B� �CD B

� ����

: ;< => ?G<

A��B� �CD B� �

� �����

E => ?: ;<

A��B� �CD B� �

� ����

OP

Q��R S��R��R S��R

> HE

A��B� �CD B� �

� ���

��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��I �JKL ��CD ����

M �C K� ��L N�

x yz{| } ~���| yz� ��� ��{ y�� �y ~z�� y ~z�� ��� ���� � y�� ��{� zy �� y�� ���� y� ~� �� �z�� ��

��� TU�VL WCX �C�� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w

Page 30: Structural Report and Calculations Series 200 Ground Mount

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

���������� ������������� ��� ��

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ���7� � �!

"#$$% &'() *�+ �&, �-�(. / �) (0 �1 *23� "!$45��!6 "7! 8� "4 "

9: ;< => ?@<

A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;<

A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E

A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;<

A��B� �CD B A��B� �CD B

� ����

: ;< => ?G<

A��B� �CD B� �

� ����

E => ?: ;<

A��B� �CD B� �

� ����

> HE

A��B� �CD B� �

� ����

I �JKL ��CD ����M �C K� ��L N�

OP

Q��R S��R��R S��R

��� TU�VL WCX �C�� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��

9: ;< => ?@<

A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;<

A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E

A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;<

A��B� �CD B A��B� �CD B

� ����

: ;< => ?G<

A��B� �CD B� �

� ����

E => ?: ;<

A��B� �CD B� �

� ����

> HE

A��B� �CD B� �

� ����

I �JKL ��CD ����M �C K� ��L N�

OP

Q��R S��R��R S��R

��� TU�VL WCX �C�� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��

9: ;< => ?@<

A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;<

A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E

A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;<

A��B� �CD B A��B� �CD B

� ����

: ;< => ?G<

A��B� �CD B� �

� �����

E => ?: ;<

A��B� �CD B� �

� ����

OP

Q��R S��R��R S��R

> HE

A��B� �CD B� �

� ���

��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��I �JKL ��CD ����

M �C K� ��L N�

x yz{| } ~���| yz� ��� ��{ y�� �y ~z�� y ~z�� ��� ���� � y�� ��{� zy �� y�� ���� y� ~� �� �z�� ��

��� TU�VL WCX �C�� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w

Page 31: Structural Report and Calculations Series 200 Ground Mount

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ���7$ � �!

"#$$% &'() *�+ �&, �-�(. / �) (0 �1 *23� "!$45��!6 "7! 8� "4 "

9: ;< => ?@<

A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;<

A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E

A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;<

A��B� �CD B A��B� �CD B

� ����

: ;< => ?G<

A��B� �CD B� �

� ����

E => ?: ;<

A��B� �CD B� �

� ����

> HE

A��B� �CD B� �

� ����

I �JKL ��CD ����M �C K� ��L N�

OP

Q��R S��R��R S��R

��� TU�VL WCX �C�� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��

9: ;< => ?@<

A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;<

A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E

A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;<

A��B� �CD B A��B� �CD B

� ����

: ;< => ?G<

A��B� �CD B� �

� ����

E => ?: ;<

A��B� �CD B� �

� ����

> HE

A��B� �CD B� �

� ����

I �JKL ��CD ����M �C K� ��L N�

OP

Q��R S��R��R S��R

��� TU�VL WCX �C�� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��

9: ;< => ?@<

A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;<

A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E

A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;<

A��B� �CD B A��B� �CD B

� ����

: ;< => ?G<

A��B� �CD B� �

� �����

E => ?: ;<

A��B� �CD B� �

� ����

OP

Q��R S��R��R S��R

> HE

A��B� �CD B� �

� ���

��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��I �JKL ��CD ����

M �C K� ��L N�

x yz{| } ~���| yz� ��� ��{ y�� �y ~z�� y ~z�� ��� ���� � y�� ��{� zy �� y�� ���� y� ~� �� �z�� ��

��� TU�VL WCX �C�� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w

Page 32: Structural Report and Calculations Series 200 Ground Mount

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������ ��� ��

� ���77 � �!

"#$$% &'() *�+ �&, �-�(. / �) (0 �1 *23� "!$45��!6 "7! 8� "4 "

9: ;< => ?@<

A��B� �CD B A��B� �CD B

� �����

9E => ?9: ;<

A��B� �CD B A��B� �CD B

� �����

FF ;< => ?9E

A��B� �CD B A��B� �CD B

� �����

G< => ?FF ;<

A��B� �CD B A��B� �CD B

� ����

: ;< => ?G<

A��B� �CD B� �

� ����

E => ?: ;<

A��B� �CD B� �

� ����

> HE

A��B� �CD B� �

� ����

I �JKL ��CD ����M �C K� ��L N�

OP

Q��R S��R��R S��R

��� TU�VL WCX �C�� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��

9: ;< => ?@<

A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;<

A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E

A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;<

A��B� �CD B A��B� �CD B

� ����

: ;< => ?G<

A��B� �CD B� �

� �����

E => ?: ;<

A��B� �CD B� �

� ����

OP

Q��R S��R��R S��R

> HE

A��B� �CD B� �

� ���

��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��I �JKL ��CD ����

M �C K� ��L N�

x yz{| } ~���| yz� ��� ��{ y�� �y ~z�� y ~z�� ��� ���� � y�� ��{� zy �� y�� ���� y� ~� �� �z�� ��

��� TU�VL WCX �C�� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w

Page 33: Structural Report and Calculations Series 200 Ground Mount

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ���7� � �!

"#$$% &'() *�+ �&, �-�(. / �) (0 �1 *23� "!$45��!6 "7! 8� "4 "

9: ;< => ?@<

A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;<

A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E

A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;<

A��B� �CD B A��B� �CD B

� ����

: ;< => ?G<

A��B� �CD B� �

� ����

E => ?: ;<

A��B� �CD B� �

� ����

> HE

A��B� �CD B� �

� ����

I �JKL ��CD ����M �C K� ��L N�

OP

Q��R S��R��R S��R

��� TU�VL WCX �C�� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��

9: ;< => ?@<

A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;<

A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E

A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;<

A��B� �CD B A��B� �CD B

� ����

: ;< => ?G<

A��B� �CD B� �

� ����

E => ?: ;<

A��B� �CD B� �

� ����

> HE

A��B� �CD B� �

� ����

I �JKL ��CD ����M �C K� ��L N�

OP

Q��R S��R��R S��R

��� TU�VL WCX �C�� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��

9: ;< => ?@<

A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;<

A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E

A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;<

A��B� �CD B A��B� �CD B

� ����

: ;< => ?G<

A��B� �CD B� �

� �����

E => ?: ;<

A��B� �CD B� �

� ����

OP

Q��R S��R��R S��R

> HE

A��B� �CD B� �

� ���

��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��I �JKL ��CD ����

M �C K� ��L N�

x yz{| } ~���| yz� ��� ��{ y�� �y ~z�� y ~z�� ��� ���� � y�� ��{� zy �� y�� ���� y� ~� �� �z�� ��

��� TU�VL WCX �C�� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w

Page 34: Structural Report and Calculations Series 200 Ground Mount

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ���7 " � �!

"#$$% &'() *�+ �&, �-�(. / �) (0 �1 *23� "!$45��!6 "7! 8� "4 "

9: ;< => ?@<

A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;<

A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E

A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;<

A��B� �CD B A��B� �CD B

� ����

: ;< => ?G<

A��B� �CD B� �

� ����

E => ?: ;<

A��B� �CD B� �

� ����

> HE

A��B� �CD B� �

� ����

I �JKL ��CD ����M �C K� ��L N�

OP

Q��R S��R��R S��R

��� TU�VL WCX �C�� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��

9: ;< => ?@<

A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;<

A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E

A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;<

A��B� �CD B A��B� �CD B

� ����

: ;< => ?G<

A��B� �CD B� �

� ����

E => ?: ;<

A��B� �CD B� �

� ����

> HE

A��B� �CD B� �

� ����

I �JKL ��CD ����M �C K� ��L N�

OP

Q��R S��R��R S��R

��� TU�VL WCX �C�� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��

9: ;< => ?@<

A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;<

A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E

A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;<

A��B� �CD B A��B� �CD B

� ����

: ;< => ?G<

A��B� �CD B� �

� �����

E => ?: ;<

A��B� �CD B� �

� ����

OP

Q��R S��R��R S��R

> HE

A��B� �CD B� �

� ���

��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��I �JKL ��CD ����

M �C K� ��L N�

x yz{| } ~���| yz� ��� ��{ y�� �y ~z�� y ~z�� ��� ���� � y�� ��{� zy �� y�� ���� y� ~� �� �z�� ��

��� TU�VL WCX �C�� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w

Page 35: Structural Report and Calculations Series 200 Ground Mount

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������ ��� ��

� ���7! � �!

"#$$% &'() *�+ �&, �-�(. / �) (0 �1 *23� "!$45��!6 "7! 8� "4 "

9: ;< => ?@<

A��B� �CD B A��B� �CD B

� �����

9E => ?9: ;<

A��B� �CD B A��B� �CD B

� �����

FF ;< => ?9E

A��B� �CD B A��B� �CD B

� �����

G< => ?FF ;<

A��B� �CD B A��B� �CD B

� ����

: ;< => ?G<

A��B� �CD B� �

� ����

E => ?: ;<

A��B� �CD B� �

� ����

> HE

A��B� �CD B� �

� ����

I �JKL ��CD ����M �C K� ��L N�

OP

Q��R S��R��R S��R

��� TU�VL WCX �C�� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��

9: ;< => ?@<

A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;<

A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E

A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;<

A��B� �CD B A��B� �CD B

� ����

: ;< => ?G<

A��B� �CD B� �

� �����

E => ?: ;<

A��B� �CD B� �

� ����

OP

Q��R S��R��R S��R

> HE

A��B� �CD B� �

� ���

��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��I �JKL ��CD ����

M �C K� ��L N�

x yz{| } ~���| yz� ��� ��{ y�� �y ~z�� y ~z�� ��� ���� � y�� ��{� zy �� y�� ���� y� ~� �� �z�� ��

��� TU�VL WCX �C�� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w

Page 36: Structural Report and Calculations Series 200 Ground Mount

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ���7 � � �!

"#$$% &'() *�+ �&, �-�(. / �) (0 �1 *23� "!$45��!6 "7! 8� "4 "

9: ;< => ?@<

A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;<

A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E

A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;<

A��B� �CD B A��B� �CD B

� ����

: ;< => ?G<

A��B� �CD B� �

� ����

E => ?: ;<

A��B� �CD B� �

� ����

> HE

A��B� �CD B� �

� ����

I �JKL ��CD ����M �C K� ��L N�

OP

Q��R S��R��R S��R

��� TU�VL WCX �C�� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��

9: ;< => ?@<

A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;<

A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E

A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;<

A��B� �CD B A��B� �CD B

� ����

: ;< => ?G<

A��B� �CD B� �

� ����

E => ?: ;<

A��B� �CD B� �

� ����

> HE

A��B� �CD B� �

� ����

I �JKL ��CD ����M �C K� ��L N�

OP

Q��R S��R��R S��R

��� TU�VL WCX �C�� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��

9: ;< => ?@<

A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;<

A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E

A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;<

A��B� �CD B A��B� �CD B

� ����

: ;< => ?G<

A��B� �CD B� �

� �����

E => ?: ;<

A��B� �CD B� �

� ����

OP

Q��R S��R��R S��R

> HE

A��B� �CD B� �

� ���

��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��I �JKL ��CD ����

M �C K� ��L N�

x yz{| } ~���| yz� ��� ��{ y�� �y ~z�� y ~z�� ��� ���� � y�� ��{� zy �� y�� ���� y� ~� �� �z�� ��

��� TU�VL WCX �C�� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w

Page 37: Structural Report and Calculations Series 200 Ground Mount

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ���74 � �!

"#$$% &'() *�+ �&, �-�(. / �) (0 �1 *23� "!$45��!6 "7! 8� "4 "

9: ;< => ?@<

A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;<

A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E

A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;<

A��B� �CD B A��B� �CD B

� ����

: ;< => ?G<

A��B� �CD B� �

� ����

E => ?: ;<

A��B� �CD B� �

� ����

> HE

A��B� �CD B� �

� ����

I �JKL ��CD ����M �C K� ��L N�

OP

Q��R S��R��R S��R

��� TU�VL WCX �C�� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��

9: ;< => ?@<

A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;<

A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E

A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;<

A��B� �CD B A��B� �CD B

� ����

: ;< => ?G<

A��B� �CD B� �

� ����

E => ?: ;<

A��B� �CD B� �

� ����

> HE

A��B� �CD B� �

� ����

I �JKL ��CD ����M �C K� ��L N�

OP

Q��R S��R��R S��R

��� TU�VL WCX �C�� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��

9: ;< => ?@<

A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;<

A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E

A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;<

A��B� �CD B A��B� �CD B

� ����

: ;< => ?G<

A��B� �CD B� �

� �����

E => ?: ;<

A��B� �CD B� �

� ����

OP

Q��R S��R��R S��R

> HE

A��B� �CD B� �

� ���

��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��I �JKL ��CD ����

M �C K� ��L N�

x yz{| } ~���| yz� ��� ��{ y�� �y ~z�� y ~z�� ��� ���� � y�� ��{� zy �� y�� ���� y� ~� �� �z�� ��

��� TU�VL WCX �C�� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w

Page 38: Structural Report and Calculations Series 200 Ground Mount

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������ ��� ��

� ���7� � �!

"#$$% &'() *�+ �&, �-�(. / �) (0 �1 *23� "!$45��!6 "7! 8� "4 "

9: ;< => ?@<

A��B� �CD B A��B� �CD B

� �����

9E => ?9: ;<

A��B� �CD B A��B� �CD B

� �����

FF ;< => ?9E

A��B� �CD B A��B� �CD B

� �����

G< => ?FF ;<

A��B� �CD B A��B� �CD B

� �����

: ;< => ?G<

A��B� �CD B� �

� �����

E => ?: ;<

A��B� �CD B� �

� �����

> HE

A��B� �CD B� �

� �����

I �JKL ��CD ����M �C K� ��L N�

OP

Q��R S��R��R S��R

��� TU�VL WCX �C�� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��

9: ;< => ?@<

A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;<

A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E

A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;<

A��B� �CD B A��B� �CD B

� ����

: ;< => ?G<

A��B� �CD B� �

� �����

E => ?: ;<

A��B� �CD B� �

� ����

OP

Q��R S��R��R S��R

> HE

A��B� �CD B� �

� ���

��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��I �JKL ��CD ����

M �C K� ��L N�

x yz{| } ~���| yz� ��� ��{ y�� �y ~z�� y ~z�� ��� ���� � y�� ��{� zy �� y�� ���� y� ~� �� �z�� ��

��� TU�VL WCX �C�� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w

Page 39: Structural Report and Calculations Series 200 Ground Mount

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ����# � �!

"#$$% &'() *�+ �&, �-�(. / �) (0 �1 *23� "!$45��!6 "7! 8� "4 "

9: ;< => ?@<

A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;<

A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E

A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;<

A��B� �CD B A��B� �CD B

� ����

: ;< => ?G<

A��B� �CD B� �

� ����

E => ?: ;<

A��B� �CD B� �

� ����

> HE

A��B� �CD B� �

� ����

I �JKL ��CD ����M �C K� ��L N�

OP

Q��R S��R��R S��R

��� TU�VL WCX �C�� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��

9: ;< => ?@<

A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;<

A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E

A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;<

A��B� �CD B A��B� �CD B

� ����

: ;< => ?G<

A��B� �CD B� �

� ����

E => ?: ;<

A��B� �CD B� �

� ����

> HE

A��B� �CD B� �

� ����

I �JKL ��CD ����M �C K� ��L N�

OP

Q��R S��R��R S��R

��� TU�VL WCX �C�� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��

9: ;< => ?@<

A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;<

A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E

A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;<

A��B� �CD B A��B� �CD B

� ����

: ;< => ?G<

A��B� �CD B� �

� �����

E => ?: ;<

A��B� �CD B� �

� ����

OP

Q��R S��R��R S��R

> HE

A��B� �CD B� �

� ���

��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��I �JKL ��CD ����

M �C K� ��L N�

x yz{| } ~���| yz� ��� ��{ y�� �y ~z�� y ~z�� ��� ���� � y�� ��{� zy �� y�� ���� y� ~� �� �z�� ��

��� TU�VL WCX �C�� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w

Page 40: Structural Report and Calculations Series 200 Ground Mount

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ����� � �!

"#$$% &'() *�+ �&, �-�(. / �) (0 �1 *23� "!$45��!6 "7! 8� "4 "

9: ;< => ?@<

A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;<

A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E

A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;<

A��B� �CD B A��B� �CD B

� ����

: ;< => ?G<

A��B� �CD B� �

� ����

E => ?: ;<

A��B� �CD B� �

� ����

> HE

A��B� �CD B� �

� ����

I �JKL ��CD ����M �C K� ��L N�

OP

Q��R S��R��R S��R

��� TU�VL WCX �C�� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��

9: ;< => ?@<

A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;<

A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E

A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;<

A��B� �CD B A��B� �CD B

� ����

: ;< => ?G<

A��B� �CD B� �

� ����

E => ?: ;<

A��B� �CD B� �

� ����

> HE

A��B� �CD B� �

� ����

I �JKL ��CD ����M �C K� ��L N�

OP

Q��R S��R��R S��R

��� TU�VL WCX �C�� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��

9: ;< => ?@<

A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;<

A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E

A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;<

A��B� �CD B A��B� �CD B

� ����

: ;< => ?G<

A��B� �CD B� �

� �����

E => ?: ;<

A��B� �CD B� �

� ����

OP

Q��R S��R��R S��R

> HE

A��B� �CD B� �

� ���

��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��I �JKL ��CD ����

M �C K� ��L N�

x yz{| } ~���| yz� ��� ��{ y�� �y ~z�� y ~z�� ��� ���� � y�� ��{� zy �� y�� ���� y� ~� �� �z�� ��

��� TU�VL WCX �C�� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w

Page 41: Structural Report and Calculations Series 200 Ground Mount

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������ ��� ��

� ����$ � �!

"#$$% &'() *�+ �&, �-�(. / �) (0 �1 *23� "!$45��!6 "7! 8� "4 "

9: ;< => ?@<

A��B� �CD B A��B� �CD B

� �����

9E => ?9: ;<

A��B� �CD B A��B� �CD B

� �����

FF ;< => ?9E

A��B� �CD B A��B� �CD B

� �����

G< => ?FF ;<

A��B� �CD B A��B� �CD B

� �����

: ;< => ?G<

A��B� �CD B� �

� �����

E => ?: ;<

A��B� �CD B� �

� �����

> HE

A��B� �CD B� �

� �����

I �JKL ��CD ����M �C K� ��L N�

OP

Q��R S��R��R S��R

��� TU�VL WCX �C�� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��

9: ;< => ?@<

A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;<

A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E

A��B� �CD B A��B� �CD B

� �����

G< => ?FF ;<

A��B� �CD B A��B� �CD B

� �����

: ;< => ?G<

A��B� �CD B� �

� �������

E => ?: ;<

A��B� �CD B� �

� �����

OP

Q��R S��R��R S��R

> HE

A��B� �CD B� �

� ���

��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��I �JKL ��CD ����

M �C K� ��L N�

x yz{| } ~���| yz� ��� ��{ y�� �y ~z�� y ~z�� ��� ���� � y�� ��{� zy �� y�� ���� y� ~� �� �z�� ��

��� TU�VL WCX �C�� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w

Page 42: Structural Report and Calculations Series 200 Ground Mount

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ����7 � �!

"#$$% &'() *�+ �&, �-�(. / �) (0 �1 *23� "!$45��!6 "7! 8� "4 "

9: ;< => ?@<

A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;<

A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E

A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;<

A��B� �CD B A��B� �CD B

� ����

: ;< => ?G<

A��B� �CD B� �

� ����

E => ?: ;<

A��B� �CD B� �

� ����

> HE

A��B� �CD B� �

� ����

I �JKL ��CD ����M �C K� ��L N�

OP

Q��R S��R��R S��R

��� TU�VL WCX �C�� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��

9: ;< => ?@<

A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;<

A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E

A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;<

A��B� �CD B A��B� �CD B

� ����

: ;< => ?G<

A��B� �CD B� �

� ����

E => ?: ;<

A��B� �CD B� �

� ����

> HE

A��B� �CD B� �

� ����

I �JKL ��CD ����M �C K� ��L N�

OP

Q��R S��R��R S��R

��� TU�VL WCX �C�� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��

9: ;< => ?@<

A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;<

A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E

A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;<

A��B� �CD B A��B� �CD B

� ����

: ;< => ?G<

A��B� �CD B� �

� �����

E => ?: ;<

A��B� �CD B� �

� ����

OP

Q��R S��R��R S��R

> HE

A��B� �CD B� �

� ���

��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��I �JKL ��CD ����

M �C K� ��L N�

x yz{| } ~���| yz� ��� ��{ y�� �y ~z�� y ~z�� ��� ���� � y�� ��{� zy �� y�� ���� y� ~� �� �z�� ��

��� TU�VL WCX �C�� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w

Page 43: Structural Report and Calculations Series 200 Ground Mount

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ����� � �!

"#$$% &'() *�+ �&, �-�(. / �) (0 �1 *23� "!$45��!6 "7! 8� "4 "

9: ;< => ?@<

A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;<

A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E

A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;<

A��B� �CD B A��B� �CD B

� �����

: ;< => ?G<

A��B� �CD B� �

� �����

E => ?: ;<

A��B� �CD B� �

� �����

> HE

A��B� �CD B� �

� �����

I �JKL ��CD ����M �C K� ��L N�

OP

Q��R S��R��R S��R

��� TU�VL WCX �C�� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��

9: ;< => ?@<

A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;<

A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E

A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;<

A��B� �CD B A��B� �CD B

� ����

: ;< => ?G<

A��B� �CD B� �

� �����

E => ?: ;<

A��B� �CD B� �

� �����

> HE

A��B� �CD B� �

� �����

I �JKL ��CD ����M �C K� ��L N�

OP

Q��R S��R��R S��R

��� TU�VL WCX �C�� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��

9: ;< => ?@<

A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;<

A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E

A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;<

A��B� �CD B A��B� �CD B

� ����

: ;< => ?G<

A��B� �CD B� �

� �����

E => ?: ;<

A��B� �CD B� �

� ����

OP

Q��R S��R��R S��R

> HE

A��B� �CD B� �

� ���

��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��I �JKL ��CD ����

M �C K� ��L N�

x yz{| } ~���| yz� ��� ��{ y�� �y ~z�� y ~z�� ��� ���� � y�� ��{� zy �� y�� ���� y� ~� �� �z�� ��

��� TU�VL WCX �C�� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w

Page 44: Structural Report and Calculations Series 200 Ground Mount

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������ ��� ��

� ���� " � �!

"#$$% &'() *�+ �&, �-�(. / �) (0 �1 *23� "!$45��!6 "7! 8� "4 "

9: ;< => ?@<

A��B� �CD B A��B� �CD B

� �����

9E => ?9: ;<

A��B� �CD B A��B� �CD B

� �����

FF ;< => ?9E

A��B� �CD B A��B� �CD B

� �����

G< => ?FF ;<

A��B� �CD B A��B� �CD B

� �����

: ;< => ?G<

A��B� �CD B� �

� �����

E => ?: ;<

A��B� �CD B� �

� �����

> HE

A��B� �CD B� �

� �����

I �JKL ��CD ����M �C K� ��L N�

OP

Q��R S��R��R S��R

��� TU�VL WCX �C�� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��

9: ;< => ?@<

A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;<

A��B� �CD B A��B� �CD B

� �����

FF ;< => ?9E

A��B� �CD B A��B� �CD B

� �����

G< => ?FF ;<

A��B� �CD B A��B� �CD B

� �����

: ;< => ?G<

A��B� �CD B� �

� �������

E => ?: ;<

A��B� �CD B� �

� �����

OP

Q��R S��R��R S��R

> HE

A��B� �CD B� �

� ���

��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��I �JKL ��CD ����

M �C K� ��L N�

x yz{| } ~���| yz� ��� ��{ y�� �y ~z�� y ~z�� ��� ���� � y�� ��{� zy �� y�� ���� y� ~� �� �z�� ��

��� TU�VL WCX �C�� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w

Page 45: Structural Report and Calculations Series 200 Ground Mount

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ����! � �!

"#$$% &'() *�+ �&, �-�(. / �) (0 �1 *23� "!$45��!6 "7! 8� "4 "

9: ;< => ?@<

A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;<

A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E

A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;<

A��B� �CD B A��B� �CD B

� ����

: ;< => ?G<

A��B� �CD B� �

� �����

E => ?: ;<

A��B� �CD B� �

� �����

> HE

A��B� �CD B� �

� �����

I �JKL ��CD ����M �C K� ��L N�

OP

Q��R S��R��R S��R

��� TU�VL WCX �C�� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��

9: ;< => ?@<

A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;<

A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E

A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;<

A��B� �CD B A��B� �CD B

� ����

: ;< => ?G<

A��B� �CD B� �

� �����

E => ?: ;<

A��B� �CD B� �

� �����

> HE

A��B� �CD B� �

� �����

I �JKL ��CD ����M �C K� ��L N�

OP

Q��R S��R��R S��R

��� TU�VL WCX �C�� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��

9: ;< => ?@<

A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;<

A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E

A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;<

A��B� �CD B A��B� �CD B

� ����

: ;< => ?G<

A��B� �CD B� �

� �������

E => ?: ;<

A��B� �CD B� �

� �����

OP

Q��R S��R��R S��R

> HE

A��B� �CD B� �

� ���

��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��I �JKL ��CD ����

M �C K� ��L N�

x yz{| } ~���| yz� ��� ��{ y�� �y ~z�� y ~z�� ��� ���� � y � ��{� zy �� y�� ���� y� ~� �� �z�� ��

��� TU�VL WCX �C�� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w

Page 46: Structural Report and Calculations Series 200 Ground Mount

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ���� � � �!

"#$$% &'() *�+ �&, �-�(. / �) (0 �1 *23� "!$45��!6 "7! 8� "4 "

9: ;< => ?@<

A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;<

A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E

A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;<

A��B� �CD B A��B� �CD B

� �����

: ;< => ?G<

A��B� �CD B� �

� �����

E => ?: ;<

A��B� �CD B� �

� �����

> HE

A��B� �CD B� �

� �����

I �JKL ��CD ����M �C K� ��L N�

OP

Q��R S��R��R S��R

��� TU�VL WCX �C�� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��

9: ;< => ?@<

A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;<

A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E

A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;<

A��B� �CD B A��B� �CD B

� �����

: ;< => ?G<

A��B� �CD B� �

� �����

E => ?: ;<

A��B� �CD B� �

� �����

> HE

A��B� �CD B� �

� �����

I �JKL ��CD ����M �C K� ��L N�

OP

Q��R S��R��R S��R

��� TU�VL WCX �C�� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��

9: ;< => ?@<

A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;<

A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E

A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;<

A��B� �CD B A��B� �CD B

� ����

: ;< => ?G<

A��B� �CD B� �

� �������

E => ?: ;<

A��B� �CD B� �

� �����

OP

Q��R S��R��R S��R

> HE

A��B� �CD B� �

� ���

��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��I �JKL ��CD ����

M �C K� ��L N�

x yz{| } ~���| yz� ��� ��{ y�� �y ~z�� y ~z�� ��� ���� � y � ��{� zy �� y�� ���� y� ~� �� �z�� ��

��� TU�VL WCX �C�� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w

Page 47: Structural Report and Calculations Series 200 Ground Mount

� ����� ������ ��� ���� ����� ������ ��� ���

����������������������

����������������������

����������������������

����������������������

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ����� ������ ��� ���� ����� ������ ��� ���

����������������������

����������������������

����������������������

����������������������

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������ ��� ��

� ����4 � �!

"#$$% &'() *�+ �&, �-�(. / �) (0 �1 *23� "!$45��!6 "7! 8� "4 "

9: ;< => ?@<

A��B� �CD B A��B� �CD B

� �����

9E => ?9: ;<

A��B� �CD B A��B� �CD B

� �����

FF ;< => ?9E

A��B� �CD B A��B� �CD B

� �����

G< => ?FF ;<

����

������

: ;< => ?G<

����

������

E => ?: ;<

����

������

> HE

����

������

I �JKL ��CD ����M �C K� ��L N�

OP

Q��R S��R��R S��R

��� TU�VL WCX �C�� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��

9: ;< => ?@<

A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;<

A��B� �CD B A��B� �CD B

� �����

FF ;< => ?9E

A��B� �CD B A��B� �CD B

� �����

G< => ?FF ;<

����

������

: ;< => ?G<

����

��������

E => ?: ;<

����

������

OP

Q��R S��R��R S��R

> HE

����

����

��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��I �JKL ��CD ����

M �C K� ��L N�

x yz{| } ~���| yz� ��� ��{ y�� �y ~z�� y ~z�� ��� ���� � y � ��{� zy �� y�� ���� y� ~� �� �z�� ��

��� TU�VL WCX �C�� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w

Page 48: Structural Report and Calculations Series 200 Ground Mount

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ����� � �!

"#$$% &'() *�+ �&, �-�(. / �) (0 �1 *23� "!$45��!6 "7! 8� "4 "

9: ;< => ?@<

A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;<

A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E

A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;<

A��B� �CD B A��B� �CD B

� �����

: ;< => ?G<

A��B� �CD B� �

� �����

E => ?: ;<

A��B� �CD B� �

� �����

> HE

A��B� �CD B� �

� �����

I �JKL ��CD ����M �C K� ��L N�

OP

Q��R S��R��R S��R

��� TU�VL WCX �C�� ���� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��

9: ;< => ?@<

A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;<

A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E

A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;<

A��B� �CD B A��B� �CD B

� �����

: ;< => ?G<

A��B� �CD B� �

� �����

E => ?: ;<

A��B� �CD B� �

� �����

> HE

A��B� �CD B� �

� �����

I �JKL ��CD ����M �C K� ��L N�

OP

Q��R S��R��R S��R

��� TU�VL WCX �C�� ���� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��

9: ;< => ?@<

A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;<

A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E

A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;<

A��B� �CD B A��B� �CD B

� �����

: ;< => ?G<

A��B� �CD B� �

� �������

E => ?: ;<

A��B� �CD B� �

� �����

OP

Q��R S��R��R S��R

> HE

A��B� �CD B� �

� ���

��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��I �JKL ��CD ����

M �C K� ��L N�

x yz{| } ~���| yz� ��� ��{ y�� �y ~z�� y ~z�� ��� �� � � y��� ��{� zy �� y�� ���� y� ~� �� �z�� ��

��� TU�VL WCX �C�� ���� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w

Page 49: Structural Report and Calculations Series 200 Ground Mount

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ����� ������ ��� ���� ����� ������ ��� ���

����������������������

����������������������

����������������������

����������������������

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ���"# � �!

"#$$% &'() *�+ �&, �-�(. / �) (0 �1 *23� "!$45��!6 "7! 8� "4 "

9: ;< => ?@<

A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;<

A��B� �CD B A��B� �CD B

� �����

FF ;< => ?9E

A��B� �CD B A��B� �CD B

� �����

G< => ?FF ;<

����

������

: ;< => ?G<

����

������

E => ?: ;<

����

������

> HE

����

������

I �JKL ��CD ����M �C K� ��L N�

OP

Q��R S��R��R S��R

��� TU�VL WCX �C�� ���� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��

9: ;< => ?@<

A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;<

A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E

A��B� �CD B A��B� �CD B

� �����

G< => ?FF ;<

A��B� �CD B A��B� �CD B

� �����

: ;< => ?G<

A��B� �CD B� �

� �����

E => ?: ;<

A��B� �CD B� �

� �����

> HE

A��B� �CD B� �

� �����

I �JKL ��CD ����M �C K� ��L N�

OP

Q��R S��R��R S��R

��� TU�VL WCX �C�� ���� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��

9: ;< => ?@<

A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;<

A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E

A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;<

A��B� �CD B A��B� �CD B

� �����

: ;< => ?G<

A��B� �CD B� �

� �������

E => ?: ;<

A��B� �CD B� �

� �����

OP

Q��R S��R��R S��R

> HE

A��B� �CD B� �

� ���

��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��I �JKL ��CD ����

M �C K� ��L N�

x yz{| } ~���| yz� ��� ��{ y�� �y ~z�� y ~z�� ��� �� � � y��� ��{� zy �� y�� ���� y� ~� �� �z�� ��

��� TU�VL WCX �C�� ���� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w

Page 50: Structural Report and Calculations Series 200 Ground Mount

� ����� ������ ��� ���� ����� ������ ��� ���

����������������������

����������������������

����������������������

����������������������

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ����� ������ ��� ���� ����� ������ ��� ���

����������������������

����������������������

����������������������

����������������������

����������������������

��������� ������������� ��� ��

��������� ������������ ��� ��

� ���"� � �!

"#$$% &'() *�+ �&, �-�(. / �) (0 �1 *23� "!$45��!6 "7! 8� "4 "

9: ;< => ?@<

A��B� �CD B A��B� �CD B

� �����

9E => ?9: ;<

A��B� �CD B A��B� �CD B

� �����

FF ;< => ?9E

����

������

G< => ?FF ;<

����

������

: ;< => ?G<

����

������

E => ?: ;<

����

������

> HE

����

������

I �JKL ��CD ����M �C K� ��L N�

OP

Q��R S��R��R S��R

��� TU�VL WCX �C�� ���� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��

9: ;< => ?@<

A��B� �CD B A��B� �CD B

� �����

9E => ?9: ;<

A��B� �CD B A��B� �CD B

� �����

FF ;< => ?9E

A��B� �CD B A��B� �CD B

� �����

G< => ?FF ;<

����

������

: ;< => ?G<

����

��������

E => ?: ;<

����

������

OP

Q��R S��R��R S��R

> HE

����

����

��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��I �JKL ��CD ����

M �C K� ��L N�

x yz{| } ~���| yz� ��� ��{ y�� �y ~z�� y ~z�� ��� �� � � y��� ��{� zy �� y�� ���� y� ~� �� �z�� ��

��� TU�VL WCX �C�� ���� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w

Page 51: Structural Report and Calculations Series 200 Ground Mount

� ����� ������ ��� ���� ����� ������ ��� ���

����������������������

����������������������

����������������������

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ����� ������ ��� ���� ����� ������ ��� ���

����������������������

����������������������

����������������������

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ����� ������ ��� ���� ����� ������ ��� ���

����������������������

����������������������

����������������������

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ���"$ � �!

"#$$% &'() *�+ �&, �-�(. / �) (0 �1 *23� "!$45��!6 "7! 8� "4 "

9: ;< => ?@<

A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;<

A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E

A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;<

A��B� �CD B A��B� �CD B

� �����

: ;< => ?G<

����

������

E => ?: ;<

����

������

> HE

����

������

I �JKL ��CD ����M �C K� ��L N�

OP

Q��R S��R��R S��R

��� TU�VL WCX �C��� ���� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��

9: ;< => ?@<

A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;<

A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E

A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;<

A��B� �CD B A��B� �CD B

� �����

: ;< => ?G<

����

������

E => ?: ;<

����

������

> HE

����

������

I �JKL ��CD ����M �C K� ��L N�

OP

Q��R S��R��R S��R

��� TU�VL WCX �C��� ���� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��

9: ;< => ?@<

A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;<

A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E

A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;<

A��B� �CD B A��B� �CD B

� �����

: ;< => ?G<

����

��������

E => ?: ;<

����

������

OP

Q��R S��R��R S��R

> HE

����

����

��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��I �JKL ��CD ����

M �C K� ��L N�

x yz{| } ~���| yz� ��� ��{ y�� �y ~z�� y ~z�� ��� ����� � y��� ��{� zy �� y�� ���� y� ~� �� �z�� ��

��� TU�VL WCX �C��� ���� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w

Page 52: Structural Report and Calculations Series 200 Ground Mount

� ����� ������ ��� ���� ����� ������ ��� ���

����������������������

����������������������

����������������������

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ����� ������ ��� ���� ����� ������ ��� ���

����������������������

����������������������

����������������������

����������������������

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ����� ������ ��� ���� ����� ������ ��� ���

����������������������

����������������������

����������������������

����������������������

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ���"7 � �!

"#$$% &'() *�+ �&, �-�(. / �) (0 �1 *23� "!$45��!6 "7! 8� "4 "

9: ;< => ?@<

A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;<

A��B� �CD B A��B� �CD B

� �����

FF ;< => ?9E

A��B� �CD B A��B� �CD B

� �����

G< => ?FF ;<

����

������

: ;< => ?G<

����

������

E => ?: ;<

����

������

> HE

����

������

I �JKL ��CD ����M �C K� ��L N�

OP

Q��R S��R��R S��R

��� TU�VL WCX �C��� ���� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��

9: ;< => ?@<

A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;<

A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E

A��B� �CD B A��B� �CD B

� �����

G< => ?FF ;<

����

������

: ;< => ?G<

����

������

E => ?: ;<

����

������

> HE

����

������

I �JKL ��CD ����M �C K� ��L N�

OP

Q��R S��R��R S��R

��� TU�VL WCX �C��� ���� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��

9: ;< => ?@<

A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;<

A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E

A��B� �CD B A��B� �CD B

� �����

G< => ?FF ;<

A��B� �CD B A��B� �CD B

� �����

: ;< => ?G<

����

��������

E => ?: ;<

����

������

OP

Q��R S��R��R S��R

> HE

����

����

��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��I �JKL ��CD ����

M �C K� ��L N�

x yz{| } ~���| yz� ��� ��{ y�� �y ~z�� y ~z�� ��� ����� � y��� ��{� zy �� y�� ���� y� ~� �� �z�� ��

��� TU�VL WCX �C��� ���� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w

Page 53: Structural Report and Calculations Series 200 Ground Mount

� ����� ������ ��� ���� ����� ������ ��� ���

����������������������

����������������������

����������������������

����������������������

����������������������

��������� ������������� ��� ��

��������� ������������� ��� ��

� ����� ������ ��� ���� ����� ������ ��� ���

����������������������

����������������������

����������������������

����������������������

����������������������

����������������������

��������� ������������ ��� ��

� ���"� � �!

"#$$% &'() *�+ �&, �-�(. / �) (0 �1 *23� "!$45��!6 "7! 8� "4 "

9: ;< => ?@<

A��B� �CD B A��B� �CD B

� �����

9E => ?9: ;<

����

������

FF ;< => ?9E

����

������

G< => ?FF ;<

����

������

: ;< => ?G<

����

������

E => ?: ;<

����

������

> HE

����

������

I �JKL ��CD ����M �C K� ��L N�

OP

Q��R S��R��R S��R

��� TU�VL WCX �C��� ���� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��

9: ;< => ?@<

A��B� �CD B A��B� �CD B

� �����

9E => ?9: ;<

A��B� �CD B A��B� �CD B

� �����

FF ;< => ?9E

����

������

G< => ?FF ;<

����

������

: ;< => ?G<

����

��������

E => ?: ;<

����

������

OP

Q��R S��R��R S��R

> HE

����

����

��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��I �JKL ��CD ����

M �C K� ��L N�

x yz{| } ~���| yz� ��� ��{ y�� �y ~z�� y ~z�� ��� ����� � y��� ��{� zy �� y�� ���� y� ~� �� �z�� ��

��� TU�VL WCX �C��� ���� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w

Page 54: Structural Report and Calculations Series 200 Ground Mount

� ����� ������ ��� ���� ����� ������ ��� ���

����������������������

����������������������

����������������������

����������������������

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ����� ������ ��� ���� ����� ������ ��� ���

����������������������

����������������������

����������������������

����������������������

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ����� ������ ��� ���� ����� ������ ��� ���

����������������������

����������������������

����������������������

����������������������

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ���"" � �!

"#$$% &'() *�+ �&, �-�(. / �) (0 �1 *23� "!$45��!6 "7! 8� "4 "

9: ;< => ?@<

A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;<

A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E

A��B� �CD B A��B� �CD B

� �����

G< => ?FF ;<

����

������

: ;< => ?G<

����

������

E => ?: ;<

����

������

> HE

����

������

I �JKL ��CD ����M �C K� ��L N�

OP

Q��R S��R��R S��R

��� TU�VL WCX �C��� ���� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��

9: ;< => ?@<

A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;<

A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E

A��B� �CD B A��B� �CD B

� �����

G< => ?FF ;<

����

������

: ;< => ?G<

����

������

E => ?: ;<

����

������

> HE

����

������

I �JKL ��CD ����M �C K� ��L N�

OP

Q��R S��R��R S��R

��� TU�VL WCX �C��� ���� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��

9: ;< => ?@<

A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;<

A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E

A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;<

����

������

: ;< => ?G<

����

��������

E => ?: ;<

����

������

OP

Q��R S��R��R S��R

> HE

����

����

��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��I �JKL ��CD ����

M �C K� ��L N�

x yz{| } ~���| yz� ��� ��{ y�� �y ~z�� y ~z�� ��� ����� � y��� ��{� zy �� y�� ���� y� ~� �� �z�� ��

��� TU�VL WCX �C��� ���� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w

Page 55: Structural Report and Calculations Series 200 Ground Mount

� ����� ������ ��� ���� ����� ������ ��� ���

����������������������

����������������������

����������������������

����������������������

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ����� ������ ��� ���� ����� ������ ��� ���

����������������������

����������������������

����������������������

����������������������

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ����� ������ ��� ���� ����� ������ ��� ���

����������������������

����������������������

����������������������

����������������������

����������������������

��������� ������������� ��� ��

��������� ������������� ��� ��

� ���"! � �!

"#$$% &'() *�+ �&, �-�(. / �) (0 �1 *23� "!$45��!6 "7! 8� "4 "

9: ;< => ?@<

A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;<

A��B� �CD B A��B� �CD B

� �����

FF ;< => ?9E

����

������

G< => ?FF ;<

����

������

: ;< => ?G<

����

������

E => ?: ;<

����

������

> HE

����

������

I �JKL ��CD ����M �C K� ��L N�

OP

Q��R S��R��R S��R

��� TU�VL WCX �C��� ���� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��

9: ;< => ?@<

A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;<

A��B� �CD B A��B� �CD B

� �����

FF ;< => ?9E

A��B� �CD B A��B� �CD B

� �����

G< => ?FF ;<

����

������

: ;< => ?G<

����

������

E => ?: ;<

����

������

> HE

����

������

I �JKL ��CD ����M �C K� ��L N�

OP

Q��R S��R��R S��R

��� TU�VL WCX �C��� ���� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��

9: ;< => ?@<

A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;<

A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E

A��B� �CD B A��B� �CD B

� �����

G< => ?FF ;<

����

������

: ;< => ?G<

����

��������

E => ?: ;<

����

������

OP

Q��R S��R��R S��R

> HE

����

����

��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��I �JKL ��CD ����

M �C K� ��L N�

x yz{| } ~���| yz� ��� ��{ y�� �y ~z�� y ~z�� ��� ����� � y��� ��{� zy �� y�� ���� y� ~� �� �z�� ��

��� TU�VL WCX �C��� ���� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w

Page 56: Structural Report and Calculations Series 200 Ground Mount

� ����� ������ ��� ���� ����� ������ ��� ���

����������������������

����������������������

����������������������

����������������������

����������������������

��������� ������������� ��� ��

��������� ������������� ��� ��

� ����� ������ ��� ���� ����� ������ ��� ���

����������������������

����������������������

����������������������

����������������������

����������������������

����������������������

��������� ������������ ��� ��

� ���"� � �!

"#$$% &'() *�+ �&, �-�(. / �) (0 �1 *23� "!$45��!6 "7! 8� "4 "

9: ;< => ?@<

A��B� �CD B A��B� �CD B

� �����

9E => ?9: ;<

����

������

FF ;< => ?9E

����

������

G< => ?FF ;<

����

������

: ;< => ?G<

����

������

E => ?: ;<

����

������

> HE

����

������

I �JKL ��CD ����M �C K� ��L N�

OP

Q��R S��R��R S��R

��� TU�VL WCX �C��� ���� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��

9: ;< => ?@<

A��B� �CD B A��B� �CD B

� �����

9E => ?9: ;<

A��B� �CD B A��B� �CD B

� �����

FF ;< => ?9E

����

������

G< => ?FF ;<

����

������

: ;< => ?G<

����

��������

E => ?: ;<

����

������

OP

Q��R S��R��R S��R

> HE

����

����

��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��I �JKL ��CD ����

M �C K� ��L N�

x yz{| } ~���| yz� ��� ��{ y�� �y ~z�� y ~z�� ��� ����� � y��� ��{� zy �� y�� ���� y� ~� �� �z�� ��

��� TU�VL WCX �C��� ���� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w

Page 57: Structural Report and Calculations Series 200 Ground Mount

� ����� ������ ��� ���� ����� ������ ��� ���

����������� ������������ ��� ��

����������� ������������� ��� ��

����������� ������������� ��� ��

����������� ������������� ��� ��

����������� ������������� ��� ��

����������� ������������� ��� ��

����������� ������������� ��� ��

� ����� ������ ��� ���� ����� ������ ��� ���

����������� ������������ ��� ��

����������� ������������� ��� ��

����������� ������������� ��� ��

���������� ������������� ��� ��

���������� ������������� ��� ��

���������� ������������� ��� ��

���������� ������������� ��� ��

� ����� ������ ��� ���� ����� ������ ��� ���

����������� ������������ ��� ��

����������� ������������� ��� ��

���������� ������������� ��� ��

���������� ������������� ��� ��

���������� ������������� ��� ��

���������� ������������� ��� ��

���������� ������������� ��� ��

� ����� � !"

�#$$% &'() *�+ �&, �-�(. / �) (0 �1 *23! �"$�4!5"6 �7" 8! �� �

9: ;< => ?@< A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;< A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;< A��B� �CD B A��B� �CD B

� ����

: ;< => ?G< A��B� �CD B� �

� ����

E => ?: ;< A��B� �CD B� �

� ����

> HE

A��B� �CD B� �

� ����I �JKL ��CD ����

M �C K� ��L N�

OP

Q��R S��R��R S��R

��� TU�VL WCX �C� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��

9: ;< => ?@< A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;< A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;< A��B� �CD B A��B� �CD B

� ����

: ;< => ?G< A��B� �CD B� �

� ����

E => ?: ;< A��B� �CD B� �

� ����

> HE

A��B� �CD B� �

� ����I �JKL ��CD ����

M �C K� ��L N�

OP

Q��R S��R��R S��R

��� TU�VL WCX �C� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��

9: ;< => ?@< A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;< A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;< A��B� �CD B A��B� �CD B

� ����

: ;< => ?G< A��B� �CD B� �

� ����

E => ?: ;< A��B� �CD B� �

� ����

> HE

A��B� �CD B� �

� ����M �C K� ��L N�

OP

Q��R S��R��R S��R

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��I �JKL ��CD ����

x yz{| } ~���| yz� ��� ��{ y�� �y ~z�� y ~z�� ��� ��� ��{� zy �� y�� ���� y� ~� �� �z�� ��

��� TU�VL WCX �C� U�Y� W�Z

Page 58: Structural Report and Calculations Series 200 Ground Mount

� ����� ������ ��� ���� ����� ������ ��� ���

����������� ������������ ��� ��

���������� ������������� ��� ��

���������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ����� ������ ��� ���� ����� ������ ��� ���

����������� ������������ ��� ��

���������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ����� ������ ��� ���� ����� ������ ��� ���

����������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ����! � !"

�#$$% &'() *�+ �&, �-�(. / �) (0 �1 *23! �"$�4!5"6 �7" 8! �� �

9: ;< => ?@< A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;< A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;< A��B� �CD B A��B� �CD B

� ����

: ;< => ?G< A��B� �CD B� �

� ����

E => ?: ;< A��B� �CD B� �

� ����

> HE

A��B� �CD B� �

� ����I �JKL ��CD ����

M �C K� ��L N�

OP

Q��R S��R��R S��R

��� TU�VL WCX �C� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��

9: ;< => ?@< A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;< A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;< A��B� �CD B A��B� �CD B

� ����

: ;< => ?G< A��B� �CD B� �

� ����

E => ?: ;< A��B� �CD B� �

� ����

> HE

A��B� �CD B� �

� ����I �JKL ��CD ����

M �C K� ��L N�

OP

Q��R S��R��R S��R

��� TU�VL WCX �C� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��

9: ;< => ?@< A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;< A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;< A��B� �CD B A��B� �CD B

� ����

: ;< => ?G< A��B� �CD B� �

� �����

E => ?: ;< A��B� �CD B� �

� ����

OP

Q��R S��R��R S��R

> HE

A��B� �CD B� �

� ���

��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��I �JKL ��CD ����

M �C K� ��L N�

x yz{| } ~���| yz� ��� ��{ y�� �y ~z�� y ~z�� ��� ��� ��{� zy �� y�� ���� y� ~� �� �z�� ��

��� TU�VL WCX �C� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w

Page 59: Structural Report and Calculations Series 200 Ground Mount

� ����� ������ ��� ���� ����� ������ ��� ���

����������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ����� ������ ��� ���� ����� ������ ��� ���

���������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ���"# � !"

�#$$% &'() *�+ �&, �-�(. / �) (0 �1 *23! �"$�4!5"6 �7" 8! �� �

9: ;< => ?@< A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;< A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;< A��B� �CD B A��B� �CD B

� ����

: ;< => ?G< A��B� �CD B� �

� ����

E => ?: ;< A��B� �CD B� �

� ����

> HE

A��B� �CD B� �

� ����I �JKL ��CD ����

M �C K� ��L N�

OP

Q��R S��R��R S��R

��� TU�VL WCX �C� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��

9: ;< => ?@< A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;< A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;< A��B� �CD B A��B� �CD B

� ����

: ;< => ?G< A��B� �CD B� �

� �����

E => ?: ;< A��B� �CD B� �

� ����

OP

Q��R S��R��R S��R

> HE

A��B� �CD B� �

� ���

��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��I �JKL ��CD ����

M �C K� ��L N�

x yz{| } ~���| yz� ��� ��{ y�� �y ~z�� y ~z�� ��� ��� ��{� zy �� y�� ���� y� ~� �� �z�� ��

��� TU�VL WCX �C� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w

Page 60: Structural Report and Calculations Series 200 Ground Mount

� ����� ������ ��� ���� ����� ������ ��� ���

����������� ������������ ��� ��

����������� ������������� ��� ��

����������� ������������� ��� ��

����������� ������������� ��� ��

����������� ������������� ��� ��

����������� ������������� ��� ��

����������� ������������� ��� ��

� ����� ������ ��� ���� ����� ������ ��� ���

����������� ������������ ��� ��

����������� ������������� ��� ��

����������� ������������� ��� ��

���������� ������������� ��� ��

���������� ������������� ��� ��

���������� ������������� ��� ��

����������� ������������� ��� ��

� ����� ������ ��� ���� ����� ������ ��� ���

����������� ������������ ��� ��

���������� ������������� ��� ��

���������� ������������� ��� ��

���������� ������������� ��� ��

���������� ������������� ��� ��

���������� ������������� ��� ��

���������� ������������� ��� ��

� ���"5 � !"

�#$$% &'() *�+ �&, �-�(. / �) (0 �1 *23! �"$�4!5"6 �7" 8! �� �

9: ;< => ?@< A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;< A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;< A��B� �CD B A��B� �CD B

� ����

: ;< => ?G< A��B� �CD B� �

� ����

E => ?: ;< A��B� �CD B� �

� ����

> HE

A��B� �CD B� �

� ����I �JKL ��CD ����

M �C K� ��L N�

OP

Q��R S��R��R S��R

��� TU�VL WCX �C� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��

9: ;< => ?@< A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;< A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;< A��B� �CD B A��B� �CD B

� ����

: ;< => ?G< A��B� �CD B� �

� ����

E => ?: ;< A��B� �CD B� �

� ����

> HE

A��B� �CD B� �

� ����I �JKL ��CD ����

M �C K� ��L N�

OP

Q��R S��R��R S��R

��� TU�VL WCX �C� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��

9: ;< => ?@< A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;< A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;< A��B� �CD B A��B� �CD B

� ����

: ;< => ?G< A��B� �CD B� �

� �����

E => ?: ;< A��B� �CD B� �

� ����

OP

Q��R S��R��R S��R

> HE

A��B� �CD B� �

� ���

��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��I �JKL ��CD ����

M �C K� ��L N�

x yz{| } ~���| yz� ��� ��{ y�� �y ~z�� y ~z�� ��� ��� � y�� ��{� zy �� y�� ���� y� ~� �� �z�� ��

��� TU�VL WCX �C� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w

Page 61: Structural Report and Calculations Series 200 Ground Mount

� ����� ������ ��� ���� ����� ������ ��� ���

����������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ����� ������ ��� ���� ����� ������ ��� ���

����������� ������������ ��� ��

���������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ����� ������ ��� ���� ����� ������ ��� ���

���������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ���"$ � !"

�#$$% &'() *�+ �&, �-�(. / �) (0 �1 *23! �"$�4!5"6 �7" 8! �� �

9: ;< => ?@< A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;< A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;< A��B� �CD B A��B� �CD B

� ����

: ;< => ?G< A��B� �CD B� �

� ����

E => ?: ;< A��B� �CD B� �

� ����

> HE

A��B� �CD B� �

� ����I �JKL ��CD ����

M �C K� ��L N�

OP

Q��R S��R��R S��R

��� TU�VL WCX �C� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��

9: ;< => ?@< A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;< A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;< A��B� �CD B A��B� �CD B

� ����

: ;< => ?G< A��B� �CD B� �

� ����

E => ?: ;< A��B� �CD B� �

� ����

> HE

A��B� �CD B� �

� ����I �JKL ��CD ����

M �C K� ��L N�

OP

Q��R S��R��R S��R

��� TU�VL WCX �C� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��

9: ;< => ?@< A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;< A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;< A��B� �CD B A��B� �CD B

� ����

: ;< => ?G< A��B� �CD B� �

� �����

E => ?: ;< A��B� �CD B� �

� ����

OP

Q��R S��R��R S��R

> HE

A��B� �CD B� �

� ���

��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��I �JKL ��CD ����

M �C K� ��L N�

x yz{| } ~���| yz� ��� ��{ y�� �y ~z�� y ~z�� ��� ��� � y�� ��{� zy �� y�� ���� y� ~� �� �z�� ��

��� TU�VL WCX �C� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w

Page 62: Structural Report and Calculations Series 200 Ground Mount

� ����� ������ ��� ���� ����� ������ ��� ���

���������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ����� ������ ��� ���� ����� ������ ��� ���

���������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ���"7 � !"

�#$$% &'() *�+ �&, �-�(. / �) (0 �1 *23! �"$�4!5"6 �7" 8! �� �

9: ;< => ?@< A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;< A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;< A��B� �CD B A��B� �CD B

� ����

: ;< => ?G< A��B� �CD B� �

� ����

E => ?: ;< A��B� �CD B� �

� ����

> HE

A��B� �CD B� �

� ����I �JKL ��CD ����

M �C K� ��L N�

OP

Q��R S��R��R S��R

��� TU�VL WCX �C� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��

9: ;< => ?@< A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;< A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;< A��B� �CD B A��B� �CD B

� ����

: ;< => ?G< A��B� �CD B� �

� �����

E => ?: ;< A��B� �CD B� �

� ����

OP

Q��R S��R��R S��R

> HE

A��B� �CD B� �

� ���

��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��I �JKL ��CD ����

M �C K� ��L N�

x yz{| } ~���| yz� ��� ��{ y�� �y ~z�� y ~z�� ��� ��� � y�� ��{� zy �� y�� ���� y� ~� �� �z�� ��

��� TU�VL WCX �C� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w

Page 63: Structural Report and Calculations Series 200 Ground Mount

� ����� ������ ��� ���� ����� ������ ��� ���

����������� ������������ ��� ��

���������� ������������� ��� ��

���������� ������������� ��� ��

����������� ������������� ��� ��

���������� ������������� ��� ��

����������� ������������� ��� ��

����������� ������������� ��� ��

� ����� ������ ��� ���� ����� ������ ��� ���

����������� ������������ ��� ��

���������� ������������� ��� ��

���������� ������������� ��� ��

���������� ������������� ��� ��

���������� ������������� ��� ��

���������� ������������� ��� ��

����������� ������������� ��� ��

� ����� ������ ��� ���� ����� ������ ��� ���

���������� ������������ ��� ��

���������� ������������� ��� ��

���������� ������������� ��� ��

���������� ������������� ��� ��

��������� ������������� ��� ��

���������� ������������� ��� ��

���������� ������������� ��� ��

� ���"� � !"

�#$$% &'() *�+ �&, �-�(. / �) (0 �1 *23! �"$�4!5"6 �7" 8! �� �

9: ;< => ?@< A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;< A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;< A��B� �CD B A��B� �CD B

� ����

: ;< => ?G< A��B� �CD B� �

� ����

E => ?: ;< A��B� �CD B� �

� ����

> HE

A��B� �CD B� �

� ����I �JKL ��CD ����

M �C K� ��L N�

OP

Q��R S��R��R S��R

��� TU�VL WCX �C�� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��

9: ;< => ?@< A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;< A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;< A��B� �CD B A��B� �CD B

� ����

: ;< => ?G< A��B� �CD B� �

� ����

E => ?: ;< A��B� �CD B� �

� ����

> HE

A��B� �CD B� �

� ����I �JKL ��CD ����

M �C K� ��L N�

OP

Q��R S��R��R S��R

��� TU�VL WCX �C�� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��

9: ;< => ?@< A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;< A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;< A��B� �CD B A��B� �CD B

� ����

: ;< => ?G< A��B� �CD B� �

� �����

E => ?: ;< A��B� �CD B� �

� ����

OP

Q��R S��R��R S��R

> HE

A��B� �CD B� �

� ���

��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��I �JKL ��CD ����

M �C K� ��L N�

x yz{| } ~���| yz� ��� ��{ y�� �y ~z�� y ~z�� ��� ���� � y�� ��{� zy �� y�� ���� y� ~� �� �z�� ��

��� TU�VL WCX �C�� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w

Page 64: Structural Report and Calculations Series 200 Ground Mount

� ����� ������ ��� ���� ����� ������ ��� ���

���������� ������������ ��� ��

���������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ����� ������ ��� ���� ����� ������ ��� ���

���������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ����� ������ ��� ���� ����� ������ ��� ���

���������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ���" � � !"

�#$$% &'() *�+ �&, �-�(. / �) (0 �1 *23! �"$�4!5"6 �7" 8! �� �

9: ;< => ?@< A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;< A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;< A��B� �CD B A��B� �CD B

� ����

: ;< => ?G< A��B� �CD B� �

� ����

E => ?: ;< A��B� �CD B� �

� ����

> HE

A��B� �CD B� �

� ����I �JKL ��CD ����

M �C K� ��L N�

OP

Q��R S��R��R S��R

��� TU�VL WCX �C�� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��

9: ;< => ?@< A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;< A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;< A��B� �CD B A��B� �CD B

� ����

: ;< => ?G< A��B� �CD B� �

� ����

E => ?: ;< A��B� �CD B� �

� ����

> HE

A��B� �CD B� �

� ����I �JKL ��CD ����

M �C K� ��L N�

OP

Q��R S��R��R S��R

��� TU�VL WCX �C�� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��

9: ;< => ?@< A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;< A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;< A��B� �CD B A��B� �CD B

� ����

: ;< => ?G< A��B� �CD B� �

� �����

E => ?: ;< A��B� �CD B� �

� ����

OP

Q��R S��R��R S��R

> HE

A��B� �CD B� �

� ���

��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��I �JKL ��CD ����

M �C K� ��L N�

x yz{| } ~���| yz� ��� ��{ y�� �y ~z�� y ~z�� ��� ���� � y�� ��{� zy �� y�� ���� y� ~� �� �z�� ��

��� TU�VL WCX �C�� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w

Page 65: Structural Report and Calculations Series 200 Ground Mount

� ����� ������ ��� ���� ����� ������ ��� ���

���������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ���"" � !"

�#$$% &'() *�+ �&, �-�(. / �) (0 �1 *23! �"$�4!5"6 �7" 8! �� �

9: ;< => ?@< A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;< A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;< A��B� �CD B A��B� �CD B

� ����

: ;< => ?G< A��B� �CD B� �

� ����

E => ?: ;< A��B� �CD B� �

� ����

> HE

A��B� �CD B� �

� ����I �JKL ��CD ����

M �C K� ��L N�

OP

Q��R S��R��R S��R

��� TU�VL WCX �C�� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��

9: ;< => ?@< A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;< A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;< A��B� �CD B A��B� �CD B

� ����

: ;< => ?G< A��B� �CD B� �

� �����

E => ?: ;< A��B� �CD B� �

� ����

OP

Q��R S��R��R S��R

> HE

A��B� �CD B� �

� ���

��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��I �JKL ��CD ����

M �C K� ��L N�

x yz{| } ~���| yz� ��� ��{ y�� �y ~z�� y ~z�� ��� ���� � y�� ��{� zy �� y�� ���� y� ~� �� �z�� ��

��� TU�VL WCX �C�� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w

Page 66: Structural Report and Calculations Series 200 Ground Mount

� ����� ������ ��� ���� ����� ������ ��� ���

���������� ������������ ��� ��

���������� ������������� ��� ��

���������� ������������� ��� ��

���������� ������������� ��� ��

���������� ������������� ��� ��

����������� ������������� ��� ��

����������� ������������� ��� ��

� ����� ������ ��� ���� ����� ������ ��� ���

���������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

���������� ������������� ��� ��

���������� ������������� ��� ��

���������� ������������� ��� ��

���������� ������������� ��� ��

� ����� ������ ��� ���� ����� ������ ��� ���

���������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

���������� ������������� ��� ��

���������� ������������� ��� ��

� ���" � � !"

�#$$% &'() *�+ �&, �-�(. / �) (0 �1 *23! �"$�4!5"6 �7" 8! �� �

9: ;< => ?@< A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;< A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;< A��B� �CD B A��B� �CD B

� ����

: ;< => ?G< A��B� �CD B� �

� ����

E => ?: ;< A��B� �CD B� �

� ����

> HE

A��B� �CD B� �

� ����I �JKL ��CD ����

M �C K� ��L N�

OP

Q��R S��R��R S��R

��� TU�VL WCX �C�� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��

9: ;< => ?@< A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;< A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;< A��B� �CD B A��B� �CD B

� ����

: ;< => ?G< A��B� �CD B� �

� ����

E => ?: ;< A��B� �CD B� �

� ����

> HE

A��B� �CD B� �

� ����I �JKL ��CD ����

M �C K� ��L N�

OP

Q��R S��R��R S��R

��� TU�VL WCX �C�� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��

9: ;< => ?@< A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;< A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;< A��B� �CD B A��B� �CD B

� ����

: ;< => ?G< A��B� �CD B� �

� �����

E => ?: ;< A��B� �CD B� �

� ����

OP

Q��R S��R��R S��R

> HE

A��B� �CD B� �

� ���

��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��I �JKL ��CD ����

M �C K� ��L N�

x yz{| } ~���| yz� ��� ��{ y�� �y ~z�� y ~z�� ��� ���� � y�� ��{� zy �� y�� ���� y� ~� �� �z�� ��

��� TU�VL WCX �C�� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w

Page 67: Structural Report and Calculations Series 200 Ground Mount

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ���"� � !"

�#$$% &'() *�+ �&, �-�(. / �) (0 �1 *23! �"$�4!5"6 �7" 8! �� �

9: ;< => ?@< A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;< A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;< A��B� �CD B A��B� �CD B

� ����

: ;< => ?G< A��B� �CD B� �

� ����

E => ?: ;< A��B� �CD B� �

� ����

> HE

A��B� �CD B� �

� ����I �JKL ��CD ����

M �C K� ��L N�

OP

Q��R S��R��R S��R

��� TU�VL WCX �C�� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��

9: ;< => ?@< A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;< A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;< A��B� �CD B A��B� �CD B

� ����

: ;< => ?G< A��B� �CD B� �

� ����

E => ?: ;< A��B� �CD B� �

� ����

> HE

A��B� �CD B� �

� ����I �JKL ��CD ����

M �C K� ��L N�

OP

Q��R S��R��R S��R

��� TU�VL WCX �C�� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��

9: ;< => ?@< A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;< A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;< A��B� �CD B A��B� �CD B

� ����

: ;< => ?G< A��B� �CD B� �

� �����

E => ?: ;< A��B� �CD B� �

� ����

OP

Q��R S��R��R S��R

> HE

A��B� �CD B� �

� ���

��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��I �JKL ��CD ����

M �C K� ��L N�

x yz{| } ~���| yz� ��� ��{ y�� �y ~z�� y ~z�� ��� ���� � y�� ��{� zy �� y�� ���� y� ~� �� �z�� ��

��� TU�VL WCX �C�� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w

Page 68: Structural Report and Calculations Series 200 Ground Mount

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ���"! � !"

�#$$% &'() *�+ �&, �-�(. / �) (0 �1 *23! �"$�4!5"6 �7" 8! �� �

9: ;< => ?@< A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;< A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;< A��B� �CD B A��B� �CD B

� ����

: ;< => ?G< A��B� �CD B� �

� ����

E => ?: ;< A��B� �CD B� �

� ����

> HE

A��B� �CD B� �

� ����I �JKL ��CD ����

M �C K� ��L N�

OP

Q��R S��R��R S��R

��� TU�VL WCX �C�� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��

9: ;< => ?@< A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;< A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;< A��B� �CD B A��B� �CD B

� ����

: ;< => ?G< A��B� �CD B� �

� �����

E => ?: ;< A��B� �CD B� �

� ����

OP

Q��R S��R��R S��R

> HE

A��B� �CD B� �

� ���

��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��I �JKL ��CD ����

M �C K� ��L N�

x yz{| } ~���| yz� ��� ��{ y�� �y ~z�� y ~z�� ��� ���� � y�� ��{� zy �� y�� ���� y� ~� �� �z�� ��

��� TU�VL WCX �C�� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w

Page 69: Structural Report and Calculations Series 200 Ground Mount

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

���������� ������������� ��� ��

���������� ������������� ��� ��

����������� ������������� ��� ��

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

���������� ������������� ��� ��

���������� ������������� ��� ��

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

���������� ������������� ��� ��

� ����# � !"

�#$$% &'() *�+ �&, �-�(. / �) (0 �1 *23! �"$�4!5"6 �7" 8! �� �

9: ;< => ?@< A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;< A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;< A��B� �CD B A��B� �CD B

� ����

: ;< => ?G< A��B� �CD B� �

� ����

E => ?: ;< A��B� �CD B� �

� ����

> HE

A��B� �CD B� �

� ����I �JKL ��CD ����

M �C K� ��L N�

OP

Q��R S��R��R S��R

��� TU�VL WCX �C�� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��

9: ;< => ?@< A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;< A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;< A��B� �CD B A��B� �CD B

� ����

: ;< => ?G< A��B� �CD B� �

� ����

E => ?: ;< A��B� �CD B� �

� ����

> HE

A��B� �CD B� �

� ����I �JKL ��CD ����

M �C K� ��L N�

OP

Q��R S��R��R S��R

��� TU�VL WCX �C�� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��

9: ;< => ?@< A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;< A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;< A��B� �CD B A��B� �CD B

� ����

: ;< => ?G< A��B� �CD B� �

� �����

E => ?: ;< A��B� �CD B� �

� ����

OP

Q��R S��R��R S��R

> HE

A��B� �CD B� �

� ���

��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��I �JKL ��CD ����

M �C K� ��L N�

x yz{| } ~���| yz� ��� ��{ y�� �y ~z�� y ~z�� ��� ���� � y�� ��{� zy �� y�� ���� y� ~� �� �z�� ��

��� TU�VL WCX �C�� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w

Page 70: Structural Report and Calculations Series 200 Ground Mount

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ����5 � !"

�#$$% &'() *�+ �&, �-�(. / �) (0 �1 *23! �"$�4!5"6 �7" 8! �� �

9: ;< => ?@< A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;< A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;< A��B� �CD B A��B� �CD B

� ����

: ;< => ?G< A��B� �CD B� �

� ����

E => ?: ;< A��B� �CD B� �

� ����

> HE

A��B� �CD B� �

� ����I �JKL ��CD ����

M �C K� ��L N�

OP

Q��R S��R��R S��R

��� TU�VL WCX �C�� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��

9: ;< => ?@< A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;< A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;< A��B� �CD B A��B� �CD B

� ����

: ;< => ?G< A��B� �CD B� �

� ����

E => ?: ;< A��B� �CD B� �

� ����

> HE

A��B� �CD B� �

� ����I �JKL ��CD ����

M �C K� ��L N�

OP

Q��R S��R��R S��R

��� TU�VL WCX �C�� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��

9: ;< => ?@< A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;< A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;< A��B� �CD B A��B� �CD B

� ����

: ;< => ?G< A��B� �CD B� �

� �����

E => ?: ;< A��B� �CD B� �

� ����

OP

Q��R S��R��R S��R

> HE

A��B� �CD B� �

� ���

��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��I �JKL ��CD ����

M �C K� ��L N�

x yz{| } ~���| yz� ��� ��{ y�� �y ~z�� y ~z�� ��� ���� � y�� ��{� zy �� y�� ���� y� ~� �� �z�� ��

��� TU�VL WCX �C�� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w

Page 71: Structural Report and Calculations Series 200 Ground Mount

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ����$ � !"

�#$$% &'() *�+ �&, �-�(. / �) (0 �1 *23! �"$�4!5"6 �7" 8! �� �

9: ;< => ?@< A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;< A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;< A��B� �CD B A��B� �CD B

� ����

: ;< => ?G< A��B� �CD B� �

� ����

E => ?: ;< A��B� �CD B� �

� ����

> HE

A��B� �CD B� �

� ����I �JKL ��CD ����

M �C K� ��L N�

OP

Q��R S��R��R S��R

��� TU�VL WCX �C�� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��

9: ;< => ?@< A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;< A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;< A��B� �CD B A��B� �CD B

� ����

: ;< => ?G< A��B� �CD B� �

� �����

E => ?: ;< A��B� �CD B� �

� ����

OP

Q��R S��R��R S��R

> HE

A��B� �CD B� �

� ���

��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��I �JKL ��CD ����

M �C K� ��L N�

x yz{| } ~���| yz� ��� ��{ y�� �y ~z�� y ~z�� ��� ���� � y�� ��{� zy �� y�� ���� y� ~� �� �z�� ��

��� TU�VL WCX �C�� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w

Page 72: Structural Report and Calculations Series 200 Ground Mount

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

���������� ������������� ��� ��

����������� ������������� ��� ��

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

���������� ������������� ��� ��

���������� ������������� ��� ��

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

���������� ������������� ��� ��

� ����7 � !"

�#$$% &'() *�+ �&, �-�(. / �) (0 �1 *23! �"$�4!5"6 �7" 8! �� �

9: ;< => ?@< A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;< A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;< A��B� �CD B A��B� �CD B

� ����

: ;< => ?G< A��B� �CD B� �

� ����

E => ?: ;< A��B� �CD B� �

� ����

> HE

A��B� �CD B� �

� ����I �JKL ��CD ����

M �C K� ��L N�

OP

Q��R S��R��R S��R

��� TU�VL WCX �C�� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��

9: ;< => ?@< A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;< A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;< A��B� �CD B A��B� �CD B

� ����

: ;< => ?G< A��B� �CD B� �

� ����

E => ?: ;< A��B� �CD B� �

� ����

> HE

A��B� �CD B� �

� ����I �JKL ��CD ����

M �C K� ��L N�

OP

Q��R S��R��R S��R

��� TU�VL WCX �C�� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��

9: ;< => ?@< A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;< A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;< A��B� �CD B A��B� �CD B

� ����

: ;< => ?G< A��B� �CD B� �

� �����

E => ?: ;< A��B� �CD B� �

� ����

OP

Q��R S��R��R S��R

> HE

A��B� �CD B� �

� ���

��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��I �JKL ��CD ����

M �C K� ��L N�

x yz{| } ~���| yz� ��� ��{ y�� �y ~z�� y ~z�� ��� ���� � y�� ��{� zy �� y�� ���� y� ~� �� �z�� ��

��� TU�VL WCX �C�� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w

Page 73: Structural Report and Calculations Series 200 Ground Mount

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ����� � !"

�#$$% &'() *�+ �&, �-�(. / �) (0 �1 *23! �"$�4!5"6 �7" 8! �� �

9: ;< => ?@< A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;< A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;< A��B� �CD B A��B� �CD B

� ����

: ;< => ?G< A��B� �CD B� �

� ����

E => ?: ;< A��B� �CD B� �

� ����

> HE

A��B� �CD B� �

� ����I �JKL ��CD ����

M �C K� ��L N�

OP

Q��R S��R��R S��R

��� TU�VL WCX �C�� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��

9: ;< => ?@< A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;< A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;< A��B� �CD B A��B� �CD B

� ����

: ;< => ?G< A��B� �CD B� �

� ����

E => ?: ;< A��B� �CD B� �

� ����

> HE

A��B� �CD B� �

� ����I �JKL ��CD ����

M �C K� ��L N�

OP

Q��R S��R��R S��R

��� TU�VL WCX �C�� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��

9: ;< => ?@< A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;< A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;< A��B� �CD B A��B� �CD B

� ����

: ;< => ?G< A��B� �CD B� �

� �����

E => ?: ;< A��B� �CD B� �

� ����

OP

Q��R S��R��R S��R

> HE

A��B� �CD B� �

� ���

��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��I �JKL ��CD ����

M �C K� ��L N�

x yz{| } ~���| yz� ��� ��{ y�� �y ~z�� y ~z�� ��� ���� � y�� ��{� zy �� y�� ���� y� ~� �� �z�� ��

��� TU�VL WCX �C�� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w

Page 74: Structural Report and Calculations Series 200 Ground Mount

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ����� � !"

�#$$% &'() *�+ �&, �-�(. / �) (0 �1 *23! �"$�4!5"6 �7" 8! �� �

9: ;< => ?@< A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;< A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;< A��B� �CD B A��B� �CD B

� ����

: ;< => ?G< A��B� �CD B� �

� ����

E => ?: ;< A��B� �CD B� �

� ����

> HE

A��B� �CD B� �

� ����I �JKL ��CD ����

M �C K� ��L N�

OP

Q��R S��R��R S��R

��� TU�VL WCX �C�� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��

9: ;< => ?@< A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;< A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;< A��B� �CD B A��B� �CD B

� ����

: ;< => ?G< A��B� �CD B� �

� �����

E => ?: ;< A��B� �CD B� �

� ����

OP

Q��R S��R��R S��R

> HE

A��B� �CD B� �

� ���

��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��I �JKL ��CD ����

M �C K� ��L N�

x yz{| } ~���| yz� ��� ��{ y�� �y ~z�� y ~z�� ��� ���� � y�� ��{� zy �� y�� ���� y� ~� �� �z�� ��

��� TU�VL WCX �C�� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w

Page 75: Structural Report and Calculations Series 200 Ground Mount

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

���������� ������������� ��� ��

���������� ������������� ��� ��

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

���������� ������������� ��� ��

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

���������� ������������� ��� ��

� ����" � !"

�#$$% &'() *�+ �&, �-�(. / �) (0 �1 *23! �"$�4!5"6 �7" 8! �� �

9: ;< => ?@< A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;< A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;< A��B� �CD B A��B� �CD B

� ����

: ;< => ?G< A��B� �CD B� �

� ����

E => ?: ;< A��B� �CD B� �

� ����

> HE

A��B� �CD B� �

� ����I �JKL ��CD ����

M �C K� ��L N�

OP

Q��R S��R��R S��R

��� TU�VL WCX �C�� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��

9: ;< => ?@< A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;< A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;< A��B� �CD B A��B� �CD B

� ����

: ;< => ?G< A��B� �CD B� �

� ����

E => ?: ;< A��B� �CD B� �

� ����

> HE

A��B� �CD B� �

� ����I �JKL ��CD ����

M �C K� ��L N�

OP

Q��R S��R��R S��R

��� TU�VL WCX �C�� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��

9: ;< => ?@< A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;< A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;< A��B� �CD B A��B� �CD B

� ����

: ;< => ?G< A��B� �CD B� �

� �����

E => ?: ;< A��B� �CD B� �

� ����

OP

Q��R S��R��R S��R

> HE

A��B� �CD B� �

� ���

��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��I �JKL ��CD ����

M �C K� ��L N�

x yz{| } ~���| yz� ��� ��{ y�� �y ~z�� y ~z�� ��� ���� � y�� ��{� zy �� y�� ���� y� ~� �� �z�� ��

��� TU�VL WCX �C�� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w

Page 76: Structural Report and Calculations Series 200 Ground Mount

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ����� � !"

�#$$% &'() *�+ �&, �-�(. / �) (0 �1 *23! �"$�4!5"6 �7" 8! �� �

9: ;< => ?@< A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;< A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;< A��B� �CD B A��B� �CD B

� ����

: ;< => ?G< A��B� �CD B� �

� ����

E => ?: ;< A��B� �CD B� �

� ����

> HE

A��B� �CD B� �

� ����I �JKL ��CD ����

M �C K� ��L N�

OP

Q��R S��R��R S��R

��� TU�VL WCX �C�� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��

9: ;< => ?@< A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;< A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;< A��B� �CD B A��B� �CD B

� ����

: ;< => ?G< A��B� �CD B� �

� ����

E => ?: ;< A��B� �CD B� �

� ����

> HE

A��B� �CD B� �

� ����I �JKL ��CD ����

M �C K� ��L N�

OP

Q��R S��R��R S��R

��� TU�VL WCX �C�� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��

9: ;< => ?@< A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;< A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;< A��B� �CD B A��B� �CD B

� ����

: ;< => ?G< A��B� �CD B� �

� �����

E => ?: ;< A��B� �CD B� �

� ����

OP

Q��R S��R��R S��R

> HE

A��B� �CD B� �

� ���

��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��I �JKL ��CD ����

M �C K� ��L N�

x yz{| } ~���| yz� ��� ��{ y�� �y ~z�� y ~z�� ��� ���� � y�� ��{� zy �� y�� ���� y� ~� �� �z�� ��

��� TU�VL WCX �C�� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w

Page 77: Structural Report and Calculations Series 200 Ground Mount

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ����� � !"

�#$$% &'() *�+ �&, �-�(. / �) (0 �1 *23! �"$�4!5"6 �7" 8! �� �

9: ;< => ?@< A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;< A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;< A��B� �CD B A��B� �CD B

� ����

: ;< => ?G< A��B� �CD B� �

� ����

E => ?: ;< A��B� �CD B� �

� ����

> HE

A��B� �CD B� �

� ����I �JKL ��CD ����

M �C K� ��L N�

OP

Q��R S��R��R S��R

��� TU�VL WCX �C�� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��

9: ;< => ?@< A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;< A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;< A��B� �CD B A��B� �CD B

� ����

: ;< => ?G< A��B� �CD B� �

� �����

E => ?: ;< A��B� �CD B� �

� ����

OP

Q��R S��R��R S��R

> HE

A��B� �CD B� �

� ���

��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��I �JKL ��CD ����

M �C K� ��L N�

x yz{| } ~���| yz� ��� ��{ y�� �y ~z�� y ~z�� ��� ���� � y�� ��{� zy �� y�� ���� y� ~� �� �z�� ��

��� TU�VL WCX �C�� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w

Page 78: Structural Report and Calculations Series 200 Ground Mount

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

���������� ������������� ��� ��

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

���������� ������������� ��� ��

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ����! � !"

�#$$% &'() *�+ �&, �-�(. / �) (0 �1 *23! �"$�4!5"6 �7" 8! �� �

9: ;< => ?@< A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;< A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;< A��B� �CD B A��B� �CD B

� ����

: ;< => ?G< A��B� �CD B� �

� ����

E => ?: ;< A��B� �CD B� �

� ����

> HE

A��B� �CD B� �

� ����I �JKL ��CD ����

M �C K� ��L N�

OP

Q��R S��R��R S��R

��� TU�VL WCX �C�� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��

9: ;< => ?@< A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;< A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;< A��B� �CD B A��B� �CD B

� ����

: ;< => ?G< A��B� �CD B� �

� ����

E => ?: ;< A��B� �CD B� �

� ����

> HE

A��B� �CD B� �

� ����I �JKL ��CD ����

M �C K� ��L N�

OP

Q��R S��R��R S��R

��� TU�VL WCX �C�� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��

9: ;< => ?@< A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;< A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;< A��B� �CD B A��B� �CD B

� ����

: ;< => ?G< A��B� �CD B� �

� �����

E => ?: ;< A��B� �CD B� �

� ����

OP

Q��R S��R��R S��R

> HE

A��B� �CD B� �

� ���

��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��I �JKL ��CD ����

M �C K� ��L N�

x yz{| } ~���| yz� ��� ��{ y�� �y ~z�� y ~z�� ��� ���� � y�� ��{� zy �� y�� ���� y� ~� �� �z�� ��

��� TU�VL WCX �C�� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w

Page 79: Structural Report and Calculations Series 200 Ground Mount

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ����# � !"

�#$$% &'() *�+ �&, �-�(. / �) (0 �1 *23! �"$�4!5"6 �7" 8! �� �

9: ;< => ?@< A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;< A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;< A��B� �CD B A��B� �CD B

� ����

: ;< => ?G< A��B� �CD B� �

� ����

E => ?: ;< A��B� �CD B� �

� ����

> HE

A��B� �CD B� �

� ����I �JKL ��CD ����

M �C K� ��L N�

OP

Q��R S��R��R S��R

��� TU�VL WCX �C�� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��

9: ;< => ?@< A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;< A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;< A��B� �CD B A��B� �CD B

� ����

: ;< => ?G< A��B� �CD B� �

� ����

E => ?: ;< A��B� �CD B� �

� ����

> HE

A��B� �CD B� �

� ����I �JKL ��CD ����

M �C K� ��L N�

OP

Q��R S��R��R S��R

��� TU�VL WCX �C�� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��

9: ;< => ?@< A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;< A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;< A��B� �CD B A��B� �CD B

� ����

: ;< => ?G< A��B� �CD B� �

� �����

E => ?: ;< A��B� �CD B� �

� ����

OP

Q��R S��R��R S��R

> HE

A��B� �CD B� �

� ���

��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��I �JKL ��CD ����

M �C K� ��L N�

x yz{| } ~���| yz� ��� ��{ y�� �y ~z�� y ~z�� ��� ���� � y�� ��{� zy �� y�� ���� y� ~� �� �z�� ��

��� TU�VL WCX �C�� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w

Page 80: Structural Report and Calculations Series 200 Ground Mount

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ����5 � !"

�#$$% &'() *�+ �&, �-�(. / �) (0 �1 *23! �"$�4!5"6 �7" 8! �� �

9: ;< => ?@< A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;< A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;< A��B� �CD B A��B� �CD B

� ����

: ;< => ?G< A��B� �CD B� �

� ����

E => ?: ;< A��B� �CD B� �

� ����

> HE

A��B� �CD B� �

� ����I �JKL ��CD ����

M �C K� ��L N�

OP

Q��R S��R��R S��R

��� TU�VL WCX �C�� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��

9: ;< => ?@< A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;< A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;< A��B� �CD B A��B� �CD B

� ����

: ;< => ?G< A��B� �CD B� �

� �����

E => ?: ;< A��B� �CD B� �

� ����

OP

Q��R S��R��R S��R

> HE

A��B� �CD B� �

� ���

��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��I �JKL ��CD ����

M �C K� ��L N�

x yz{| } ~���| yz� ��� ��{ y�� �y ~z�� y ~z�� ��� ���� � y�� ��{� zy �� y�� ���� y� ~� �� �z�� ��

��� TU�VL WCX �C�� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w

Page 81: Structural Report and Calculations Series 200 Ground Mount

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

���������� ������������� ��� ��

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

���������� ������������� ��� ��

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ����$ � !"

�#$$% &'() *�+ �&, �-�(. / �) (0 �1 *23! �"$�4!5"6 �7" 8! �� �

9: ;< => ?@< A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;< A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;< A��B� �CD B A��B� �CD B

� ����

: ;< => ?G< A��B� �CD B� �

� ����

E => ?: ;< A��B� �CD B� �

� ����

> HE

A��B� �CD B� �

� ����I �JKL ��CD ����

M �C K� ��L N�

OP

Q��R S��R��R S��R

��� TU�VL WCX �C�� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��

9: ;< => ?@< A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;< A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;< A��B� �CD B A��B� �CD B

� ����

: ;< => ?G< A��B� �CD B� �

� ����

E => ?: ;< A��B� �CD B� �

� ����

> HE

A��B� �CD B� �

� ����I �JKL ��CD ����

M �C K� ��L N�

OP

Q��R S��R��R S��R

��� TU�VL WCX �C�� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��

9: ;< => ?@< A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;< A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;< A��B� �CD B A��B� �CD B

� ����

: ;< => ?G< A��B� �CD B� �

� �����

E => ?: ;< A��B� �CD B� �

� ����

OP

Q��R S��R��R S��R

> HE

A��B� �CD B� �

� ���

��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��I �JKL ��CD ����

M �C K� ��L N�

x yz{| } ~���| yz� ��� ��{ y�� �y ~z�� y ~z�� ��� ���� � y�� ��{� zy �� y�� ���� y� ~� �� �z�� ��

��� TU�VL WCX �C�� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w

Page 82: Structural Report and Calculations Series 200 Ground Mount

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ����7 � !"

�#$$% &'() *�+ �&, �-�(. / �) (0 �1 *23! �"$�4!5"6 �7" 8! �� �

9: ;< => ?@< A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;< A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;< A��B� �CD B A��B� �CD B

� ����

: ;< => ?G< A��B� �CD B� �

� ����

E => ?: ;< A��B� �CD B� �

� ����

> HE

A��B� �CD B� �

� ����I �JKL ��CD ����

M �C K� ��L N�

OP

Q��R S��R��R S��R

��� TU�VL WCX �C�� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��

9: ;< => ?@< A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;< A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;< A��B� �CD B A��B� �CD B

� ����

: ;< => ?G< A��B� �CD B� �

� ����

E => ?: ;< A��B� �CD B� �

� ����

> HE

A��B� �CD B� �

� ����I �JKL ��CD ����

M �C K� ��L N�

OP

Q��R S��R��R S��R

��� TU�VL WCX �C�� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��

9: ;< => ?@< A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;< A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;< A��B� �CD B A��B� �CD B

� ����

: ;< => ?G< A��B� �CD B� �

� �����

E => ?: ;< A��B� �CD B� �

� ����

OP

Q��R S��R��R S��R

> HE

A��B� �CD B� �

� ���

��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��I �JKL ��CD ����

M �C K� ��L N�

x yz{| } ~���| yz� ��� ��{ y�� �y ~z�� y ~z�� ��� ���� � y�� ��{� zy �� y�� ���� y� ~� �� �z�� ��

��� TU�VL WCX �C�� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w

Page 83: Structural Report and Calculations Series 200 Ground Mount

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ����� � !"

�#$$% &'() *�+ �&, �-�(. / �) (0 �1 *23! �"$�4!5"6 �7" 8! �� �

9: ;< => ?@< A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;< A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;< A��B� �CD B A��B� �CD B

� ����

: ;< => ?G< A��B� �CD B� �

� ����

E => ?: ;< A��B� �CD B� �

� ����

> HE

A��B� �CD B� �

� ����I �JKL ��CD ����

M �C K� ��L N�

OP

Q��R S��R��R S��R

��� TU�VL WCX �C�� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��

9: ;< => ?@< A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;< A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;< A��B� �CD B A��B� �CD B

� ����

: ;< => ?G< A��B� �CD B� �

� �����

E => ?: ;< A��B� �CD B� �

� ����

OP

Q��R S��R��R S��R

> HE

A��B� �CD B� �

� ���

��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��I �JKL ��CD ����

M �C K� ��L N�

x yz{| } ~���| yz� ��� ��{ y�� �y ~z�� y ~z�� ��� ���� � y�� ��{� zy �� y�� ���� y� ~� �� �z�� ��

��� TU�VL WCX �C�� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w

Page 84: Structural Report and Calculations Series 200 Ground Mount

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

���������� ������������� ��� ��

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ���� � � !"

�#$$% &'() *�+ �&, �-�(. / �) (0 �1 *23! �"$�4!5"6 �7" 8! �� �

9: ;< => ?@< A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;< A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;< A��B� �CD B A��B� �CD B

� ����

: ;< => ?G< A��B� �CD B� �

� ����

E => ?: ;< A��B� �CD B� �

� ����

> HE

A��B� �CD B� �

� ����I �JKL ��CD ����

M �C K� ��L N�

OP

Q��R S��R��R S��R

��� TU�VL WCX �C�� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��

9: ;< => ?@< A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;< A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;< A��B� �CD B A��B� �CD B

� ����

: ;< => ?G< A��B� �CD B� �

� ����

E => ?: ;< A��B� �CD B� �

� ����

> HE

A��B� �CD B� �

� ����I �JKL ��CD ����

M �C K� ��L N�

OP

Q��R S��R��R S��R

��� TU�VL WCX �C�� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��

9: ;< => ?@< A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;< A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;< A��B� �CD B A��B� �CD B

� ����

: ;< => ?G< A��B� �CD B� �

� �����

E => ?: ;< A��B� �CD B� �

� ����

OP

Q��R S��R��R S��R

> HE

A��B� �CD B� �

� ���

��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��I �JKL ��CD ����

M �C K� ��L N�

x yz{| } ~���| yz� ��� ��{ y�� �y ~z�� y ~z�� ��� ���� � y�� ��{� zy �� y�� ���� y� ~� �� �z�� ��

��� TU�VL WCX �C�� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w

Page 85: Structural Report and Calculations Series 200 Ground Mount

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ����" � !"

�#$$% &'() *�+ �&, �-�(. / �) (0 �1 *23! �"$�4!5"6 �7" 8! �� �

9: ;< => ?@< A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;< A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;< A��B� �CD B A��B� �CD B

� ����

: ;< => ?G< A��B� �CD B� �

� ����

E => ?: ;< A��B� �CD B� �

� ����

> HE

A��B� �CD B� �

� ����I �JKL ��CD ����

M �C K� ��L N�

OP

Q��R S��R��R S��R

��� TU�VL WCX �C�� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��

9: ;< => ?@< A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;< A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;< A��B� �CD B A��B� �CD B

� ����

: ;< => ?G< A��B� �CD B� �

� ����

E => ?: ;< A��B� �CD B� �

� ����

> HE

A��B� �CD B� �

� ����I �JKL ��CD ����

M �C K� ��L N�

OP

Q��R S��R��R S��R

��� TU�VL WCX �C�� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��

9: ;< => ?@< A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;< A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;< A��B� �CD B A��B� �CD B

� ����

: ;< => ?G< A��B� �CD B� �

� �����

E => ?: ;< A��B� �CD B� �

� ����

OP

Q��R S��R��R S��R

> HE

A��B� �CD B� �

� ���

��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��I �JKL ��CD ����

M �C K� ��L N�

x yz{| } ~���| yz� ��� ��{ y�� �y ~z�� y ~z�� ��� ���� � y�� ��{� zy �� y�� ���� y� ~� �� �z�� ��

��� TU�VL WCX �C�� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w

Page 86: Structural Report and Calculations Series 200 Ground Mount

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ���� � � !"

�#$$% &'() *�+ �&, �-�(. / �) (0 �1 *23! �"$�4!5"6 �7" 8! �� �

9: ;< => ?@< A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;< A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;< A��B� �CD B A��B� �CD B

� ����

: ;< => ?G< A��B� �CD B� �

� ����

E => ?: ;< A��B� �CD B� �

� ����

> HE

A��B� �CD B� �

� ����I �JKL ��CD ����

M �C K� ��L N�

OP

Q��R S��R��R S��R

��� TU�VL WCX �C�� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��

9: ;< => ?@< A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;< A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;< A��B� �CD B A��B� �CD B

� ����

: ;< => ?G< A��B� �CD B� �

� �����

E => ?: ;< A��B� �CD B� �

� ����

OP

Q��R S��R��R S��R

> HE

A��B� �CD B� �

� ���

��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��I �JKL ��CD ����

M �C K� ��L N�

x yz{| } ~���| yz� ��� ��{ y�� �y ~z�� y ~z�� ��� ���� � y�� ��{� zy �� y�� ���� y� ~� �� �z�� ��

��� TU�VL WCX �C�� ��� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w

Page 87: Structural Report and Calculations Series 200 Ground Mount

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

���������� ������������� ��� ��

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ����� � !"

�#$$% &'() *�+ �&, �-�(. / �) (0 �1 *23! �"$�4!5"6 �7" 8! �� �

9: ;< => ?@< A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;< A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;< A��B� �CD B A��B� �CD B

� ����

: ;< => ?G< A��B� �CD B� �

� ����

E => ?: ;< A��B� �CD B� �

� ����

> HE

A��B� �CD B� �

� ����I �JKL ��CD ����

M �C K� ��L N�

OP

Q��R S��R��R S��R

��� TU�VL WCX �C�� ���� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��

9: ;< => ?@< A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;< A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;< A��B� �CD B A��B� �CD B

� ����

: ;< => ?G< A��B� �CD B� �

� ����

E => ?: ;< A��B� �CD B� �

� ����

> HE

A��B� �CD B� �

� ����I �JKL ��CD ����

M �C K� ��L N�

OP

Q��R S��R��R S��R

��� TU�VL WCX �C�� ���� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��

9: ;< => ?@< A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;< A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;< A��B� �CD B A��B� �CD B

� ����

: ;< => ?G< A��B� �CD B� �

� �����

E => ?: ;< A��B� �CD B� �

� ����

OP

Q��R S��R��R S��R

> HE

A��B� �CD B� �

� ���

��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��I �JKL ��CD ����

M �C K� ��L N�

x yz{| } ~���| yz� ��� ��{ y�� �y ~z�� y ~z�� ��� ���� � y��� ��{� zy �� y�� ���� y� ~� �� �z�� ��

��� TU�VL WCX �C�� ���� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w

Page 88: Structural Report and Calculations Series 200 Ground Mount

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ����! � !"

�#$$% &'() *�+ �&, �-�(. / �) (0 �1 *23! �"$�4!5"6 �7" 8! �� �

9: ;< => ?@< A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;< A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;< A��B� �CD B A��B� �CD B

� ����

: ;< => ?G< A��B� �CD B� �

� ����

E => ?: ;< A��B� �CD B� �

� ����

> HE

A��B� �CD B� �

� ����I �JKL ��CD ����

M �C K� ��L N�

OP

Q��R S��R��R S��R

��� TU�VL WCX �C�� ���� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��

9: ;< => ?@< A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;< A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;< A��B� �CD B A��B� �CD B

� ����

: ;< => ?G< A��B� �CD B� �

� ����

E => ?: ;< A��B� �CD B� �

� ����

> HE

A��B� �CD B� �

� ����I �JKL ��CD ����

M �C K� ��L N�

OP

Q��R S��R��R S��R

��� TU�VL WCX �C�� ���� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��

9: ;< => ?@< A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;< A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;< A��B� �CD B A��B� �CD B

� ����

: ;< => ?G< A��B� �CD B� �

� �����

E => ?: ;< A��B� �CD B� �

� ����

OP

Q��R S��R��R S��R

> HE

A��B� �CD B� �

� ���

��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��I �JKL ��CD ����

M �C K� ��L N�

x yz{| } ~���| yz� ��� ��{ y�� �y ~z�� y ~z�� ��� ���� � y��� ��{� zy �� y�� ���� y� ~� �� �z�� ��

��� TU�VL WCX �C�� ���� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w

Page 89: Structural Report and Calculations Series 200 Ground Mount

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ���!# � !"

�#$$% &'() *�+ �&, �-�(. / �) (0 �1 *23! �"$�4!5"6 �7" 8! �� �

9: ;< => ?@< A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;< A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;< A��B� �CD B A��B� �CD B

� ����

: ;< => ?G< A��B� �CD B� �

� ����

E => ?: ;< A��B� �CD B� �

� ����

> HE

A��B� �CD B� �

� ����I �JKL ��CD ����

M �C K� ��L N�

OP

Q��R S��R��R S��R

��� TU�VL WCX �C�� ���� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��

9: ;< => ?@< A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;< A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;< A��B� �CD B A��B� �CD B

� ����

: ;< => ?G< A��B� �CD B� �

� �����

E => ?: ;< A��B� �CD B� �

� ����

OP

Q��R S��R��R S��R

> HE

A��B� �CD B� �

� ���

��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��I �JKL ��CD ����

M �C K� ��L N�

x yz{| } ~���| yz� ��� ��{ y�� �y ~z�� y ~z�� ��� ���� � y��� ��{� zy �� y�� ���� y� ~� �� �z�� ��

��� TU�VL WCX �C�� ���� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w

Page 90: Structural Report and Calculations Series 200 Ground Mount

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ���!5 � !"

�#$$% &'() *�+ �&, �-�(. / �) (0 �1 *23! �"$�4!5"6 �7" 8! �� �

9: ;< => ?@< A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;< A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;< A��B� �CD B A��B� �CD B

� ����

: ;< => ?G< A��B� �CD B� �

� ����

E => ?: ;< A��B� �CD B� �

� ����

> HE

A��B� �CD B� �

� ����I �JKL ��CD ����

M �C K� ��L N�

OP

Q��R S��R��R S��R

��� TU�VL WCX �C��� ���� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��

9: ;< => ?@< A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;< A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;< A��B� �CD B A��B� �CD B

� ����

: ;< => ?G< A��B� �CD B� �

� ����

E => ?: ;< A��B� �CD B� �

� ����

> HE

A��B� �CD B� �

� ����I �JKL ��CD ����

M �C K� ��L N�

OP

Q��R S��R��R S��R

��� TU�VL WCX �C��� ���� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��

9: ;< => ?@< A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;< A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;< A��B� �CD B A��B� �CD B

� ����

: ;< => ?G< A��B� �CD B� �

� �����

E => ?: ;< A��B� �CD B� �

� ����

OP

Q��R S��R��R S��R

> HE

A��B� �CD B� �

� ���

��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��I �JKL ��CD ����

M �C K� ��L N�

x yz{| } ~���| yz� ��� ��{ y�� �y ~z�� y ~z�� ��� ����� � y��� ��{� zy �� y�� ���� y� ~� �� �z�� ��

��� TU�VL WCX �C��� ���� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w

Page 91: Structural Report and Calculations Series 200 Ground Mount

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ���!$ � !"

�#$$% &'() *�+ �&, �-�(. / �) (0 �1 *23! �"$�4!5"6 �7" 8! �� �

9: ;< => ?@< A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;< A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;< A��B� �CD B A��B� �CD B

� ����

: ;< => ?G< A��B� �CD B� �

� ����

E => ?: ;< A��B� �CD B� �

� ����

> HE

A��B� �CD B� �

� ����I �JKL ��CD ����

M �C K� ��L N�

OP

Q��R S��R��R S��R

��� TU�VL WCX �C��� ���� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��

9: ;< => ?@< A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;< A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;< A��B� �CD B A��B� �CD B

� ����

: ;< => ?G< A��B� �CD B� �

� ����

E => ?: ;< A��B� �CD B� �

� ����

> HE

A��B� �CD B� �

� ����I �JKL ��CD ����

M �C K� ��L N�

OP

Q��R S��R��R S��R

��� TU�VL WCX �C��� ���� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��

9: ;< => ?@< A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;< A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;< A��B� �CD B A��B� �CD B

� ����

: ;< => ?G< A��B� �CD B� �

� �����

E => ?: ;< A��B� �CD B� �

� ����

OP

Q��R S��R��R S��R

> HE

A��B� �CD B� �

� ���

��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��I �JKL ��CD ����

M �C K� ��L N�

x yz{| } ~���| yz� ��� ��{ y�� �y ~z�� y ~z�� ��� ����� � y��� ��{� zy �� y�� ���� y� ~� �� �z�� ��

��� TU�VL WCX �C��� ���� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w

Page 92: Structural Report and Calculations Series 200 Ground Mount

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ���!7 � !"

�#$$% &'() *�+ �&, �-�(. / �) (0 �1 *23! �"$�4!5"6 �7" 8! �� �

9: ;< => ?@< A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;< A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;< A��B� �CD B A��B� �CD B

� ����

: ;< => ?G< A��B� �CD B� �

� ����

E => ?: ;< A��B� �CD B� �

� ����

> HE

A��B� �CD B� �

� ����I �JKL ��CD ����

M �C K� ��L N�

OP

Q��R S��R��R S��R

��� TU�VL WCX �C��� ���� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��

9: ;< => ?@< A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;< A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;< A��B� �CD B A��B� �CD B

� ����

: ;< => ?G< A��B� �CD B� �

� �����

E => ?: ;< A��B� �CD B� �

� ����

OP

Q��R S��R��R S��R

> HE

A��B� �CD B� �

� ���

��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��I �JKL ��CD ����

M �C K� ��L N�

x yz{| } ~���| yz� ��� ��{ y�� �y ~z�� y ~z�� ��� ����� � y��� ��{� zy �� y�� ���� y� ~� �� �z�� ��

��� TU�VL WCX �C��� ���� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w

Page 93: Structural Report and Calculations Series 200 Ground Mount

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ���!� � !"

�#$$% &'() *�+ �&, �-�(. / �) (0 �1 *23! �"$�4!5"6 �7" 8! �� �

9: ;< => ?@< A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;< A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;< A��B� �CD B A��B� �CD B

� ����

: ;< => ?G< A��B� �CD B� �

� ����

E => ?: ;< A��B� �CD B� �

� ����

> HE

A��B� �CD B� �

� ����I �JKL ��CD ����

M �C K� ��L N�

OP

Q��R S��R��R S��R

��� TU�VL WCX �C��� ���� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��

9: ;< => ?@< A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;< A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;< A��B� �CD B A��B� �CD B

� ����

: ;< => ?G< A��B� �CD B� �

� ����

E => ?: ;< A��B� �CD B� �

� ����

> HE

A��B� �CD B� �

� ����I �JKL ��CD ����

M �C K� ��L N�

OP

Q��R S��R��R S��R

��� TU�VL WCX �C��� ���� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��

9: ;< => ?@< A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;< A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;< A��B� �CD B A��B� �CD B

� ����

: ;< => ?G< A��B� �CD B� �

� �����

E => ?: ;< A��B� �CD B� �

� ����

OP

Q��R S��R��R S��R

> HE

A��B� �CD B� �

� ���

��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��I �JKL ��CD ����

M �C K� ��L N�

x yz{| } ~���| yz� ��� ��{ y�� �y ~z�� y ~z�� ��� ����� � y��� ��{� zy �� y�� ���� y� ~� �� �z�� ��

��� TU�VL WCX �C��� ���� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w

Page 94: Structural Report and Calculations Series 200 Ground Mount

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ���! � � !"

�#$$% &'() *�+ �&, �-�(. / �) (0 �1 *23! �"$�4!5"6 �7" 8! �� �

9: ;< => ?@< A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;< A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;< A��B� �CD B A��B� �CD B

� ����

: ;< => ?G< A��B� �CD B� �

� ����

E => ?: ;< A��B� �CD B� �

� ����

> HE

A��B� �CD B� �

� ����I �JKL ��CD ����

M �C K� ��L N�

OP

Q��R S��R��R S��R

��� TU�VL WCX �C��� ���� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��

9: ;< => ?@< A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;< A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;< A��B� �CD B A��B� �CD B

� ����

: ;< => ?G< A��B� �CD B� �

� ����

E => ?: ;< A��B� �CD B� �

� ����

> HE

A��B� �CD B� �

� ����I �JKL ��CD ����

M �C K� ��L N�

OP

Q��R S��R��R S��R

��� TU�VL WCX �C��� ���� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��

9: ;< => ?@< A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;< A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;< A��B� �CD B A��B� �CD B

� ����

: ;< => ?G< A��B� �CD B� �

� �����

E => ?: ;< A��B� �CD B� �

� ����

OP

Q��R S��R��R S��R

> HE

A��B� �CD B� �

� ���

��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��I �JKL ��CD ����

M �C K� ��L N�

x yz{| } ~���| yz� ��� ��{ y�� �y ~z�� y ~z�� ��� ����� � y��� ��{� zy �� y�� ���� y� ~� �� �z�� ��

��� TU�VL WCX �C��� ���� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w

Page 95: Structural Report and Calculations Series 200 Ground Mount

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ����� ������ ��� ���� ����� ������ ��� ���

��������� ������������ ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

��������� ������������� ��� ��

� ���!" � !"

�#$$% &'() *�+ �&, �-�(. / �) (0 �1 *23! �"$�4!5"6 �7" 8! �� �

9: ;< => ?@< A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;< A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;< A��B� �CD B A��B� �CD B

� ����

: ;< => ?G< A��B� �CD B� �

� ����

E => ?: ;< A��B� �CD B� �

� ����

> HE

A��B� �CD B� �

� ����I �JKL ��CD ����

M �C K� ��L N�

OP

Q��R S��R��R S��R

��� TU�VL WCX �C��� ���� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��

9: ;< => ?@< A��B� �CD B A��B� �CD B

� ����

9E => ?9: ;< A��B� �CD B A��B� �CD B

� ����

FF ;< => ?9E A��B� �CD B A��B� �CD B

� ����

G< => ?FF ;< A��B� �CD B A��B� �CD B

� ����

: ;< => ?G< A��B� �CD B� �

� �����

E => ?: ;< A��B� �CD B� �

� ����

OP

Q��R S��R��R S��R

> HE

A��B� �CD B� �

� ���

��RPL vL ��I �JKL ��CD ����M Suv�w��RPL vL ��I �JKL ��CD ����

M �C K� ��L N�

x yz{| } ~���| yz� ��� ��{ y�� �y ~z�� y ~z�� ��� ����� � y��� ��{� zy �� y�� ���� y� ~� �� �z�� ��

��� TU�VL WCX �C��� ���� U�Y� W�Z

[\]_ a] b>�� WC �Cc W�� �� �L �W

D ���Cc W�� �� �L �Wd efg hijk lmno plhq en ihr shismtho

M Suv�w

Page 96: Structural Report and Calculations Series 200 Ground Mount

  ¡¢ £¤¥ ¦§ ¨ £¤© ª«ª¬©­ £® © «£¤¯ ¡°¢± £¤£²³® ²¬® ³¢© ¡«¤³°£® © ¤¢ £­ £® ¡µ ¶

·© «­ ¸ ¡³­ ¤¦¹¹¢ ¡¦º¹ »¼± ½ ¾¼¡¤¬°£¿À© ¤Á ¿ ³¢ £ª¡°ÂÃ

Ä £© ¤»© ²Ä £© ¤»© ²¨ £¤© ª«¿ ³¢ £ª¡°Â¨Ä «¡µ¸ ¡³­ ¤¹¢ ¡¦Å¹ ¼¤¯ Æ °¡¬«­ Ä «¡µ

ŧ ¨ £¤© ª«²³® ²¬® ³¢© ¡«¤³¤¤¬»£°³©® ¤¼³«³«­ ¡Ç£°± ³«ª¤³°£²¡«¤¢ ³«¢ ³¤¤± ¡µ«¡«¯ ¡®® ¡µ© «ª¤Á £¢ ²± ¶

ȧ À ³©®­ £¤© ª«Ç³® ¬£¤³°£³¤¯ ¡®® ¡µ¤ É Ê© «Ë

Ä Ê© «Ì

à ʩ «Í

δ ÊÁ ¤©

ϧ Ä ²± £­ ¬® £Ï¹ ³«­ Ä ²± £­ ¬® £Ð¹ ¼© ¼£­ £¤© ª«Ç³® ¬£¤³°£³¤¯ ¡®® ¡µ¤

É Ê© «Ë É Ê© «Ë

Ä Ê© «Ì Ä Ê© «Ì

à ʩ «Í à ʩ «Í

Ê© « Ñ®

Ê© « Ñ®

Ò§ ¸ ¡³­ ¿ ¡»´ © «³¢© ¡«¤¯ ¡°²³® ²¬® ³¢© ¡«¤³°£³¤¯ ¡®® ¡µ¤¨ ÓÄ ¨ Ó· ¨ Ó¹ ¶ºÒÄ Ó¹ ¶ºÒ· ¹ ¶Ô Ó·

� ���25 � 2$!

Õ ³¾ÕÐÐÈÅÕ ³¾Õ¦¦ÏÖÔ

�#$$% &'() *�+ �&, �-�(. / �) (0 �1 *23! �"$�4!5"6 �7" 8! �� �

¹ ¶ºÒ¦ ¶¹¹

¹ ¶È¦¹ ¶ÈÖ

¹ ¶ÅÖ¹ ¶Èº

¹ ¶Ï¹ ¹ ¶ÔÈ ¦Ò ¶Å¹ Ä ²± Ϲש ¼£Ä ²± йש ¼£

� � � ~Ø� ~���x �� Ø ~� ��| yz�{ y�� �y ~z�� y ~z�� y� ��Ù �ØÚ

¹ ¶ÔÐ

Page 97: Structural Report and Calculations Series 200 Ground Mount

Û ÜÝÞßà áá Üâã äÞÝáá åæ Üçß è

é êÜäÞë Þèç ìÝíî Þá âã ÜÝï ëç äÞÝèç åÝÛ ÜêÜäÞá Þêè

� ���2$ � 2$!

�#$$% &'() *�+ �&, �-�(. / �) (0 �1 *23! �"$�4!5"6 �7" 8! �� �

�Ú �� Øð ���z�ñ �� �|� �

Page 98: Structural Report and Calculations Series 200 Ground Mount

ò óô õö÷ø ùú ûóüüýûóþÿ �� �þ����ÿ ��� �� � ��� � �� � ���� � ������ � � ��� �� �� ��� !� "# $% &'(

) *�� ���+� �,� �- �� ���-� + $"# $% &'(

'(.� �// �� +� /� �� ������ �

) 0�.� �/1� � ��� �� �� � �- �� ���� !� "# $# &'(

"(

� �2 �� �.� �/3 � /� 4�,(

'55'56''5''6'"5'"6'75'76'85'86'65'66'#5'95

: ;< => ?@ABC BD< DE< =FG HDE BIJK LM LNOGPQK RST: ?=?DU ?VBGE @WAE W@BX Y�

� � ��� � �� � ���� � ���(

Z �Z ������ ��- �� ��

� [�\ �� � ���� � � ��� �� ��

]ç Ýï åÜïç Ýìëç ÜìêÜä� ���27 � 2$!

�#$$% &'() *�+ �&, �-�(. / �) (0 �1 *23! �"$�4!5"6 �7" 8! �� �

86_` &' $# &' $%" $"" $6

2 &" $7 &5 $9" $#' $8" $"

2 &" $8 &5 $#" $9' $'

2 &" $6 &5 $6" $#' $5

79 $6_` &' $% &' $%" $'&" $8 &5 $7" $"5 $9

75_` &' $% &' $%" $'" $'5 $5' $%5 $#

"" $6_` &' $6 &' $#' $9' $%

2

' $#5 $7

'6_` &5 $a &' $7' $7' $#

2 &' $a&5 $'

9 $6_` &5 $# &' $55 $a' $6

2 &' $85 $5

5_' $"5 $7' $"5 $7

2 &' $' &5 $' &' $'� b

��� �` �+� c � /� � .� �/1� � ��� ��5_.��/1� � ��� ��'%5_

� bd� be� bd� be"% $8'7" $59

f gh ijk lm nno pqr n 5 $%6 m nno pqr n'% $96"5 $"7"' $96"7 $77"8 $a9"# $##88 $8889 $7667 $86

��Pu� s�t�� sw'' $'5'" $"8'7 $87'8 $#%'6 $a%'9 $78"% $a57' $"#77 $9'7# $"67% $%a8' $#"'55 &'95

� � ��� � �� � ���� � ���(

X Y

3 � � �+�,'% $65"5 $7a"" $7%"8 $8#"# $#7u| z�x �� Ø ~� ��| yzv�xw� x��xð ��� ����

y z{| }||~��� �� ��� ���5 $%6

\ �� ��

' $55 5 $%6

�, � � ��� �� ���� ��,� �� ���� �� �, 31 � � � �

Page 99: Structural Report and Calculations Series 200 Ground Mount

G B< DI< A� BD< F=G BAE< ?=P� ;VE B@SS ;=� SJOGPQK RST 3� � �� ����� � �� ���11 � �� ��1�

\ �� ��

Ä ��ÊÎ �Ä ��'' $8 &'(3 � �4� �� � Z ����

���� !� '' $6 &''(

Ä ��ÊÎ �Ä ��'' $8 &"( � �� ����� ��4� !� '7 $# &'3��9 &'5

� �� ����� ��4� !� '' $6 &'3��9 &'5

Ä ��ÊË � ÌÄ ���'' $8 &7(3 ��� ����� ��4�3Z3� ��+� 4

3 ��� ����� ��4�3Z3� ��+� 4

Ä ��ÊË � ÌÄ ���'' $8 &8(- ��3� � � � ��� �� ��� !� '' $8 &'

- ��3� � � � ��� �� ��� !� '' $8 &"

3 ���3��9 &'53 ��� ��'' $8 $7

À3 ���

3��9 &'53 ��� ��'' $8 $7

Ã3 0 ��

3��9 &'53 ��� ��'' $8 $7

3 0��3��9 &'53 ��� ��'' $8 $7

� ��. �

���

� ��� �

� ���� �

í Þç èäç â^ åÜïç Ýìëç ÜìêÜä� ���2� � 2$!

" $%9a8 5 $'67%� �

  ¡]�#$$% &'() *�+ �&, �-�(. / �) (0 �1 *23! �"$�4!5"6 �7" 8! �� �

' $65 ' $#9 ' $55

¢£ ¤¥ ¦ §¥ ©ª §«¬­¤® ¬©£ ¤

5 $6'"%8 $55

° ±S LMM VD²³ OG�´

¿ �ÊÄ ��" $65

µ§7 $"6 ' $55 " $65 ' $55 ' $55 ' $65

� �| ��| Øñ ��| }zv�xw� x��xð ��� ���� �z���

3 � �4� �1 �� +�! � / ��3 � �4� �1 �� +�� � +���1

Page 100: Structural Report and Calculations Series 200 Ground Mount

G =?¶· ?;� DG BAE< ?=K LJE ?K LMOGPQK RST

\ �� �� '(5' $55 9 $6' $55 '65 $a"

���� �` �+� ���� �� �"" $65 $9a

�� ������ - �� ��755 $#9

��, �4 �- �� ��79 $65 $68

�� 4���� �� - �� ��865 $8"

�3� �� - �� ��

5 $5'5 $5"5 $575 $585 $565 $5#5 $595 $5%5 $5a5 $5'55 $5''5 $5'"5 $5'75 $5'85 $5'65 $5

5 $5# $"'" $7'% $6"8 $#75 $%79 $587 $'8a $766 $8#' $##9 $%97 $a%5 $'%# $"a" $8

5 $5# $"'" $7'% $6"8 $#75 $%79 $587 $'8a $766 $8#' $##9 $%97 $a%5 $'%# $"a" $8

5 $56 $#'' $7'# $a"" $#"% $"77 $a7a $686 $"65 $%6# $6#" $'#9 $997 $89a $5%8 $9

5 $58 $aa $9'8 $#'a $6"8 $8"a $"78 $'7a $587 $a8% $967 $#6% $6#7 $8#% $"97 $'

5 $58 $'% $"'" $7'# $8"5 $6"8 $#"% $97" $%7# $a8' $586 $'8a $"67 $769 $8#' $6

5 $57 $7# $9'5 $5'7 $7'# $9"5 $5"7 $7"# $#75 $577 $77# $#85 $587 $78# $#65 $5 3 ��c � /� �+1� �+ 4

5 $5" $#6 $'9 $9'5 $"'" $%'6 $8'9 $a"5 $6"7 $5"6 $#"% $"75 $977 $776 $%7% $8

� ���2 � � 2$!

� �3� �� /� ���3 ��c � /"" $61 +� ��� �� �3� �� /� ���3 ��c � /751 +� ��� �

� �3� �� /� ���3 ��c � /79 $61 +� ��� �� �3� �� /� ���3 ��c � /861 +� ��� � �#$$% &'() *�+ �&, �-�(. / �) (0 �1 *23! �"$�4!5"6 �7" 8! �� �

� �m nno pqr n � +Z ����/3 ��c � /

��-� �� ���3 ��c � /5��� �` �+� � �3� �� /� ���3 ��c � /9 $61 +� ��� �

� �3� �� /� ���3 ��c � /'61 +� ��� �

� ¹' $55

� *' $'5

�5 $%5

��� � ` �+� � �

× �Ê¿ �× º3 ��� ��9 $8� X $�9 $"(

��� �` �+� 5� �86_� zy �� y��x �� Ø ~� ��| yz�v�xw� x��xð ��� ���

× ºÊ¹ ¶º¿ »¿ ¼Ã× ½3 ��� ��9 $7� X $�9 &'(

��� �` �+� 3� �� - �� ��3 ��� � / �! � / �����! �� ���� / ��� �� ������ � � �� ��� �� ��

� � �' $' $

Page 101: Structural Report and Calculations Series 200 Ground Mount

5'5"5758565#595%5a5'55''5'"5

'55"""""""7777\Z\Z

''5"""""""7777\Z\Z

'"5"""""""7777\Z\Z

'75""""""77777\Z\Z

'85""""""77777\Z\Z

'65"""""77777\Z\Z\Z

'#5"""""7777\Z\Z\Z\Z

'95""""77777\Z\Z\Z\Z

JC ;<U D¾ B@¾ ;=BUNC ;<U D¾ B@¾ ;=BU

Ä ËÊ� �Ä ÌÊ"' $65� �

¿ ËÊ� �¿ ÌÊ'' $55� �

5'5"5758565#595%5a5'55''5'"5

'55"""""""7777\Z\ZJC ;<U D¾ B@¾ ;=BUNC ;<U D¾ B@¾ ;=BU

''5"""""""7777\Z\Z

'"5"""""""7777\Z\Z

'75""""""77777\Z\ZÄ ËÊ� �Ä ÌÊ"# $55� �

'85"""""777777\Z\Z¿ ËÊ� �¿ ÌÊ'7 $55� �

'65"""""77777\Z\Z\Z

'#5""""77777\Z\Z\Z\Z� �� 4�4� �4 �� �� ��� ����, � � ��� ���� +�� �� ��

'95777777777\Z\Z\Z\Z

� �� 4�4� �4 ���"� �� � &##� � � � �( �'%9 $'� � &�!¿� �

� �� 4�4� �4 ���7� �� � &##� � � � �( �"%5 $#� � &�!¿� �

5'5"5758565#595%5a5'55''5'"5� �� 4�4� �4 ���"� �� � &9%� � � � �( �'66 $a� � &�!¿� �

'55""""""""7777\Z

''5"""""""77777\Z� �� 4�4� �4 ���7� �� � &9%� � � � �( �"77 $%� � &�!¿� �

'"5"""""""77777\Z

'75""""""777777\Z

'85"""""777777\Z\Z

'65"""""77777\Z\Z\Z

'#5777777777\Z\Z\Z\Z

'95777777777\Z\Z\Z\Z

� ���2" � 2$!

'# � �"" $61 +� �

ÀÁÂÃÄÅÆÇÈÁÉÊËÄÌÍÎÏÐÑÒ\ �4! ���� �� �� �85� �##���� � �

3 ��c � / �#$$% &'() *�+ �&, �-�(. / �) (0 �1 *23! �"$�4!5"6 �7" 8! �� �

85� �##�� � �

ÀÁÂÃÄÅÆÇÈÁÉÊËÄÌÍÎÏÐÑÒ\ �4! ���� �� �� �85� �##���� � �

7" $65

3 ��c � /

'# $"6 85� �9%�� � �85� �9%�� � �

7a $55 'a $65

5 � �9 $61 +� �

ÀÁÂÃÄÅÆÇÈÁÉÊËÄÌÍÎÏÐÑÒ\ �4! ���� �� �� �85� �##���� � �

3 ��c � / 9 $6 � �'61 +� �

85� �##�� � �

Ó ~�� ��y{Ù �|� �{ y�Ô y ~���Õ� �z�� �

Page 102: Structural Report and Calculations Series 200 Ground Mount

5'5"5758565#595%5a5'55''5'"5

'55""""""""""777

''5"""""""""7777

'"5""""""""77777

'75"""""""777777

'85""""""7777777

'65"""""7777777\Z

'#577777777777\Z\Z

'957777777777\Z\Z\Z

JC ;<U D¾ B@¾ ;=BUNC ;<U D¾ B@¾ ;=BU

Ä ËÊ� �Ä ÌÊ"' $65� �

¿ ËÊ� �¿ ÌÊ'' $55� �

5'5"5758565#595%5a5'55''5'"5

'55"""""""""""""JC ;<U D¾ B@¾ ;=BUNC ;<U D¾ B@¾ ;=BU

''5"""""""""""""

'"5""""""""""777

'75"""""""""7777Ä ËÊ� �Ä ÌÊ"# $55� �

'85"""""""777777¿ ËÊ� �¿ ÌÊ'7 $55� �

'657777777777777

'#57777777777777� �� 4�4� �4 �� �� ��� ����, � � ��� ���� +�� �� ��

'9577777777777\Z\Z

� �� 4�4� �4 ���"� �� � &##� � � � �( �'%9 $'� � &�!¿� �

� �� 4�4� �4 ���7� �� � &##� � � � �( �"%5 $#� � &�!¿� �

5'5"5758565#595%5a5'55''5'"5� �� 4�4� �4 ���"� �� � &9%� � � � �( �'66 $a� � &�!¿� �

'55"""""""""""""

''5"""""""""""""� �� 4�4� �4 ���7� �� � &9%� � � � �( �"77 $%� � &�!¿� �

'"5"""""""""""""

'75"""""""""""77

'85"""""""""7777

'657777777777777

'#57777777777777

'957777777777777

� ���2 � � 2$!

79 $# � �861 +� �

ÀÁÂÃÄÅÆÇÈÁÉÊËÄÌÍÎÏÐÑÒ\ �4! ���� �� �� �85� �##���� � �

3 ��c � / �#$$% &'() *�+ �&, �-�(. / �) (0 �1 *23! �"$�4!5"6 �7" 8! �� �

85� �##�� � �

ÀÁÂÃÄÅÆÇÈÁÉÊËÄÌÍÎÏÐÑÒ\ �4! ���� �� �� �85� �##���� � �

7" $65

3 ��c � /

'# $"6 85� �9%�� � �85� �9%�� � �

7a $55 'a $65

"" $# � �751 +� �

ÀÁÂÃÄÅÆÇÈÁÉÊËÄÌÍÎÏÐÑÒ\ �4! ���� �� �� �85� �##���� � �

3 ��c � / 7' � �79 $61 +� �

85� �##�� � �

Ó ~�� ��y{Ù �|� �{ y�Ô y ~���Õ� �z�� �

Page 103: Structural Report and Calculations Series 200 Ground Mount

5'5"5758565#595%5a5'55''5'"5

'55""""""777\Z\Z\Z\Z

''5"""""7777\Z\Z\Z\Z

'"5"""""7777\Z\Z\Z\Z

'75"""""7777\Z\Z\Z\Z

'85""""7777\Z\Z\Z\Z\Z

'65""""7777\Z\Z\Z\Z\Z

'#5""""777\Z\Z\Z\Z\Z\Z

'95""""77\Z\Z\Z\Z\Z\Z\Z

JC ;<U D¾ B@¾ ;=BUNC ;<U D¾ B@¾ ;=BU

Ä ËÊ� �Ä ÌÊ"' $65� �

¿ ËÊ� �¿ ÌÊ'' $55� �

5'5"5758565#595%5a5'55''5'"5

'55""""""777\Z\Z\Z\ZJC ;<U D¾ B@¾ ;=BUNC ;<U D¾ B@¾ ;=BU

''5"""""7777\Z\Z\Z\Z

'"5"""""7777\Z\Z\Z\Z

'75""""77777\Z\Z\Z\ZÄ ËÊ� �Ä ÌÊ"# $55� �

'85""""7777\Z\Z\Z\Z\Z¿ ËÊ� �¿ ÌÊ'7 $55� �

'65""""7777\Z\Z\Z\Z\Z

'#57777777\Z\Z\Z\Z\Z\Z� �� 4�4� �4 �� �� ��� ����, � � ��� ���� +�� �� ��

'95777777\Z\Z\Z\Z\Z\Z\Z

� �� 4�4� �4 ���"� �� � &##� � � � �( �'%9 $'� � &�!¿� �

� �� 4�4� �4 ���7� �� � &##� � � � �( �"%5 $#� � &�!¿� �

5'5"5758565#595%5a5'55''5'"5� �� 4�4� �4 ���"� �� � &9%� � � � �( �'66 $a� � &�!¿� �

'55""""""7777\Z\Z\Z

''5""""""7777\Z\Z\Z� �� 4�4� �4 ���7� �� � &9%� � � � �( �"77 $%� � &�!¿� �

'"5"""""77777\Z\Z\Z

'75""""777777\Z\Z\Z

'85""""77777\Z\Z\Z\Z

'6577777777\Z\Z\Z\Z\Z

'#57777777\Z\Z\Z\Z\Z\Z

'95777777\Z\Z\Z\Z\Z\Z\Z

� ���2� � 2$!

'# � �"" $61 +� �

ÀÁÂÃÄÅÆÇÈÁÉÊËÄÌÍÎÏÐÑÒ\ �4! ���� �� �� �85� �9%���� � �

3 ��c � / �#$$% &'() *�+ �&, �-�(. / �) (0 �1 *23! �"$�4!5"6 �7" 8! �� �

85� �##�� � �

ÀÁÂÃÄÅÆÇÈÁÉÊËÄÌÍÎÏÐÑÒ\ �4! ���� �� �� �85� �9%���� � �

7" $65

3 ��c � /

'# $"6 85� �9%�� � �85� �9%�� � �

7a $55 'a $65

5 � �9 $61 +� �

ÀÁÂÃÄÅÆÇÈÁÉÊËÄÌÍÎÏÐÑÒ\ �4! ���� �� �� �85� �9%���� � �

3 ��c � / 9 $6 � �'61 +� �

85� �##�� � �

Ó ~�� ��y{Ù �|� �{ y�Ô y ~���Õ� �z�� �

Page 104: Structural Report and Calculations Series 200 Ground Mount

5'5"5758565#595%5a5'55''5'"5

'55"""""""777777

''5"""""""77777\Z

'"5""""""777777\Z

'75"""""777777\Z\Z

'857777777777\Z\Z\Z

'657777777777\Z\Z\Z

'#57777777\Z\Z\Z\Z\Z\Z

'95\Z\Z\Z\Z\Z\Z\Z\Z\Z\Z\Z\Z\Z

JC ;<U D¾ B@¾ ;=BUNC ;<U D¾ B@¾ ;=BU

Ä ËÊ� �Ä ÌÊ"' $65� �

¿ ËÊ� �¿ ÌÊ'' $55� �

5'5"5758565#595%5a5'55''5'"5

'55"""""""""7777JC ;<U D¾ B@¾ ;=BUNC ;<U D¾ B@¾ ;=BU

''5"""""""""7777

'"5"""""""777777

'75""""""7777777Ä ËÊ� �Ä ÌÊ"# $55� �

'85777777777777\Z¿ ËÊ� �¿ ÌÊ'7 $55� �

'657777777777\Z\Z\Z

'#577777777\Z\Z\Z\Z\Z� �� 4�4� �4 �� �� ��� ����, � � ��� ���� +�� �� ��

'95\Z\Z\Z\Z\Z\Z\Z\Z\Z\Z\Z\Z\Z

� �� 4�4� �4 ���"� �� � &##� � � � �( �'%9 $'� � &�!¿� �

� �� 4�4� �4 ���7� �� � &##� � � � �( �"%5 $#� � &�!¿� �

5'5"5758565#595%5a5'55''5'"5� �� 4�4� �4 ���"� �� � &9%� � � � �( �'66 $a� � &�!¿� �

'55"""""""""""""

''5""""""""""""7� �� 4�4� �4 ���7� �� � &9%� � � � �( �"77 $%� � &�!¿� �

'"5"""""""""7777

'75""""""""77777

'857777777777777

'657777777777777

'#57777777777\Z\Z\Z

'95\Z\Z\Z\Z\Z\Z\Z\Z\Z\Z\Z\Z\Z

� ���2! � 2$!

79 $# � �861 +� �

ÀÁÂÃÄÅÆÇÈÁÉÊËÄÌÍÎÏÐÑÒ\ �4! ���� �� �� �85� �9%���� � �

3 ��c � / �#$$% &'() *�+ �&, �-�(. / �) (0 �1 *23! �"$�4!5"6 �7" 8! �� �

85� �##�� � �

ÀÁÂÃÄÅÆÇÈÁÉÊËÄÌÍÎÏÐÑÒ\ �4! ���� �� �� �85� �9%���� � �

7" $65

3 ��c � /

'# $"6 85� �9%�� � �85� �9%�� � �

7a $55 'a $65

"" $# � �751 +� �

ÀÁÂÃÄÅÆÇÈÁÉÊËÄÌÍÎÏÐÑÒ\ �4! ���� �� �� �85� �9%���� � �

3 ��c � / 7' � �79 $61 +� �

85� �##�� � �

Ó ~�� ��y{Ù �|� �{ y�Ô y ~���Õ� �z�� �

Page 105: Structural Report and Calculations Series 200 Ground Mount

5'5"5758565#595%5a5'55''5'"5

'55"""""""""""""

''5"""""""""""""

'"5"""""""""""""

'75"""""""""""""

'85"""""""""""""

'65"""""""""""""

'#5""""""""""""7

'95"""""""""""77

JC ;<U D¾ B@¾ ;=BUNC ;<U D¾ B@¾ ;=BU

Ä ËÊ� �Ä ÌÊ"' $65� �

¿ ËÊ� �¿ ÌÊ'' $55� �

5'5"5758565#595%5a5'55''5'"5

'55"""""""""""""JC ;<U D¾ B@¾ ;=BUNC ;<U D¾ B@¾ ;=BU

''5"""""""""""""

'"5"""""""""""""

'75"""""""""""""Ä ËÊ� �Ä ÌÊ"# $55� �

'85"""""""""""""¿ ËÊ� �¿ ÌÊ'7 $55� �

'65""""""""""""7

'#5""""""""""""7� �� 4�4� �4 �� �� ��� ����, � � ��� ���� +�� �� ��

'95"""""""""""77

� �� 4�4� �4 ���"� �� � &##� � � � �( �'%9 $'� � &�!¿� �

� �� 4�4� �4 ���7� �� � &##� � � � �( �"%5 $#� � &�!¿� �

5'5"5758565#595%5a5'55''5'"5� �� 4�4� �4 ���"� �� � &9%� � � � �( �'66 $a� � &�!¿� �

'55"""""""""""""

''5"""""""""""""� �� 4�4� �4 ���7� �� � &9%� � � � �( �"77 $%� � &�!¿� �

'"5"""""""""""""

'75"""""""""""""

'85"""""""""""""

'65""""""""""""7

'#5"""""""""""77

'95"""""""""""77

� ���25# � 2$!

'# � �"" $61 +� �

ÀÁÂÃÄÅÆÇÈÁÉÊËÄÌÍÎÏÐÑÒ\ �4! ���� �� �� �85� �##���� � �

3 ��c � / �#$$% &'() *�+ �&, �-�(. / �) (0 �1 *23! �"$�4!5"6 �7" 8! �� �

85� �##�� � �

ÀÁÂÃÄÅÆÇÈÁÉÊËÄÌÍÎÏÐÑÒ\ �4! ���� �� �� �85� �##���� � �

7" $65

3 ��c � /

'# $"6 85� �9%�� � �85� �9%�� � �

7a $55 'a $65

5 � �9 $61 +� �

ÀÁÂÃÄÅÆÇÈÁÉÊËÄÌÍÎÏÐÑÒ\ �4! ���� �� �� �85� �##���� � �

3 ��c � / 9 $6 � �'61 +� �

85� �##�� � �

Ó ~�� ��y{Ù �|� �{ y��ð �����Õ� �z�� �

Page 106: Structural Report and Calculations Series 200 Ground Mount

5'5"5758565#595%5a5'55''5'"5

'55"""""""""""""

''5"""""""""""""

'"5"""""""""""""

'75"""""""""""""

'85"""""""""""""

'65""""""""""""7

'#5"""""""""""77

'95"""""""""""77

JC ;<U D¾ B@¾ ;=BUNC ;<U D¾ B@¾ ;=BU

Ä ËÊ� �Ä ÌÊ"' $65� �

¿ ËÊ� �¿ ÌÊ'' $55� �

5'5"5758565#595%5a5'55''5'"5

'55"""""""""""""JC ;<U D¾ B@¾ ;=BUNC ;<U D¾ B@¾ ;=BU

''5"""""""""""""

'"5"""""""""""""

'75"""""""""""""Ä ËÊ� �Ä ÌÊ"# $55� �

'85"""""""""""""¿ ËÊ� �¿ ÌÊ'7 $55� �

'65"""""""""""""

'#5""""""""""""7� �� 4�4� �4 �� �� ��� ����, � � ��� ���� +�� �� ��

'95"""""""""""77

� �� 4�4� �4 ���"� �� � &##� � � � �( �'%9 $'� � &�!¿� �

� �� 4�4� �4 ���7� �� � &##� � � � �( �"%5 $#� � &�!¿� �

5'5"5758565#595%5a5'55''5'"5� �� 4�4� �4 ���"� �� � &9%� � � � �( �'66 $a� � &�!¿� �

'55"""""""""""""

''5"""""""""""""� �� 4�4� �4 ���7� �� � &9%� � � � �( �"77 $%� � &�!¿� �

'"5"""""""""""""

'75"""""""""""""

'85"""""""""""""

'65"""""""""""""

'#5"""""""""""""

'95"""""""""""77

� ���255 � 2$!

79 $# � �861 +� �

ÀÁÂÃÄÅÆÇÈÁÉÊËÄÌÍÎÏÐÑÒ\ �4! ���� �� �� �85� �##���� � �

3 ��c � / �#$$% &'() *�+ �&, �-�(. / �) (0 �1 *23! �"$�4!5"6 �7" 8! �� �

85� �##�� � �

ÀÁÂÃÄÅÆÇÈÁÉÊËÄÌÍÎÏÐÑÒ\ �4! ���� �� �� �85� �##���� � �

7" $65

3 ��c � /

'# $"6 85� �9%�� � �85� �9%�� � �

7a $55 'a $65

"" $# � �751 +� �

ÀÁÂÃÄÅÆÇÈÁÉÊËÄÌÍÎÏÐÑÒ\ �4! ���� �� �� �85� �##���� � �

3 ��c � / 7' � �79 $61 +� �

85� �##�� � �

Ó ~�� ��y{Ù �|� �{ y��ð �����Õ� �z�� �

Page 107: Structural Report and Calculations Series 200 Ground Mount

5'5"5758565#595%5a5'55''5'"5

'55"""""""""""77

''5"""""""""""77

'"5"""""""""""77

'75"""""""""""77

'85""""""""""777

'65""""""""""777

'#5"""""""""7777

'95"""""""""7777

JC ;<U D¾ B@¾ ;=BUNC ;<U D¾ B@¾ ;=BU

Ä ËÊ� �Ä ÌÊ"' $65� �

¿ ËÊ� �¿ ÌÊ'' $55� �

5'5"5758565#595%5a5'55''5'"5

'55"""""""""""77JC ;<U D¾ B@¾ ;=BUNC ;<U D¾ B@¾ ;=BU

''5"""""""""""77

'"5"""""""""""77

'75"""""""""""77Ä ËÊ� �Ä ÌÊ"# $55� �

'85"""""""""""77¿ ËÊ� �¿ ÌÊ'7 $55� �

'65""""""""""777

'#5"""""""""7777� �� 4�4� �4 �� �� ��� ����, � � ��� ���� +�� �� ��

'95""""""""77777

� �� 4�4� �4 ���"� �� � &##� � � � �( �'%9 $'� � &�!¿� �

� �� 4�4� �4 ���7� �� � &##� � � � �( �"%5 $#� � &�!¿� �

5'5"5758565#595%5a5'55''5'"5� �� 4�4� �4 ���"� �� � &9%� � � � �( �'66 $a� � &�!¿� �

'55"""""""""""77

''5"""""""""""77� �� 4�4� �4 ���7� �� � &9%� � � � �( �"77 $%� � &�!¿� �

'"5"""""""""""77

'75"""""""""""77

'85"""""""""""77

'65""""""""""777

'#5"""""""""7777

'95""""""""77777

� ���25$ � 2$!

'# � �"" $61 +� �

ÀÁÂÃÄÅÆÇÈÁÉÊËÄÌÍÎÏÐÑÒ\ �4! ���� �� �� �85� �9%���� � �

3 ��c � / �#$$% &'() *�+ �&, �-�(. / �) (0 �1 *23! �"$�4!5"6 �7" 8! �� �

85� �##�� � �

ÀÁÂÃÄÅÆÇÈÁÉÊËÄÌÍÎÏÐÑÒ\ �4! ���� �� �� �85� �9%���� � �

7" $65

3 ��c � /

'# $"6 85� �9%�� � �85� �9%�� � �

7a $55 'a $65

5 � �9 $61 +� �

ÀÁÂÃÄÅÆÇÈÁÉÊËÄÌÍÎÏÐÑÒ\ �4! ���� �� �� �85� �9%���� � �

3 ��c � / 9 $6 � �'61 +� �

85� �##�� � �

Ó ~�� ��y{Ù �|� �{ y��ð �����Õ� �z�� �

Page 108: Structural Report and Calculations Series 200 Ground Mount

5'5"5758565#595%5a5'55''5'"5

'55"""""""""""""

''5""""""""""""7

'"5""""""""""""7

'75"""""""""""77

'85"""""""""""77

'65"""""""""""77

'#5""""""""""777

'95""""""""77777

JC ;<U D¾ B@¾ ;=BUNC ;<U D¾ B@¾ ;=BU

Ä ËÊ� �Ä ÌÊ"' $65� �

¿ ËÊ� �¿ ÌÊ'' $55� �

5'5"5758565#595%5a5'55''5'"5

'55"""""""""""""JC ;<U D¾ B@¾ ;=BUNC ;<U D¾ B@¾ ;=BU

''5"""""""""""""

'"5"""""""""""""

'75""""""""""""7Ä ËÊ� �Ä ÌÊ"# $55� �

'85"""""""""""77¿ ËÊ� �¿ ÌÊ'7 $55� �

'65"""""""""""77

'#5"""""""""""77� �� 4�4� �4 �� �� ��� ����, � � ��� ���� +�� �� ��

'95""""""""""777

� �� 4�4� �4 ���"� �� � &##� � � � �( �'%9 $'� � &�!¿� �

� �� 4�4� �4 ���7� �� � &##� � � � �( �"%5 $#� � &�!¿� �

5'5"5758565#595%5a5'55''5'"5� �� 4�4� �4 ���"� �� � &9%� � � � �( �'66 $a� � &�!¿� �

'55"""""""""""""

''5"""""""""""""� �� 4�4� �4 ���7� �� � &9%� � � � �( �"77 $%� � &�!¿� �

'"5"""""""""""""

'75"""""""""""""

'85""""""""""""7

'65"""""""""""77

'#5"""""""""""77

'95"""""""""""77

� ���257 � 2$!

79 $# � �861 +� �

ÀÁÂÃÄÅÆÇÈÁÉÊËÄÌÍÎÏÐÑÒ\ �4! ���� �� �� �85� �9%���� � �

3 ��c � / �#$$% &'() *�+ �&, �-�(. / �) (0 �1 *23! �"$�4!5"6 �7" 8! �� �

85� �##�� � �

ÀÁÂÃÄÅÆÇÈÁÉÊËÄÌÍÎÏÐÑÒ\ �4! ���� �� �� �85� �9%���� � �

7" $65

3 ��c � /

'# $"6 85� �9%�� � �85� �9%�� � �

7a $55 'a $65

"" $# � �751 +� �

ÀÁÂÃÄÅÆÇÈÁÉÊËÄÌÍÎÏÐÑÒ\ �4! ���� �� �� �85� �9%���� � �

3 ��c � / 7' � �79 $61 +� �

85� �##�� � �

Ó ~�� ��y{Ù �|� �{ y��ð �����Õ� �z�� �

Page 109: Structural Report and Calculations Series 200 Ground Mount

` �� �Ö ` �� �Ö

3 �� �× 3 �� �×

� �� �Ø � �� �Ø

٠TS �� � &�! ٠TS �� � &�!

1� +, � +4��� ��� � �� ����� �+3 ��� 4� �,2 � � �

Ú- ��3 � �/ �/� ��� �� �� ��2 � � �� �/- � Û 4� �� /

� ��� � �� ��� ��� ��3 � ���� � �� ���

� ���25� � 2$!

5 $"a

5 $79

9%9"a%'# �#$$% &'() *�+ �&, �-�(. / �) (0 �1 *23! �"$�4!5"6 �7" 8! �� �

3 �, / �� 85 �/3 �, / �� %5 �� � / �� +�� � � � � �� ��� ��

3 �,85�� � 3 �,%5�� �

5 $96

' $55

5 $7'

5 $7a�| ��Ù �|�� ��Ø|{| Ø��| yz�

Page 110: Structural Report and Calculations Series 200 Ground Mount

\ �� �� '(

- ���� �+� � ��� �� ���

� ���25 � � 2$!

�#$$% &'() *�+ �&, �-�(. / �) (0 �1 *23! �"$�4!5"6 �7" 8! �� �96%%6

%''7"' $55 $77% $'67a8'%##95

9aa%' $55 $779 $'6756'

687'7

#%#6' $55 $77# $'6""98#65a%

697"' $55 $776 $'6'#'"

"976

86aa' $55 $778 $'#'5#8876"a

�13-

78##' $55 $777 $'##"a7

Ô yy�| z}x �� Ø ~� ��| yz�{ y�x ���Ü z�� �Ø��| ���- ���� �+/ �� +� ���4 �'655 ��� ����! �� �+�� ���� � Ý'65 ���� � � �! �� �+

�� ���� �/ �� �� �� ��� ��� � � ��"65 ��� $

- ���� �+� � ��� �� ���

/3'!,

Page 111: Structural Report and Calculations Series 200 Ground Mount

'"�.�/ Z � / 2 4

'%�.�/ Z � / 2 4 7� � 8� � 6� � #� � 9� �

"8�.�/ Z � / 2 4\ �� �� '(

� ���25" � 2$!

- ���� �+/ �� +� ���4 �'655 ��� ����! �� �+�� ���� � Ý'65 ���� � � �! �� �+

�� ���� �/ �� �� �� ��� ��� � � ��"65 ��� $�#$$% &'() *�+ �&, �-�(. / �) (0 �1 *23! �"$�4!5"6 �7" 8! �� �"8

"""5

"a"#"7

'9'6'7

"5'%'9

1 ��,1 ��,�� �(1 ��,�� �(1 ��,�� �(

'"'"'"

Ô yy�| z}Þ ��| yz{ y�� ��� �ß ���Ô y ~z� ��| yz� ��� ��� ���, ��� ���� �� �Z � / 2 4- ���� �+�

'"/� $�� �'"� ¸�/ Z � / 2 4�'%� ¸�/ Z � / 2 4�"8� ¸�/ Z � / 2 4�

Page 112: Structural Report and Calculations Series 200 Ground Mount

Steel Column ENERCALC, INC. 1983-2017, Build:6.17.3.29, Ver:6.17.3.29Licensee : norman scheel seLic. # : KW-06002320

File = G:\Jobfiles\12065\10-24-17 Code Update\12065.ec6

Description : Brace A

Norman Scheel Structural Engineer5022 Sunrise Blvd.Fair Oaks, CA 95628(916) 536-9585Title Block" selection.

Project Title: 200 Series Ground MountEngineer: Project ID: 12065

Printed: 24 OCT 2017, 10:21AM

Project Descr:

.Code ReferencesCalculations per AISC 360-10, IBC 2015, CBC 2016, ASCE 7-10Load Combinations Used : ASCE 7-10General Information

Steel Stress GradeTop & Bottom PinnedAnalysis Method :

A-36, Carbon Steel, Fy = 36 ksi

8.150Overall Column Height

ft

Top & Bottom FixityAllowable Strength

Fy : Steel Yieldksi29,000.0ksi

Steel Section Name : HSS 1.900X0.145

36.0

ft

E : Elastic Bending ModulusY-Y (depth) axis :

X-X (width) axis :Unbraced Length for X-X Axis buckling = 8.5 ft, K = 1.0

Unbraced Length for Y-Y Axis buckling = 8.5 ft, K = 1.0

Brace condition for deflection (buckling) along columns :

.Applied Loads Service loads entered. Load Factors will be applied for calculations.

Column self weight included : 22.171 lbs * Dead Load FactorAXIAL LOADS . . . Axial Load at 8.150 ft, D = 4.20 k

.DESIGN SUMMARY

PASS Max. Axial+Bending Stress Ratio = 0.9957

Location of max.above base 0.0 ft

4.222 k4.240 k

0.0 k-ft

Load Combination D Only

Load Combination

0.7563 k-ft

Bending & Shear Check Results

PASS Maximum Shear Stress Ratio =

0.0 k

0.0 : 1

Location of max.above base 0.0 ftAt maximum location values are . . .

: 1

At maximum location values are . . .

k

0.7563 k-ft0.0 k-ft

Pa : AxialPn / Omega : AllowableMa-x : AppliedMn-x / Omega : AllowableMa-y : AppliedMn-y / Omega : Allowable

Va : AppliedVn / Omega : Allowable

Maximum SERVICE Load Reactions . .

(see tab for all)

Top along X-X 0.0 kBottom along X-X 0.0 kTop along Y-Y 0.0 kBottom along Y-Y 0.0 k

Maximum SERVICE Load Deflections . . .Along Y-Y 0.0 in at 0.0 ft above base

for load combination :

Along X-X 0.0 in at 0.0 ft above basefor load combination :

0.0.

Maximum Axial + Bending Stress Ratios Maximum Shear RatiosLoad Combination Stress Ratio Location Stress Ratio Status LocationStatus

Load Combination Results

D Only PASS PASS 0.00 0.000 0.00 ftft 0.996+0.60D PASS PASS 0.00 0.000 0.00 ftft 0.597

.k k-ft

Note: Only non-zero reactions are listed.

Load CombinationX-X Axis Reaction Y-Y Axis ReactionAxial Reaction

@ Base @ Top @ Base @ Base @ Top

Maximum Reactions

@ Base @ Base @ Top @ TopMx - End Moments My - End Moments

D Only 4.222+0.60D 2.533

k k-ftItem

X-X Axis Reaction Y-Y Axis ReactionAxial Reaction @ Base @ Top @ Base @ Base @ Top

Extreme Reactions

Extreme Value @ Base @ Base @ Top @ TopMx - End Moments My - End Moments

MaximumAxial @ Base 4.222Minimum " 2.533MaximumReaction, X-X Axis 4.222Minimum " 4.222MaximumReaction, Y-Y Axis 4.222Minimum " 4.222MaximumReaction, X-X Axis 4.222

Page 113: Structural Report and Calculations Series 200 Ground Mount

Steel Column ENERCALC, INC. 1983-2017, Build:6.17.3.29, Ver:6.17.3.29Licensee : norman scheel seLic. # : KW-06002320

File = G:\Jobfiles\12065\10-24-17 Code Update\12065.ec6

Description : Brace A

Norman Scheel Structural Engineer5022 Sunrise Blvd.Fair Oaks, CA 95628(916) 536-9585Title Block" selection.

Project Title: 200 Series Ground MountEngineer: Project ID: 12065

Printed: 24 OCT 2017, 10:21AM

Project Descr:

k k-ftItem

X-X Axis Reaction Y-Y Axis ReactionAxial Reaction @ Base @ Top @ Base @ Base @ Top

Extreme Reactions

Extreme Value @ Base @ Base @ Top @ TopMx - End Moments My - End Moments

Minimum " 4.222MaximumReaction, Y-Y Axis 4.222Minimum " 4.222MaximumMoment, X-X Axis Ba 4.222Minimum " 4.222MaximumMoment, Y-Y Axis Ba 4.222Minimum " 4.222MaximumMoment, X-X Axis To 4.222Minimum " 4.222MaximumMoment, Y-Y Axis To 4.222Minimum " 4.222

.Maximum Deflections for Load CombinationsMax. X-X Deflection Max. Y-Y Deflection DistanceLoad Combination Distance

D Only 0.0000 0.000 0.000 ftft inin 0.000+0.60D 0.0000 0.000 0.000 ftft inin 0.000

.Steel Section Properties : HSS 1.900X0.145

R xx =

0.626

in

Depth = 1.900 in

R yy =

0.626

in

J = 0.586 in^4

Diameter = 1.900 inWall Thick

= 0.145 in Zx = 0.421 in^3

Area=

0.749 in^2Weight = 2.720 plf

I xx = 0.29 in^4S xx = 0.31 in^3Design Thick = 0.135 in

I yy = 0.293 in^4 C = 0.617 in^3S yy = 0.309 in^3

Ycg = 0.000 in

1.90in

Y

XLoad 1

Hei

ght =

8.1

50 ft

4.20k

Loads are total entered value. Arrows do not reflect absolute direction.

Page 114: Structural Report and Calculations Series 200 Ground Mount

Steel Column ENERCALC, INC. 1983-2017, Build:6.17.3.29, Ver:6.17.3.29Licensee : norman scheel seLic. # : KW-06002320

File = G:\Jobfiles\12065\10-24-17 Code Update\12065.ec6

Description : Brace C

Norman Scheel Structural Engineer5022 Sunrise Blvd.Fair Oaks, CA 95628(916) 536-9585Title Block" selection.

Project Title: 200 Series Ground MountEngineer: Project ID: 12065

Printed: 24 OCT 2017, 10:21AM

Project Descr:

.Code ReferencesCalculations per AISC 360-10, IBC 2015, CBC 2016, ASCE 7-10Load Combinations Used : ASCE 7-10General Information

Steel Stress GradeTop & Bottom PinnedAnalysis Method :

A-36, Carbon Steel, Fy = 36 ksi

11.310Overall Column Height

ft

Top & Bottom FixityAllowable Strength

Fy : Steel Yieldksi29,000.0ksi

Steel Section Name : HSS 1.900X0.145

36.0

ft

E : Elastic Bending ModulusY-Y (depth) axis :

X-X (width) axis :Unbraced Length for X-X Axis buckling = 8.5 ft, K = 1.0

Unbraced Length for Y-Y Axis buckling = 8.5 ft, K = 1.0

Brace condition for deflection (buckling) along columns :

.Applied Loads Service loads entered. Load Factors will be applied for calculations.

Column self weight included : 30.767 lbs * Dead Load FactorAXIAL LOADS . . . Axial Load at 11.310 ft, D = 4.20 k

.DESIGN SUMMARY

PASS Max. Axial+Bending Stress Ratio = 0.9977

Location of max.above base 0.0 ft

4.231 k4.240 k

0.0 k-ft

Load Combination D Only

Load Combination

0.7563 k-ft

Bending & Shear Check Results

PASS Maximum Shear Stress Ratio =

0.0 k

0.0 : 1

Location of max.above base 0.0 ftAt maximum location values are . . .

: 1

At maximum location values are . . .

k

0.7563 k-ft0.0 k-ft

Pa : AxialPn / Omega : AllowableMa-x : AppliedMn-x / Omega : AllowableMa-y : AppliedMn-y / Omega : Allowable

Va : AppliedVn / Omega : Allowable

Maximum SERVICE Load Reactions . .

(see tab for all)

Top along X-X 0.0 kBottom along X-X 0.0 kTop along Y-Y 0.0 kBottom along Y-Y 0.0 k

Maximum SERVICE Load Deflections . . .Along Y-Y 0.0 in at 0.0 ft above base

for load combination :

Along X-X 0.0 in at 0.0 ft above basefor load combination :

0.0.

Maximum Axial + Bending Stress Ratios Maximum Shear RatiosLoad Combination Stress Ratio Location Stress Ratio Status LocationStatus

Load Combination Results

D Only PASS PASS 0.00 0.000 0.00 ftft 0.998+0.60D PASS PASS 0.00 0.000 0.00 ftft 0.599

.k k-ft

Note: Only non-zero reactions are listed.

Load CombinationX-X Axis Reaction Y-Y Axis ReactionAxial Reaction

@ Base @ Top @ Base @ Base @ Top

Maximum Reactions

@ Base @ Base @ Top @ TopMx - End Moments My - End Moments

D Only 4.231+0.60D 2.538

k k-ftItem

X-X Axis Reaction Y-Y Axis ReactionAxial Reaction @ Base @ Top @ Base @ Base @ Top

Extreme Reactions

Extreme Value @ Base @ Base @ Top @ TopMx - End Moments My - End Moments

MaximumAxial @ Base 4.231Minimum " 2.538MaximumReaction, X-X Axis 4.231Minimum " 4.231MaximumReaction, Y-Y Axis 4.231Minimum " 4.231MaximumReaction, X-X Axis 4.231

Page 115: Structural Report and Calculations Series 200 Ground Mount

Steel Column ENERCALC, INC. 1983-2017, Build:6.17.3.29, Ver:6.17.3.29Licensee : norman scheel seLic. # : KW-06002320

File = G:\Jobfiles\12065\10-24-17 Code Update\12065.ec6

Description : Brace C

Norman Scheel Structural Engineer5022 Sunrise Blvd.Fair Oaks, CA 95628(916) 536-9585Title Block" selection.

Project Title: 200 Series Ground MountEngineer: Project ID: 12065

Printed: 24 OCT 2017, 10:21AM

Project Descr:

k k-ftItem

X-X Axis Reaction Y-Y Axis ReactionAxial Reaction @ Base @ Top @ Base @ Base @ Top

Extreme Reactions

Extreme Value @ Base @ Base @ Top @ TopMx - End Moments My - End Moments

Minimum " 4.231MaximumReaction, Y-Y Axis 4.231Minimum " 4.231MaximumMoment, X-X Axis Ba 4.231Minimum " 4.231MaximumMoment, Y-Y Axis Ba 4.231Minimum " 4.231MaximumMoment, X-X Axis To 4.231Minimum " 4.231MaximumMoment, Y-Y Axis To 4.231Minimum " 4.231

.Maximum Deflections for Load CombinationsMax. X-X Deflection Max. Y-Y Deflection DistanceLoad Combination Distance

D Only 0.0000 0.000 0.000 ftft inin 0.000+0.60D 0.0000 0.000 0.000 ftft inin 0.000

.Steel Section Properties : HSS 1.900X0.145

R xx =

0.626

in

Depth = 1.900 in

R yy =

0.626

in

J = 0.586 in^4

Diameter = 1.900 inWall Thick

= 0.145 in Zx = 0.421 in^3

Area=

0.749 in^2Weight = 2.720 plf

I xx = 0.29 in^4S xx = 0.31 in^3Design Thick = 0.135 in

I yy = 0.293 in^4 C = 0.617 in^3S yy = 0.309 in^3

Ycg = 0.000 in

1.90in

Y

XLoad 1

Hei

ght =

11.

310

ft

4.20k

Loads are total entered value. Arrows do not reflect absolute direction.

Page 116: Structural Report and Calculations Series 200 Ground Mount

Steel Column ENERCALC, INC. 1983-2017, Build:6.17.3.29, Ver:6.17.3.29Licensee : norman scheel seLic. # : KW-06002320

File = G:\Jobfiles\12065\10-24-17 Code Update\12065.ec6

Description : Brace D

Norman Scheel Structural Engineer5022 Sunrise Blvd.Fair Oaks, CA 95628(916) 536-9585Title Block" selection.

Project Title: 200 Series Ground MountEngineer: Project ID: 12065

Printed: 24 OCT 2017, 10:21AM

Project Descr:

.Code ReferencesCalculations per AISC 360-10, IBC 2015, CBC 2016, ASCE 7-10Load Combinations Used : ASCE 7-10General Information

Steel Stress GradeTop & Bottom PinnedAnalysis Method :

A-36, Carbon Steel, Fy = 36 ksi

8.060Overall Column Height

ft

Top & Bottom FixityAllowable Strength

Fy : Steel Yieldksi29,000.0ksi

Steel Section Name : HSS 1.900X0.145

36.0

ft

E : Elastic Bending ModulusY-Y (depth) axis :

X-X (width) axis :Unbraced Length for X-X Axis buckling = 8.5 ft, K = 1.0

Unbraced Length for Y-Y Axis buckling = 8.5 ft, K = 1.0

Brace condition for deflection (buckling) along columns :

.Applied Loads Service loads entered. Load Factors will be applied for calculations.

Column self weight included : 21.926 lbs * Dead Load FactorAXIAL LOADS . . . Axial Load at 8.060 ft, D = 4.20 k

.DESIGN SUMMARY

PASS Max. Axial+Bending Stress Ratio = 0.9956

Location of max.above base 0.0 ft

4.222 k4.240 k

0.0 k-ft

Load Combination D Only

Load Combination

0.7563 k-ft

Bending & Shear Check Results

PASS Maximum Shear Stress Ratio =

0.0 k

0.0 : 1

Location of max.above base 0.0 ftAt maximum location values are . . .

: 1

At maximum location values are . . .

k

0.7563 k-ft0.0 k-ft

Pa : AxialPn / Omega : AllowableMa-x : AppliedMn-x / Omega : AllowableMa-y : AppliedMn-y / Omega : Allowable

Va : AppliedVn / Omega : Allowable

Maximum SERVICE Load Reactions . .

(see tab for all)

Top along X-X 0.0 kBottom along X-X 0.0 kTop along Y-Y 0.0 kBottom along Y-Y 0.0 k

Maximum SERVICE Load Deflections . . .Along Y-Y 0.0 in at 0.0 ft above base

for load combination :

Along X-X 0.0 in at 0.0 ft above basefor load combination :

0.0.

Maximum Axial + Bending Stress Ratios Maximum Shear RatiosLoad Combination Stress Ratio Location Stress Ratio Status LocationStatus

Load Combination Results

D Only PASS PASS 0.00 0.000 0.00 ftft 0.996+0.60D PASS PASS 0.00 0.000 0.00 ftft 0.597

.k k-ft

Note: Only non-zero reactions are listed.

Load CombinationX-X Axis Reaction Y-Y Axis ReactionAxial Reaction

@ Base @ Top @ Base @ Base @ Top

Maximum Reactions

@ Base @ Base @ Top @ TopMx - End Moments My - End Moments

D Only 4.222+0.60D 2.533

k k-ftItem

X-X Axis Reaction Y-Y Axis ReactionAxial Reaction @ Base @ Top @ Base @ Base @ Top

Extreme Reactions

Extreme Value @ Base @ Base @ Top @ TopMx - End Moments My - End Moments

MaximumAxial @ Base 4.222Minimum " 2.533MaximumReaction, X-X Axis 4.222Minimum " 4.222MaximumReaction, Y-Y Axis 4.222Minimum " 4.222MaximumReaction, X-X Axis 4.222

Page 117: Structural Report and Calculations Series 200 Ground Mount

Steel Column ENERCALC, INC. 1983-2017, Build:6.17.3.29, Ver:6.17.3.29Licensee : norman scheel seLic. # : KW-06002320

File = G:\Jobfiles\12065\10-24-17 Code Update\12065.ec6

Description : Brace D

Norman Scheel Structural Engineer5022 Sunrise Blvd.Fair Oaks, CA 95628(916) 536-9585Title Block" selection.

Project Title: 200 Series Ground MountEngineer: Project ID: 12065

Printed: 24 OCT 2017, 10:21AM

Project Descr:

k k-ftItem

X-X Axis Reaction Y-Y Axis ReactionAxial Reaction @ Base @ Top @ Base @ Base @ Top

Extreme Reactions

Extreme Value @ Base @ Base @ Top @ TopMx - End Moments My - End Moments

Minimum " 4.222MaximumReaction, Y-Y Axis 4.222Minimum " 4.222MaximumMoment, X-X Axis Ba 4.222Minimum " 4.222MaximumMoment, Y-Y Axis Ba 4.222Minimum " 4.222MaximumMoment, X-X Axis To 4.222Minimum " 4.222MaximumMoment, Y-Y Axis To 4.222Minimum " 4.222

.Maximum Deflections for Load CombinationsMax. X-X Deflection Max. Y-Y Deflection DistanceLoad Combination Distance

D Only 0.0000 0.000 0.000 ftft inin 0.000+0.60D 0.0000 0.000 0.000 ftft inin 0.000

.Steel Section Properties : HSS 1.900X0.145

R xx =

0.626

in

Depth = 1.900 in

R yy =

0.626

in

J = 0.586 in^4

Diameter = 1.900 inWall Thick

= 0.145 in Zx = 0.421 in^3

Area=

0.749 in^2Weight = 2.720 plf

I xx = 0.29 in^4S xx = 0.31 in^3Design Thick = 0.135 in

I yy = 0.293 in^4 C = 0.617 in^3S yy = 0.309 in^3

Ycg = 0.000 in

1.90in

Y

XLoad 1

Hei

ght =

8.0

60 ft

4.20k

Loads are total entered value. Arrows do not reflect absolute direction.

Page 118: Structural Report and Calculations Series 200 Ground Mount

Steel Column ENERCALC, INC. 1983-2017, Build:6.17.3.29, Ver:6.17.3.29Licensee : norman scheel seLic. # : KW-06002320

File = G:\Jobfiles\12065\10-24-17 Code Update\12065.ec6

Description : Brace E

Norman Scheel Structural Engineer5022 Sunrise Blvd.Fair Oaks, CA 95628(916) 536-9585Title Block" selection.

Project Title: 200 Series Ground MountEngineer: Project ID: 12065

Printed: 24 OCT 2017, 10:21AM

Project Descr:

.Code ReferencesCalculations per AISC 360-10, IBC 2015, CBC 2016, ASCE 7-10Load Combinations Used : ASCE 7-10General Information

Steel Stress GradeTop & Bottom PinnedAnalysis Method :

A-36, Carbon Steel, Fy = 36 ksi

9.360Overall Column Height

ft

Top & Bottom FixityAllowable Strength

Fy : Steel Yieldksi29,000.0ksi

Steel Section Name : HSS 1.900X0.145

36.0

ft

E : Elastic Bending ModulusY-Y (depth) axis :

X-X (width) axis :Unbraced Length for X-X Axis buckling = 8.5 ft, K = 1.0

Unbraced Length for Y-Y Axis buckling = 8.5 ft, K = 1.0

Brace condition for deflection (buckling) along columns :

.Applied Loads Service loads entered. Load Factors will be applied for calculations.

Column self weight included : 25.463 lbs * Dead Load FactorAXIAL LOADS . . . Axial Load at 9.360 ft, D = 4.20 k

.DESIGN SUMMARY

PASS Max. Axial+Bending Stress Ratio = 0.9965

Location of max.above base 0.0 ft

4.225 k4.240 k

0.0 k-ft

Load Combination D Only

Load Combination

0.7563 k-ft

Bending & Shear Check Results

PASS Maximum Shear Stress Ratio =

0.0 k

0.0 : 1

Location of max.above base 0.0 ftAt maximum location values are . . .

: 1

At maximum location values are . . .

k

0.7563 k-ft0.0 k-ft

Pa : AxialPn / Omega : AllowableMa-x : AppliedMn-x / Omega : AllowableMa-y : AppliedMn-y / Omega : Allowable

Va : AppliedVn / Omega : Allowable

Maximum SERVICE Load Reactions . .

(see tab for all)

Top along X-X 0.0 kBottom along X-X 0.0 kTop along Y-Y 0.0 kBottom along Y-Y 0.0 k

Maximum SERVICE Load Deflections . . .Along Y-Y 0.0 in at 0.0 ft above base

for load combination :

Along X-X 0.0 in at 0.0 ft above basefor load combination :

0.0.

Maximum Axial + Bending Stress Ratios Maximum Shear RatiosLoad Combination Stress Ratio Location Stress Ratio Status LocationStatus

Load Combination Results

D Only PASS PASS 0.00 0.000 0.00 ftft 0.996+0.60D PASS PASS 0.00 0.000 0.00 ftft 0.598

.k k-ft

Note: Only non-zero reactions are listed.

Load CombinationX-X Axis Reaction Y-Y Axis ReactionAxial Reaction

@ Base @ Top @ Base @ Base @ Top

Maximum Reactions

@ Base @ Base @ Top @ TopMx - End Moments My - End Moments

D Only 4.225+0.60D 2.535

k k-ftItem

X-X Axis Reaction Y-Y Axis ReactionAxial Reaction @ Base @ Top @ Base @ Base @ Top

Extreme Reactions

Extreme Value @ Base @ Base @ Top @ TopMx - End Moments My - End Moments

MaximumAxial @ Base 4.225Minimum " 2.535MaximumReaction, X-X Axis 4.225Minimum " 4.225MaximumReaction, Y-Y Axis 4.225Minimum " 4.225MaximumReaction, X-X Axis 4.225

Page 119: Structural Report and Calculations Series 200 Ground Mount

Steel Column ENERCALC, INC. 1983-2017, Build:6.17.3.29, Ver:6.17.3.29Licensee : norman scheel seLic. # : KW-06002320

File = G:\Jobfiles\12065\10-24-17 Code Update\12065.ec6

Description : Brace E

Norman Scheel Structural Engineer5022 Sunrise Blvd.Fair Oaks, CA 95628(916) 536-9585Title Block" selection.

Project Title: 200 Series Ground MountEngineer: Project ID: 12065

Printed: 24 OCT 2017, 10:21AM

Project Descr:

k k-ftItem

X-X Axis Reaction Y-Y Axis ReactionAxial Reaction @ Base @ Top @ Base @ Base @ Top

Extreme Reactions

Extreme Value @ Base @ Base @ Top @ TopMx - End Moments My - End Moments

Minimum " 4.225MaximumReaction, Y-Y Axis 4.225Minimum " 4.225MaximumMoment, X-X Axis Ba 4.225Minimum " 4.225MaximumMoment, Y-Y Axis Ba 4.225Minimum " 4.225MaximumMoment, X-X Axis To 4.225Minimum " 4.225MaximumMoment, Y-Y Axis To 4.225Minimum " 4.225

.Maximum Deflections for Load CombinationsMax. X-X Deflection Max. Y-Y Deflection DistanceLoad Combination Distance

D Only 0.0000 0.000 0.000 ftft inin 0.000+0.60D 0.0000 0.000 0.000 ftft inin 0.000

.Steel Section Properties : HSS 1.900X0.145

R xx =

0.626

in

Depth = 1.900 in

R yy =

0.626

in

J = 0.586 in^4

Diameter = 1.900 inWall Thick

= 0.145 in Zx = 0.421 in^3

Area=

0.749 in^2Weight = 2.720 plf

I xx = 0.29 in^4S xx = 0.31 in^3Design Thick = 0.135 in

I yy = 0.293 in^4 C = 0.617 in^3S yy = 0.309 in^3

Ycg = 0.000 in

1.90in

Y

XLoad 1

Hei

ght =

9.3

60 ft

4.20k

Loads are total entered value. Arrows do not reflect absolute direction.

Page 120: Structural Report and Calculations Series 200 Ground Mount

Steel Column ENERCALC, INC. 1983-2017, Build:6.17.3.29, Ver:6.17.3.29Licensee : norman scheel seLic. # : KW-06002320

File = G:\Jobfiles\12065\10-24-17 Code Update\12065.ec6

Description : Brace F

Norman Scheel Structural Engineer5022 Sunrise Blvd.Fair Oaks, CA 95628(916) 536-9585Title Block" selection.

Project Title: 200 Series Ground MountEngineer: Project ID: 12065

Printed: 24 OCT 2017, 10:22AM

Project Descr:

.Code ReferencesCalculations per AISC 360-10, IBC 2015, CBC 2016, ASCE 7-10Load Combinations Used : ASCE 7-10General Information

Steel Stress GradeTop & Bottom PinnedAnalysis Method :

A-36, Carbon Steel, Fy = 36 ksi

5.060Overall Column Height

ft

Top & Bottom FixityAllowable Strength

Fy : Steel Yieldksi29,000.0ksi

Steel Section Name : HSS 1.900X0.145

36.0

ft

E : Elastic Bending ModulusY-Y (depth) axis :

X-X (width) axis :Unbraced Length for X-X Axis buckling = 8.5 ft, K = 1.0

Unbraced Length for Y-Y Axis buckling = 8.5 ft, K = 1.0

Brace condition for deflection (buckling) along columns :

.Applied Loads Service loads entered. Load Factors will be applied for calculations.

Column self weight included : 13.765 lbs * Dead Load FactorAXIAL LOADS . . . Axial Load at 5.060 ft, D = 4.20 k

.DESIGN SUMMARY

PASS Max. Axial+Bending Stress Ratio = 0.9937

Location of max.above base 0.0 ft

4.214 k4.240 k

0.0 k-ft

Load Combination D Only

Load Combination

0.7563 k-ft

Bending & Shear Check Results

PASS Maximum Shear Stress Ratio =

0.0 k

0.0 : 1

Location of max.above base 0.0 ftAt maximum location values are . . .

: 1

At maximum location values are . . .

k

0.7563 k-ft0.0 k-ft

Pa : AxialPn / Omega : AllowableMa-x : AppliedMn-x / Omega : AllowableMa-y : AppliedMn-y / Omega : Allowable

Va : AppliedVn / Omega : Allowable

Maximum SERVICE Load Reactions . .

(see tab for all)

Top along X-X 0.0 kBottom along X-X 0.0 kTop along Y-Y 0.0 kBottom along Y-Y 0.0 k

Maximum SERVICE Load Deflections . . .Along Y-Y 0.0 in at 0.0 ft above base

for load combination :

Along X-X 0.0 in at 0.0 ft above basefor load combination :

0.0.

Maximum Axial + Bending Stress Ratios Maximum Shear RatiosLoad Combination Stress Ratio Location Stress Ratio Status LocationStatus

Load Combination Results

D Only PASS PASS 0.00 0.000 0.00 ftft 0.994+0.60D PASS PASS 0.00 0.000 0.00 ftft 0.596

.k k-ft

Note: Only non-zero reactions are listed.

Load CombinationX-X Axis Reaction Y-Y Axis ReactionAxial Reaction

@ Base @ Top @ Base @ Base @ Top

Maximum Reactions

@ Base @ Base @ Top @ TopMx - End Moments My - End Moments

D Only 4.214+0.60D 2.528

k k-ftItem

X-X Axis Reaction Y-Y Axis ReactionAxial Reaction @ Base @ Top @ Base @ Base @ Top

Extreme Reactions

Extreme Value @ Base @ Base @ Top @ TopMx - End Moments My - End Moments

MaximumAxial @ Base 4.214Minimum " 2.528MaximumReaction, X-X Axis 4.214Minimum " 4.214MaximumReaction, Y-Y Axis 4.214Minimum " 4.214MaximumReaction, X-X Axis 4.214

Page 121: Structural Report and Calculations Series 200 Ground Mount

Steel Column ENERCALC, INC. 1983-2017, Build:6.17.3.29, Ver:6.17.3.29Licensee : norman scheel seLic. # : KW-06002320

File = G:\Jobfiles\12065\10-24-17 Code Update\12065.ec6

Description : Brace F

Norman Scheel Structural Engineer5022 Sunrise Blvd.Fair Oaks, CA 95628(916) 536-9585Title Block" selection.

Project Title: 200 Series Ground MountEngineer: Project ID: 12065

Printed: 24 OCT 2017, 10:22AM

Project Descr:

k k-ftItem

X-X Axis Reaction Y-Y Axis ReactionAxial Reaction @ Base @ Top @ Base @ Base @ Top

Extreme Reactions

Extreme Value @ Base @ Base @ Top @ TopMx - End Moments My - End Moments

Minimum " 4.214MaximumReaction, Y-Y Axis 4.214Minimum " 4.214MaximumMoment, X-X Axis Ba 4.214Minimum " 4.214MaximumMoment, Y-Y Axis Ba 4.214Minimum " 4.214MaximumMoment, X-X Axis To 4.214Minimum " 4.214MaximumMoment, Y-Y Axis To 4.214Minimum " 4.214

.Maximum Deflections for Load CombinationsMax. X-X Deflection Max. Y-Y Deflection DistanceLoad Combination Distance

D Only 0.0000 0.000 0.000 ftft inin 0.000+0.60D 0.0000 0.000 0.000 ftft inin 0.000

.Steel Section Properties : HSS 1.900X0.145

R xx =

0.626

in

Depth = 1.900 in

R yy =

0.626

in

J = 0.586 in^4

Diameter = 1.900 inWall Thick

= 0.145 in Zx = 0.421 in^3

Area=

0.749 in^2Weight = 2.720 plf

I xx = 0.29 in^4S xx = 0.31 in^3Design Thick = 0.135 in

I yy = 0.293 in^4 C = 0.617 in^3S yy = 0.309 in^3

Ycg = 0.000 in

1.90in

Y

XLoad 1

Hei

ght =

5.0

60 ft

4.20k

Loads are total entered value. Arrows do not reflect absolute direction.

Page 122: Structural Report and Calculations Series 200 Ground Mount

2-D Frame ENERCALC, INC. 1983-2017, Build:6.17.3.29, Ver:6.17.3.29Licensee : norman scheel seLic. # : KW-06002320

File = G:\Jobfiles\12065\10-24-17 Code Update\12065.ec6

Description : Frame

Norman Scheel Structural Engineer5022 Sunrise Blvd.Fair Oaks, CA 95628(916) 536-9585Title Block" selection.

Project Title: 200 Series Ground MountEngineer: Project ID: 12065

Printed: 24 OCT 2017, 10:23AM

Project Descr:

X

X

A/Pipe1-1/2 Std

X

X

B/Pipe1-1/2 Std

X

X

C/Pipe1-1/2 Std

X

X

D/Pipe1-1/2 StdX: W(1.1)

Y: W(1.9)

1

2

3

4

Joints...Joint CoordinatesJoint Joint

X Yft ft deg F

Label X Translational Restraint Y Translational Restraint Z Rotational Restraint Temp

1 0.0 0.0 Fixed Fixed 02 0.0 3.060 03 7.310 5.850 04 7.310 0.0 Fixed Fixed 0

.Members...

(rotation)

MemberProperty LabelLabel LengthEndpoint Joints

(rotation)

Releases Specify Connectivity of Member Ends to JointsI Joint J Joint x y zyx zft

J EndMember

I End

A Pipe1-1/2 Std 2 4 7.925 Fixed Fixed Fixed Fixed Fixed FixedB Pipe1-1/2 Std 1 2 3.060 Fixed Fixed Fixed Fixed Fixed FixedC Pipe1-1/2 Std 2 3 7.824 Fixed Fixed Fixed Fixed Fixed FixedD Pipe1-1/2 Std 3 4 5.850 Fixed Fixed Fixed Fixed Fixed Fixed

.Member Stress Check Data...Member Unbraced Lengths Slenderness Factors AISC Bending & Stability Factors

Label Lu : z Lu : y K : z K : y Cm CbftA 7.925 7.925 1.00 1.00 1.000 1.000B 3.060 3.060 1.00 1.00 1.000 1.000C 7.824 7.824 1.00 1.00 1.000 1.000D 5.850 5.850 1.00 1.00 1.000 1.000

.Materials...Member Youngs Density Thermal Yield

Label in/degrksi kcf ksiDefault 1.00 0.000 0.000000 1.00Steel 29,000.00 0.490 0.000650 50.00Tube 29,000.00 0.490 0.000650 42.00

.

Page 123: Structural Report and Calculations Series 200 Ground Mount

2-D Frame ENERCALC, INC. 1983-2017, Build:6.17.3.29, Ver:6.17.3.29Licensee : norman scheel seLic. # : KW-06002320

File = G:\Jobfiles\12065\10-24-17 Code Update\12065.ec6

Description : Frame

Norman Scheel Structural Engineer5022 Sunrise Blvd.Fair Oaks, CA 95628(916) 536-9585Title Block" selection.

Project Title: 200 Series Ground MountEngineer: Project ID: 12065

Printed: 24 OCT 2017, 10:23AM

Project Descr:

Member Sections...Prop Label Group Tag Material Area IxxDepth IyyWidth

Default Tube in^2 in^41.0 0.0 0.0 1.0 1.0in in in^4GroupPipe1-1/2 Std Tube in^2 in^40.750 1.90 1.90 0.2930 0.2930in in in^4Group

.Joint Loads.... Note: Loads labeled "Global Y" act downward (in "-Y" direction)

Joint LabelLoad

Direction Dead Roof Live Live Snow Seismic Wind EarthLoad Magnitude

2 k1.10Global X2 k1.90Global Y

...Strength/Stress Load Combinations ASCE 7-10Load Combination Factors

Dead Roof Live Live Snow Seismic Wind EarthLoad Combination

Description Cd

+D+H 0.9 1.0 1.0+D+L+H 1 1.0 1.0 1.0+D+Lr+H 1.25 1.0 1.0 1.0+D+S+H 1.15 1.0 1.0 1.0+D+0.750Lr+0.750L+H 1.25 1.0 0.750 0.750 1.0+D+0.750L+0.750S+H 1.15 1.0 0.750 0.750 1.0+D+0.60W+H 1.6 1.0 0.60 1.0+D+0.70E+H 0.9 1.0 0.7 1.0+D+0.750Lr+0.750L+0.450W+H 1.6 1.0 0.750 0.750 0.450 1.0+D+0.750L+0.750S+0.450W+H 1.6 1.0 0.750 0.750 0.450 1.0+D+0.750L+0.750S+0.5250E+H 1.15 1.0 0.750 0.750 0.525 1.0+0.60D+0.60W+0.60H 1.6 0.60 0.60 0.60+0.60D+0.70E+0.60H 0.9 0.60 0.7 0.60

..Reaction Load Combinations ASCE 7-10Load Combination Factors

Dead Roof Live Live Snow Seismic Wind EarthLoad Combination

Description+D+H 1.0 1.0+D+L+H 1.0 1.0 1.0+D+Lr+H 1.0 1.0 1.0+D+S+H 1.0 1.0 1.0+D+0.750Lr+0.750L+H 1.0 0.750 0.750 1.0+D+0.750L+0.750S+H 1.0 0.750 0.750 1.0+D+0.60W+H 1.0 0.60 1.0+D+0.70E+H 1.0 0.70 1.0+D+0.750Lr+0.750L+0.450W+H 1.0 0.750 0.750 0.450 1.0+D+0.750L+0.750S+0.450W+H 1.0 0.750 0.750 0.450 1.0+D+0.750L+0.750S+0.5250E+H 1.0 0.750 0.750 0.5250 1.0+0.60D+0.60W+0.60H 0.60 0.60 0.60+0.60D+0.70E+0.60H 0.60 0.70 0.60D Only 1.0Lr Only 1.0L Only 1.0S Only 1.0W Only 1.0E Only 1.0H Only 1.0

..Deflection Load Combinations ASCE 7-10Load Combination Factors

Dead Roof Live Live Snow Seismic Wind EarthLoad Combination

Description+D+H 1.0 1.0+D+L+H 1.0 1.0 1.0+D+Lr+H 1.0 1.0 1.0+D+S+H 1.0 1.0 1.0+D+0.750Lr+0.750L+H 1.0 0.750 0.750 1.0+D+0.750L+0.750S+H 1.0 0.750 0.750 1.0+D+0.60W+H 1.0 0.60 1.0

Page 124: Structural Report and Calculations Series 200 Ground Mount

2-D Frame ENERCALC, INC. 1983-2017, Build:6.17.3.29, Ver:6.17.3.29Licensee : norman scheel seLic. # : KW-06002320

File = G:\Jobfiles\12065\10-24-17 Code Update\12065.ec6

Description : Frame

Norman Scheel Structural Engineer5022 Sunrise Blvd.Fair Oaks, CA 95628(916) 536-9585Title Block" selection.

Project Title: 200 Series Ground MountEngineer: Project ID: 12065

Printed: 24 OCT 2017, 10:23AM

Project Descr:

+D+0.70E+H 1.0 0.70 1.0+D+0.750Lr+0.750L+0.450W+H 1.0 0.750 0.750 0.450 1.0+D+0.750L+0.750S+0.450W+H 1.0 0.750 0.750 0.450 1.0+D+0.750L+0.750S+0.5250E+H 1.0 0.750 0.750 0.5250 1.0+0.60D+0.60W+0.60H 0.60 0.60 0.60+0.60D+0.70E+0.60H 0.60 0.70 0.60D Only 1.0Lr Only 1.0L Only 1.0S Only 1.0Deflection Load Combinations ASCE 7-10

Load Combination FactorsDead Roof Live Live Snow Seismic Wind Earth

Load CombinationDescription

W Only 1.0E Only 1.0H Only 1.0

...Extreme Joint Displacements Only Load Combinations giving maximum values are listed

Joint LabelJoint Displacements

in in RadiansYX Z

1 0.0 0.0 -.0000750W Only +0.450W +0.450WMax

1 0.0 0.0 -0.000167+0.450W W Only W OnlyMin

2 0.004624 -0.001094 -.000020W Only +0.450W +0.450WMax

2 0.002081 -0.002430 -.0000440+0.450W W Only W OnlyMin

3 0.003695 0.0 -.0000040W Only +0.450W +0.450WMax

3 0.001663 -.0000010 -.0000090+0.450W W Only W OnlyMin

4 0.0 0.0 -.0000140W Only +0.450W +0.450WMax

4 0.0 0.0 -.000030+0.450W W Only W OnlyMin

.Extreme Joint Reactions Only Load Combinations giving maximum values are listed

Joint LabelJoint Reactions

k k k-ftYX Z

1 -0.000694 1.440+0.450W W OnlyMax

-0.001542 0.6478W Only +0.450WMin

2Max

Min3

Max

Min4 -0.4943 0.4605

+0.450W W OnlyMax-1.098 0.2072

W Only +0.450WMin.Extreme Member End Forces Only Load Combinations giving maximum values are listed

Member LabelMember " J " End ForcesMember " I " End Forces

Momentk-ftk kk k-ft k

Axial ShearShearAxial Moment

Page 125: Structural Report and Calculations Series 200 Ground Mount

2-D Frame ENERCALC, INC. 1983-2017, Build:6.17.3.29, Ver:6.17.3.29Licensee : norman scheel seLic. # : KW-06002320

File = G:\Jobfiles\12065\10-24-17 Code Update\12065.ec6

Description : Frame

Norman Scheel Structural Engineer5022 Sunrise Blvd.Fair Oaks, CA 95628(916) 536-9585Title Block" selection.

Project Title: 200 Series Ground MountEngineer: Project ID: 12065

Printed: 24 OCT 2017, 10:23AM

Project Descr:

A 0.7142 0.0 0.0 0.0 0.000285 0.0+0.60W +0.60WMax

A 0.0 -0.000285 -0.001192 -0.7142 0.0 -0.001066+0.60W +0.60W +0.60W +0.60WMin

B 0.8637 0.000925 0.0 0.0 0.0 0.002831+0.60W +0.60W +0.60W +0.60WMax

B 0.0 0.0 0.0 -0.8637 -0.000925 0.0+0.60W +0.60WMin

C 0.000292 0.0 0.0 0.0 0.000378 0.0+0.60W +0.60WMax

C 0.0 -0.000378 -0.001639 -0.000292 0.0 -0.001321+0.60W +0.60W +0.60W +0.60WMin

Page 126: Structural Report and Calculations Series 200 Ground Mount

2-D Frame ENERCALC, INC. 1983-2017, Build:6.17.3.29, Ver:6.17.3.29Licensee : norman scheel seLic. # : KW-06002320

File = G:\Jobfiles\12065\10-24-17 Code Update\12065.ec6

Description : Frame

Norman Scheel Structural Engineer5022 Sunrise Blvd.Fair Oaks, CA 95628(916) 536-9585Title Block" selection.

Project Title: 200 Series Ground MountEngineer: Project ID: 12065

Printed: 24 OCT 2017, 10:23AM

Project Descr:

Extreme Member End Forces Only Load Combinations giving maximum values are listed

Member LabelMember " J " End ForcesMember " I " End Forces

Momentk-ftk kk k-ft k

Axial ShearShearAxial Moment

D 0.000249 0.000408 0.001321 0.0 0.0 0.001066+0.60W +0.60W +0.60W +0.60WMax

D 0.0 0.0 0.0 -0.000249 -0.000408 0.0+0.60W +0.60WMin

.Extreme Member Forces Only Load Combinations giving maximum values are listed

Mmbr Label ShearDist from "I" Joint Dist from "I" JointDist from "I" JointAxial MomentA -0.5356 0.0 7.925 ftft 0.00.001066 -0.000214k ft

+0.450W +0.60W +0.450WMaxkk-ft

-0.7142 0.0 0.0 ftft 0.0-0.001192 -0.000285k ft+0.60W +0.60W +0.60WMin

kk-ft

B -0.6478 0.0 0.1249 ftft 0.0-0.000116 0.000925k ft+0.450W +0.60W +0.60WMax

kk-ft

-0.8637 0.0 3.060 ftft 0.0-0.002831 0.000694k ft+0.60W +0.60W +0.450WMin

kk-ft

C -0.000219 0.0 7.824 ftft 0.00.001321 -0.000284k ft+0.450W +0.60W +0.450WMax

kk-ft

-0.000292 0.0 0.0 ftft 0.0-0.001639 -0.000378k ft+0.60W +0.60W +0.60WMin

kk-ft

D -0.000187 0.0 0.0 ftft 0.00.001321 0.000408k ft+0.450W +0.60W +0.60WMax

kk-ft

-0.000249 0.0 5.850 ftft 0.0-0.001066 0.000306k ft+0.60W +0.60W +0.450WMin

kk-ft

.

Member Stress Checks per AISC 360-10 & NDS 2015Member Stress Checks...

SectionLabel Label Load Combination

Max. Axial + Bending Stress Ratios Max. Shear Stress RatiosRatio Status Dist (ft) Load Combination Ratio StatusMaterial Dist (ft)

A +0.60W 0.075 PASS 0.00 +0.60W 0.000 PASS 0.00SteelGroupB +0.60W 0.057 PASS 0.00 +0.60W 0.000 PASS 0.00SteelGroupC +0.60W 0.002 PASS 0.00 +0.60W 0.000 PASS 0.00SteelGroupD +0.60W 0.002 PASS 0.00 +0.60W 0.000 PASS 0.00SteelGroup

.

Page 127: Structural Report and Calculations Series 200 Ground Mount

2-D Frame ENERCALC, INC. 1983-2017, Build:6.17.3.29, Ver:6.17.3.29Licensee : norman scheel seLic. # : KW-06002320

File = G:\Jobfiles\12065\10-24-17 Code Update\12065.ec6

Description : Frame

Norman Scheel Structural Engineer5022 Sunrise Blvd.Fair Oaks, CA 95628(916) 536-9585Title Block" selection.

Project Title: 200 Series Ground MountEngineer: Project ID: 12065

Printed: 24 OCT 2017, 10:23AM

Project Descr:

X

X

A/Pipe1-1/2 Std

X

X

B/Pipe1-1/2 Std

X

X

C/Pipe1-1/2 Std

X

X

D/Pipe1-1/2 StdX: W(1.1)

Y: W(1.9)

1

2

3

4

Page 128: Structural Report and Calculations Series 200 Ground Mount

               Series 200               Structural Report and Calculations  

NSSE                                       5022 Sunrise Boulevard Fair Oaks CA 95628 (916) 536‐9585  Page A1  

Appendix A: ASCE-2010 to 2005 conversion sheet The 200 Series report’s results have been calculated according to the ASCE-2010 guidelines. If the results would rather be examined in terms of the ASCE-2005 codes, the following conversions must be applied for the two codes’ results to be of equivalence. This appendix also applies for converting to different years for IBC codes. For 2006 and 2009 IBC, use the ASCE-2005 codes, and for the 2012 and 2015 IBC, use the ASCE-2010 codes. Factors specific to this report

1) The ground-mounted solar panels are in terms of Risk Category I 2) The importance factor for the ASCE-2005 code is I = .77 3) The ASCE-2010 code has no importance factor for the wind loads 4) The snow load’s importance factor remains the same for both the 2005 and 2010 codes 5) Thus, calculations that utilize wind loads are the ONLY ones that need conversions

Velocity Equivalence (mph)

V3-sec (ASCE7-05) Vult. (ASCE7-10)

85 100 90 116 100 129 110 142 120 155 130 168 140 181 150 194

The following velocities listed in the graph refer to some V2005 being equal to some V2010. In other words, use the following velocities in accordance with either ASCE-2005 or ASCE-2010.

Page 129: Structural Report and Calculations Series 200 Ground Mount

DESCRIPTION:PART NUMBER:SCALE:DESIGNER:

APPROVED BY:

REVISION:

MAINSTREAM ENERGY CORP.

775 FIERO LANE, SUITE 200 ǒ SAN LUIS OBISPO, CA 93401 USA

PHONE (805) 528-9705 ǒ FAX (805) 528-9701

THE INFORMATION IN THIS DRAWING IS CONFIDENTIAL AND PROPRIETARY. ANY REPRODUCTION,

DISCLOSURE, OR USE THEREOF IS PROHIBITED WITHOUT THE WRITTEN CONSENT OF

MAINSTREAM ENERGY CORPORATION.

SERIES 200 DRAWING SET COVERS200 D00

D Ryan

REV

G

DATE:

DNS

120113

DRAFTER:

G McPheeters

S200 D00: SERIES 200 DRAWING SET COVER

S200 D01: SERIES 200 OVERVIEW

S200 D02: SERIES 200 SYSTEM DETAILS

S200 D03: SERIES 200 BRACED OPTION

S200 D04: SERIES 200 SYSTEM DETAILS, 3 MODULE PANELS

S200 D05: SERIES 200 BRACED OPTION, 3 MODULE PANELS

S200 D06: SERIES 200 PIER DETAILS

S200 D07: SERIES 200 GRADE BEAM OPTION

S200 D08: SERIES 200 3-RAIL CONFIGURATIONS, UN-BRACED OPTION

S200 D09: SERIES 200 3-RAIL CONFIGURATIONS, BRACED OPTION

Page 130: Structural Report and Calculations Series 200 Ground Mount

DETAIL A

SCALE 1 / 5

A

DESCRIPTION:PART NUMBER:SCALE:DESIGNER:

APPROVED BY:

REVISION:

MAINSTREAM ENERGY CORP.

775 FIERO LANE, SUITE 200 ǒ SAN LUIS OBISPO, CA 93401 USA

PHONE (805) 528-9705 ǒ FAX (805) 528-9701

THE INFORMATION IN THIS DRAWING IS CONFIDENTIAL AND PROPRIETARY. ANY REPRODUCTION,

DISCLOSURE, OR USE THEREOF IS PROHIBITED WITHOUT THE WRITTEN CONSENT OF

MAINSTREAM ENERGY CORPORATION.

SERIES 200 OVERVIEWS200 D01

D Ryan

REV

G

DATE:

DNS

120113

DRAFTER:

G McPheeters

SEE ENGINEERNG TABLES

FOR PIER DEPTHS AND

SPAN LIMITATIONS.

UNLESS OTHERWISE

SPECIFIED IN

ENGINEERING DOCS,

THE FOLLOWING

VALUES APPLY:

MAX RAIL LENGTH: 162"

RAIL SPAN: 96"

MAX RAIL OVERHANG: 32"

STANDARD CONCRETE

PIER CONFIGURATION

ISO VIEW OF RACKING ASSEMBLY

DETAILED VIEW OF PIPE TO RAIL AND BRACING INTERFACE

ARRAY SIDE VIEW ARRAY BACK VIEW

BRACE D: WHEN BRACE C IS

REQUIRED, BRACE D IS ALSO

REQUIRED IF:

- SITE SDS VALUE EXCEEDS 1

- FRONT (SHORT) POST HEIGHT

EXCEEDS 36"

ARRAY TILT ANGLE

8' RAIL SPAN (RS)

MAX RAIL LENGTH (RL)

MAX RAIL OVERHANG (RO)

MAX 48"

ABOVE GRADE

PIER DEPTH

6" MAX

6" MAX

SNAPNRACK GROUND RAIL

WITH MAX RAIL LENGTH

(RL), 8' RAIL SPAN (RS)

AND MAX RAIL OVERHANG

OR CANTILEVER (RO)

GROUND RAIL

HORIZONTAL

PIPE

BRACE D

BRACE C

SNAPNRACK

CHANNEL NUT

SNAPNRACK

PIPE CLAMP 1-1/2"

SECURE PIPE CLAMPS

WITH 5/16" X 1-1/2"

HEX BOLTS WITH SS

SPLIT LOCK WASHERS

SNAPNRACK MID

CLAMP ASSEMBLIESMODULES TYP

MAX DIMENSIONS

78" X 40" X 2" THICK

MAX WEIGHT: 65 LBS

SNAPNRACK GROUND RAIL

SPEED RAIL OR EQUIVALENT

SINGLE SOCKET SWIVELS

CONNECT ANGLED BRACES

TO VERTICAL PIPES

(A AND C BRACES, TYP)

MAX PIPE OVERHANG (PS)/4

BRACE D: SEE NOTE

ON REQUIREMENTS

FOR BRACE D

BRACE C: SEE TABLE FOR

CONDITIONS WHEN THIS

BRACE IS REQUIRED AND

MINIMUM FREQUENCY.

ALTERNATE BRACE

ORIENTATION AS SHOWN

SNAPNRACK UNIVERSAL

END CLAMPS (SHOWN)

OR SNAPNRACK TOP

MOUNT END CLAMPS

Page 131: Structural Report and Calculations Series 200 Ground Mount

DESCRIPTION:PART NUMBER:SCALE:DESIGNER:

APPROVED BY:

REVISION:

MAINSTREAM ENERGY CORP.

775 FIERO LANE, SUITE 200 ǒ SAN LUIS OBISPO, CA 93401 USA

PHONE (805) 528-9705 ǒ FAX (805) 528-9701

THE INFORMATION IN THIS DRAWING IS CONFIDENTIAL AND PROPRIETARY. ANY REPRODUCTION,

DISCLOSURE, OR USE THEREOF IS PROHIBITED WITHOUT THE WRITTEN CONSENT OF

MAINSTREAM ENERGY CORPORATION.

SERIES 200 SYSTEM DETAILSS200 D02

D. Ryan

REV

G

DATE:

DNS

120131

DRAFTER:

G. McPheeters

TYPICAL ARRAY

OF 4 MODULES

RAIL SHOWN

BEFORE MODULES

ARE INSTALLED

SNAPNRACK UNIVERSAL

END CLAMP (SHOWN)

OR SNAPNRACK TOP

MOUNT END CLAMP

SNAPNRACK

CHANNEL NUTS

5

16" X 1

1

2" SS HEX BOLTS

WITH SS SPLIT LOCK WASHERS

MODULE MID CLAMP

ASSEMBLY

MODULE END

CLAMP

ASSEMBLY

NOTE:

TORQUE

5

16

" SS SILVER HEX

BOLTS TO 10-16 FT-LBS

TORQUE

5

16

" SS BLACK HEX

BOLTS TO 7-9 FT-LBS

SNAPNRACK

GROUND RAIL

1

1

2" SCHEDULE 40

(MIN) STEEL PIPE

NOTE:

TORQUE

5

16

" SS

SILVER HEX BOLTS

TO 10-16 FT-LBS

TORQUE

5

16

" SS

BLACK HEX BOLTS

TO 7-9 FT-LBS

MODULE MOUNTING HARDWARE

SNAPNRACK UNIVERSAL END CLAMP

(FOR END OF ROW)

CLAMPS MODULE WITH

5

16

" STAINLESS

HARDWARE USING WEDGE CLAMP

FOR MODULES WITHOUT AN UNDERSIDE

LIP USE SNAPNRACK TOP MOUNT END

CLAMPS

MODULES TYP

MAX DIMENSIONS:

78" X 40" X 2" THICK

MAX WEIGHT: 65 LBS

MODULE MOUNTING HARDWARE MID CLAMP (FOR MIDDLE

OF ROW). CLAMPS MODULE WITH

5

16

" STAINLESS

HARDWARE INTO CHANNEL NUT IN RAIL

SNAPNRACK GROUND RAILS

SECURE ROWS OF MODULES

TO TOPS OF HORIZONTAL

MOUNTING PIPES

ISO VIEW OF RACKING ASSEMBLY

MODULE AND RAIL ATTACHMENT DETAILS

PIPE TO RAIL CONNECTION EXPLODED

PIPE TO RAIL CONNECTION

PIPE FITTING DETAILS

THREADED PIPE

COUPLERS

1

1

2" SCHED 40 (MIN) STEEL

PIPE FOR VERTICAL MEMBERS

1

1

2" SCHED 40 (MIN)

STEEL PIPE FOR

BRACING MEMBERS

SPEED RAIL OR

EQUIVALENT

SINGLE SOCKET

SWIVELS

1

1

2" SCHED 40 (MIN)

STEEL PIPE FOR

HORIZONTAL MEMBERS

SPEED RAIL OR

EQUIVALENT

PIPE TEES

SNAPNRACK PIPE CLAMP 1

1

2"

SECURE PIPE CLAMPS WITH

5

16" X 1

1

2" SS HEX

BOLTS WITH SS SPLIT SLOCK WASHERS

HORIZONTAL PIPE SUPPORTS RAILS

1

1

2" SCH 40 (MIN) STEEL PIPE

SNAPNRACK

RAIL END CAP

SNAPNRACK PIPE

CLAMP ASSEMBLY

Page 132: Structural Report and Calculations Series 200 Ground Mount

DETAIL A

A

DESCRIPTION:PART NUMBER:SCALE:DESIGNER:

APPROVED BY:

REVISION:

MAINSTREAM ENERGY CORP.

775 FIERO LANE, SUITE 200 ǒ SAN LUIS OBISPO, CA 93401 USA

PHONE (805) 528-9705 ǒ FAX (805) 528-9701

THE INFORMATION IN THIS DRAWING IS CONFIDENTIAL AND PROPRIETARY. ANY REPRODUCTION,

DISCLOSURE, OR USE THEREOF IS PROHIBITED WITHOUT THE WRITTEN CONSENT OF

MAINSTREAM ENERGY CORPORATION.

SERIES 200 BRACED OPTIONS200 D03

D. Ryan

REV

G

DATE:

DNS

120113

DRAFTER:

G. McPheeters

BRACING OPTION FOR HIGH LOAD OR

LONGER SPAN APPLICATIONS

SEE ENGINEERNG TABLES FOR PIER DEPTHS AND SPAN

LIMITATIONS.

COMPATIBLE WITH ALL PIER OPTIONS INCLUDING

STANDARD PIERS AND GRADE BEAMS

UNLESS OTHERWISE SPECIFIED IN ENGINEERING

DOCS, THE FOLLOWING VALUES APPLY:

MAX RL: 162"

RS: 96"

MAX RO: 32"

SNAPNRACK GROUND

RAIL WITH MAX RAIL

LENGTH (RL), MAX

RAIL SPAN (RS) AND

MAX RAIL OVERHANG

OR CANTILEVER (RO)

BRACE A: SEE TABLE

FOR CONDITIONS

WHEN THIS BRACE IS

REQUIRED. BRACE A

SHOULD ALWAYS BE

THE CLOSEST BRACE

TO CONCRETE PIERS

6" MAX

PIERS (VARIOUS

OPTIONS)

6" MAX

MAX 48"

ABOVE

GRADE

ARRAY TILT ANGLE

8' RAIL SPAN (RS)

VARIES BY TILT

MAX BRACED PIPE

OVERHANG (PS/3)

(PS)/3

MAX BRACED PIPE SPAN (PS)

(PS)/3

BRACE E CONNECTS

FRONT HORIZONTAL

PIPE TO FRONT PIERS

BRACE F CONNECTS REAR

HORIZONTAL PIPE TO REAR PIERS.

DIAGONAL BRACING ON BOTH

HORIZONTAL PIPES REPLACE

BRACE C (ALL BAYS) AND

SUPPORT HORIZONTAL PIPE

AT

1

3

AND

2

3

OF PIPE SPAN (PS)

MAX RAIL LENGTH (RL)

MAX RAIL OVERHANG (RO)

GROUND RAIL

POST

BRACE F

BRACE A

BRACE E

8" MAX

Page 133: Structural Report and Calculations Series 200 Ground Mount

DESCRIPTION:PART NUMBER:SCALE:DESIGNER:

APPROVED BY:

REVISION:

MAINSTREAM ENERGY CORP.

775 FIERO LANE, SUITE 200 ǒ SAN LUIS OBISPO, CA 93401 USA

PHONE (805) 528-9705 ǒ FAX (805) 528-9701

THE INFORMATION IN THIS DRAWING IS CONFIDENTIAL AND PROPRIETARY. ANY REPRODUCTION,

DISCLOSURE, OR USE THEREOF IS PROHIBITED WITHOUT THE WRITTEN CONSENT OF

MAINSTREAM ENERGY CORPORATION.

SERIES 200 SYSTEM DETAILS, 3 MODULE

PANELS

S200 D04

D. Ryan

REV

G

DATE:

DNS

120113

DRAFTER:

G. McPheeters

TYPICAL ARRAY

OF 3 MODULES

RAIL SHOWN

BEFORE MODULES

ARE INSTALLED

SNAPNRACK UNIVERSAL

END CLAMP (SHOWN)

OR SNAPNRACK TOP

MOUNT END CLAMP

SNAPNRACK

CHANNEL NUTS

5

16" X 1

1

2" SS HEX BOLTS

WITH SS SPLIT LOCK WASHERS

SNAPNRACK BONDING

MODULE MID CLAMP

ASSEMBLY

SNAPNRACK MODULE

END CLAMP ASSEMBLY

NOTE:

TORQUE

5

16

" SS SILVER HEX

BOLTS TO 10-16 FT-LBS

TORQUE

5

16

" SS BLACK HEX

BOLTS TO 7-9 FT-LBS

SNAPNRACK

GROUND RAIL

1

1

2" SCHEDULE 40

(MIN) STEEL PIPE

NOTE:

TORQUE

5

16

" SS

SILVER HEX BOLTS

TO 10-16 FT-LBS

TORQUE

5

16

" SS

BLACK HEX BOLTS

TO 7-9 FT-LBS

MODULE MOUNTING HARDWARE

SNAPNRACK UNIVERSAL END CLAMP

(FOR END OF ROW)

CLAMPS MODULE WITH

5

16

" STAINLESS

HARDWARE USING WEDGE CLAMP

FOR MODULES WITHOUT AN UNDERSIDE

LIP USE SNAPNRACK TOP MOUNT

END CLAMPS

MODULES TYP

MAX DIMENSIONS:

78" X 40" X 2" THICK

MAX WEIGHT: 65 LBS

MODULE MOUNTING HARDWARE MID CLAMP (FOR MIDDLE

OF ROW). CLAMPS MODULE WITH

5

16

" STAINLESS

HARDWARE INTO CHANNEL NUT IN RAIL

SNAPNRACK GROUND RAILS

SECURE ROWS OF MODULES

TO TOPS OF HORIZONTAL

MOUNTING PIPES

ISO VIEW OF RACKING ASSEMBLY

MODULE AND RAIL ATTACHMENT DETAILS

PIPE TO RAIL CONNECTION EXPLODED

PIPE TO RAIL CONNECTION

PIPE FITTING DETAILS

THREADED PIPE

COUPLERS

1

1

2" SCHED 40 (MIN) STEEL

PIPE FOR VERTICAL MEMBERS

1

1

2" SCHED 40 (MIN)

STEEL PIPE FOR

BRACING MEMBERS

SPEED RAIL OR

EQUIVALENT

SINGLE SOCKET

SWIVELS

1

1

2" SCHED 40 (MIN)

STEEL PIPE FOR

HORIZONTAL MEMBERS

SPEED RAIL OR

EQUIVALENT

PIPE TEES

SNAPNRACK MILL FINISH PIPE CLAMP 1

1

2"

SECURE PIPE CLAMPS WITH

5

16" X 1

1

2" SS HEX

BOLTS WITH SS SPLIT SLOCK WASHERS

HORIZONTAL PIPE SUPPORTS RAILS

1

1

2" SCH 40 (MIN) STEEL PIPE

SNAPNRACK

RAIL END CAP

SNAPNRACK PIPE

CLAMP ASSEMBLY

Page 134: Structural Report and Calculations Series 200 Ground Mount

DETAIL A

A

DESCRIPTION:PART NUMBER:SCALE:DESIGNER:

APPROVED BY:

REVISION:

MAINSTREAM ENERGY CORP.

775 FIERO LANE, SUITE 200 ǒ SAN LUIS OBISPO, CA 93401 USA

PHONE (805) 528-9705 ǒ FAX (805) 528-9701

THE INFORMATION IN THIS DRAWING IS CONFIDENTIAL AND PROPRIETARY. ANY REPRODUCTION,

DISCLOSURE, OR USE THEREOF IS PROHIBITED WITHOUT THE WRITTEN CONSENT OF

MAINSTREAM ENERGY CORPORATION.

SERIES 200 BRACED OPTION 3 MODULE

PANELS

S200 D05

D. Ryan

REV

G

DATE:

DNS

120113

DRAFTER:

G. McPheeters

BRACING OPTION FOR HIGH LOAD OR LONGER

SPAN APPLICATIONS - 3 MODULE PANELS

SEE ENGINEERNG TABLES FOR PIER DEPTHS AND SPAN

LIMITATIONS.

COMPATIBLE WITH ALL PIER OPTIONS INCLUDING

STANDARD PIERS AND GRADE BEAMS

UNLESS OTHERWISE SPECIFIED IN ENGINEERING DOCS,

THE FOLLOWING VALUES APPLY:

MAX RL: 122"

RS: 72"

MAX RO: 24"

DIAGONAL BRACING ON BOTH

HORIZONTAL PIPES REPLACE

BRACE C (ALL BAYS) AND

SUPPORT HORIZONTAL PIPE

AT

1

3

AND

2

3

OF PIPE SPAN (PS)

POST

BRACE F

BRACE A

BRACE E

SNAPNRACK GROUND

RAIL WITH MAX RAIL

LENGTH (RL), MAX

RAIL SPAN (RS) AND

MAX RAIL OVERHANG

OR CANTILEVER (RO)

BRACE A: SEE TABLE

FOR CONDITIONS

WHEN THIS BRACE IS

REQUIRED. BRACE A

SHOULD ALWAYS BE

THE CLOSEST BRACE

TO CONCRETE PIERS

ARRAY TILT ANGLE

MAX RAIL LENGTH (RL)

6' RAIL SPAN (RS)

MAX RAIL OVERHANG (RO)

PIERS (VARIOUS

OPTIONS)

VARIES BY TILT

MAX 48"

ABOVE

GRADE

6" MAX

6" MAX

GROUND RAIL

MAX BRACED PIPE SPAN (PS)

(PS)/3 (PS)/3

MAX BRACED PIPE

OVERHANG (PS/3)

BRACE E CONNECTS

FRONT HORIZONTAL

PIPE TO FRONT PIERS

BRACE F CONNECTS REAR

HORIZONTAL PIPE TO REAR PIERS.

8" MAX

Page 135: Structural Report and Calculations Series 200 Ground Mount

DESCRIPTION:PART NUMBER:SCALE:DESIGNER:

APPROVED BY:

REVISION:

MAINSTREAM ENERGY CORP.

775 FIERO LANE, SUITE 200 ǒ SAN LUIS OBISPO, CA 93401 USA

PHONE (805) 528-9705 ǒ FAX (805) 528-9701

THE INFORMATION IN THIS DRAWING IS CONFIDENTIAL AND PROPRIETARY. ANY REPRODUCTION,

DISCLOSURE, OR USE THEREOF IS PROHIBITED WITHOUT THE WRITTEN CONSENT OF

MAINSTREAM ENERGY CORPORATION.

SERIES 200 PIER DETAILSS200 D06

D. Ryan

REV

G

DATE:

DNS

120113

DRAFTER:

G. McPheeters

NOTE:

FLANGE MOUNTS ARE A VIABLE OPTION FOR INSTALLATION

OF GROUND MOUNT SYSTEMS ON CONCRETE PADS OR

VARIOUS TYPES OF ROOF TOP STRUCTURES, BUT ARE NOT

SPECIFIED IN DETAIL IN THE STANDARD ENGINEERING

REVIEW FOR 2013.

STANDARD

PIER DETAIL

STANDARD

PIER DETAIL

ON SLOPED

GRADE

5 FEET

TO "CLEAR"

PIER DEPTH

PIER DIAMETER

12" TYP.

CONCRETE PIERS

CONCRETE: 2,500

PSI MIN.

OPTIONAL:

FORM TOP OF PIER 4"

TYPICAL ABOVE GRADE

WITH 8" SONATUBE

4" TYP. HEIGHT

ABOVE GRADE

OPTIONAL:

FORM TOP OF PIER 4"

TYPICAL ABOVE GRADE

WITH 8" SONATUBE

CONCRETE PIERS

CONCRETE: 2,500

PSI MIN.

PIER DEPTH

PIER DIAMETER

12" TYP.

1.5" SCH 40 STEEL

PIPE VERTICAL POSTS

ATTACH SPEED RAIL

OR EQUIVALENT

FLANGES TO BOTTOM

OF VERTICAL SUPPORT

POSTS OR WELD 0.25"

PLATE TO BOTTOM OF

VERTICAL POSTS TO

CREATE FLANGE SURFACE

EXISTING STRUCTURAL

ROOF SURFACE OR

CONCRETE PAD

SECURE FLANGES

TO SURFACE USING

APPROPRIATE HARDWARE

TO RESIST PULL OUT

FORCES OF 800 LBS

TYPICAL

FLANGE MOUNT

DETAIL

SHEATHING TYP.

RAFTER

4" TYP. HEIGHT

ABOVE GRADE

SLOPED GRADE TYP.

Page 136: Structural Report and Calculations Series 200 Ground Mount

DESCRIPTION:PART NUMBER:SCALE:DESIGNER:

APPROVED BY:

REVISION:

MAINSTREAM ENERGY CORP.

775 FIERO LANE, SUITE 200 ǒ SAN LUIS OBISPO, CA 93401 USA

PHONE (805) 528-9705 ǒ FAX (805) 528-9701

THE INFORMATION IN THIS DRAWING IS CONFIDENTIAL AND PROPRIETARY. ANY REPRODUCTION,

DISCLOSURE, OR USE THEREOF IS PROHIBITED WITHOUT THE WRITTEN CONSENT OF

MAINSTREAM ENERGY CORPORATION.

SERIES 200 GRADE BEAM OPTIONS200 D07

D Ryan

REV

G

DATE:

DNS

120113

DRAFTER:

G McPheeters

GRADE BEAM FOUNDATION DETAIL

ARRAY SIDE VIEW

ARRAY BACK VIEW

BRACE D: WHEN BRACE C IS

REQUIRED, BRACE D IS ALSO

REQUIRED IF:

- SITE SDS VALUE EXCEEDS 1

- FRONT (SHORT) POST HEIGHT

EXCEEDS 36"

GRADE BEAM

FOUNDATION

CONFIGURATION

SEE ENGINEERING TABLES FOR

SPAN LIMITATIONS.

UNLESS OTHERWISE SPECIFIED IN

ENGINEERING DOCS, THE

FOLLOWING VALUES APPLY:

MAX RL: 162"

RS: 96"

MAX RO: 32"

MIN GBW: 12"

MIN GBD: 18"

GRADE BEAM FOUNDATIONS

SHOULD ONLY BE USED IN

FLAT GROUND CONDITIONS

(GROUND SLOPE LESS THAN

5 DEGREES TYPICAL)

COMPATIBLE WITH ALL

BRACING OPTIONS

1.5" SCH 40 STEEL

PIPE VERTICAL POSTS

OPTIONAL:

FORM TOP OF PIER 4"

TYPICAL ABOVE GRADE

WITH 8" SONATUBE

(2) #4 BARS SHALL BE USED AT BOTH

THE TOP AND BOTTOM OF THE GRADE

BEAM, ONE ON EACH SIDE OF THE

VERTICAL PIPE. THESE SHALL HAVE A

MINIMUM OF 3" CLEAR OF CONCRETE COVER

GRADE BEAM DEPTH

4" TYP. HEIGHT ABOVE GRADE

MIN 6"

CLEARANCE

CONCRETE PIERS

CONCRETE: 2,500 PSI MIN.

MAX 48"

ABOVE GRADE

ARRAY TILT ANGLE

8' RAIL SPAN (RS)

MAX RAIL OVERHANG (RO)

MAX RAIL LENGTH (RL)

SNAPNRACK GROUND RAIL

WITH MAX RAIL LENGTH

(RL), MAX RAIL SPAN (RS)

AND MAX RAIL OVERHANG

OR CANTILEVER (RO)

BRACE A: SEE TABLE

FOR CONDITIONS WHEN

THIS BRACE IS REQUIRED.

6" MAX

6" MAX

1.5" SCH 40 GALVANIZED STEEL PIPE POSTS SET

IN CONCRETE FILLED GRADE BEAMS (ASSUME SOIL

LATERAL PASSIVE VALUE OF 150 PSF (CODE

MINIMUM FOR SAND CLASS SOILS)

GRADE BEAM DEPTH

BRACE C: SEE TABLE FOR CONDITIONS

WHEN THIS BRACE IS REQUIRED AND

MINIMUM FREQUENCY. ALTERNATE

BRACE ORIENTATION AS SHOWN

MAX PIPE OVERHANG (PS/4)

GRADE BEAM WIDTH (GBW)

MAX PIPE SPAN (PS)

REBAR

BRACE D: SEE NOTE

ON REQUIREMENTS

FOR BRACE D

Page 137: Structural Report and Calculations Series 200 Ground Mount

DESCRIPTION:PART NUMBER:SCALE:DESIGNER:

APPROVED BY:

REVISION:

MAINSTREAM ENERGY CORP.

775 FIERO LANE, SUITE 200 ǒ SAN LUIS OBISPO, CA 93401 USA

PHONE (805) 528-9705 ǒ FAX (805) 528-9701

THE INFORMATION IN THIS DRAWING IS CONFIDENTIAL AND PROPRIETARY. ANY REPRODUCTION,

DISCLOSURE, OR USE THEREOF IS PROHIBITED WITHOUT THE WRITTEN CONSENT OF

MAINSTREAM ENERGY CORPORATION.

SERIES 200, 3-RAIL CONFIGURATIONS,

UN-BRACED OPTION

S200 D08

DRyan

REV

G

DATE:

DNS

120113

DRAFTER:

GMcPheeters

HORIZONTAL PIPE

SERIES 200 3-RAIL CONFIGURATIONS

THE SERIES 200 3-RAIL OPTION CAN BE SET UP

FOR 3 MODULE AND 4 MODULE PANELS USING 3

RAILS PER PANEL.

3 SNAPNRACK GROUND

RAILS PER PANEL

4 MODULE PANEL, TYP.

POST

BRACE C

BRACE D

BRACE A

HORIZONTAL PIPE

POST

3 SNAPNRACK GROUND

RAILS PER PANEL

3 MODULE PANEL, TYP.

BRACE C

BRACE D

BRACE A

4 MODULE PANEL CONFIGURATION

3 MODULE PANEL CONFIGURATION

SNAPNRACK MODULE

MOUNTING HARDWARE

SNAPNRACK MODULE

MOUNTING HARDWARE

Page 138: Structural Report and Calculations Series 200 Ground Mount

DESCRIPTION:PART NUMBER:SCALE:DESIGNER:

APPROVED BY:

REVISION:

MAINSTREAM ENERGY CORP.

775 FIERO LANE, SUITE 200 ǒ SAN LUIS OBISPO, CA 93401 USA

PHONE (805) 528-9705 ǒ FAX (805) 528-9701

THE INFORMATION IN THIS DRAWING IS CONFIDENTIAL AND PROPRIETARY. ANY REPRODUCTION,

DISCLOSURE, OR USE THEREOF IS PROHIBITED WITHOUT THE WRITTEN CONSENT OF

MAINSTREAM ENERGY CORPORATION.

SERIES 200, 3-RAIL CONFIGURATIONS,

BRACED OPTION

S200 D09

DRyan

REV

G

DATE:

DNS

120113

DRAFTER:

GMcPheeters

SNAPNRACK MODULE

MOUNTING HARDWARE

3 SNAPNRACK GROUND

RAILS PER PANEL

HORIZONTAL PIPE

POST

BRACE A

BRACE E

BRACE F

BRACE E

BRACE F

POST

4 MODULE PANEL, TYP.

3 MODULE PANEL, TYP.

3 SNAPNRACK GROUND

RAILS PER PANEL

HORIZONTAL PIPE

SNAPNRACK MODULE

MOUNTING HARDWARE

3 MODULE PANEL CONFIGURATION

4 MODULE PANEL CONFIGURATION

SERIES 200 3-RAIL CONFIGURATIONS

THE SERIES 200 3-RAIL OPTION CAN BE SET UP

FOR 3 MODULE AND 4 MODULE PANELS USING 3

RAILS PER PANEL.

BRACE A