Page 1: Strategic Project Selection in Oil & Gas Industry

1

LEAN SIX SIGMA IN A PETROLEUM REFINERY - A CASE STUDY

NAVEEN NARAYANANSSA BUSINESS SOLUTIONS (P) LTD.

SEPTEMBER 24TH, 2011

PRESENTED TO:

Page 2: Strategic Project Selection in Oil & Gas Industry

2

INDUSTRY CHALLENGES

‣ State regulated product pricing

‣ Cumulated losses of

₹78000 crores in FY 2010-2011*

‣ Capital intensive & high operating cost

‣ Huge profit leakages due to process inefficiencies

*SOURCE: BUSINESS STANDARD, MAY 2011

Page 3: Strategic Project Selection in Oil & Gas Industry

3

NEED OF THE HOUR

PEOPLE ENROLLMENTEVERYONE COMMITTED & INVOLVED

| PROACTIVE PROBLEM SOLVING

PROCESS EXCELLENCECONTINUAL IMPROVEMENT | FACT

BASED MANAGEMENT

WASTE ELIMINATIONREDUCE PROFIT LEAKAGE |

ENHANCE EFFICIENCY

OPERATIONAL EFFICIENCYREDUCE COST | IMPROVE EFFICIENCY

NEED OF THE HOUR

Page 4: Strategic Project Selection in Oil & Gas Industry

4

CI INITIATIVES

7 QC Tools Quality Circles Suggestion Scheme

5 ‘S ’ Daily Work Management

TPM

Strategic Alignment? Bottom-line focus? Sustainable?| |

Page 5: Strategic Project Selection in Oil & Gas Industry

5

WHY LEAN SIX SIGMA?

✓ Engagement across the organization

✓ Analytical approach

✓ Align-able with strategy planning

✓ Focus on operational efficiency

✓ Capability for breakthrough improvements

✓ Internalization of Six Sigma skills

✓ Cross-functional team based problem solving

✓ Drive continual improvements

Page 6: Strategic Project Selection in Oil & Gas Industry

6

LSS DEPLOYMENT ROADMAPHOW ‘PINNACLE’ REFINERY EMBRACED LSS

Page 7: Strategic Project Selection in Oil & Gas Industry

7

ROLL-OUT MODEL

PILOT PHASE SCALE UP PHASE SUSTAIN PHASE

PILOT WAVE (6 MONTHS)

- PROJECT REPOSITORY

- LEADERSHIP BUY-IN

- CREATE BUZZ

- PEOPLE ENROLLMENT

SCALE-UP (1 YEAR)

- COMPANY-WIDE ROLLOUT

- SUPPORT FUNCTIONS

- FINANCIAL FOCUS

- KRA LINKAGES

- INTEGRATE WITH STRATEGY PLANNING

- ALIGN WITH BSC

- INTERNAL MBBs

INTERNALIZE (3 YEARS)

Page 8: Strategic Project Selection in Oil & Gas Industry

8

DEPLOYMENT ROADMAP

Training

-Executive Overview (Leadership)-Champions training (15)-Green Belt (19)-Black Belt (11)

-Green Belt (31)-Black Belt (17)

-Green Belt (86)-Black Belt (15)

Coaching

-GB Projects (7)-BB Projects (4)

-GB Projects (11)-BB Projects (5)

-GB Projects (23)-BB Projects (7)

Piloting

Wave 2 Scale up

Page 9: Strategic Project Selection in Oil & Gas Industry

9

PROJECT SELECTIONHOW ‘PINNACLE’ IDENTIFIED STRATEGIC PROJECTS

Page 10: Strategic Project Selection in Oil & Gas Industry

10

PROJECT SELECTION

✓ Top-down approach

✓ Leadership Involvement

✓ Balanced focus

✓ Realistic expectations

✓ Aligned with scorecards

Page 11: Strategic Project Selection in Oil & Gas Industry

11

TOP DOWN APPROACH

MISSION: “A Great Place to Work”

VISION:“Role Model for Environmental, Health, & Safety Performance”

“Consistently Most Profitable, and Reliable Refinery”

“Market Responsive”

STRATEGIC THEMES:1)Environment & Safety Performance2)Market Responsive/ Customer Focus3)Resource Optimization4)Great Place to Work

STRATEGIC INITIATIVES:1)Six Sigma Projects2)Other Strategic Projects3)People & Process Alignment

Page 12: Strategic Project Selection in Oil & Gas Industry

12

REFINERY VISION:ROLE MODEL FOR EHS | CONSISTENTLY MOST PROFITABLE AND RELIABLE REFINERY | MARKET RESPONSIVE

REFINERY VISION:ROLE MODEL FOR EHS | CONSISTENTLY MOST PROFITABLE AND RELIABLE REFINERY | MARKET RESPONSIVE

ENVIRONMENT & SAFETY PERFORMANCE

ENVIRONMENT & SAFETY PERFORMANCE

MARKET RESPONSIVE/CUSTOME

R FOCUS

MARKET RESPONSIVE/CUSTOME

R FOCUS

RESOURCE OPTIMIZATION

RESOURCE OPTIMIZATION

GREAT PLACE TO WORK

GREAT PLACE TO WORK

✓Improve Reliability of Fire Extinguishers

✓Bring Down Number of Fires

✓Improve Reliability of Fire Extinguishers

✓Bring Down Number of Fires

✓Bitumen Lorry TAT < 2hr.

✓Product Availability for MMPL

✓Biturox Production (All 3 Grades Availability)

✓Minimize fill weight variation of LPG

✓Minimize losses during ATF production

✓Bitumen Lorry TAT < 2hr.

✓Product Availability for MMPL

✓Biturox Production (All 3 Grades Availability)

✓Minimize fill weight variation of LPG

✓Minimize losses during ATF production

✓Maintain FO line sample viscosity between 150-180

✓Increase Power Reliability

✓Minimize variation in LPG Filling

✓Sustain Yield as per VDU Column

✓Reducing Tankage TAT

✓Minimizing Crude Loss

✓Maintain FO line sample viscosity between 150-180

✓Increase Power Reliability

✓Minimize variation in LPG Filling

✓Sustain Yield as per VDU Column

✓Reducing Tankage TAT

✓Minimizing Crude Loss

✓Reduce Wastage in Canteen

✓Minimize complaints in estate

✓Increase number of suggestions

✓Minimize electricity consumption in estate

✓Optimize overtime in canteen

✓Reduce Wastage in Canteen

✓Minimize complaints in estate

✓Increase number of suggestions

✓Minimize electricity consumption in estate

✓Optimize overtime in canteen

PROJECT DRILL-DOWN

MISSION:“A GREAT PLACE TO WORK”

MISSION:“A GREAT PLACE TO WORK”

Page 13: Strategic Project Selection in Oil & Gas Industry

13

PROJECT SELECTION RATIONALE

‣ Organizational Impact

‣ Clarity of Scope

‣ Feasibility of Solutions Implementation

‣ Feasibility of Completion within 6 Months

‣ Cuts Across Functions/Cross Functional Teams

‣ Domain Expert Available in Team

Page 14: Strategic Project Selection in Oil & Gas Industry

14

SAMPLE PROJECTSProject Goal Metric Baseline Goal

Optimize Product Yield for VD, and VGO from VDU Column

% Wt. on crude

2.5% 3.9%

Reduce H2 Losses to flare

Tons/day 2.4 ton/day 0 ton/day

Reduce TAT of Bitumen Lorries

Time 4.3 hrs. 2 hrs.

Improve Reliability of Rotary Equipments

Failures/yr.

4/year 2/year

Maintain Fuel Oil Viscosity

CST 260 160

Improve Reliability of Fire Extinguishers

% non reliable

15% 5%

Optimization of I/F generation in MMPL Volume 206 Kl 195Kl

Page 15: Strategic Project Selection in Oil & Gas Industry

15

5

2 1

3

4

PROJECT HOPPER

‣ Align LSS with annual strategy planning/Balanced Scorecard

‣ Monthly steering committee meetings to review progress/identify projects

‣ Customer voice as a source of projects

‣ Linkages with KRA

Page 16: Strategic Project Selection in Oil & Gas Industry

16

COMMON PITFALLS AVOIDED

Web

(1) Hype‣Piloting‣Avoided Big-Bang rollout

(2) Trivial Projects

‣Project drill-down from strategic theme‣Charter created by champions

(3) Vague ₹ Gains

‣All projects’ gains ratified by CFO

(4) Limited Champion Support

‣Champions involved at early stages‣Training/certification mandatory‣KRA Linkages

(5) Tool Obsession

‣Application of tools on need base‣Retrofit data analysis instead of DOE wherever possible

Page 17: Strategic Project Selection in Oil & Gas Industry

17

SUCCESS FACTORS

‣ Involvement of Sponsors at all stages

‣ Meticulous project selection process

‣ Abundant data in system

‣ Strict adherence to timelines & toll-gates

‣ Realistic Expectations

Page 18: Strategic Project Selection in Oil & Gas Industry

18

ENHANCED CUSTOMER SATISFACTION: SEVERAL PROJECTS LINKED WITH CUSTOMER EXPERIENCE & LOYALTY

PROCESS IMPROVEMENT: BREAKTHROUGH AND SUSTAINABLE PROCESS IMPROVEMENTS

ACCOLADES: RECOGNIZED AS BEST PROJECTS IN SEVERAL NATIONAL & INTERNATIONAL AWARDS SUCH AS INSSAN, QIMPRO, IDEAS ETC.

PRODUCTIVITY GAINS: DRAMATIC IMPROVEMENT IN OPERATIONAL EFFICIENCY, CONSISTENCY AND RELIABILITY OF PROCESSES

FINANCIAL SAVINGS: DIRECT LINKAGE TO BOTTOM-LINE, CUMULATED SAVINGS (RATIFIED) OF OVER INR 200 CRORE

RESULT

Page 19: Strategic Project Selection in Oil & Gas Industry

19

CASE STUDY 1:VDU COLUMN YIELD

IMPROVEMENT

Page 20: Strategic Project Selection in Oil & Gas Industry

20

PROCESS SCHEMATIC

Page 21: Strategic Project Selection in Oil & Gas Industry

21

PROJECT CHARTER

Page 22: Strategic Project Selection in Oil & Gas Industry

22

PROCESS TREND

LOW VD YIELD - AVG. 2.63% V/S TARGET 4%

Page 23: Strategic Project Selection in Oil & Gas Industry

23-VE Cpk VALUES INDICATE EXTREMELY POOR

PERFORMANCE

PROCESS CAPABILITY

Page 24: Strategic Project Selection in Oil & Gas Industry

24

PROCESS FMEA

Page 25: Strategic Project Selection in Oil & Gas Industry

25

POTENTIAL CAUSES

X1 X2

X3

X4

X5

Y

Page 26: Strategic Project Selection in Oil & Gas Industry

VDIR/RCO V/S YIELD HVGOCR V/S YIELD

LVGOCR/RCO V/S YIELD RTC 293 V/S YIELD26

REGRESSION

Page 27: Strategic Project Selection in Oil & Gas Industry

27

DRAMATIC IMPROVEMENT IN VD YILED - AVERAGE YIELD OF 4.5%

BREAKTHROUGH RESULTS

Page 28: Strategic Project Selection in Oil & Gas Industry

28

Page 29: Strategic Project Selection in Oil & Gas Industry

29

CASE STUDY 2:REDUCTION IN GATE ENTRY

TIME

Page 30: Strategic Project Selection in Oil & Gas Industry

30

BUSINESS CASE

Project Title: Reduction in process time for Gate Entry Operation for visitors

Problem Definition:-Welcome slip is not ready when visitor arrives.-Average 15 minutes are taken for gate entry process

-Too many counters for Welcome Slip, Mobile Phone hand-over, Vehicle pass, Laptop and other item entry

Goal:-Reduce Gate entry processing time-Provide better experience to the visitors at Gate entry-Improve company image

Page 31: Strategic Project Selection in Oil & Gas Industry

31

AS-IS PROCESS

Page 32: Strategic Project Selection in Oil & Gas Industry

32

Problem Root Cause SolutionToo much waiting for Visitors at early morning, lunch time & end of the shift

No manning before 8am, after 3:30pm, lunch time

2 shift Counter operation (7:30 am to 5.30 pm)

Visitors had to move back & forth at different windows

Vehicle pass, Laptop entry & Mobile deposit area  at different counter

Vehicle no on the same welcome slip, single window approach, allow mobile for admin area, laptop entry by visitor CISF to confirm

Visitor has to wait till welcome slip is ready

Minimum communication between the visitor and staff

SMS to visitor on slip approval to ensure the slip is created prior

All types of visitors through Welcome Slip

No convenient procedure for contractor, delivery persons

Welcome Slip for visitors and daily pass for technocrats/ delivery persons

ROOT CAUSES

Page 33: Strategic Project Selection in Oil & Gas Industry

33

Phase I: Implemented Solutions

One window will be operational all the time

2.System-generated monthly report giving department-wise count and just-in-time slips

3.Training and job rotation for window clerk

Phase II: Implementation in pipeline

Board at entrance to guide people of different locations

2.Infrastructural modifications will be undertaken for front end counters

3.Kiosk with a printer for enabling the visitor for generating the welcome slip on his own without external interference and CISF to check and allow the visitor after photo id confirmation

SOLUTION IMPLEMENTATION

Page 34: Strategic Project Selection in Oil & Gas Industry

34

IMPROVED PROCESS

Page 35: Strategic Project Selection in Oil & Gas Industry

35

Gate Entry Processing time reduced from Avg.15 mins to Avg. 4 mins

BEFORE/AFTER

Page 36: Strategic Project Selection in Oil & Gas Industry

36

ABOUT SSA

Page 37: Strategic Project Selection in Oil & Gas Industry

37

PURPOSE & VISION

Purpose:To enhance Stakeholder’s Value through partnering for growth; our journey will continue as long as there is a passion for perfection.

Vision:To become the No.1 Business excellence solutions provider in India by 2015 with 20% revenue from overseas consulting.

HIGH PERFORMANCE CAPABILITY | HIGH FINANCIAL STRENGTH

Page 38: Strategic Project Selection in Oil & Gas Industry

38

HISTORY

1999

SSA IS BORNSSA IS BORN

- BORN WITH A MISSIONARY ZEAL

- VISION: ‘MAKE MADE IN INDIA SYNONYMOUS TO QUALITY’

MANAGEMENT SYSTEMSMANAGEMENT SYSTEMS

2001

- ISO 9001, QS 9000, ISO 14000, ISO 27001

- HRMS

- BPMS

- SIX SIGMA

PROCESS EXCELLENCEPROCESS EXCELLENCE

2006

- ENTERPRISE-WIDE PROCESS MODELING

- PROCESS REPOSITORY CREATION

- KPI DASHBOARDS

- LEAN DEPLOYMENT

- GLOBAL ALLIANCES

- GLOBAL DEPLOYMENTS

BUSINESS EXCELLENCEBUSINESS EXCELLENCE

2010

- INTEGRATED STRATEGY & PERFORMANCE MANAGEMENT SYSTEM

HIGH PERFORMANCE CAPABILITY | HIGH FINANCIAL STRENGTH

Page 39: Strategic Project Selection in Oil & Gas Industry

39

ACCREDITATIONS

RATED SE-2A BY CRISIL | HIGH PERFORMANCE CAPABILITY HIGH FINANCIAL STRENGTH

ISO 9001 CERTIFIED

ANSI IACET 1-2007 AUTHORIZED PROVIDER

ISO 27001 ISMS CERTIFIED

HIGH PERFORMANCE CAPABILITY | HIGH FINANCIAL STRENGTH

Page 40: Strategic Project Selection in Oil & Gas Industry

40

SELECT CLIENTELE

HIGH PERFORMANCE CAPABILITY | HIGH FINANCIAL STRENGTH

Page 41: Strategic Project Selection in Oil & Gas Industry

41

GLOBAL REACH

HIGH PERFORMANCE CAPABILITY | HIGH FINANCIAL STRENGTH

Page 42: Strategic Project Selection in Oil & Gas Industry

42

BASKET OF OFFERING

Lean Six Sigma

Lean Management

BPMS Solutions

TPM

ISO/ISMS/EMS/OHSAS

Process SimulationDaily Work Management

Project Management

Design for Six Sigma (DFSS)

Performance Management

IT & ITES Support

HIGH PERFORMANCE CAPABILITY | HIGH FINANCIAL STRENGTH

Page 43: Strategic Project Selection in Oil & Gas Industry

43

SSA’S ISM MODEL

“ISM® aligns people and the processes with the corporate objectives and goals”

- NCHIGH PERFORMANCE CAPABILITY | HIGH FINANCIAL STRENGTH

Page 44: Strategic Project Selection in Oil & Gas Industry

44

QUESTIONS?!

HIGH PERFORMANCE CAPABILITY | HIGH FINANCIAL STRENGTH

Page 45: Strategic Project Selection in Oil & Gas Industry

45

Naveen Narayanan