strategic project selection in oil & gas industry
DESCRIPTION
How Pinnacle refinery (name changed) went about strategic project (Lean Six Sigma) selection and deploymentTRANSCRIPT
1
LEAN SIX SIGMA IN A PETROLEUM REFINERY - A CASE STUDY
NAVEEN NARAYANANSSA BUSINESS SOLUTIONS (P) LTD.
SEPTEMBER 24TH, 2011
PRESENTED TO:
2
INDUSTRY CHALLENGES
‣ State regulated product pricing
‣ Cumulated losses of
₹78000 crores in FY 2010-2011*
‣ Capital intensive & high operating cost
‣ Huge profit leakages due to process inefficiencies
*SOURCE: BUSINESS STANDARD, MAY 2011
3
NEED OF THE HOUR
PEOPLE ENROLLMENTEVERYONE COMMITTED & INVOLVED
| PROACTIVE PROBLEM SOLVING
PROCESS EXCELLENCECONTINUAL IMPROVEMENT | FACT
BASED MANAGEMENT
WASTE ELIMINATIONREDUCE PROFIT LEAKAGE |
ENHANCE EFFICIENCY
OPERATIONAL EFFICIENCYREDUCE COST | IMPROVE EFFICIENCY
NEED OF THE HOUR
4
CI INITIATIVES
7 QC Tools Quality Circles Suggestion Scheme
5 ‘S ’ Daily Work Management
TPM
Strategic Alignment? Bottom-line focus? Sustainable?| |
5
WHY LEAN SIX SIGMA?
✓ Engagement across the organization
✓ Analytical approach
✓ Align-able with strategy planning
✓ Focus on operational efficiency
✓ Capability for breakthrough improvements
✓ Internalization of Six Sigma skills
✓ Cross-functional team based problem solving
✓ Drive continual improvements
6
LSS DEPLOYMENT ROADMAPHOW ‘PINNACLE’ REFINERY EMBRACED LSS
7
ROLL-OUT MODEL
PILOT PHASE SCALE UP PHASE SUSTAIN PHASE
PILOT WAVE (6 MONTHS)
- PROJECT REPOSITORY
- LEADERSHIP BUY-IN
- CREATE BUZZ
- PEOPLE ENROLLMENT
SCALE-UP (1 YEAR)
- COMPANY-WIDE ROLLOUT
- SUPPORT FUNCTIONS
- FINANCIAL FOCUS
- KRA LINKAGES
- INTEGRATE WITH STRATEGY PLANNING
- ALIGN WITH BSC
- INTERNAL MBBs
INTERNALIZE (3 YEARS)
8
DEPLOYMENT ROADMAP
Training
-Executive Overview (Leadership)-Champions training (15)-Green Belt (19)-Black Belt (11)
-Green Belt (31)-Black Belt (17)
-Green Belt (86)-Black Belt (15)
Coaching
-GB Projects (7)-BB Projects (4)
-GB Projects (11)-BB Projects (5)
-GB Projects (23)-BB Projects (7)
Piloting
Wave 2 Scale up
9
PROJECT SELECTIONHOW ‘PINNACLE’ IDENTIFIED STRATEGIC PROJECTS
10
PROJECT SELECTION
✓ Top-down approach
✓ Leadership Involvement
✓ Balanced focus
✓ Realistic expectations
✓ Aligned with scorecards
11
TOP DOWN APPROACH
MISSION: “A Great Place to Work”
VISION:“Role Model for Environmental, Health, & Safety Performance”
“Consistently Most Profitable, and Reliable Refinery”
“Market Responsive”
STRATEGIC THEMES:1)Environment & Safety Performance2)Market Responsive/ Customer Focus3)Resource Optimization4)Great Place to Work
STRATEGIC INITIATIVES:1)Six Sigma Projects2)Other Strategic Projects3)People & Process Alignment
12
REFINERY VISION:ROLE MODEL FOR EHS | CONSISTENTLY MOST PROFITABLE AND RELIABLE REFINERY | MARKET RESPONSIVE
REFINERY VISION:ROLE MODEL FOR EHS | CONSISTENTLY MOST PROFITABLE AND RELIABLE REFINERY | MARKET RESPONSIVE
ENVIRONMENT & SAFETY PERFORMANCE
ENVIRONMENT & SAFETY PERFORMANCE
MARKET RESPONSIVE/CUSTOME
R FOCUS
MARKET RESPONSIVE/CUSTOME
R FOCUS
RESOURCE OPTIMIZATION
RESOURCE OPTIMIZATION
GREAT PLACE TO WORK
GREAT PLACE TO WORK
✓Improve Reliability of Fire Extinguishers
✓Bring Down Number of Fires
✓Improve Reliability of Fire Extinguishers
✓Bring Down Number of Fires
✓Bitumen Lorry TAT < 2hr.
✓Product Availability for MMPL
✓Biturox Production (All 3 Grades Availability)
✓Minimize fill weight variation of LPG
✓Minimize losses during ATF production
✓Bitumen Lorry TAT < 2hr.
✓Product Availability for MMPL
✓Biturox Production (All 3 Grades Availability)
✓Minimize fill weight variation of LPG
✓Minimize losses during ATF production
✓Maintain FO line sample viscosity between 150-180
✓Increase Power Reliability
✓Minimize variation in LPG Filling
✓Sustain Yield as per VDU Column
✓Reducing Tankage TAT
✓Minimizing Crude Loss
✓Maintain FO line sample viscosity between 150-180
✓Increase Power Reliability
✓Minimize variation in LPG Filling
✓Sustain Yield as per VDU Column
✓Reducing Tankage TAT
✓Minimizing Crude Loss
✓Reduce Wastage in Canteen
✓Minimize complaints in estate
✓Increase number of suggestions
✓Minimize electricity consumption in estate
✓Optimize overtime in canteen
✓Reduce Wastage in Canteen
✓Minimize complaints in estate
✓Increase number of suggestions
✓Minimize electricity consumption in estate
✓Optimize overtime in canteen
PROJECT DRILL-DOWN
MISSION:“A GREAT PLACE TO WORK”
MISSION:“A GREAT PLACE TO WORK”
13
PROJECT SELECTION RATIONALE
‣ Organizational Impact
‣ Clarity of Scope
‣ Feasibility of Solutions Implementation
‣ Feasibility of Completion within 6 Months
‣ Cuts Across Functions/Cross Functional Teams
‣ Domain Expert Available in Team
14
SAMPLE PROJECTSProject Goal Metric Baseline Goal
Optimize Product Yield for VD, and VGO from VDU Column
% Wt. on crude
2.5% 3.9%
Reduce H2 Losses to flare
Tons/day 2.4 ton/day 0 ton/day
Reduce TAT of Bitumen Lorries
Time 4.3 hrs. 2 hrs.
Improve Reliability of Rotary Equipments
Failures/yr.
4/year 2/year
Maintain Fuel Oil Viscosity
CST 260 160
Improve Reliability of Fire Extinguishers
% non reliable
15% 5%
Optimization of I/F generation in MMPL Volume 206 Kl 195Kl
15
5
2 1
3
4
PROJECT HOPPER
‣ Align LSS with annual strategy planning/Balanced Scorecard
‣ Monthly steering committee meetings to review progress/identify projects
‣ Customer voice as a source of projects
‣ Linkages with KRA
16
COMMON PITFALLS AVOIDED
Web
(1) Hype‣Piloting‣Avoided Big-Bang rollout
(2) Trivial Projects
‣Project drill-down from strategic theme‣Charter created by champions
(3) Vague ₹ Gains
‣All projects’ gains ratified by CFO
(4) Limited Champion Support
‣Champions involved at early stages‣Training/certification mandatory‣KRA Linkages
(5) Tool Obsession
‣Application of tools on need base‣Retrofit data analysis instead of DOE wherever possible
17
SUCCESS FACTORS
‣ Involvement of Sponsors at all stages
‣ Meticulous project selection process
‣ Abundant data in system
‣ Strict adherence to timelines & toll-gates
‣ Realistic Expectations
18
ENHANCED CUSTOMER SATISFACTION: SEVERAL PROJECTS LINKED WITH CUSTOMER EXPERIENCE & LOYALTY
PROCESS IMPROVEMENT: BREAKTHROUGH AND SUSTAINABLE PROCESS IMPROVEMENTS
ACCOLADES: RECOGNIZED AS BEST PROJECTS IN SEVERAL NATIONAL & INTERNATIONAL AWARDS SUCH AS INSSAN, QIMPRO, IDEAS ETC.
PRODUCTIVITY GAINS: DRAMATIC IMPROVEMENT IN OPERATIONAL EFFICIENCY, CONSISTENCY AND RELIABILITY OF PROCESSES
FINANCIAL SAVINGS: DIRECT LINKAGE TO BOTTOM-LINE, CUMULATED SAVINGS (RATIFIED) OF OVER INR 200 CRORE
RESULT
19
CASE STUDY 1:VDU COLUMN YIELD
IMPROVEMENT
20
PROCESS SCHEMATIC
21
PROJECT CHARTER
22
PROCESS TREND
LOW VD YIELD - AVG. 2.63% V/S TARGET 4%
23-VE Cpk VALUES INDICATE EXTREMELY POOR
PERFORMANCE
PROCESS CAPABILITY
24
PROCESS FMEA
25
POTENTIAL CAUSES
X1 X2
X3
X4
X5
Y
VDIR/RCO V/S YIELD HVGOCR V/S YIELD
LVGOCR/RCO V/S YIELD RTC 293 V/S YIELD26
REGRESSION
27
DRAMATIC IMPROVEMENT IN VD YILED - AVERAGE YIELD OF 4.5%
BREAKTHROUGH RESULTS
28
29
CASE STUDY 2:REDUCTION IN GATE ENTRY
TIME
30
BUSINESS CASE
Project Title: Reduction in process time for Gate Entry Operation for visitors
Problem Definition:-Welcome slip is not ready when visitor arrives.-Average 15 minutes are taken for gate entry process
-Too many counters for Welcome Slip, Mobile Phone hand-over, Vehicle pass, Laptop and other item entry
Goal:-Reduce Gate entry processing time-Provide better experience to the visitors at Gate entry-Improve company image
31
AS-IS PROCESS
32
Problem Root Cause SolutionToo much waiting for Visitors at early morning, lunch time & end of the shift
No manning before 8am, after 3:30pm, lunch time
2 shift Counter operation (7:30 am to 5.30 pm)
Visitors had to move back & forth at different windows
Vehicle pass, Laptop entry & Mobile deposit area at different counter
Vehicle no on the same welcome slip, single window approach, allow mobile for admin area, laptop entry by visitor CISF to confirm
Visitor has to wait till welcome slip is ready
Minimum communication between the visitor and staff
SMS to visitor on slip approval to ensure the slip is created prior
All types of visitors through Welcome Slip
No convenient procedure for contractor, delivery persons
Welcome Slip for visitors and daily pass for technocrats/ delivery persons
ROOT CAUSES
33
Phase I: Implemented Solutions
One window will be operational all the time
2.System-generated monthly report giving department-wise count and just-in-time slips
3.Training and job rotation for window clerk
Phase II: Implementation in pipeline
Board at entrance to guide people of different locations
2.Infrastructural modifications will be undertaken for front end counters
3.Kiosk with a printer for enabling the visitor for generating the welcome slip on his own without external interference and CISF to check and allow the visitor after photo id confirmation
SOLUTION IMPLEMENTATION
34
IMPROVED PROCESS
35
Gate Entry Processing time reduced from Avg.15 mins to Avg. 4 mins
BEFORE/AFTER
36
ABOUT SSA
37
PURPOSE & VISION
Purpose:To enhance Stakeholder’s Value through partnering for growth; our journey will continue as long as there is a passion for perfection.
Vision:To become the No.1 Business excellence solutions provider in India by 2015 with 20% revenue from overseas consulting.
HIGH PERFORMANCE CAPABILITY | HIGH FINANCIAL STRENGTH
38
HISTORY
1999
SSA IS BORNSSA IS BORN
- BORN WITH A MISSIONARY ZEAL
- VISION: ‘MAKE MADE IN INDIA SYNONYMOUS TO QUALITY’
MANAGEMENT SYSTEMSMANAGEMENT SYSTEMS
2001
- ISO 9001, QS 9000, ISO 14000, ISO 27001
- HRMS
- BPMS
- SIX SIGMA
PROCESS EXCELLENCEPROCESS EXCELLENCE
2006
- ENTERPRISE-WIDE PROCESS MODELING
- PROCESS REPOSITORY CREATION
- KPI DASHBOARDS
- LEAN DEPLOYMENT
- GLOBAL ALLIANCES
- GLOBAL DEPLOYMENTS
BUSINESS EXCELLENCEBUSINESS EXCELLENCE
2010
- INTEGRATED STRATEGY & PERFORMANCE MANAGEMENT SYSTEM
HIGH PERFORMANCE CAPABILITY | HIGH FINANCIAL STRENGTH
39
ACCREDITATIONS
RATED SE-2A BY CRISIL | HIGH PERFORMANCE CAPABILITY HIGH FINANCIAL STRENGTH
ISO 9001 CERTIFIED
ANSI IACET 1-2007 AUTHORIZED PROVIDER
ISO 27001 ISMS CERTIFIED
HIGH PERFORMANCE CAPABILITY | HIGH FINANCIAL STRENGTH
40
SELECT CLIENTELE
HIGH PERFORMANCE CAPABILITY | HIGH FINANCIAL STRENGTH
41
GLOBAL REACH
HIGH PERFORMANCE CAPABILITY | HIGH FINANCIAL STRENGTH
42
BASKET OF OFFERING
Lean Six Sigma
Lean Management
BPMS Solutions
TPM
ISO/ISMS/EMS/OHSAS
Process SimulationDaily Work Management
Project Management
Design for Six Sigma (DFSS)
Performance Management
IT & ITES Support
HIGH PERFORMANCE CAPABILITY | HIGH FINANCIAL STRENGTH
43
SSA’S ISM MODEL
“ISM® aligns people and the processes with the corporate objectives and goals”
- NCHIGH PERFORMANCE CAPABILITY | HIGH FINANCIAL STRENGTH
44
QUESTIONS?!
HIGH PERFORMANCE CAPABILITY | HIGH FINANCIAL STRENGTH
45
Naveen Narayanan
Glendale, AZ, December 8th, 2010