stream restoration projects update - alexandriava.gov...update september 2019. city team 2...

16
Stream Restoration Projects Update September 2019

Upload: others

Post on 29-Jul-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Stream Restoration Projects Update - AlexandriaVA.Gov...Update September 2019. City Team 2 Transportation and Environmental Services (T&ES) Recreation, Parks ... Syed Imran. Civil

Stream Restoration Projects Update

September 2019

Page 2: Stream Restoration Projects Update - AlexandriaVA.Gov...Update September 2019. City Team 2 Transportation and Environmental Services (T&ES) Recreation, Parks ... Syed Imran. Civil

City Team

2

Transportation and Environmental

Services (T&ES)

Recreation, Parks and Cultural

Activities (RPCA)

Department of Project

Implementation (DPI)

Joni CalmbacherCivil Engineer IIIStormwater Management [email protected]

Demond FrazierCivil Engineer [email protected]

Murphy NgCivil Engineer [email protected]

Syed ImranCivil Engineer [email protected]

Bob WilliamsDivision ChiefNatural [email protected]

Page 3: Stream Restoration Projects Update - AlexandriaVA.Gov...Update September 2019. City Team 2 Transportation and Environmental Services (T&ES) Recreation, Parks ... Syed Imran. Civil

Stream Restoration Program

3

1. Protect, stabilize, and improve the City’s waterways

2. Address Chesapeake Bay clean up mandates (Action Plan strategy)

3. Consistent with the City’s Environmental Sustainability Strategic Goal

Physical Chemical Biological

Page 4: Stream Restoration Projects Update - AlexandriaVA.Gov...Update September 2019. City Team 2 Transportation and Environmental Services (T&ES) Recreation, Parks ... Syed Imran. Civil

Benefits

Habitat

Aesthetics Bank and Channel Stability

Water Quality

Native Vegetation

Natural Characteristics

4

Page 5: Stream Restoration Projects Update - AlexandriaVA.Gov...Update September 2019. City Team 2 Transportation and Environmental Services (T&ES) Recreation, Parks ... Syed Imran. Civil

Typical In-Stream Structures

5

Page 6: Stream Restoration Projects Update - AlexandriaVA.Gov...Update September 2019. City Team 2 Transportation and Environmental Services (T&ES) Recreation, Parks ... Syed Imran. Civil

Stream Restoration Projects

• Lucky Run: ~900 LF• Strawberry Run: ~900 LF• Taylor Run: ~1900 LF

Three Current Projects

• 50/50 Stormwater Local Assistance Fund (SLAF) Grants• Lucky $668,720; Strawberry $800,000; Taylor $2.255M

Funding

• Parks and Recreation Commission• Civic Association and HOA Meetings• Public Meetings• Website• Social Media

Outreach

6

Page 7: Stream Restoration Projects Update - AlexandriaVA.Gov...Update September 2019. City Team 2 Transportation and Environmental Services (T&ES) Recreation, Parks ... Syed Imran. Civil

Lucky Run

7

Page 8: Stream Restoration Projects Update - AlexandriaVA.Gov...Update September 2019. City Team 2 Transportation and Environmental Services (T&ES) Recreation, Parks ... Syed Imran. Civil

Lucky Run

8

Page 9: Stream Restoration Projects Update - AlexandriaVA.Gov...Update September 2019. City Team 2 Transportation and Environmental Services (T&ES) Recreation, Parks ... Syed Imran. Civil

Lucky Run Status

100% Design Complete

Temporary Construction Easements by end of October

Invitation to bid estimated winter 2019

Construction estimated to begin spring/summer 2020

9

Archaeology and Survey Complete

Page 10: Stream Restoration Projects Update - AlexandriaVA.Gov...Update September 2019. City Team 2 Transportation and Environmental Services (T&ES) Recreation, Parks ... Syed Imran. Civil

Strawberry Run near Taft Avenue

10

Page 11: Stream Restoration Projects Update - AlexandriaVA.Gov...Update September 2019. City Team 2 Transportation and Environmental Services (T&ES) Recreation, Parks ... Syed Imran. Civil

Strawberry Run

11

Page 12: Stream Restoration Projects Update - AlexandriaVA.Gov...Update September 2019. City Team 2 Transportation and Environmental Services (T&ES) Recreation, Parks ... Syed Imran. Civil

Strawberry Run Status

12

60% Initial draft design is complete

Survey is complete

Phase I Archaeology complete

Phase II Archaeology to begin next month

Construction estimated to begin fall/winter 2020

Page 13: Stream Restoration Projects Update - AlexandriaVA.Gov...Update September 2019. City Team 2 Transportation and Environmental Services (T&ES) Recreation, Parks ... Syed Imran. Civil

Taylor Run near Chinquapin Park

13

Page 14: Stream Restoration Projects Update - AlexandriaVA.Gov...Update September 2019. City Team 2 Transportation and Environmental Services (T&ES) Recreation, Parks ... Syed Imran. Civil

14

Taylor Run

Page 15: Stream Restoration Projects Update - AlexandriaVA.Gov...Update September 2019. City Team 2 Transportation and Environmental Services (T&ES) Recreation, Parks ... Syed Imran. Civil

TaylorRun Status

15

Survey is in progress

Phase I Archaeology in progress

40% design anticipated Dec. 2019

Construction estimated to begin early 2021

Page 16: Stream Restoration Projects Update - AlexandriaVA.Gov...Update September 2019. City Team 2 Transportation and Environmental Services (T&ES) Recreation, Parks ... Syed Imran. Civil

Strawberry Run – Downstream Project

16

Before After