67 th St between Crenshaw Bl and Victoria Av The contractor MetroBuilders is scheduled to conclude construction activity on 67 th St. Final construction activities will include installation of street pavement, replacement of driveway, replacement of curb, and re-sodding the area between curb and sidewalk. What: Final street restoration When: Anticipated to begin Monday 3/31/2014 7am-3pm Monday through Sunday, weather permitting Where: 67 th St from Crenshaw Bl to Victoria Av. Duration: Approximately One week Work will be completed incrementally in segments from Crenshaw Bl to Victoria Av Restricted driveway access for residents will be implemented Parking restrictions will be implemented in the immediate area of the construction Access to emergency vehicles will be maintained This work is the summation of previous construction activity taking place on 67 th St. Final Street Restoration Work March 26, 2014

Upload: others

Post on 25-Aug-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Street Restoration Work 033114libraryarchives.metro.net/db_attachments/140327_Crenshaw_LAX_Fi… · los segmentos del bulevar Crenshaw a avenida Victoria Se implementará entrada

67th St between Crenshaw Bl and Victoria Av

The contractor MetroBuilders isscheduled to concludeconstruction activity on 67th St.

Final construction activities willinclude installation of streetpavement, replacement ofdriveway, replacement of curb,and re-sodding the area betweencurb and sidewalk.

What: Final street restoration

When: Anticipated to begin Monday3/31/2014 7am-3pm Monday throughSunday, weather permitting

Where: 67th St from Crenshaw Bl toVictoria Av.

Duration: Approximately One week

Work will be completedincrementally in segments fromCrenshaw Bl to Victoria Av

Restricted driveway access forresidents will be implemented

Parking restrictions will beimplemented in the immediate areaof the construction

Access to emergency vehicles willbe maintained

This work is the summation ofprevious construction activity takingplace on 67th St.

Final Street Restoration Work

March 26, 2014

Page 2: Street Restoration Work 033114libraryarchives.metro.net/db_attachments/140327_Crenshaw_LAX_Fi… · los segmentos del bulevar Crenshaw a avenida Victoria Se implementará entrada

Calle 67 entre bulevar Crenshaw y avenida Victoria

El Contratista Metro Builderstiene programado concluir laactividad de construcción en lacalle 67.

Las actividades de construcciónfinal incluirán la instalación depavimento de la calle, reemplazode entrada a cochera, reemplazode acera y colocación de nuevopasto en la zona entre acera ybanqueta.

QUE: Restauración Final de la Calle

CUANDO: Se anticipa empezar lunes, 31 demarzo, 7am-3pm, Monday through Sunday,weather permitting

DONDE: calle 67 desde bulevar Crenshaw aavenida Victoria

DURACION: Approximadamente una semana

Trabajo se completará gradualmente enlos segmentos del bulevar Crenshaw aavenida Victoria

Se implementará entrada a cocherarestringida

Restricciones de estacionamiento seráimplementado en el área inmediata de laconstrucción

Se mantendrá el acceso a los vehículosde emergencia

Esta obra es el fin de la actividadde construcción anterior llevandoa cabo en la calle 67.

Trabajos de Restauración Final de la Calle