Evanston Public Works March 26, 2012
STREETSCAPE PROJECTCONCEPT PLANS
DODGE AND LAKE
CHURCH STREET
ORRINGTON AVENUE
![Page 2: Streetscape presentation final 3.26.12](https://reader033.vdocuments.us/reader033/viewer/2022052622/5597824c1a28ab31648b459c/html5/thumbnails/2.jpg)
Evanston Public Works March 26, 20122
Dodge and Lake Streetscape Project
♦Limits of the Project♦Dodge Avenue and Lake Street Intersection
♦Southeast corner
♦Develop Plaza with Streetscape Concept
♦Bus Shelter
♦Seating Wall
![Page 3: Streetscape presentation final 3.26.12](https://reader033.vdocuments.us/reader033/viewer/2022052622/5597824c1a28ab31648b459c/html5/thumbnails/3.jpg)
Evanston Public Works March 26, 20123
Design Elements – Existing Dodge & Lake
North
![Page 4: Streetscape presentation final 3.26.12](https://reader033.vdocuments.us/reader033/viewer/2022052622/5597824c1a28ab31648b459c/html5/thumbnails/4.jpg)
Evanston Public Works March 26, 20124
Design Elements – Proposed Dodge & Lake
North
![Page 5: Streetscape presentation final 3.26.12](https://reader033.vdocuments.us/reader033/viewer/2022052622/5597824c1a28ab31648b459c/html5/thumbnails/5.jpg)
Evanston Public Works March 26, 20125
Craig’s visual for this area goes here
Dodge and Lake Visual
![Page 6: Streetscape presentation final 3.26.12](https://reader033.vdocuments.us/reader033/viewer/2022052622/5597824c1a28ab31648b459c/html5/thumbnails/6.jpg)
Evanston Public Works March 26, 20126
Craig’s visual for this area goes here
Dodge and Lake Visual
![Page 7: Streetscape presentation final 3.26.12](https://reader033.vdocuments.us/reader033/viewer/2022052622/5597824c1a28ab31648b459c/html5/thumbnails/7.jpg)
Evanston Public Works March 26, 20127
Craig’s visual for this area goes here
Dodge and Lake Visual
![Page 8: Streetscape presentation final 3.26.12](https://reader033.vdocuments.us/reader033/viewer/2022052622/5597824c1a28ab31648b459c/html5/thumbnails/8.jpg)
Evanston Public Works March 26, 20128
“Green” Elements• Porous Concrete Sidewalk• Rain Gardens• Reuse of brick pavers in wall construction
Project Schedule• Project to be let in April
• Construction mid June to mid August (during high school summer break)
Design Elements
![Page 9: Streetscape presentation final 3.26.12](https://reader033.vdocuments.us/reader033/viewer/2022052622/5597824c1a28ab31648b459c/html5/thumbnails/9.jpg)
Evanston Public Works March 26, 20129
A rain garden catches rainfall and storm water runoff. The water is filtered and cleaned as it passes through the soil. This helps reduce
water pollution.
Design Elements – Rain Garden
![Page 10: Streetscape presentation final 3.26.12](https://reader033.vdocuments.us/reader033/viewer/2022052622/5597824c1a28ab31648b459c/html5/thumbnails/10.jpg)
Evanston Public Works March 26, 201210
Church Street Streetscape Project
♦Limits of the Project♦Dodge to Ridge (Paving up to Ashland)♦Ridge to Chicago
♦Sidewalk Brick Replacement ♦Protected Bike Path♦Bike Shelter♦Sidewalk Furniture♦Pedestrian Lighting
![Page 11: Streetscape presentation final 3.26.12](https://reader033.vdocuments.us/reader033/viewer/2022052622/5597824c1a28ab31648b459c/html5/thumbnails/11.jpg)
Evanston Public Works March 26, 201211
Public Works/Engineering staff presented the proposed improvements at:First ward meeting
Second ward meeting
Fifth ward meeting
Downtown Evanston meeting Discussed improvements with Fourth Ward
Alderman
Public Coordination
![Page 12: Streetscape presentation final 3.26.12](https://reader033.vdocuments.us/reader033/viewer/2022052622/5597824c1a28ab31648b459c/html5/thumbnails/12.jpg)
Evanston Public Works March 26, 201212
Design Elements – Existing - Church/Dodge
North
![Page 13: Streetscape presentation final 3.26.12](https://reader033.vdocuments.us/reader033/viewer/2022052622/5597824c1a28ab31648b459c/html5/thumbnails/13.jpg)
Evanston Public Works March 26, 201213
Design Elements – Proposed – Church/Dodge
North
![Page 14: Streetscape presentation final 3.26.12](https://reader033.vdocuments.us/reader033/viewer/2022052622/5597824c1a28ab31648b459c/html5/thumbnails/14.jpg)
Evanston Public Works March 26, 201214
Design Elements – Resurfacing & Streetscape
![Page 15: Streetscape presentation final 3.26.12](https://reader033.vdocuments.us/reader033/viewer/2022052622/5597824c1a28ab31648b459c/html5/thumbnails/15.jpg)
Evanston Public Works March 26, 201215
Design Elements - Resurfacing
![Page 16: Streetscape presentation final 3.26.12](https://reader033.vdocuments.us/reader033/viewer/2022052622/5597824c1a28ab31648b459c/html5/thumbnails/16.jpg)
Evanston Public Works March 26, 201216
Design Elements - Resurfacing
![Page 17: Streetscape presentation final 3.26.12](https://reader033.vdocuments.us/reader033/viewer/2022052622/5597824c1a28ab31648b459c/html5/thumbnails/17.jpg)
Evanston Public Works March 26, 201217
Design Elements – Resurfacing
![Page 18: Streetscape presentation final 3.26.12](https://reader033.vdocuments.us/reader033/viewer/2022052622/5597824c1a28ab31648b459c/html5/thumbnails/18.jpg)
Evanston Public Works March 26, 201218
Design Elements – Resurfacing & Streetscape
![Page 19: Streetscape presentation final 3.26.12](https://reader033.vdocuments.us/reader033/viewer/2022052622/5597824c1a28ab31648b459c/html5/thumbnails/19.jpg)
Evanston Public Works March 26, 201219
Design Elements – Resurfacing & Streetscape
![Page 20: Streetscape presentation final 3.26.12](https://reader033.vdocuments.us/reader033/viewer/2022052622/5597824c1a28ab31648b459c/html5/thumbnails/20.jpg)
Evanston Public Works March 26, 201220
Design Elements – Resurfacing & Streetscape
![Page 21: Streetscape presentation final 3.26.12](https://reader033.vdocuments.us/reader033/viewer/2022052622/5597824c1a28ab31648b459c/html5/thumbnails/21.jpg)
Evanston Public Works March 26, 201221
Design Elements – Existing
![Page 22: Streetscape presentation final 3.26.12](https://reader033.vdocuments.us/reader033/viewer/2022052622/5597824c1a28ab31648b459c/html5/thumbnails/22.jpg)
Evanston Public Works March 26, 201222
Design Elements – Resurfacing & Streetscape
![Page 23: Streetscape presentation final 3.26.12](https://reader033.vdocuments.us/reader033/viewer/2022052622/5597824c1a28ab31648b459c/html5/thumbnails/23.jpg)
Evanston Public Works March 26, 201223
Church Street Bike Path Color Results
45%
20%
14%
13%
8%Jade
Diamantina
Turquoise
Green
Tan
Bike Path Color
Jade Diamantina Turquoise Green Tan
296 136 95 87 55
Design Elements – Bike Path
Bike Path Markers
![Page 24: Streetscape presentation final 3.26.12](https://reader033.vdocuments.us/reader033/viewer/2022052622/5597824c1a28ab31648b459c/html5/thumbnails/24.jpg)
Evanston Public Works March 26, 201224
Craig’s visual for this area goes here
Church and Orrington Visual
![Page 25: Streetscape presentation final 3.26.12](https://reader033.vdocuments.us/reader033/viewer/2022052622/5597824c1a28ab31648b459c/html5/thumbnails/25.jpg)
Evanston Public Works March 26, 201225
Craig’s visual for this area goes here
Church and Orrington Visual
![Page 26: Streetscape presentation final 3.26.12](https://reader033.vdocuments.us/reader033/viewer/2022052622/5597824c1a28ab31648b459c/html5/thumbnails/26.jpg)
Evanston Public Works March 26, 201226
Craig’s visual for this area goes here
Church and Orrington Visual
![Page 27: Streetscape presentation final 3.26.12](https://reader033.vdocuments.us/reader033/viewer/2022052622/5597824c1a28ab31648b459c/html5/thumbnails/27.jpg)
Evanston Public Works March 26, 201227
Design Elements – Street Furniture
![Page 28: Streetscape presentation final 3.26.12](https://reader033.vdocuments.us/reader033/viewer/2022052622/5597824c1a28ab31648b459c/html5/thumbnails/28.jpg)
Evanston Public Works March 26, 201228
Design Elements – Street Furniture
![Page 29: Streetscape presentation final 3.26.12](https://reader033.vdocuments.us/reader033/viewer/2022052622/5597824c1a28ab31648b459c/html5/thumbnails/29.jpg)
Evanston Public Works March 26, 201229
Design Elements – Street Furniture
![Page 30: Streetscape presentation final 3.26.12](https://reader033.vdocuments.us/reader033/viewer/2022052622/5597824c1a28ab31648b459c/html5/thumbnails/30.jpg)
Evanston Public Works March 26, 201230
“Green” Elements
• Reuse of brick pavers
• Rain gardens around trees and in plaza area at Orrington
• LED Pedestrian Lighting
![Page 31: Streetscape presentation final 3.26.12](https://reader033.vdocuments.us/reader033/viewer/2022052622/5597824c1a28ab31648b459c/html5/thumbnails/31.jpg)
Evanston Public Works March 26, 201231
Project Schedule
Church Street – Dodge to AshlandProject to be let in April combined with Dodge & Lake Intersection StreetscapeConstruction mid June to mid August
Church Street – Ridge to ChicagoProject to be let in JuneConstruction August to October
![Page 32: Streetscape presentation final 3.26.12](https://reader033.vdocuments.us/reader033/viewer/2022052622/5597824c1a28ab31648b459c/html5/thumbnails/32.jpg)
Evanston Public Works March 26, 201232
Construction Staging – Ridge to Chicago
Roadway work – maintain one traffic lane east bound on Church at any time
Streetscape – North side (two Blocks under construction only at any given time)
Maintain pedestrian access by stage construction – half of the sidewalk width & bridges to the businesses.
South side streetscape to follow
![Page 33: Streetscape presentation final 3.26.12](https://reader033.vdocuments.us/reader033/viewer/2022052622/5597824c1a28ab31648b459c/html5/thumbnails/33.jpg)
Evanston Public Works March 26, 201233
Construction Staging – Ridge to Chicago
Two blocks under construction only at any given time
Maintain pedestrian access by stage construction – half of the sidewalk width & bridges to the businesses.
![Page 34: Streetscape presentation final 3.26.12](https://reader033.vdocuments.us/reader033/viewer/2022052622/5597824c1a28ab31648b459c/html5/thumbnails/34.jpg)
Evanston Public Works March 26, 201234
Orrington Ave - Streetscape Project
♦Limits of the project Church Street to Davis Street
East side only
♦Sidewalk brick replacement
♦Street Furniture
♦Bike Shelter
♦Pedestrian Lighting
![Page 35: Streetscape presentation final 3.26.12](https://reader033.vdocuments.us/reader033/viewer/2022052622/5597824c1a28ab31648b459c/html5/thumbnails/35.jpg)
Evanston Public Works March 26, 201235
Project Schedule
Project to be let in JuneConstruction – September to October
![Page 36: Streetscape presentation final 3.26.12](https://reader033.vdocuments.us/reader033/viewer/2022052622/5597824c1a28ab31648b459c/html5/thumbnails/36.jpg)
Evanston Public Works March 26, 201236
2013 and Beyond
• Complete bike path connection on Church to the Lakefront Bike Path and McCormick Bike Path
• Complete Davis Street Streetscape, Street Resurfacing and west bound Protected Bike Path
• Complete Main Street Streetscape Improvement and Resurfacing
• Identify other streets for protected bike path
• Continue streetscape enhancements city-wide
![Page 37: Streetscape presentation final 3.26.12](https://reader033.vdocuments.us/reader033/viewer/2022052622/5597824c1a28ab31648b459c/html5/thumbnails/37.jpg)
Evanston Public Works March 26, 201237
QUESTIONS?